    URBAN CORRIDOR MANAGEMENT FOR

    HETEROGENOUS TRAFFIC CONDITIONS A CASE

    STUDY OF AMEERPET TO KUKATPALLY

    CORRIDOR, HYDERABAD

    Page 1

    J Pradeep ChytanyaAsst. Engineer (Highway Designs)Egis India Consulting Engineers Pvt. Ltd.

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    2/47

    INTRODUCTION

    CORRIDORCORRIDORCORRIDORCORRIDOR:

    MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENT:.CORRIDOR PROBLEMS:CORRIDOR PROBLEMS:CORRIDOR PROBLEMS:CORRIDOR PROBLEMS: PHV, VOR, ACCESS &PHV, VOR, ACCESS &PHV, VOR, ACCESS &PHV, VOR, ACCESS &CONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOURCONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOURCONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOURCONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOUR

    Page 2

    : ,,,,FUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTPFUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTPFUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTPFUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTPOBJECTIVES:OBJECTIVES:OBJECTIVES:OBJECTIVES: IDENTIFY, UNDERSTAND, EVALUATE MANAGEIDENTIFY, UNDERSTAND, EVALUATE MANAGEIDENTIFY, UNDERSTAND, EVALUATE MANAGEIDENTIFY, UNDERSTAND, EVALUATE MANAGE

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    3/47

    LITERATURE REVIEW

    HAND BOOKS OF VARIOUS DOTS HAS BEENREFERRED

    AMERIACN, EUROPEAN AND AUSTRALIAN

    Page 3

    REVIEWED & BEST METHODOLOGY FOR INDIANCONDITIONS WAS DRAWN

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    4/47

    GETTING ORGANIZED

    KNOW THE CORRIDOR

    DEVELOP THE CHOICES

    SELECT PREFFEREDIMPLEMENTATION

    SUSTAIN THE VISION

    US DOT METHODOLOGY EUROPEAN METHODOLOGY

    IDENTIFY CORRIDOR

    CONVEY TO PUBLIC

    REVIEW OF OPTIONS

    DRAFT CMPPUBLIC REVIEW &COMENTS

    FINAL CMP

    Page 4

    GETTING ORGANIZED

    EXISTING & FUTURE CONDITIONS

    DEVELOP VISION & STRATEGIESDEVELOP IMPLEMENTATION PLAN

    DRAFT CMP & PUBLIC ISSUE

    MONITOR PROGRESS

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    5/47

    CURRENT STUDY METHODOLOGY

    Page 5

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    6/47

    STUDY AREA = HYDERABADSTUDY AREA DESCRIPTION : Hyderabad, the capital of Andhra

    Pradesh has emerged as most preferred destination for innovativetechnologies. The main growth driver in Real Estate Market is IT, ITESand BPO industries. Hyderabad, during the last 7- 8 years.

    ABOUT STUDY AREA

    Page 6

    = -MAIN ARTERIAL

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    7/47

    Page 7

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    8/47

    AMEERPET - MYTHRIVANAM

    Page 8

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    9/47

    MYTHRIVANAM SR NAGAR

    Page 9

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    10/47

    SR NAGAR - ESI

    Page 10

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    11/47

    ESI - ERRAGADDA

    Page 11

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    12/47

    ERRAGADDA - KUKATPALLY

    Page 12

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    13/47

    DATA COLLECTION

    INTERSECTIONS = 6

    SEGMENTS = 5

    CORRIDOR LENGTH = 6.1 Km

    SEGMENT LENGTHS

    Page 13

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    14/47

    PHYSICAL INVENTORY

    Page 14

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    15/47

    Page 15

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    16/47

    TRAFFIC VOLUMES OF SEGMENTS

    SEGMENT PEAK HOUR

    VOLUME(PCUS/HR)

    PEAK HOUR

    Ameerpet Jn toMythrivanam

    5075 11:30 am - 12:30 noon

    Page 16

    Mythrivanam to SR Nagar 4853 11:00 am - 12:00 noon

    SR Nagar to ESI 5292 6:00 pm 7:00 pm

    ESI to Erragadda 4844 4:45 pm 5:45 pm

    Erragadda to Kukatpally Y

    Jn.

