32
Page of 1 GQH-SPC Intelligent Power Distribution Unit Data Center Solution Instructions for Use Reference No.: Edition: A02

GQH-SPC Intelligent Power Distribution Unit Data Center ...donar.messe.de/exhibitor/hannovermesse/2017/J870853/gqh-spc... · Surge protection of ... Custody After purchasing, if the

Embed Size (px)

Citation preview

Page of 1

GQH-SPC Intelligent Power Distribution Unit

Data Center Solution

Instructions for Use

Reference No.:

Edition: A02

Page of 2

Table of Contents

I. Overview ............................................................................................................................. 3

II. Technological function and parameter information ..................................................................... 4

III. Installation Maintenance ................................................................................................................ 6

3.1 Installation procedure of product ......................................................................................... 6

3.2 Product use ............................................................................................................................... 7

3.3 Installation introduction ......................................................................................................... 7

IV. Attached technical data .................................................................................................................... 10

V. Packaging, transportation and safekeeping .................................................................................. 11

VI. After-sale service and ordering notice ...................................................................................... 11

Appendix 1 Monitoring System .............................................................................................. 12

Appendix 2 Operation Instruction of iTAC120 M Series Intelligent Adjustable Module ........ 19

Appendix 3 System Diagram ................................................................................................... 31

Page of 3

I. Overview

Intelligent module precision array cabinet low-voltage power distribution ( hereinafter

referred to SPC (Smart Power Center) is new generation of modularization power distribution

management system and mainly serves for IDC data room in finance, telecom, electric power

dispatch, government and IT industry as well as provides the refined power utilization

distribution and management for user’s important loading.

Product appearance

Touch screen

Input circuit breaker

Main power indicator

Precise power distribution

feeder components

Branch power indicator

Page of 4

II. Technological function and parameter information

Standard rated capacity 20~200kVA

mechanical

parameter

Overall dimension

(W×D×H)

600(800,1000)×1100(500,600,800,1000,

1200)×2000 (2200,2500)mm,customizable

Weight 160-250kg (without isolation transformer )

Electric

parameters

service voltage

AC50/60HZ,Three Phase 400V,Single Phase

230V Grade

DC 24VDC, 48VDC and 240VDC etc. multiple

grades

Input part Optional for single circuit and double circuit

Breaking capability of

input switch ≥25kA

output unit Optional for single pole and multipole (MCB

below 63A)

Breaking capability of

output ≥6kA

Surge protection of

electrical Optional (Imax=20kA,8/20µS)

Protection level IP20

Testing

parameters

Measureable parameters

on main circuit

Electric quantity of main circuit, loading

percentage, apparent power, active power, reactive

power, power factor, electrical degree, frequency,

zero-earth voltage and harmonic

Measureable parameters

on branch circuit

Electric quantity of branch circuit, loading

percentage, apparent power, active power, power

factor, electrical degree, frequency, harmonic and

switch status, temperature, opening and closing

frequency

Warning information on

the branch circuit

Input overvoltage/undervoltage, loss of power,

overloading, frequency ultralimit, lightning

protection on-off action, early warning for current

on each branch circuit, warning of branch circuit,

switch temperature and switch life.

Optional

components

one-to-one transformer Optional

Auxiliary contact for

branch circuit switch Switch location, auxiliary warning contact

Extension testing Temperature testing, humidity testing and smoke

sensing testing inside cabinet

Page of 5

Parameters

under

normal

working

environment

Temperature and

humidity

Temperature: -5℃~+40℃,humidity: 0-90% no

condensation

Elevation above sea level ≤2000m; while exceeding 2000m, use for derating

capacity

Others Non-dustiness Occasion free of intense vibration

and impact

Communication protocol RS485, RS232 Modbus, TCP/IP and SNMP etc.

