Upload
rladdha9401
View
216
Download
0
Embed Size (px)
Citation preview
8/7/2019 Green Building Building Work Shop Presentation
1/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
GreenGreen BuildingBuilding WorkshopWorkshop
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
PreviewPreview
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Th e f r o g d o e s n o t d r i n k u p t h e w a t e r f r o m Th e f r o g d o e s no t d r i n k u p t h e w a t e r f r o m
w h i ch he l i ves .w h i ch he l ives .
-- American Indian SayingAmerican Indian Saying
8/7/2019 Green Building Building Work Shop Presentation
2/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Ecological Debtor & Creditor CountriesEcological Debtor & Creditor Countries
Debtors Creditors
Footprint > 1.5 Biocap acity
Footprint = 1.0 - 1.5 Biocapacity Biocapacity = 1.0 - 1.5 Footpr int
Biocapacity > 1.5 Footprint
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
IndiaIndias Ecological Footprints Ecological Footprint
Source: Global Footprint Ne tw ork, USA
India Footprint, Biocapacity and GDP
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1961 1966 1971 1976 1981 1986 1991 1996 2001
Globalhectarespercapita
0
100
200
300
400
500
600
GDPpercapita.constant2000US$
Footprint
Biocapacity
GDP
8/7/2019 Green Building Building Work Shop Presentation
3/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WhyWhy SUSTAINABLE DEVELOPMENTSUSTAINABLE DEVELOPMENT..
n For India to achieve a Developed Country status
q Need to maintain high GDP growth rates
n Flipside of higher growth rates
q Increased use of natural resources
n Energy, Water, etc.
q Increased emissions and discharges
NEED OF THE HOUR!!!
IN OUR RACE TO SAVE THE PLANET.
Need to focus on Ecologically Sustainable grow th
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Core PurposeCore Purpose
To promote and champion
conservation of Natural
resources in Indian Industry
without compromising on
high and accelerated growth
8/7/2019 Green Building Building Work Shop Presentation
4/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
What is LEED?What is LEED?
LLeadershipeadership inin EEnergynergy & E& Environmentalnvironmental DDesignesign Voluntary, Consensus-based, Market driven for developing high
performance, sustainable buildings
Based on professional reference standards like NBC, ASHRAE,ECBC etc.,
Points can be obtained for individual credits categories
1.1. Sustainable SitesSustainable Sites
2.2. Water EfficiencyWater Efficiency
3.3. Energy & AtmosphereEnergy & Atmosphere
4.4. Material and ResourcesMaterial and Resources
5.5. Indoor Air QualityIndoor Air Quality
6.6. InnovationInnovation
Centre of Excellence for Energy, Environment, Green Buildings,Renewable energy, Water & Climate change activities in India
CIICII Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre
A unique Public Private Partnership( CII, Govt of Andhra Pradesh, USAID and Pir ojsha Godrej Foundation )
8/7/2019 Green Building Building Work Shop Presentation
5/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
the journeythe journey
2001: 1st Green Building
20,000 sq.ft. 2010: 508 Green Buildings
353 Million sq.ft.
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Green Building Movement in IndiaGreen Building Movement in India
LEED India NC in force effective 1st Jan 2007
Did not reinvent the wheel
500+ projects registered under LEED
Assessment by III Party Assessors & USGBC
8/7/2019 Green Building Building Work Shop Presentation
6/106
8/7/2019 Green Building Building Work Shop Presentation
7/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
IGBC Rating Systems Certification LevelsIGBC Rating Systems Certification Levels
LEED INDIA-NC
7 Prerequisites
Certified 26 to 31Silver 32 to 38Gold 39 to 51Platinum 52 to 69
IGBC GREEN HOMES
8 Prerequisites
Certified 30-37Silver 38-44Gold 45-52Platinum 53-75
LEED INDIA-CS
7 Prerequisites
Certified 23 to 27
Silver 28 to 33
Gold 34 to 44
Platinum 45 to 61
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
What is Green?What is Green?Energy Efficiency
Water Efficiency
8/7/2019 Green Building Building Work Shop Presentation
8/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
What is Green?What is Green?
Use of Recycled/recyclableproducts
Use of Renewable Energy
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
What is Green Building?What is Green Building?Externally : both look alike
Functionally : both are same
Differences
Concern for Human Comfort
& Indoor Environment
Operational Savings
Overall cost (2-3%) but pays for itself
8/7/2019 Green Building Building Work Shop Presentation
9/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
COST OF GREEN BUILDINGSCOST OF GREEN BUILDINGS -- INDIAN EXPERIENCEINDIAN EXPERIENCE
6 %
8 %
15 %
20 %
% increase incost
3 years
5 years
6 years
7 years
TypicalPayback
Gold (42 Points)40,000Grundfos
Pumps,
Chennai
Platinum (57 Points)1,75,000Wipro,
Gurgaon
Platinum (52 points)1,70,000ITC Green
Centre,
Gurgaon
Platinum (56 points)20,000CII-Godrej GBC
RatingSqftBuilding
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Green Building FeaturesGreen Building Features
Incorporates several Green Features
Efficient Use of Water
Efficient Use of Landscape
Energy Efficient &
Eco Friendly Equipment
Use of Renewable Energy
Use of Recycled/Recyclable
Materials
Effective Control & Building
Management Systems
Improved indoor air quality
for health and comfort
Energy Resource CenterEnergy Resource Center
Southern California Gas CompanySouthern California Gas Company
AA SempraSempra Energy CompanyEnergy Company
Downey, CaliforniaDowney, California
8/7/2019 Green Building Building Work Shop Presentation
10/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Benefits of Green BuildingBenefits of Green Building
TangibleTangible Reduce operating costs
Increased Marketability
Optimize life cycle of Equipment / Product
Enhanced Efficiency
Considers embodied energy
Savings of investments on equipment
v Water savings: 40 50 %
v Energy savings: 20 30 %
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Intangible Environmental benefits
Reduce impact on environment
Health and Safety benefits
Enhance occupant comfort
Improved productivity
Reduced Absenteeism
Employee Retention
Safety procedures incorporated while construction & measuresafter occupancy
World Class Standards & Procedures
Benefits of Green BuildingBenefits of Green Building
8/7/2019 Green Building Building Work Shop Presentation
11/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Few LEED Rated Projects in IndiaFew LEED Rated Projects in India
Wipro-Gurgaon Raheja-Mumbai
L&T-Hazira
British Gas, Hiranandani
Mumbai Spectral-Noida
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Project RegistrationProject Registration
Registration using the form in IGBC website
v www.igbc.in
Resources for Registered projects
v Free reference Guide
v Templates
v 2 Free CIRs
When to register
v Can register at any stage
Registration a early stage max. potential for achieving
certification and benefits
8/7/2019 Green Building Building Work Shop Presentation
12/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
LEED India Certification ProcessLEED India Certification Process
30 Days
Project team appeals thecertification awarded
within 1 month
PROJECT REGISTRATION (www.igbc.in )
PRELIMINARY REVIEW BY III PARTY ASSESSORS
SUBMIT DOCUMENTS FOR FINAL REVIEW
FINAL REVIEW BY III PARTY ASSESSORS
NOTIFY FINAL LEED SCORE BY IGBC
PROJECT ACCEPTS
IGBC PRESENTS PLAQUE IN DICATINGCERTIFICATION LEVEL
YES
SUBMIT DOCUMENTS FOR PRELIMINARY REVIEW
30 Days
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
To Sum UpTo Sum Up
Green Buildings
Excellent opportunity to
reduce operating costs
Sustainability of Business
Tremendous benefits
Tangible & Intangible
Long term benefits
Bu ild Green, Everyone profits
http://www.igbc.in/http://www.igbc.in/8/7/2019 Green Building Building Work Shop Presentation
13/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Save the planetSave the planet
Treat softlyTreat softly
Save the planet
8/7/2019 Green Building Building Work Shop Presentation
14/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Sustainable SitesSustainable Sites
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
Light pollution reduction
Heat Islands Effect
Storm water Design
Site development
Alternative transportation
Brownfield redevelopment
Development Density & Community Connectivity
Site selection
Erosion and Sedimentation Control
Title
Total 13
1Credit 8
1-2Credit 7
1-2Credit 6
1-2Credit 5
1-3Credit 4
1Credit 3
1Credit 2
1Credit 1
RequiredPrereq 1
Point(s)Credit
8/7/2019 Green Building Building Work Shop Presentation
15/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Prerequisite 1:SS Prerequisite 1: Erosion & SedimentationErosion & Sedimentation
ControlControlIntent
Control erosion & sedimentation of soil toreduce negative impacts on
Water quality
Air quality dust generation
Erosion from Construction sites can carry
toxicants & nutrients polluting the stormwater
run-off & subsequently the receiving streams.