    4602 9:30 am 10:30 am

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    17/47

    TRAFFIC VOLUMES OF INTERSECTIONS

    INTERSECTION PEAK HOUR

    VOLUME (PCUS/HR)

    PEAK HOUR

    SRINAGAR 13105 6:45 PM to 7:45 PM

    MYTHRIVANAM 6712 10:15 AM to 11:15AM

    Page 17

    SR NAGAR 16181 10:00 AM to 11:00 AMESI 12740 10:45 AM to 11:45 AM

    ERRAGADDA 8848 7:00 PM to 8:00 PM

    KUKATPALLY Y Jn 6721 7:00 PM to 8:00 PM

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    18/47

    PEAK HOUR VARIATIONS

    13105

    16182

    12741

    PEAK HOUR VARIATIONS IN THE CORRIDOR

    PEAK HOUR VOLUMES (PCU'S/Hr)

    Page 18

    5076

    6713

    4853 5292 4845

    8848

    4602

    6721

    Srinagar Jn. Ameerpet -Mythrivanam

    MythrivanamJn.

    Mythrivanam- SRNagar

    SR Nagar Jn. SR Nagar -ESI

    ESI Jn ESI -Erradadda

    ErragaddaJn.

    Erragadda -Kukatpally

    Kukatpally"Y" Jn.

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    19/47

    2W58%

    AUTO20%

    TRUCKS0%

    BUS5%

    CARS17%

    OTHERS0%

    AMEERPET - MYTHRIVANAM

    2W56%

    AUTO

    TRUCKS0%

    BUS5%

    CARS20%

    OTHERS0%

    MYTHRIVANAM - SR NAGAR

    MODAL SHARES ALONG THE CORRIDOR

    Page 19

    2W60%

    AUTOS20%

    TRUCKS1%

    BUS2%

    CARS17%

    OTHERS

    0%

    SR NAGAR - ESI

    2W58%AUTO

    16%

    TRUCKS0%

    BUS4%

    CARS22%

    OTHERS0%

    ESI - ERRAGADDA

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    20/47

    2W59%

    AUTOS17%

    TRUCKS1%

    BUS3%

    CARS19%

    OTHERS1%

    ERRAGADDA - KUKATPALLY

    2W52%

    AUTO21%

    TRUCKS0%

    BUS3%

    CAR24%

    OTHERS0%

    SRINAGAR JN

    Page 20

    2W53%

    AUTOS19%

    TRUCKS1%

    BUS4%

    CARS23%

    OTHERS0%

    MYTHRIVANAM JN

    2W48%

    AUTOS22%

    TRUCKS1%

    BUS2%

    CARS26%

    OTHERS1%

    SR NAGAR JN

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    21/47

    2W57%

    AUTOS21%

    TRUCKS0%

    BUS2%

    CARS20%

    OTHERS0%

    ESI Jn

    2W45%

    AUTOS26%

    TRUCKS1%

    BUS4%

    CARS24%

    OTHERS0%

    ERRAGADDA Jn

    KUKATPALLY "Y" Jn

    Page 21

    2W

    50%

    AUTOS19%

    TRUCKS2%

    BUS7%

    CARS22%

    OTHERS0%

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    22/47

    SIGNAL TIMINGS ALONG THE CORRIDOR

    Page 22

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    23/47

    CAPACITY OF MID BLOCKS

    CAPACITY & LOS OF MID BLOCKS

    MORTAB AND CHARI 1991 = 4 LANE DIVIDED

    For LOS C & for 10% SMV the DSVS are as follows

    MODEMODEMODEMODE DSVSDSVSDSVSDSVS

    Page 23

    Capacity of Single Lane = Capacity * (100/(100 - % of SMV))..(1)

    Capacity of whole Segment = Capacity of single lane * 2..(2)

    CARS2075BUS 1820

    TRUCKS 1445

    AUTOS 1935

    2WHEELERS 3300

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    24/47

    SPEED FLOW CURVES = 6 LANE DIVIDED

    DELAY & LOS OF INTERSECTIONSBASED ON HCM 200

    Controlled Delay = Stopped Delay +Acc/Dcc Delay3= *

    Page 24

    ...