Certifications 3C,CMA

Page of 6

III. Installation Maintenance

3.1 Installation procedure of product

Appearance inspection

1. Inspect the outer packing of cabinet. If the obvious collision and deformation trace is

found, remain the original status and timely notify the forwarding agent.

2. Open the cabinet packing and inspect the cabinet appearance. If the cabinet appearance is

found to be damaged, notify the forwarding agent and dealer, please!

3. Inspect whether the attached accessories are complete. If the accessories are found to

lack, immediately notify the dealer, notify the dealer, please!

Cabinet carrying and fixing

1. Carry the cabinet onto the site where the installation is ready to be conducted. In the

process of carrying, the forklift and other similar hoisting equipment must be employed,

the hoisting mode can’t be employed.

2. After the cabinet is positioned, fix the cabinet foot or fix the cabinet securely by the

screw. The cabinet weight is heavier, ensure that the cabinet has been safe and reliable.

Notice: the installation environment must meet the requirement of this manual; under

normal condition, over 800mm operating space should be reserved on the front and back

of cabinet. If the cabinet that can lean against the wall rearward is customized, reserve

the sufficient space on the corresponding side.

Cabinet wiring

1. Based on loading condition, select the electric cable with appropriate specification.

2. Before inspecting the wiring safely, the upper input switch required to be contacted in the

whole operation must be confirmed to have been disconnected already, the electric cable

and connecting conductor are electrically neutral uniformly. In the process of

installation, the necessary protective tools must be used correctly.

c.The input null line is connected onto corresponding copper bar conductor.

3. d.The input live wire is connected onto corresponding Phase A,Phase B and Phase C

input terminal for wiring.

a. Penetrate the input electric cable into cabinet. On the top and at the bottom of cabinet,

uniformly provide the incoming line hole, the use may select the upward incoming line

or downward incoming line mode based on actual requirement.

b. Connect the input ground wire onto the corresponding copper bar conductor.

c. Lead out the corresponding live wire, null wire and ground wire from terminal board as

Page of 7

well as connect onto the corresponding loading.

d. Employ the fixing bracket of electric cable to fix each electric cable. Generally, the

input electric cable and output electric cable should be routed respectively and fixed to

reduce the crosstalk between input and output.

e. Based on demand, connect the corresponding communication connecting wire.

3.2 Product use

Prior to putting into use, following inspection must be conducted for cabinet:

1. Confirm that the cabinet’s ground wire has been connected reliably.

2. The insulated resistance of measured cabinet should not be lower than 2MΩ. (Prior to

measuring, be sure to cut off relevant secondary circuit. Each output switch is on

disconnection status.)

3. After confirming to be free of error, power on the equipment according to steps as

follows.

Notice: prior to powering, the equipment must be confirmed by the engineer !

Powering step:

1. Switch on the main circuit.

2. After 1 minute, observe whether LCD displays normally.

3. LCD operation guider operates LCD and observes whether each parameter is normal.

4. According to demand, switch on the output switch of corresponding feeder and supply

the power towards loading.

3.3 Installation introduction

Prior to installation, properly design the loop number required by the system and

allocate the corresponding standard communication interface and installation baseplate.

There are two kinds of specification for standard communication interface and

installation baseplate uniformly:

Page of 8

1. 2# standard communication interface board

8-M6 Flare-in nut

Page of 9

1 2# standard installation baseplate

2 2# standard installation baseplate

8-M6 Flare-in nut

Page of 10

3.3.1 Internal Layout

Dimension of power distribution cabinet

(1200W*600D*2000H)

S/N Miniature circuit

breaker Loop number

1 1P 8

2 1P+MX 2

3 3P 4

4 3P+MX 34

IV. Attached technical data

• precise power distribution cabinet operation instruction

• Ex-factory test report

• Whole set of technical drawing

Page of 11

• Compliance Certificate

• Packing List

• Others

V. Packaging, transportation and safekeeping

Packing

Employ the dampproof and dust proof wholly-sealed packing case that can’t be damaged

mechanically.