Measures should address both construction &post-occupancy
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Requirements
Erosion control measures as highlighted in
the National Building Codes of India (NBC)
Part 10, section 1, chapter 4.
Topsoil should be stockpiled for reuse
later.
Develop appropriate measures to
address soil erosion , post occupancy
Erosion Control Techniques
Stabilization
Structural Control
Erosion & Sedimentation ControlErosion & Sedimentation Control
8/7/2019 Green Building Building Work Shop Presentation
16/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
StabilizationStabilization
Erosion & Sedimentation ControlErosion & Sedimentation Control
TEMPORARY
SEEDINGPERMANENT
SEEDING MULCHING
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Erosion & Sedimentation ControlErosion & Sedimentation Control
Structural ControlStructural Control
EARTH DIKES SILT FENCING SEDIMENTATIONBASIN / TRAP
8/7/2019 Green Building Building Work Shop Presentation
17/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 1 : Site SelectionSS Credit 1 : Site Selection
Intentv Not to build on inappropriate sites
Inappropriate sitesv Prime Farmland
v Land whose elevation is lower than
5 feet above the elevation of the
100-year flood as defined by FEMA
v Land which provides habitat for any
species on the threatened or endangered
list of Wildlife Institute of India
v Within 100 feet of any wetland as
defined by local or state lawv Land which prior to acquisition for the
project was public parkland
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 2: Development density &SS Credit 2: Development density &
Community ConnectivityCommunity Connectivity
Intentv Build in areas where infrastructure is
already developed
v Avoid occupying green field
Requirements
Option 1:
Minimum development density60,000 sq ft / acre for the building
(And)Average density > 60000 sft/acre
Local terminology : FAR =1.38
8/7/2019 Green Building Building Work Shop Presentation
18/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Project should show development density > 60000
AND
Average density also > 60000
Density radius =
3 (site area in acres x 43560)
Empty site
Area to be considered
Public places, parks, roads
No need to consider area
Radius crossing a site Consider entire area of the site
& built-up area
Development DensityDevelopment Density
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
62,199Ave Density (SF/Acres)
16.04997665Total
0.244300 z
0.76-V
0.5133,650T
0.3933,425A
Site Area
(acres)
Building Space
(SF)
Buildings within
Density radius
Building space 30,000 sft
Site Area 0.44 acres
DD = 30000 / 0.44
DD = 68182 sq.ft/acre
Development DensityDevelopment Density
8/7/2019 Green Building Building Work Shop Presentation
19/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Community ConnectivityCommunity ConnectivityRequirements
Option 2:
Within mile radius of residential zone or Neighborhood with density of 10 units /
acre net (And)
10 basic services within mile radius (And)
Pedestrian access to basic services
Basic Services
1. Bank
2. Place of Worship
3. Day Care
4. Fire Station
5. Cleaners
6. Library
7. Medical
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Basic Services8. Park
9. Post Office
10. Restaurant
11. School
12. Supermarket
13. Fitness Cent er
14. ATM
15. Hardware
16. Beauty Saloon
17. Theater
18. Pharmacy
19. Museum
20. Community Center
The above services are examples and not exhaustive; other services can also be included
CommunityCommunity ConnectivityConnectivity
8/7/2019 Green Building Building Work Shop Presentation
20/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 3: Brownfield RedevelopmentSS Credit 3: Brownfield Redevelopment
Intentv Construct on dilapidated site /
environmentally damaged sites
After treatment
Requirement
v Site having hazardous substances
Remediation efforts to be performed
Water: Pump & Treat
Soil : Bioreactors, Solar detoxification
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 4: Alternative TransportationSS Credit 4: Alternative TransportationCredit 4.1 : Public Transportation AccessCredit 4.1 : Public Transportation Access
Intent
To reduce pollution
from automobile use
Requirement
Building within 0.8 km of
railway line
(OR)
Within 0.4 km of two or
more bus lines
8/7/2019 Green Building Building Work Shop Presentation
21/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.2 : Low Emitting & Fuel Efficient VehiclesCredit 4.2 : Low Emitting & Fuel Efficient Vehicles
Intent
Reduce pollution from automobile use
Requirement
Option 1:
Low emitting & fuel efficient vehicles
for 3% of FTE occupants (and)
Preferred parking also to be provided
Option 2:
Provide AFV - Refueling stations
3% of the total vehicle parking capacity
Electric charging, liquid or gaseous fuelingfacilities
SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 4: Alternative TransportationSS Credit 4: Alternative TransportationCredit 4.2 : Low Emitting & Fuel Efficient VehiclesCredit 4.2 : Low Emitting & Fuel Efficient Vehicles
2854908240First Shift
4
(hrs)
60
Occupants
Part-time occupants
1408110Second Shift
Occupants(hrs)Occupants
Full-time equivalent
(FTE) occupants
Full-time OccupantsShift
Convert Part time occupants to Full Time Equivalent
For eg. 90 occupancy for 4 hrs = 90 x 4/8 = 45, which is added to240 occupants which are for full 8 hrs.
Hence total = 240 + 45 = 285
8/7/2019 Green Building Building Work Shop Presentation
22/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.3 : Parking CapacityCredit 4.3 : Parking CapacityIntent Reduce pollution from automobile use
Requirement
Option 1:
Parking capacity should not exceed localzoning requirement (AND)
Preferred parking for Car/Vanpool serving5% of total parking spaces
Option 2:
Add no new parking for rehabilitationproject (AND)
Preferred parking for Car/Vanpool for 5% oftotal parking spaces
SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 4: Alternative TransportationSS Credit 4: Alternative Transportation
Credit 4.3 : Parking CapacityCredit 4.3 : Parking Capacity
v Preferred parking
Places closest to the main entrancePlaces closest to the main entrance
Should not include spaces designatedShould not include spaces designated
for handicappedfor handicapped
(OR)(OR)
Parking passes at a discounted priceParking passes at a discounted price
8/7/2019 Green Building Building Work Shop Presentation
23/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 5: Site DevelopmentSS Credit 5: Site Development
Credit 5.1: Protect or Restore HabitatCredit 5.1: Protect or Restore HabitatIntent
To minimize disturbance
Requirements
Option 1 (Greenfield)
Limit site disturbance i.e earth
work and cleaning of vegetation
40 beyond building perimeter
5 beyond perimeter roadways and utility branch trenches
25 beyond constructed areas with permeable surfaces (such as
pervious paving areas, playing fields)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Protect or Restore HabitatProtect or Restore Habitat
Site Disturbance
Must have off-set
more than 40 feet
Buildingfootprint
Site
40 ft
Building
footprint
Site40 ft
8/7/2019 Green Building Building Work Shop Presentation
24/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Option 2 :(Previously developed sites)
Restore min 50% of the site
area by replacing impervious surfaces
with native and adapted vegetation
{Site Area : Total Site Area Bldg. foot print area}
Protect or Restore HabitatProtect or Restore Habitat
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 5.2: Maximize Open AreasCredit 5.2: Maximize Open Areas
Intent
Reduce the building foot prints
Requirements
Case 1: (where local zoning requirement present)
Reduce the building footprint to exceed the local zonings open space
requirement for the site by 25%.
