25
GRAPHENE XT SPEED MP For optimum performance use: HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft) Rec. String Tension: 22-26 kg / 48-57 lbs Main Strings Start at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6. Cross Strings For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9. Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.

GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

Embed Size (px)

Citation preview

Page 1: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED MP

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.

Page 2: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED S

For optimum performance use: HEAD Lynx

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.

Page 3: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED PRO

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 18 Main (6,5 m / 21,5 ft) 20 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L34 + R34. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L34 + R34 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L7 + R7. Cross StringsFor the cross string measure 5,5m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L27 + R27. Tighten all 20 cross strings in direction of racquet throat. Tie off at hole L10 + R10.Please note that grommets L8+ R8, L9 + R9, L26 + R26, L27 + R27 share both main and cross strings.

Page 4: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED MP A 16/16

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use NEON 16/16 ASP insert

Main StringsStart at the top with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 as well as L25 + R25. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole L11 + R11.

Page 5: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED MP A 16/19

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use BLACK 16/19 ASP insert

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L6 + R6

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L31 + R31 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R11 + L11.

Page 6: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED REV PRO 16/16

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use NEON 16/16 ASP insert

Main StringsStart at the top with the center holes L32 + R32. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L32 + R32 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L25 + R25. Tie off at holes L26 + R26.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole R7 + L7.

Page 7: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED REV PRO 16/19

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use BLACK 16/19 ASP insert

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L35 + R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L30 + R30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7 + L7.

Page 8: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT SPEED LITE

For optimum performance use: HEAD Lynx

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) each at hole L35 + R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L7 + R7, L9 + R9 as well as L27 + R27, L29 + R29. Tie off at holes L28 + R28.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L30/R30 and lace string through hole L29 + R29. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R5 + L5.

Page 9: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE PRESTIGE PRO

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

Page 10: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE PRESTIGE REV PRO

For optimum performance use: HEAD Hawk

Total String Length: 11 m / 36,5 ft

String Pattern: 16 Main (6 m / 20 ft) 19 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

Page 11: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE PRESTIGE MP

For optimum performance use: HEAD Hawk

Total String Length: 11 m / 36,5 ft

String Pattern: 18 Main (6 m / 20 ft) 20 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs

Main StringsStart at the top with the center holes L38 + R38. For the left side of the main strings clamp 3m (10ft) at hole L38 + R38. Tighten 2 main strings right, two main strings left and so on, skipping holes L31 + R31, L29 + R29 as well as L9 + R9. Tie off at holes L7 + R7.

Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole R 33 and lace string through hole R31. Tighten all 20 cross strings in direction of racquet throat. Tie off at hole R12.

Page 12: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE PRESTIGE S

For optimum performance use: HEAD Sonic Pro

Total String Length: 11 m / 36,5 ft

String Pattern: 16 Main (6 m / 20 ft) 19 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

Page 13: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE PRESTIGE PWR

For optimum performance use: HEAD PWR Fusion

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs

Main StringsStart at the bottom with the centre holes L1 + R1. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L7 + R7 and L9 + R9. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18 ft) string. Tie on the cross strings at hole R28 + L28 and lace string through hole L26 + R26. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L4 + R4. Please note that grommets L10 + R10, L25 + R25, L26 + R26 share both main and cross strings.

Page 14: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE RADICAL PRO

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.

Page 15: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE RADICAL MP

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.

Page 16: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE RADICAL S

For optimum performance use: HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.

Page 17: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE RADICAL REV

For optimum performance use: HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.

Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.

Page 18: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT INSTINCT MP

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.

Page 19: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT INSTINCT S

For optimum performance use: HEAD Lynx

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.

Page 20: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT INSTINCT REV PRO 16/16

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use WHITE16/16 ASP Insert

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L25 + R25. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole L11 + R11.

Page 21: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT INSTINCT REV PRO 16/19

For optimum performance use: HEAD Gravity

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

NOTE: Use BLUE 16/19 ASP Insert

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L6+R6.

Cross Strings For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L31 + R31 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R11 + L11.

Page 22: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

GRAPHENE XT INSTINCT LITE

For optimum performance use: HEAD PWR Lynx

Total String Length: 12 m / 39,5 ft

Besaitungsbild: 16 Main (6,5 m/21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.

Page 23: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE EXTREME PRO

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.

Page 24: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE EXTREME MP

For optimum performance use: HEAD Hawk

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.

Page 25: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and

YOUTEKTM GRAPHENE EXTREME LITE

For optimum performance use: HEAD Hydrosorb Pro

Total String Length: 12 m / 39,5 ft

String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.

Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.