Transportation

The fierce vibration, collision and inversion should not be allowed during product transit.

Custody

After purchasing, if the immediate use isn’t conducted, following points should be noticed

when the long-term or short-term safekeeping is required:

The equipment should be stored in the place with good ventilation to avoid high-temperature

and dusty environment with much metallic foam.

The rainproofing, waterproofing and sunshine-proofing measures should be taken in the

storage place.

VI. After-sale service and ordering notice

After sale service

When the product is damaged not to work normally due to poor manufacturing quality, this

company shall debug and repair free of charge. or replace the spare parts and guarantee for

one year, with lifetime maintenance, the maintenance demand shall be responded within two

hours; in the place where the aircraft is open to navigation, the maintenance demand shall be

responded within 24 hours. Rush onto site.

Ordering Information:

• Note the equipment service environment and purpose;

• Note the equipment name, model, specification, quantity and date of delivery as well

as relevant parameter requirement of system;

• Note the incoming line and branch circuit branch’s capacity and quantity, frequent

loading capacity and relevant requirements;

• Note the overall dimension and color of cabinet;

• When the user has the special service environment and other technical requirements

for equipment, the technicians from factory shall be invited to sign the technical

agreement through negotiation.

Page of 12

Appendix 1 Monitoring System

Monitoring Network Diagram

The precise power distribution cabinet covers two parts: hardware system and software

monitoring system. The hardware system mainly covers collection modules to monitor

power quality (including the current,voltage, etc), alarm output device, LCD touch screen,etc.

The monitoring system is composed by system monitoring software to implement the

all-around monitoring and record for power supply status, current detection/monitor on each

part, pre-alarm for voltage and current’s threshold valve and switch action warning

parameters,etc.

Main interface of Touch screen operation

Touch screen

Cable

Communication supervisor computer

Centralized

monitoring system on

the backstage

View remotely

A collection module of main circuit

Wed view remotely

Management server About Mobile Phones

RS485 busbar

Cable

RS485 busbar RS485 busbar

B collection module of main circuit

Feeder switch Feeder switch Feeder switch Feeder switch Switch 1 Switch 1 Switch 1 Switch 1

Switch n Switch n Switch n Switch n

Page of 13

Page of 14

Page of 15

Page of 16

Page of 17

Page of 18

Page of 19

Appendix 2 Operation Instruction of iTAC120 M Series Intelligent Adjustable Module

1. Scope of Application

iTAC120 M series intelligent Adjustable Modules are applicable to data center and other

power distribution systems in Telecom, IT companies, financial companies, schools,

buildings, cloud servers, etc.

2. Structure composition

Hot plugging

phase-adjustable

part

Outgoing line

part

Gathering

module

A/B/C/N

copper bar

Communication

and power

baseboard

Base

Page of 20

iTAC120M series intelligent adjustable modules are mainly composed by pluggable

phasing part of incoming line, outgoing line part and base.

Therein, the connection between incoming line part and incoming line of main power

source is provided with the live pluggable phasing function; except that the power source

is supplied to loading end on the outgoing line part, the built-in acquisition module can

also acquire various electricity parameters for feeder on this branch circuit and

implement the information interaction for communication baseplate of base and

backstage so as to realize the system’s remote management.

3. Main functions

Pluggable maintenance in live doesn’t affect other branch circuits’ power supply;

Easy phase selecting, three-phase loading for balanced system, onsite display for phase

sequence;

RS485 communication function;

Support OF and SD of auxiliary installation contact;;

Monitor the current, voltage, power, power factor, active and reactive power, power factor,

electrical degree, harmonic wave and switch temperature, etc;

The rated current of components is designed to meet the application demand of 63A rated

current rating and below;

All miniature circuit breakers at home and abroad as ABB, Schneider, Nader and Dem are

compatible, and can be flexibly assembled as required.