Open space = Site area Development footprint
Development footprint
Building footprint
Access roads
Parking
Utility area
SS Credit 5: Site DevelopmentSS Credit 5: Site Development
8/7/2019 Green Building Building Work Shop Presentation
25/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Maximize Open AreasMaximize Open Areas
Case 2: (Campus situation or No local regulation) Leave vegetated open space equivalent of building footprint
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 6: Stormwater DesignSS Credit 6: Stormwater Design
Credit 6.1: Quantity ControlCredit 6.1: Quantity Control
Intent
To manage stormwater runoffs to limit pollutionof natural water
Requirements
Case 1: (existing Imperviousness 50%)
Implement stormwater management plan that
results in a 25% decrease in rate and quantity ofstormwater runoff.
Impervious Area = Surface area x Run-off coefficientImperviousness% = Total Pervious Area / Total Site Area
8/7/2019 Green Building Building Work Shop Presentation
26/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Stormwater Quantity DesignStormwater Quantity Design
0.10 0.30Vegetation, Flat-to-Steep
0.25 0.45Turf, Flat-to-steep
0.50 0.10Roofs, Garden roof(20in)
0.95Roofs, conventional
0.75Pavement, Gravel
0.85Pavement, Brick
0.95Pavement, Concrete
0.95Pavement, Asphalt
Runoff CoefficientSurface type
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Stormwater Quantity DesignStormwater Quantity Design
Basecase
Imperviousness-48.62%
43,84390,170
1,20012,0000.10Vegetation, Flat
11,29345,1700.25Turf, Flat
31,35033,0000.95Pavement, Asphalt
ImperviousArea (sft)Run-off co-effSurface
8/7/2019 Green Building Building Work Shop Presentation
27/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Stormwater Quantity DesignStormwater Quantity Design
Proposed case
Imperviousness-20.52%
18,50090,170
2,00057,1700.10Vegetation, Flat
16,50033,0000.50Roof Garden
ImperviousArea (sft)Run-off co-effSurface
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 6.2: Quality ControlCredit 6.2: Quality Control
Intent
To treat the stormwater before
discharge
Requirements
Construct site stormwater treatment system to remove
80% TSS (Average annual post development)
Standards: NBC (Part 10, Section 1,Clause 5.2 StormWater Management & Filtration Techniques)
Methods: Filtration, Rain Water Harvesting Pits
SS Credit 6: Stormwater DesignSS Credit 6: Stormwater Design
8/7/2019 Green Building Building Work Shop Presentation
28/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
BEST MANAGEMENT PRACTICESBEST MANAGEMENT PRACTICES
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 7: Heat Island EffectSS Credit 7: Heat Island EffectCredit 7.1: NonCredit 7.1: Non--RoofRoof
Intent
Reduce heat islands (thermal gradient differencesbetween developed and undeveloped areas)
Requirements
Provide Shade (within 5yrs) and/or use lightcolored/high albedo material (reflectance of atleast0.3) and/or open grid pavement for atleast 30% ofthe sites non-roof impervious surfaces, includingparking lots, walkways, plazas etc.
OR
Place minimum of 50% of parking spaces
underground or covered by structured parkingOR
Use an open grid pavement system (less than 50%impervious) for a minimum of 50% of the parking lotarea
8/7/2019 Green Building Building Work Shop Presentation
29/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 7: Heat Island EffectSS Credit 7: Heat Island EffectCredit 7.2: RoofIntent Reduce heat islands (thermal gradient
differences between developed and
undeveloped areas)
Requirements 75% of the Roof surface should have Roofing material having Solar Reflectance Index
(SRI) as mentioned in the table below
OR
Vegetated Roof for atleast 50% of the roof area
OR
Install high-albedo and vegetated roof in combination to meet the following
(Area of SRI roof/0.75) + (Area of Vegetated roof/0.5) >= Total Roof Area
29>= 2:12Steep-sloped roof
78
8/7/2019 Green Building Building Work Shop Presentation
30/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 7: Heat Island EffectSS Credit 7: Heat Island Effect
SRI for Typical Roofing MaterialsSRI for Typical Roofing Materials
104PVC White
107White Coating 2 Coats, 20 mils
90White Cement Tile
36Red Clay Tile
37Light Gravel on Built-Up Roof
56Aluminum
79White-Coated Gravel on Built-Up Roof
82White Coating on Metal Roof
84White EPDM
100White Coating 1 Coat, 8 mils
28White Granular Surface Bitumen
25Unpainted Cement Tile
Solar Reflectance Index (SRI)Generic Roofing Materials
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 8: Light Pollution ReductionSS Credit 8: Light Pollution ReductionIntent Minimize light trespass from building, reduce sky-glow, improve nighttime
visibility through glare reduction & reduce impact on nocturnalenvironments
Requirements
Meet or provide lower light levels and
than those recommendation by IESNA
For Interior Lighting
Maximum candela from each luminaire
shall intersect opaque building interior
surfaces and not exit out of windowsOR
All non-emergency interior lighting, shall be automatically controlled to turn offduring non-business hours. Provide manual override capability
8/7/2019 Green Building Building Work Shop Presentation
31/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
SS Credit 8: Light Pollution ReductionSS Credit 8: Light Pollution Reduction
For Exterior Lighting Light areas as required for safety and comfort
Lighting not to exceed
ASHRAE/IESNA 90.1 2004
80% of LPD for exteriors
Parking areas : 0.15 W/sft
Walkways:
1 W /linear foot (< 10 feet width)
0.2 W/sft (>10 feet width)
50% of LPD for faade & landscape 0.2 W/sft or 5 W/linear foot (ASHRAE)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
THANK YOU
8/7/2019 Green Building Building Work Shop Presentation
32/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Water EfficiencyWater Efficiency
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
70% OF EARTH IS COVERED IN WATER
OVERVIEW
8/7/2019 Green Building Building Work Shop Presentation
33/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
FRESH WATER
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
FRESH WATER
Saltwater
97.5%
Freshwater
2.5%
Total Surface Freshwater 0.4%
TOTAL WATERGroundwater
30.1%
Surfacewater
0.4%
Glaciers
69.5%
FRESHWATER
8/7/2019 Green Building Building Work Shop Presentation
34/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WATER USAGE
Only 20 per cent of the water is used for drinking, cooking;
Over 60 per cent is used for bathing, washing and flushingdown the toilet. Important that our water toilets are still 10-12 litres per each pull of the chain.
Literally, water down the drain
...80% potable water ends up as waste-water
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
IN COMMERCIAL BUILDINGSq Major Water consumers are
n Plumbing (Flow / Flush Fixtures)
n HVAC
n Landscaping
q Thus efficient use of water can lower water use fees, lowersewage volumes to treat etc. and thus lower capacitycharges and limits
q Technologies are available to treat gray water, harvest rain
water and use treated water for landscaping / flushing etc.