    FVS = Fraction of vehicles stopping = Vstop / Vtot ....5

    Free-Flow

    Speed

    7 vehicles 8-19

    vehicles

    20-30

    vehicles 60km/h +5 +2 +1

    >60-71 km/h +7 +4 +2

    >71 km/h +9 7 +5

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    25/47

    DELAYS & LOS OF INTERSECTIONS

    INTERSECTION STOPED DELAY

    (Sec/Veh)

    Acc/Dcc Delay

    (Sec/Veh)

    LOS

    SRINAGAR 16.4 1.9 B

    MYTHRIVANAM 37.9 1.5 D

    Page 25

    SR NAGAR 65.2 1.8 E

    ESI 24.1 1.3 C

    ERRAGADDA 23.4 1.5 C

    KUKATPALLY Y

    Jn

    49.6 1.3 D

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    26/47

    CAPACITY & LOS OF SEGMENTS

    SEGMENT NAME CAPACITY

    (vph)

    V/C

    RATIO

    LOS

    Ameerpet Jn to Mythrivanam 4200 0.766 C

    Page 26

    Mythrivanam to SR Nagar 4465 0.835 D

    SR Nagar to ESI 6246 0.763 C

    ESI to Erragadda 4560 0.827 D

    Erragadda to Kukatpally Y Jn. 5688 0.756 C

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    27/47

    FLOATING CAR SURVEYS

    2 TRAILS IN PEAK & OFF PEAK

    TO & FRO PEAK = 10:00 AM 11:00 AM

    =

    Page 27

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    28/47

    AMEERPET TO KUKATPALLY

    ELEMENT PEAK OFF PEAK

    Avg. Journey Time (Min)

    13.08 8.15

    12.35 7.76

    Page 28

    Avg. Running Time (Min)

    Avg. Journey Speed (Kmph)

    27.15 44.73

    Avg. Running speed (Kmph)

    29.07 47.67

    Avg. Delay (Sec)

    44 23

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    29/47

    KUKATPALLY TO AMEERPET

    ELEMENT PEAK OFF PEAK

    Avg. Journey Time (Min)

    15.33 9.76

    Page 29

    Avg. Running Time (Min)

    . .

    Avg. Journey Speed (Kmph)

    24.96 41.53

    Avg. Running speed (Kmph)

    26.32 44.19

    Avg. Delay (Sec)

    59 20

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    30/47

    BOTTLENECK ANALYSIS

    DATA COLLECTED FLOATING CAR SURVEYS

    TIME/100m

    PLOTTED USINGMINITAB 15 &D PLOT

    Page 30

    X AXIS = TIME

    Y AXIS = DISTANCE

    Z AXIS = SPEED

    RESULTS COMPARED

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    31/47

    WORKING WITH MINITAB 15

    Page 31

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    32/47

    WORKING WITH D-PLOT

    Page 32

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    33/47

    COMPARISION OF BOTTLENECKS

    Page 33

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    34/47

    OBSERVATIONS

    Page 34

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    35/47

    SPEED PROFILES

    RECORDED DURING FLOATING CAR SURVEYS

    SPEEDS COMPARED B/W PEAK AND OFF PEAK TIMES

    Page 35

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    36/47

    50

    60

    70

    80

    90

    100

    ED(Kmph)

    AMEERPET - KUKATPALLY

    OFF - PEAK

    PEAK

    Page 36

    0

    10

    20

    30

    40SPE

    DISTANCE (m)