Page of 21

4. Model & Meaning & Technical Indexes

Technical Indexes

Model iTAC120M series

Number of poles 1, 2, 3 and 4 poles

Rated current (1-63A) depending on the rated current of selected miniature circuit breaker

Rated voltage

AC Single pole 230/400V

Multi-pole 400V

DC Single pole 110/220V

Temperature

range

Normal working environment Temperature:-5~+40℃; humidity: 0~90%, without condensation

Storage environment Temperature:-40~+70℃; humidity: 0~90%, without condensation

Output wiring range 0.75~25mm2

Tightening torque 3.5 Nm

Special use for modularized precise power

distribution miniature circuit breaker

120- Intelligent detection for temperature and

switch status

121- Monitor power quality excluding

harmonic

122- Monitor power quality including

harmonic

Page of 22

Communication mode RS 485

Dimension of single-P assembly

Width * depth * height

200*130*18 mm

Function List

Parameter name Symbol Unit Precision Measurement Range iTAC 120M iTAC 121M iTAC 122M

Single-phase voltage U V 0.2% 0~400 - ■ ■

Single-phase current I A 0.5% 0~63 - ■ ■

Frequency Hz Hz 0.01Hz 45~65 - ■ ■

Active power P KW 0.5% - ■ ■

Reactive power Q KVAR 0.5% - ■ ■

Apparent power S KAV 0.5% - ■ ■

Power factor PF 0.5% - ■ ■

Active electrical degree KWh KW.h 0.5% - ■ ■

Voltage harmonic wave (THD%) Uh 0.5% - - ■

Current harmonic wave (THD%) Ih 0.5% - - ■

Temperature T ℃ 0.5% -10~100 ■ ■ ■

Open/closed state(switch) DI ■ ■ ■

Switch failure state DI ■ ■ ■

Over-current alarm I A - ■ ■

High & low temperature alarms T ℃ ■ ■ ■

Communication RS485, baud rate: 4,800, 9,600, 19,200, 38,400, 57,600, 115,200

Note: The mark “■” is standard configuration, and the one “-” means no such function.

Page of 23

5 Installation examples

Schematic Diagram on Installation for Horizontal Left and Right Side

Page of 24

Base mounting

1. Baseboard; 2. Base; 3. ST 6.0*18 tapping screw.

Busbar mounting

1 and 3,special busbar clamp; 2.Busbar; 4. ST 6.0*45 Screw.

Page of 25

Installation of communication PCB

Buckle

One end of PCB locates underneath buckle, and the other

and is fastened by screw, a screw is set every 100mm

approximately.

1. PCB board 2. ST 4.2*10 self-tapping screw.

Module Installation

1. Phasing components; 2.Miniature circuit breaker; 3.Gathered components for outgoing line ; 4.Gathering module.

Page of 26

Parts of iTAC120M series

Pluggable phase-selector base

The assembly without the

collection module

Specification Number of

packages

Product code

iTAC120M

pluggable

phase-selector

base, 63A

1 iTAC120M-B

iTAC121M

pluggable

phase-selector

base, 63A

1 iTAC121M-B

iTAC122M

pluggable

phase-selector

base, 63A

1 iTAC122M-B

Note: If you need multi-pole switch combination, please

communicate with pre-sale technical personnel

beforehand.

Collection module

Component insertion

Loosen the buckle on both sides

Tightly lock the buckle on both sides

Proper phasing

1. Module components.

C Insertion

Page of 27

Specification Number of

packages

Product code

Collection module

Collection module

of iTAC122M

assembly

1 IPM-S

Collection module

of iTAC121M

assembly

1 IPM-S3

Collection module

of iTAC120M

assembly

1 IPM-S1

Communication adapter plate

Communication adapter

plate

Specification Number of

packages

Product code

Communication

adapter plate -02,

44*270.8mm,

installed with 13

molded assemblies

1 iTAC-PCB13

Communication

adapter plate -01,

44*470.8mm,

installed with 24

molded assemblies

1 iTAC-PCB24

Communication

adapter plate -03,

44*516.0mm,

installed with 27

molded assemblies

1 iTAC-PCB27

Note: Ф4.2*10 self-tapping screws shall be provided by

yourself at installation.