q Potential to reduce water consumption upto 30%
8/7/2019 Green Building Building Work Shop Presentation
35/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
Water Use Reduction
Innovative Wastewater Technologies
Water Efficiency in Air-Conditioning System
Water Efficient Landscaping
Title
Total 6
1-2Credit 4
1Credit 3
1Credit 2
1-2Credit 1
Point(s)Credit
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 1 : Water Efficient LandscapingWE Credit 1 : Water Efficient LandscapingCredit 1.1: 50% ReductionCredit 1.1: 50% ReductionIntent
v Limit or eliminate the use of potable
water for landscape irrigation
Requirementsv Demonstrate 50% reduction in potable water
consumption for irrigation
Strategiesv Adopt native irrigation
v Use of recycled wastewater (STP)
v Use of captured rainwater (RainwaterHarvesting)
v High Efficient Irrigation systemSprinkler : 0.63
Drip : 0.90
8/7/2019 Green Building Building Work Shop Presentation
36/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 1.2: No Potable Water Use or No IrrigationCredit 1.2: No Potable Water Use or No IrrigationIntentv Eliminate the use of potable
water for landscape irrigation
Requirements
v Use Rain or recycled water to
eliminate 100% potable water use
for site irrigation
OR
v Install Landscaping that does not
require permanent irrigation system
Temporary irrigation is allowed for one year
WE Credit 1 : Water Efficient LandscapingWE Credit 1 : Water Efficient Landscaping
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 2 :WE Credit 2 :
Water Efficiency in AirWater Efficiency in Air--Conditioning SystemConditioning System
50% Reduce50% ReduceIntent
v Limit or eliminate the use of
potable water for Air-
conditioning make-up
Requirements
v Use Rain or recycled water to
reduce the potable water use
for air-conditioning by 50%
8/7/2019 Green Building Building Work Shop Presentation
37/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 3 : Innovative Wastewater TechnologiesWE Credit 3 : Innovative Wastewater Technologies
Intentv Reduce generation of wastewater and
potable water demand while increasing
the local aquifer recharge
Requirements
v Reduce potable water use for building
sewage conveying by 50% by use
of non potable water
(OR)
v Treat 100% waste water onsite
to tertiary standards. Treated water
must be infiltrated or used on-site
(Water Balance)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
RAIN WATER HARVESTING
8/7/2019 Green Building Building Work Shop Presentation
38/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
RAIN WATER HARVESTING
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use Reduction
Credit 4.1: 20% ReductionCredit 4.1: 20% Reduction
Intent
v Maximize water efficiency within buildings
by installing water efficient plumbing fixtures
v Will result in reduction of waste water
generation also
Requirements
v Employ strategies that in aggregate use
20% less water than the baseline
calculated for the building (not including
irrigation)
8/7/2019 Green Building Building Work Shop Presentation
39/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use Reduction
Reduction Strategies
v Select efficient water fixtures
v The baseline flow requirements to beat are as follows:
2.5
2.5
1.0
1.6
Flow Requirement
Base Case
Faucets (GPF)*
Showerheads (GPM)*
Urinals (GPF)
Water Closets (GPF)
Fixture
* At flowing water pressure of 80 pounds per square inch (psi)
2.0
2.0
0.8
1.3
20% less than
Base Case
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
WE Credit 4 : Water Use ReductionWE Credit 4 : Water Use ReductionCredit 4.2: 30% ReductionCredit 4.2: 30% Reduction
Intent
vMaximize water efficiency within
buildings by installing water
efficient plumbing fixtures
Requirements
vEmploy strategies to minimizewater consumption by 30% vis--
vis the baseline (Sample Sheet)
8/7/2019 Green Building Building Work Shop Presentation
40/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Every drop countsEvery drop counts
8/7/2019 Green Building Building Work Shop Presentation
41/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy EfficiencyEnergy Efficiency
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
Green Power
Measurement & Verification
Ozone Depletion
Additional Commissioning
Onsite Renewable Energy
Optimize Energy Performance
Fundamental Refrigerant Management
Minimum Energy Performance
Fundamental Building System Commissioning
Title
Total 17
1Credit 6
1Credit 5
1Credit 4
1Credit 3
1-3Credit 2
1-10Credit 1
RequiredPre-req 3
RequiredPre-req 2
RequiredPre-req 1
Point(s)Credit
8/7/2019 Green Building Building Work Shop Presentation
42/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Prerequisite 1:Prerequisite 1:
Fundamental CommissioningFundamental Commissioning
Intent
v Verify and ensure that fundamental building elements andsystems are designed, installed and calibrated to operate asintended
Requirementsv Engage Commissioning Team,
Can be from project team but not responsible for design
v Develop and implement commissioning plan
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
qWHY COMMISSIONING?
v Commissioning is a quality based method
v It is owners means of verifying that the planning, design,
construction and operational processes are achieving their
goals
v It ensures delivery of high quality building with maximum
asset value
Prerequisite 1:Prerequisite 1:
Fundamental CommissioningFundamental Commissioning
8/7/2019 Green Building Building Work Shop Presentation
43/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
q A commissioned building provides
v Optimized energy efficiency
v Indoor Air Quality
v Occupants comfort
v And thus sets stage for minimal operation and
maintenance cost
Prerequisite 1:Prerequisite 1:
Fundamental CommissioningFundamental Commissioning
Properly executed commissioning process often increases
energy efficiency by 5% - 10%
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
q LEED focuses on systems and assemblies having to do with
projects operational performance particularly those related
to LEED pre-requisites and credits
q HVAC and their associated system
q Building Management System
q Lighting systems
q Renewable and alternative energy technologies
q Rain water harvesting systems
q Water treatment systems
Prerequisite 1:Prerequisite 1:
Fundamental CommissioningFundamental Commissioning
8/7/2019 Green Building Building Work Shop Presentation
44/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
COMMISSIONING HVAC
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
COMMISSIONING HVAC
8/7/2019 Green Building Building Work Shop Presentation
45/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
COMMISSIONING
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance
Intent
v Establish the minimum level of Energy efficiency for the
proposed building and systems
Requirements
v Design to meet standards
ASHRAE/IESNA 90.1-2004
Submittals
v Energy cost budget compliance report
Visual DOE or any other appropriate simulation software
8/7/2019 Green Building Building Work Shop Presentation
46/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
n Project design needs to comply withMandatory Provisions & Prescriptive Requirement of ASHRAE
Std - 90.1, 2004
Section 5 Building Envelope
Section 6 HVAC
Section 7 Service water heating
Section 8 Power distribution
Section 9 Lighting
Section 10 Other equipments
EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
q Two methods to comply to this pre-requisite
q Performance rating (Whole building Simulation ASHRAE
90.1, Appendix G)
q Energy Cost Budget (ASHRAE 90.1, Section 11)
EA Prerequisite 2: Minimum Energy PerformanceEA Prerequisite 2: Minimum Energy Performance
8/7/2019 Green Building Building Work Shop Presentation
47/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Prerequisite 3:EA Prerequisite 3:
CFC Reduction In HVAC&R EquipmentCFC Reduction In HVAC&R Equipment
Intent
v Reduce Ozone Depletion
Requirements
v Zero use of CFC-based refrigerants in new base building
HVAC&R systems
Submittals
v Provide a LEED Template, signed by a Licensed professional
Engineer, declaring that the Buildings HVAC&R systems donot use CFC based refrigerants
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Prerequisite 3:EA Prerequisite 3:CFC Reduction In HVAC&R EquipmentCFC Reduction In HVAC&R Equipment
8/7/2019 Green Building Building Work Shop Presentation
48/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Credit 1: Optimize Energy PerformanceEA Credit 1: Optimize Energy Performance
Intentv Achieve higher levels of energy efficiency
vis--vis base lines
RequirementsvWhole Building Simulation (1-10 Points)
Demonstrate a percentage improvement
in the proposed building performance
rating compared to baseline building
performance as per ASHRAE/IESNA
90.1-2004
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
1042
835
628
421
214
PointsReduction in design
energy cost (%)*
EA Credit 1: Optimize Energy PerformanceEA Credit 1: Optimize Energy Performance
Distribution of points for this credit are as follows
The percentage improvement over base building can be
demonstrated by energy simulation using Building
performance method as per Appendix G ASHRAE 90.1, 2004
8/7/2019 Green Building Building Work Shop Presentation
49/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy ModelingEnergy Modeling
v Developing a 3D Model of theproject
v Developing Base Case Model for the
project as per the requirements of
ASHRAE 90.1-2004 standard.
v Developing the Proposed Case
model and comparing against the
Base Case.
v Identifying and developing Energy
Conservation Measures (ECM)
v Combining ECM's for Maximum and
optimum Energy savings
(Sample Report)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
Over Deck Insulation
8/7/2019 Green Building Building Work Shop Presentation
50/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
Over Deck Insulation
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
Wall Insulation
8/7/2019 Green Building Building Work Shop Presentation
51/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
GLAZING
Energy Conservation MeasuresEnergy Conservation Measures
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
DOUBLE GLAZEDARGON FILLED
DOUBLE GLAZED
TRIPLE GLAZED
8/7/2019 Green Building Building Work Shop Presentation
52/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
Demand Controlled Ventilation
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy Conservation MeasuresEnergy Conservation Measures
VFDS for AHUs
Occupancy & Lux level sensors
8/7/2019 Green Building Building Work Shop Presentation
53/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Credit 2: Renewable EnergyEA Credit 2: Renewable Energy
Intentv Encourage higher levels of onsite renewable energy in order
to reduce the environmental impacts associated with fossil
fuel energy use
Requirement
vDemonstrate that atleast 2.5% of Building annual energy cost
will be derived from on-site Renewable energy.
