Green Valley Corridor Road Network Issues Regional traffic Local traffic Combined traffic

Green Valley Corridor Road Network Issues Regional traffic Local traffic Combined traffic

Embed Size (px)

Citation preview

Green Valley CorridorRoad Network Issues

Regional trafficLocal trafficCombined traffic

Regional Routes accessedVia Green Valley Road

WesternRoute End Point &

Waypoint Area

EasternRoute End Point &

Waypoint Area

Local Routes accessedVia Green Valley Road

Green Valley Critical Path:No parallel capacity,No nearby alternate route

Combined Regional& Local Routes accessedVia Green Valley Road

Combined Regional& Local Routes accessedVia Green Valley Road

Same Critical Path

Same Critical Path

A growth issue:

Road Network too sparse for good service in urban & suburban land use

Inadequate capacity on critical linkscauses congestion & delays.

Lack of parallel links limits road network capacity.

Lack of alternate routes produces additional delaysduring heavy traffic, road obstructions, and closures.

Sacramento County’s urban & suburban road network is dense,El Dorado County’s road network is sparse.

Icons for final slides, about viabilityof possible alternative solutions

(yes, it’s tongue-in-cheek ratings for serious business)

Goes down in flames Flies like a dodo

This pig might fly Flies great,costs zillions,

annoys some folks

Flies a few feet & plops,just damage control

It flies. Not dazzling,but gets us somewhere,

annoys other folks

Ways to improve traffic on Green Valley Road

Reduce traffic volume, no changes to road:Buy back existing development & revert it to open spaceor rural land uses. Try to charge tolls for through traffic.

Starting with the silliest proposal and groping onward toward a solution…

Don’t worry about traffic. Just continue approvingmore new development along the Green Valley Corridor.

Institute a moratorium on new developmentuntil the tooth fairy funds road system improvements.

Ways to improve traffic on Green Valley RoadLess-simple solutions have ranges of viability (2 icons), they depend on details…

Build new small roads, including at least one additionalarterial to relieve Green Valley traffic. Overall, giveEDH a denser, better-connected road network

Theoretically feasible, satisfies multiple objectives.Catch: $$$$. EDH roads could devour the entire County budget.

Rebuild a lot of Green Valley Road to add capacity.-- Widen 2-lane to 4 or 5 lanes, Francisco to Cameron Pk.-- Replace signalized intersections with roundabouts.-- Be ready to widen the existing 4 lane section (west of Salmon Falls) to 6 lanes SOON.