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    37/47

    CAUSALITY ANALYSIS

    CARRIED OUT DURING SURVEYS

    PROBLEMS IDENTIFIED MANAGEMENT MEASURES SUGGESTED

    Page 37

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    38/47

    AMEERPET - MYTHRIVANAM

    LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

    AMEERPET BUS STOP SLOW TRAFFIC MOVEMENT

    DUE TO BUS STOP BUS STOP

    RELOCATION OF BUS STOP

    MYTHRIVANAM JN. PEDESTRIAN CROSSING SEPARATE PHASE FOR

    Page 38

    INSTALL BULLBOUTS

    MYTHRIVANAM JN. MINOR LEG EXPERIENCING

    MORE DELAY

    GREEN TIME HAS TO BE

    ALTERED

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    39/47

    MYTHRIVANAM SR NAGAR

    LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

    MYTHRIVANAM BUS STOP HIGH SPEEDS OF THE

    VEHICLES, PEDESTRAIN

    CROSSING

    INSTALL SPEED BREAKERS

    OR CUSHIONS OR A SPEED

    HUMP

    Page 39

    FOOT OVER BRIDGE

    SR NAGAR JN. SIGNAL JUMPING AT

    AMEERPET TO KUKATPALLY

    LEG

    TYRE FLATTENING,

    SR NAGAR JN. DELAY AND QUEUE LENGTH

    ARE GETTING INCREASED

    FOR THE MINOR LEG

    CLOSE THE DIVIDER WHICH

    IS JUST 28M OF LENGTH

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    40/47

    SR NAGAR - ESI

    LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

    ESI BUS STOP SLOWING DOWN OF SPEEDS

    BECAUSE IT WAS LOCATED

    MUST BE RELOCATED AFTER

    300M

    Page 40

    VERY NEXT TO THENARROWED ROAD AT

    DARGA.

    ESI JN. SIGNAL JUMPING FROM THE

    TWO WHEELERS.

    TYRE FLATTENING.

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    41/47

    ESI - ERRAGADDA

    LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

    FRUIT MARKET ENCROACHMENTS AND SIDEFRICTION.

    ENCROACHMENTS NEED TOBE STRICTLY CLEARED

    Page 41

    FRUIT MARKET ILLEGAL MEDIAN OPENING, ILLEGAL MEDIAN OPENINGHAS TO BE CLOSED.

    ERRAGADDA JN. PEDESTRIAN CROSSINGS

    CAUSING INTERFERENCE TO

    THE THROUGH TRAFFIC.

    MEDIAN HAS TO BE RAISED

    TO SOME HEIGHT SO THAT

    THE CROSSINGS WILL BE

    DONE AT THE ESI JN.

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    42/47

    ERRAGADDA - KUKATPALLY

    LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

    MOOSAPET ENCROACHMENTS AND SIDE

    FRICTION.

    ENCROACHMENTS NEED TO

    BE STRICTLY CLEARED

    MOOSAPET BUS STOP ILLEGAL MEDIAN OPENING ILLEGAL MEDIAN OPENING

    Page 42

    HAS TO BE CLOSED.

    KUKATPALLY Y JN. BUSES ARE STOPPING ON THE

    PASSENGERS REQUEST AT

    THE JUNCTION

    BUS STOP HAS TO BE

    RELOCATED AT A DISTANCE

    OF 250M FROM THE Y JN.

    INSTALL A SPEED HUMP JUST

    BEFORE THE INTERSECTION

    SO AS TO REDUCE THE SPEED

    OF THE THROUGH TRAFFIC.

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    43/47

    BULL BOUTS

    Page 43

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    44/47

    SPEED HUMPS

    Page 44

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    45/47

    CONCLUSIONS

    PEAK HOUR VOLUME IS HIGH AT SR NAGAR Jn & SR

    NAGAR ESI MID BLOCKDELAY AT SR NAGAR IS HIGH & LESS AT SRINAGAR

    Page 45

    AMEERPET MYTHRIVANAM HAVE LESS CAPACITY

    KUKATPALLY ERRAGADDA HAVE MORE DELAY

    ESI SR NAGAR HAVE LESS DELAY 4 BOTTLENECKS IDENTIFIED WITH 2 ON EITHER

    SIDE

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    46/47

    OVERALL CORRIDOR PERFORMANCE CAN BE

    IMPROVED WHEN, PEDESTRAIN CROSSINGS

    Page 46

    ENCROACHMENTS CLEARED

  • 8/4/2019 J Pradeep Chaitanya - Urban Corridor Management for Heterogenous Traffic Conditions [Compatibility Mode]

    47/47

    VERY GLAD TO HAVE THIS OPPORTUNITYVERY GLAD TO HAVE THIS OPPORTUNITYVERY GLAD TO HAVE THIS OPPORTUNITYVERY GLAD TO HAVE THIS OPPORTUNITY

    THANKING YOU,THANKING YOU,THANKING YOU,THANKING YOU,

    Page 47

    J Pradeep Chytanya