1) 2.5 % - 1 Point
2) 5.0% - 2 Point
3) 7.5% - 3 Point
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Renewable Energy (Examples)Renewable Energy (Examples)
SOLAR ENERGY
WIND ENERGY
8/7/2019 Green Building Building Work Shop Presentation
54/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Renewable EnergyRenewable Energy
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Renewable Energy (BIOMASS)Renewable Energy (BIOMASS)
8/7/2019 Green Building Building Work Shop Presentation
55/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Credit 3: Additional CommissioningEA Credit 3: Additional Commissioning
Intentv Verify & ensure that the entire building is designed, constructed and
calibrated to operate as intended
Requirement
v Review of
Design prior to construction
Installation documents before completion
Contract submittals
v Develop re-commissioning management manual
v Post occupancy review for 10 months
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Credit 4: Ozone DepletionEA Credit 4: Ozone Depletion
Intent
v Reduce ozone depletion and support early compliance with
the Montreal Protocol
Requirement
v Install HVAC&R equipments and fire suppression systems thatdo not contain HCFCs & halons
Submittals
vManufactures datasheet stating that the refrigerants used in
the equipments are not HCFC or halons
8/7/2019 Green Building Building Work Shop Presentation
56/106
8/7/2019 Green Building Building Work Shop Presentation
57/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
v Provide Metering for the following End -Use Lighting Systems and Controls
Constant and Variable Motor Loads
Variable Frequency Drive operation
Chiller Efficiency at variable loads (KW/ton)
Cooling Load
Air and Water economizer and heat recovery cycles
Air Distribution static pressures and ventilation air volumes
Building related process energy systems and equipment
Indoor Water Risers and outdoor irrigation systems
EA Credit 5: Measurement & VerificationEA Credit 5: Measurement & Verification
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EA Credit 6: Green PowerEA Credit 6: Green Power
Intentv Encourage investments in off-site
renewable energy technologies
to be exported to grid
Requirementv Invest in off-site Green power
anywhere in the country
To meet 50% Energy requirement
v Investment must be because of
the rated building GREEN POWERso generated can be counted only
once
8/7/2019 Green Building Building Work Shop Presentation
58/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
8/7/2019 Green Building Building Work Shop Presentation
59/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Materials & ResourcesMaterials & Resources
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
Certified Wood
Rapidly Renewable Materials
Regional Materials
Recycled Content
Resource Reuse
Construction Waste Management
Building Reuse
Storage & Collection of Recyclables
Title
Total 13
1Credit 7
1Credit 6
1-2Credit 5
1-2Credit 4
1-2Credit 3
1-2Credit 2
1-3Credit 1
RequiredPrereq 1
Point(s)Credit
8/7/2019 Green Building Building Work Shop Presentation
60/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Prerequisite 1MR Prerequisite 1
Intent
v Facilitate reduction of the waste
generated by building occupants
v Prevent waste being disposed in
landfills
Requirements
v Provide easily accessible area that
is dedicated for collection, separation
and storage of the materials
Minimum - paper, cardboard, glass, plastics & metals
Storage & Collection of Recyclables
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Recycling Area Guidelines
What we need to do?
v Have dedicated place for recycling
v Recycling program
v Identification for recycling
v Tracking & Awareness program for building occupants
Storage & Collection of RecyclablesStorage & Collection of Recyclables
500200,001 or more
275100,001 to 200,000
22550,001 to 100,000
17515,001 to 50,000
Recycling Area Sq.ftBuilding Sq.ft
8/7/2019 Green Building Building Work Shop Presentation
61/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 1 : Building ReuseMR Credit 1 : Building Reuse
Intentv Extend the life cycle of existing building
material
v To reduce the waste, conserve resources,
limit or eliminate the impact due
to materials extraction,
manufacturing & transport
Requirements
v Maintain or Reuse large portions of
existing structures and shell during
renovation or redevelopment projects
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 1 : Building ReuseMR Credit 1 : Building ReuseHow many points are at stake?Credit 1.1: Maintain 75% of Existing building structure & shell
Credit 1.2: Maintain 100% of Existing building structure & shell
Credit 1.3: Maintain 100% of Existing building structure & shell
AND 50% non-shell structure
What includes in structure & shell?
v Shell- Exterior Walls, Framing, Roof
v Structure- Foundation, Slab, Beam, Floor deck,
Roof deck, Basement Wallv Non - Shell
- Interior Walls, False ceiling, doors,
Windows, wood flooring
8/7/2019 Green Building Building Work Shop Presentation
62/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management
Intentv Avoid construction, demolition and land
clearing debris from reaching landfills
v Redirect recycled waste back to
manufacturing process
v Redirect reusable materials to own or
other appropriate sites
How many points are at stake?
Credit 2.1: Reduce and/or salvage atleast 50% (WT./VOL) of construction,
demolition and land clearing wasteCredit 2.2: Reduce and/or salvage atleast 75% (WT./VOL) of construction,
demolition and land clearing waste
More than 95% would earn one innovation point
8/7/2019 Green Building Building Work Shop Presentation
63/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management
Typical Examples
v Waste Concrete
v Broken bricks
v Scrap Steel
v Broken Glass
v Cement Bags
v Aluminum
v ACC blocks
v Packaging material (NEG-Micon)
Rocks and sand removed from site
are not considered for calculation
Commercial constructions generateabout 1 kg of solid waste / sq.ft.