Page of 28

Base plate for installation

Base plate for

installation

Specification Number of

packages

Product code

Base plate for

installation-02,

456*274mm,

installed with 26

molded assembles

1

iTAC-26P

Base plate for

installation-01,

456*474mm,

installed with 48

molded assembles

1

iTAC-48P

Base plate for

installation-03,

456*549mm,

installed with 54

molded assembles

1

iTAC-54P

Note: Ф6.0*18 bolts shall be provided by yourself at

installation.

Standard copper bus-bar

Standard copper bus-bar

Specification Number of

packages

Product code

Standard copper

bus-bar,

20*3mm*2m, 200A

1

iTAC-CU

Special bus-bar clamp

Special bus-bar clamp

Specification Number of

packages

Product code

Special bus-bar

clamp -01,

specially for

20*3mm standard

copper bus-bar

1

iTAC-CU01

Special bus-bar

clamp -02,

specially for

20*3mm standard

copper bus-bar

1

iTAC-CU02

Note: Bus-bar clamp -01 and bus-bar clamp-02 shall be used

in pair and used as fixed copper bus-bar, and Ф6.0*45 bolts

shall be provided by yourself at installation.

Cascade base

Page of 29

Specification Number of

packages

Product code

Cascade base

Length * width *

height

200*18*30mm

1

iTAC-B

Single-P protective cover plate

Single-P protective

cover plate

Specification Number of

packages

Product code

Length * width

200*18mm

1 iTAC-TP

Note: It is only for extra protection. It is flexibly demand and

used with the common base set together.

6 Module dial-up setting

Set the module address as shown in the figure below, dial onto ON location, it is 1; dial

downward, it is 0; it is suggested not to set 00000 and 11111, this address is used as

broadcasting location frequently, the specific setting is as follows accordingly:

Binary

system

10000 01000 11000 00100 10100 01100 11100 00010

Decimal

system

1 2 3 4 5 6 7 8

Binary

system

10010 01010 11010 00110 10110 01110 11110 00001

Decimal

system

9 10 11 12 13 14 15 16

Binary

system

10001 01001 11001 00101 10101 01101 11101 00011

Decimal

system

17 18 19 20 21 22 23 24

Binary

system

10011 01011 11011 00111 10111 01111

Decimal

system

25 26 27 28 29 30

7. Use and maintenance

ON

1 2 3 4 5

Page of 30

1. The product can’t be exposed to rain during transportation & safekeeping and shall be

placed or installed free from the invasion of rain.

2. The product shall be regularly inspected during operating, and the inspection period

depends on the work condition, and the power supply shall be cut off during the inspection.

The inspection items mainly include:

A. Remove the dust and dirt, and particularly remove the dirt between incoming and outgoing

line levels.

B. Tighten the binding screws.

8. Safety warning

1. While installing the products, the operation in live isn’t allowed so as to prevent the

electric shock:

2. The live wire ( phase wire) to earth short-circuit or null wire ( neutral wire) and live wire

touching method is not employed to test the product performance so as to avoid

endangering the personal safety.

3. While installing, the wiring screw should be tightened tightly, and the lead wire can’t be

loosen or pulled out easily, the cross section of lead wire should be selected according to

the requirement specified in this instruction;

4. It is strictly forbidden to operate the circuit breaker by using wet hands, otherwise, the

electric shock accident may occur possibly;

Page of 31

Appendix 3 System Diagram

Appendix 1 Typical Array Cabinet System Diagram

Appendix 2 Communication Base Plate Wiring Diagram

Note: V01 and V21 of communication base plate are two groups of independent 5V power supply.

Page of 32