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 2: Construction Waste ManagementMR Credit 2: Construction Waste Management
Strategies to Earn points
v Minimize the generation of waste
v System of Weighing & Disposal
v Develop a plan at the design stage
to identify waste and its salvaging
opportunity
v At construction site
- Designate the area for waste
collection
- Train site workers for proper disposal
Reuse / Sale / Donation accepted
Cement/Concretewaste
Wooden waste
Barricade for designating thewaste collection area
8/7/2019 Green Building Building Work Shop Presentation
64/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse
Intent
v Reuse building materials in order to reduce the demand for virgin materials
and to reduce waste
Green Building Concern
v Reduce the waste generated
v Reduce the landfill space
v Less Air & Water Contamination
v Reduce impact on environment
in producing virgin materials
v Support the local economy
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse
How many points are at stake?Credit 3.1: 5% of building materials (by Cost)
Credit 3.2: 10% of building materials (by Cost)
Requirementsv Use salvaged or refurbished
materials for 5-10%
Examples
- Broken tiles (China Mosaic)
- Used carpets
- In-built furniture (Movable furniture
like chairs, etc not accounted)
- Broken bricks (from other sites) for
construction of retaining walls- Floor panels
- Decorative items
Reprocessing is allowed
8/7/2019 Green Building Building Work Shop Presentation
65/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 3: Resource ReuseMR Credit 3: Resource Reuse
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 4: Recycled ContentMR Credit 4: Recycled Content
Intent
v Increase the use of materials that
incorporate recycled content, therefore
reducing the demand for virgin materials
- Post consumer / Post industrial
How many points are at stake?Use materials that constitutes at least
Credit 4.1: 5% of total value of building
material cost
Credit 4.2: 10% of total value of building
material cost
8/7/2019 Green Building Building Work Shop Presentation
66/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 4: Recycled ContentMR Credit 4: Recycled Content
Post-Consumer / Post-Industrialv Post Consumer (PC)
v Waste material available after
consumer use
- Paper, Tetrapack, Glass etc
v Post Industrial (PI)
v Waste material generated during
manufacturing
- Fly ash, Gypsum, etc
v Recycled Content can be calculated as follows:
PC recycled value + PI recycled value 5-10%
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 4: Recycled ContentMR Credit 4: Recycled Content
Typical Materials with High Recycled Content
25-30False roof
20-25Steel
15MDF wood
20-30Ceramic Tiles
10-15Glass
30-40Fly ash blocks
% Recycled contentMaterials
8/7/2019 Green Building Building Work Shop Presentation
67/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 5: Regional MaterialsMR Credit 5: Regional Materials
Credit 5.1: Use 20% (by value) of building materials that aremanufactured Regionally within a radius of 800km
Credit 5.2: Of the above materials, 50% of materials that areextracted, harvested or recovered within same distance
Intent
v Increase the use & demand of materials that are manufactured (Locally)
v Encourage Local economy
v Reduce the environmental impacts due to transportation
Manufacturing refers to: Final place of assembly into furnished product
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 6: Rapidly Renewable materialsMR Credit 6: Rapidly Renewable materials
Intent
v Reduce the use and depletion of finite
raw materials (5% by cost)
v Encourage the use of rapidly
renewable materials
Rapidly renewable materials are those
materials that are planted and replenished
In less than 10 year cycle
Requirement
v Reduce the use and depletion of finite
raw materials
8/7/2019 Green Building Building Work Shop Presentation
68/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 6: Rapidly Renewable materialsMR Credit 6: Rapidly Renewable materials
Examplesv Bamboo products
v False ceiling
v Cellulose fiber and cotton
v Composite wood (bagasse based)
v Eco Board
v Vertical Blinds made of woven
cotton
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 7: Certified WoodMR Credit 7: Certified Wood
Intent
v Encourage environmentally responsible
forest management
v Reduce the impact on forestry like
Deforestation, loss of wildlife habitat
Requirement
v Use a minimum of 50% of wood-based
materials and products, - FSC certified
(virgin wood)
8/7/2019 Green Building Building Work Shop Presentation
69/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MR Credit 7: Certified WoodMR Credit 7: Certified Wood
What is FSC?v The Forest Stewardship Council (FSC) is an independent, not for profit,
non-government organization based in Bonn, Germany
v So far, 48 million hectares in more than 60 countries have been certified
v FSC operates in more than 34 countries
v FSC accredited certification body certifies
the forest
v Provides Chain of custody certification
v Raw materials to Consumers
Master Material Sheet
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
THANK YOU
8/7/2019 Green Building Building Work Shop Presentation
70/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Indoor Environmental QualityIndoor Environmental Quality
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
Total 15
Daylighting and views
Thermal comfort
Controllability of systems
Indoor chemical & pollutant source control
Low-emitting materials
Construction IAQ management plan
Increased ventilation
Outdoor Air Delivery Monitoring
Environmental Tobacco Smoke Control
Minimum IAQ performance
Title
1-2Credit 8
1-2Credit 7
1-2Credit 6
1Credit 5
1-4Credit 4
1-2Credit 3
1Credit 2
1Credit 1
RequiredPrereq 2
RequiredPrereq 1
Point(s)Credit
8/7/2019 Green Building Building Work Shop Presentation
71/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Prerequisite 1:EQ Prerequisite 1:
Intent
v Prevent indoor air quality problems
v Enhance indoor air quality
Comfort
Well-being of the occupants
Requirement
v To design based on ASHRAE 62.1-2004
v Location of Fresh Air intakes
25 away from any possible contamination areas
v Minimize growth & dissemination of micro-organisms
Minimum IAQ PerformanceMinimum IAQ Performance
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Minimum IAQ PerformanceMinimum IAQ PerformanceVentilation systems for Acceptable IAQ
(Design based on ASHRAE 62.1-2004)
vMechanically Ventilated System
Sections 4 through 7 of ASHRAE 62.1-2004
Specifies minimum ventilation rates & IAQ levels
v Location of Fresh Air Intakes should be away from contaminantsources like
Building Exhaust Fans
Sanitary Vents
Standing Water
Outside Smoking rooms
Cooling Towers
Vehicular Exhaust
8/7/2019 Green Building Building Work Shop Presentation
72/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Examples of Typical Fresh Air Requirements
Calculation of amount of Fresh Air Intake (sample sheet)
Mall Common areas
Retail Sales
Warehouses
Pharmacy (Preparation
areas)
Office space
Area
0.06
0.12
0.06
0.18
0.06
cfm per sq.ft
7.5
7.5
-
5
5
cfm per person
Minimum Fresh Air required for each space= (Occupancy x cfm per person) + (Area x cfm per sq.ft)
Minimum IAQ PerformanceMinimum IAQ Performance
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Minimum IAQ PerformanceMinimum IAQ Performance
v Naturally Ventilated System
Comply Paragraph 5.1 of ASHRAE 62.1-2004
Specifies minimum ventilation rates & IAQ levels
v Location & Size of Openings
Spaces permanently open to operable
wall or roof opening within a distance
of 8m and area not less than 4%
of floor area
Interior spaces without direct openings
& ventilated thro adjoining rooms
q Opening between the rooms-permanently obstructed
q Area NOT less than 8% of the room area and NOT less than 25 sqft
8/7/2019 Green Building Building Work Shop Presentation
73/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Prerequisite 2: EnvironmentalEQ Prerequisite 2: Environmental
Intent
v Prevent exposure of building occupants to Environmental
Tobacco Smoke (ETS)
Requirement
v Zero Exposure of non-smokers to
Environmental tobacco smoke
v Restaurants, Pubs, Open Offices,
Cabins cannot be declared as
Smoking Areas
Tobacco Smoke (ETS) ControlTobacco Smoke (ETS) Control
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Option 1:
v Declare the building as NO SMOKINGbuilding
OR
Option 2:
v Provide designated smoking areas
Provide deck-to-deck partition
Operate exhaust sufficient to create a negative pressure of atleast an
average of 5 Pa (0.02WC)
Test leakages in smoking rooms
v Locate exterior designed smoking area atleast 25 ft away
from entries, fresh air intake, operable windows
Environmental Tobacco Smoke (ETS) ControlEnvironmental Tobacco Smoke (ETS) Control
8/7/2019 Green Building Building Work Shop Presentation
74/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 1: Outdoor Air Delivery MonitoringEQ Credit 1: Outdoor Air Delivery Monitoring
Intentv Provide ventilation system monitoring to help sustain long-term occupant
health and comfort and well being
v Sick Building Syndrome (SBS)
Requirementv Install permanent CO2 monitoring
systems that provide feedback to ensure
that minimum design ventilation
requirements are maintained
v Configure the monitoring system to
generate an alarm when the conditions vary by 10% or more from set point
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
CO2 MonitoringCO2 Monitoringv For Mechanically Ventilated System
Monitor CO2 concentrations within alldensely occupied spaces
q CO2 locations between 3 and 6above the floor
Non-densely occupied spaces
q Install CO2 monitoring sensors (inAHUs) and outdoor airflowmeasurement device
q Minimum air flow should be as perASHRAE 62.1-2004
v For Naturally Ventilated System Monitor CO2 concentrations within all
naturally ventilated spaces
q CO2 locations between 3 and 6above the floor
q One CO2 sensor for multiple spaces
8/7/2019 Green Building Building Work Shop Presentation
75/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
CO2 and VentilationCO2 and Ventilation
Inside/ outside differential = 1000 ppm Inside/ outside differential = 530 ppm
equal to : 10 cfm/ person equal to : 25 cfm / person
Not more than 530 ppm (differential) w.r.t outside
Case #1 Case #2Poor Ventilat ion Good Ventilat ion
Outside CO2400 ppm
930 ppm
Outside CO2400 ppm
1400ppm
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 2: Increased VentilationEQ Credit 2: Increased VentilationIntent
v Provide additional outdoor air ventilation system to improve indoor
air quality for improved occupant comfort
Requirementv Increase air ventilation rates to all occupied spaces by at least 30%
above the minimum rate required by ASHRAE 62.1-2004
8/7/2019 Green Building Building Work Shop Presentation
76/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Increased VentilationIncreased Ventilation
Calculation of amount of Fresh Air Intake
Requirement: 30% more than the above
Mall Common areas
Retail Sales
Warehouses
Pharmacy (Preparation
areas)
Office space
Area
0.06
0.12
0.06
0.18
0.06
cfm per sq.ft
7.5
7.5
-
5
5
cfm per person
Minimum Fresh Air required for each space
= (Occupancy x cfm per person) + (Area x cfm per sq.ft)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 3:EQ Credit 3:Construction IAQ Management PlanConstruction IAQ Management Plan
Credit 3.1: During Construction
Intent
vAddress IAQ problems during
construction / renovation to
help sustain comfort &
well-being of construction
workers & building occupants
8/7/2019 Green Building Building Work Shop Presentation
77/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Construction IAQ during constructionConstruction IAQ during construction
Requirementv Minimum IAQ to meet control
measures of the Sheet Metal & Air
Conditioning Contractors national
Association (SMACNA) IAQ guidelines
v Protect materials from moisture
damage
Stored & installed materials
v If AHU used during construction,
then use filtration media with a
minimum MERV 8
Replace before occupancy,with MERV 8
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 3:EQ Credit 3:Construction IAQ Management PlanConstruction IAQ Management Plan
Credit 3.2: Before Occupancy
Intent
vAddress IAQ problems before occupancy
Requirement
v After construction ends and prior to occupancy conduct a minimum two-
week building flush-out with new Minimum Efficiency Reporting Value
(MERV) 8 filtration media at 100% outside air.
v After flush-out, new filter with a minimum MERV 8 value, must replace allfilters except those solely processing outside air.
v For Projects attempting IEQ Credit 5, these filters must be MERV 13 or
better.
8/7/2019 Green Building Building Work Shop Presentation
78/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 4: LowEQ Credit 4: Low--Emitting MaterialsEmitting Materials
Intentv Reduce the use of materials that are
Odorous
Potentially irritating
VOC materials
High VOCs (Volatile Organic Compounds) content materials cause illness and
decrease occupant productivity
How many points are at stake?
Use materials that contain low VOC materials
Credit 4.1: Adhesive & Sealants
Credit 4.2: Paints
Credit 4.3: CarpetsCredit 4.4: Composite Wood & Agrifiber products
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 4: LowEQ Credit 4: Low--Emitting MaterialsEmitting Materials
8/7/2019 Green Building Building Work Shop Presentation
79/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants
50Dry Wall and Panel Adhesives
100Structural Glazing Adhesives
70Multipurpose Construction Adhesives
50VCT and Asphalt Tile Adhesives
65Ceramic Tile Adhesives
60Rubber Floor Adhesives
100Wood Flooring Adhesive
50Carpet Pad Adhesives
50Indoor Carpet Adhesives
Current VOC Limit (g/l)Applications
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants
8/7/2019 Green Building Building Work Shop Presentation
80/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.1: Adhesives & SealantsCredit 4.1: Adhesives & Sealants
420Other
450Single-Ply Roof Membrane
250Roadway
300Non-membrane Roof
250Architectural
Current VOC Limit (g/l)Sealants
750Other
250
775
Architectural
Non Porous
Porous
Current VOC Limit (g/l)Sealant Primers
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.2: Paints & CoatingsCredit 4.2: Paints & Coatings
250Anti corrosive/Anti rust
50Flat (Mat)
150Non-Flat
Current VOC Limit (g/l)Paints
250
275
200
Sealers
Water proofing sealer
Sanding sealer
Other sealer
250Stains
100Floor coatings
350
550
Clear Wood Finishes
Varnish
Lacquer
Current VOC Limit (g/l)Coatings
8/7/2019 Green Building Building Work Shop Presentation
81/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.2: Paints & CoatingsCredit 4.2: Paints & Coatings
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.3: CarpetsCredit 4.3: CarpetsRequirement
v Carpet systems must meet or exceed Carpet and Rug Institute
(CRI), Green Label Plus requirements
v Carpet adhesives VOC limit of 50 g/L
8/7/2019 Green Building Building Work Shop Presentation
82/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit 4.3:Credit 4.3:
Composite Wood & Agrifiber productsComposite Wood & Agrifiber products
Requirement
vMust not contain added
urea-formaldehyde resins
v Low VOC resins
Phenol-formaldehyde resins
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 5: Indoor Chemical & PollutantEQ Credit 5: Indoor Chemical & PollutantSource ControlSource Control
Intent
vAvoid exposure due to use of potentially hazardous
particulates & chemical pollutants
Requirement
v Permanent entryway systems of 6 ft long
Grills, grates or slotted systems
for all exterior entrances
Rollout mat if when maintained on
a weekly basis
v Trapping of dust
8/7/2019 Green Building Building Work Shop Presentation
83/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Indoor Chemical & Pollutant Source ControlIndoor Chemical & Pollutant Source Control
Requirementv Deck-to-deck partitions & Independent Ventilation for Chemical
Rooms/Copy Rooms with ventilation rate of 0.50 cfm/sq.ft.
v Provision of MERV 13 or better filtration media prior to occupancy MERV - Minimum Efficiency
reporting Value
The higher the MERV, the more
efficient the air filter is in
capturing particles
95% or MERV 14
Final filter in hospital HVAC systems
85% or MERV 13
Above average commercial applications
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Indoor Chemical & Pollutant Source ControlIndoor Chemical & Pollutant Source Control
8/7/2019 Green Building Building Work Shop Presentation
84/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 6: Controllability of SystemsEQ Credit 6: Controllability of Systems
Credit 6.1: Lighting ControlIntentv Provide a high level of Comfort controls system
control by individual occupants or specific
groups in multi-occupant spaces
Requirementv Provide individual lighting controls for
minimum 90% of the building occupants
Strategiesv Provide adjustable task lighting
Permanently attached fixture
v For Shared multi-occupants Spaces
(Conference room), provide controlsto suit their activities
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 6: Controllability of SystemsEQ Credit 6: Controllability of Systems
Credit 6.2: Thermal Control
Intent
v Provide a high level of Comfort controls
system control by individual occupants or
specific groups in multi-occupant spaces
Requirement
v Provide individual comfort controls
for minimum 50% of the building
occupantsv For Shared multi-occupants spaces
(Conference room), provide controls to
meet the group needs & preferences
8/7/2019 Green Building Building Work Shop Presentation
85/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Controllability of SystemsControllability of Systems
Operable Window
v Operable Windows in lieu of comfort control for occupant areas that are 20
ft inside and 10 ft to either side of operable part of the window
Operable window
20 ft
10 ft
10 ft
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Regularly / NonRegularly / Non
--regularly Occupied areasregularly Occupied areas
Regularly Occupied Areas
n Areas / Spaces where the employees work, either seated or standing
n Even if occupied for one day in a year
n Eg. Conference Hall, Training Hall, Cafeteria, Classrooms etc
Non-Regularly Occupied Areas
n Eg. Corridors, Walkways, Lobbies, Storage rooms, Kitchen, restrooms,
Stairwells etc
8/7/2019 Green Building Building Work Shop Presentation
86/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 7: Thermal ComfortEQ Credit 7: Thermal Comfort
Credit 7.1: DesignIntentv Provide a comfort thermal environment that
supports the productivity and well-beingof building occupants
Requirement
v Design the HVAC systems and thebuilding envelope to meet the requirementsof ASHRAE standard 55-2004
v Thermal Comfort to be met throughoutthe year
v Air temperature , air speed & humidityto be met
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Thermal Comfort: DesignThermal Comfort: Design
Requirement
v Permanent Temperature and Humidity monitoring system
v Thermally comfortable environment
Comply with ASHRAE standard 55 2004, including humidity control
Temperature 24 +/- 2
v RH should be maintained between 50-60%
Humidification and De-humidification systems to maintain RH
8/7/2019 Green Building Building Work Shop Presentation
87/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 7: Thermal ComfortEQ Credit 7: Thermal Comfort
Credit 7.2: VerificationIntent
v Provide assessment of the building thermal comfort over a
period of time
Requirement
v Survey
Monitor the thermal performance of the building within a period
of 6 to 18 months after occupancy
Install a permanent temperature & humidity monitoring system
vCorrective plan if more than 20% of occupants dissatisfied Plan in accordance with ASHRAE 55-2004 (sample Sheet)
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
EQ Credit 8: DaylightEQ Credit 8: DaylightCredit 8.1: Daylight 75% of spaces
Intent
vDaylight in regularly occupied areasof the building
Requirement
vAchieve a minimum daylight
factor of 2% (excluding all
direct sunlight penetration)
in 75% of all spaces occupiedfor critical visual spaces
(Sample Sheet)
8/7/2019 Green Building Building Work Shop Presentation
88/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
DaylightDaylight
Calculation:
Win Area x Win Geometry Factor x Actual T vis x Win Height Factor
Floor Area Min T vis
Spaces excluded:
Copy rooms
Storage rooms
Mechanical plants
Laundry
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Daylight design criteriaDaylight design criteria
8/7/2019 Green Building Building Work Shop Presentation
89/106
8/7/2019 Green Building Building Work Shop Presentation
90/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
THANK YOU
8/7/2019 Green Building Building Work Shop Presentation
91/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
Innovation & DesignInnovation & Design
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Credit SummaryCredit Summary
LEED Accredited Professional
LEED Innovation Credits
Title
Total 5
1Credit 2
1-4Credit 1
Point(s)Credit
8/7/2019 Green Building Building Work Shop Presentation
92/106
8/7/2019 Green Building Building Work Shop Presentation
93/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
THANK YOU
8/7/2019 Green Building Building Work Shop Presentation
94/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Presented byPresented by
Godrej & Boyce Mfg Co LtdGodrej & Boyce Mfg Co Ltd
Case StudyCase Study
CIICII--GBCGBC
Centre of Excellence for Energy, Environment, Green Buildings, Renewable energy,
Water & Climate change activities in India.
CII Sohrabji Godrej Green Business Centre,
HyderabadA unique Public Private Partnership
( CII, Govt of Andhra Pradesh, USAID and Pirojsha Godrej Foundation )
8/7/2019 Green Building Building Work Shop Presentation
95/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
CIICII--SohrabjiSohrabji Godrej Green Business Centre,Godrej Green Business Centre,
HyderabadHyderabad
v First Green Building in India
First Platinum rated building
outside US
First Platinum building in the
World under version LEED 2.0
(other 2 buildings are under
version LEED 1.0)
CII Godrej GBC building has achieved 56
points out of 59 points attempted
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
CIICII
--Godrej GBC BuildingGodrej GBC Building
vDemonstration of
Practicing what we preach
Green buildings are
possible & viable
India can reach global
environmental standards
Indian construction
industry can reach global
standards
8/7/2019 Green Building Building Work Shop Presentation
96/106
8/7/2019 Green Building Building Work Shop Presentation
97/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Sustainable SitesSustainable Sites
v Roof Garden To reduce heat ingress
into the building
2 inch deep plastic trays
filled with earth
Conventional terrace garden
6-12 inch deep soil
Load on the structure
reduced tremendously
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Sustainable SitesSustainable Sites
v One Electric Car
v Two Charging station at site
v Cater to more than 5%
building occupants
8/7/2019 Green Building Building Work Shop Presentation
98/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building
2. Water Efficiency2. Water Efficiency
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Water EfficiencyWater Efficiencyv Zero water discharge
Recycling of 100 % grey water reuse for agriculture
v 35% reduction on potable water use
High efficient fittings
Installation of waterless urinals
v Rain water harvesting
Collection pond at site
8 Lacs litres capacity
8/7/2019 Green Building Building Work Shop Presentation
99/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Water EfficiencyWater Efficiency
vWaterless urinals
Cartridge with sealing liquid
Blue liquid
q 95% biodegradable
q Acts as a seal
q Density lower than urine
q Cuts of smell
v Tremendous saving in water
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Water EfficiencyWater Efficiencyv Irrigation Efficiency
Sprinklers 0.625
Drip- 0.90
vWastewater treatment system
v Root Zone Treatment
Biological mechanism
Treated water used for irrigation
Sprinklers
Drip
8/7/2019 Green Building Building Work Shop Presentation
100/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building
3. Energy Efficiency3. Energy Efficiency
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Energy EfficiencyEnergy Efficiency
v Overall reduction of 55% on total energy vis--vis ASHRAE
40 % on Air-conditioning load
88% on lighting energy
v High Efficient Chillers used
Water Cooled Scroll chiller
COP 4.23
HFC refrigerant R407 C
8/7/2019 Green Building Building Work Shop Presentation
101/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
vWind tower
Fresh air intake through
towers
Thermal mass
Water spray
Drop in air temperature
5 7C
v Results in 2 3 % reduction of air
conditioning load
Energy EfficiencyEnergy Efficiency
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
v In-Situ power generation
v 24 KW capacity
v Grid connected
Generates about 100-110 units/day
v Meets 20 % of total energy requirement of the building
Detail of PV Panels
PV array installedon south-west wall
Energy EfficiencyEnergy Efficiency
8/7/2019 Green Building Building Work Shop Presentation
102/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
v Reduction of 88% on lighting
energy
Maximum day lighting
Energy efficient light sources (CFLs)
Occupancy and dimmer controls
Day lightingDay lighting
v Fenestration maximized on
the north orientation to
Minimize heat gains from windows
Maximize day lighting
Day Light Sensors
Energy EfficiencyEnergy Efficiency
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
v Construction Materials enabling energy savings
Entire buildings with AAC block
q U value 0.65 W/Sq.m oK
vis--vis 1.9 for concrete
U-values of walls, roof and Glass
0.573.28Wall
0.2943.57Roof
1.76.91Double Glazed Glass
CII-Godrej GBC
(W/Sq.m o K )
ASHRAE 90.1 -2001
(W/Sq.m o K )
Type
Energy EfficiencyEnergy Efficiency
8/7/2019 Green Building Building Work Shop Presentation
103/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building
4. Materials & Resources4. Materials & Resources
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
MaterialsMaterialsConstruction Waste Management
v Recycling of construction waste debris (>50%)
Brick, masonry waste, concrete
q Filling up of Undulated site areas
Paint cans, Packaging material
q Recycling
Cement bags
q Reuse
8/7/2019 Green Building Building Work Shop Presentation
104/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
v Local Materials
More than 90% materials sourced within 500 miles from the site
v Recycled materials
80% of the building materials
v Rapidly renewable materials
10% of the total building construction cost
q Furniture of Ecoboard made of baggasse
q False ceiling of cellulose fiber and cotton
q Vertical Blinds of woven cotton
v Resource Reuse
>5% of the total cost
q Broken china mosaic pieces for pillarsq Salvaged furniture for cafeteria
MaterialsMaterials
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Features incorporated CIIFeatures incorporated CII--Godrej GBC BuildingGodrej GBC Building
5. Indoor Air Quality5. Indoor Air Quality
8/7/2019 Green Building Building Work Shop Presentation
105/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Indoor Air QualityIndoor Air Quality
v Declared entire site as Non Smoking areav 2 week building flush out carried out before occupancy
Replaced AHU filters with MERV (Minimum Efficiency Reporting Value)
of 13
CO2 monitoring
Installed CO2 sensors at
return air ducts and outside
building
CO2 sensor
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Low VOC content materials
v Carpets
CRI certified - Total VOC is less
than 0.50 mg/sq.m-hr
Carpet Adhesives total VOC less
than 10 mg/sq.mt-hr
v Paints
Non Flat
Flat
Type
10 g/l150 g/l
5 g/l50 g/l
GBCLEED
Requirement
Indoor Air QualityIndoor Air Quality
8/7/2019 Green Building Building Work Shop Presentation
106/106
GREEN BUILDING CONSULTANCY SERVICESGREEN BUILDING CONSULTANCY SERVICES
Daylight & Views
v Day lighting
More than 75 % of
permanently occupied
area
v Views
90% of permanently
occupied area
Indoor Air QualityIndoor Air Quality