GOVERNMENT OF RAJASTHAN
RURAL DEVELOPMENT & PANCHAYATI RAJ
DEPARTMENT
(WATERSHED DEVELOPMENT & SOIL CONSERVATION)
NAME OF PROJECT : SIKAR IWMP 18(CHAINPURA)
EFFECTIVE AREA OF PROJECT : 5016 Ha
COST /HA - 15000
COST OF PROJECT : 752.40 lacs.
BLOCK : PIPRALI
DISTRICT: SIKAR
PIA – ASSISTANT
ENGINEER
W.D. & S.C., P.S. –
PIPRALI
PROJECT MANAGER,
WCDC
W.D. & S.C., DISTRICT –
SIKAR
2
Detail of Project
1. Name of Project : CHAINPURA
2. Sanction No. & date of Project : ,Q 18 (vkbZ .51) futHkwl @ vkbZMCyw,eih@ 2011-12/4800-5087/5-8-11
3. Macro & Micro Nos : Cluster
4. Deviation from Project Sanctioned :
Items As per Project Sanctioned As proposed in DPR
Project Area 5016 5016
Macro/Micro No Cluster Cluster
Name of Gram
Panchayats
CHAINPURA, GOKULPURA, NANI,
RADHAKISHANPURA, CHANDPURA
CHAINPURA, GOKULPURA, NANI,
RADHAKISHANPURA, CHANDPURA
Name of Villages CHAINPURA(01701000),
HARDAYALPURA(01689300), CHARAN
KA BAS (01700900), DADLI(01689400),
GOKULPURA(01690300), DASA KI
DHANI(01690100), NANI(01688600),
NATHAWATPURA(01688500),
RADHAKISHANPURA(01690000), DULA
KI DHANI(01690200),
CHANDPURA(01690600), BAJAJ
GRAM(01690500), DHANI SALAMSINGH
KI(01690400),
CHAINPURA(01701000),
HARDAYALPURA(01689300),
CHARAN KA BAS (01700900),
DADLI(01689400),
GOKULPURA(01690300), DASA KI
DHANI(01690100), NANI(01688600),
NATHAWATPURA(01688500),
RADHAKISHANPURA(01690000),
DULA KI DHANI(01690200),
CHANDPURA(01690600), BAJAJ
GRAM(01690500), DHANI
SALAMSINGH KI(01690400),
Project Cost (Rs in
Lakhs)
752.4 lac 752.4 lac
3
Index
S.No Topics Page
no.
1 Chapter
Location
General Features of watershed (Cost and Area details)
Climatic and Hydrological information
Other Development Schemes in the project area
Details of infrastructure in the project areas
Institutional arrangements (WCDC,PIA,WDT,WC)
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status With Per Capita Production 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status
3 Chapter Proposed Development Plan
4 Chapter Activity wise Total Abstract of cost
5 Chapter Annual Action Plan
5.1 Project fund 5.2 Convergence Plan
4
6 Chapter Project outcomes
7 Technical designs and estimates for proposed activities
8 Enclosures
8 .1 Maps b. Location –District, block, village, watershed location map c. Map of Project with Watershed Boundary demarcation in cadastral
map d. Land Use Land Cover map e. Existing water bodies, DLT f. PRA Map (along with photos & paper drawing) g. GIS based intervention map h. Treatment map ie proposed works on revenue map
8.2 Documents of Agreements:
Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Documents related to PRA exercise
Proceedings of gram sabha for DPR approval
Proceedings of Panchayat Samiti General body for DPR approval
Proceedings of Zila Parishad Standing Committee for DPR approval
5
CHAPTER – I
INTRODUCTION
Location.
CHAINPURA Project is located in PIPRALI, Block, of SIKAR district. The project area is between
the latitudes 270 35’-40 & longitudes 70o 25’ -30. It is at a distance of 10 km from its Block head
quarters and 10 Kms from the district head quarters. There are 13 no. of habitations in the Project
area and other details are given below.
General features of watershed
S.No. Name of Project(as per GOI) IWMP
(a) Name of Catchment CHAINPURA
(b) Name of watershed area(local name) CHAINPURA
© Project Area 6401.95
(d) Net treatable Area 5016
e) Cost of Project 752.4 lac
f) Cost/hectare 15000
g) Year of Sanction 2011-12
h) Watershed Code Cluster
i) No. of Gram Panchayats in project
area
05
j) No. of villages in project area 13
k) Type of Project Desert
l) Elevation (metres) 1
m) Major streams -
n) Slope range (%) 1 TO 8 %
6
Macro/micro
Name of Gram
Panchayat
Name of Villages
Covered
Census code
of villages
Area
1 CHAINPURA 1 CHAINPURA 01701000 499
2 HARDAYALPURA 01689300 255
3 CHARAN KA BAS 01700900 755
4 DADLI 01689400 342
2 GOKULPURA 1 GOKULPURA 01690300 380
2 DASA KI DHANI 01690100 125
3 NANI 1 NANI 01688600 882
2 NATHAWATPURA 01688500 408
4RADHAKISHANPURA 1 RADHAKISHANPURA 01690000 470
2 DULLLA KI DHANI 01690200 170
5 CHANDPURA 1 CHANDPURA 01690600 620
2 BAJAJ GRAM 01690500 70
3 DHANI SALAM SINGH 01690400 40
The watershed falls in Agroclimatic Zone 2a The soil texture is Sandy The average rainfall is
590mm . The temperatures in the area are in the range between 30 to 50 centigrade during
summer and 0.5 to 38 centigrade during winter. The major crops in the area are Bajara, Chawala,
Guvar, Wheat, Gram, Musted, out of land is under cultivation is 200 land fallow, land is wasteland
538Ha. 1319.720Ha land is irrigated through tube well. 170 No of households are BPL(4.73%
households) 146 are landless households(4.07% households) and 3382 household are small and
marginal farmers(94.28 %household). Average land holding in the area is .61 ha. 4543Ha area is
single cropped , area and 1319 Ha is double cropped. The main source of irrigation is tube well.
The major festivals in the village are Holi, Deepawali, idd, Gangor, & Rakshabandhan. At present
this village is having 21697 population with Communities like Jat, Gurjar, Kumawat, Brahaman,
Balai, and Agarwal etc.
7
Climatic and Hydrological information
1 Average Annual Rainfall(mm)
Year Average Annual Rainfall(mm)
1 2003 152
2 2004 584
3 2005 458.30
4 2006 468
5 2007 427
6 2008 1804
7 2009 128
8 2010 839
9 2011 680
10 2012 720
2 Average Monthly rainfall (last ten years)
Month Rainfall(mm)
i) June 88.50
ii) July 166.30
iii) August 154.10
iv) September 110.64
3 Maximum rainfall intensity (mm)
Duration rainfall intensity(mm)
i) 15 minute duration 22
ii) 30 minute duration 43
iii) 60 minute duration 100
4 Temperature (Degree C)
Season Max Min
i) Summer Season 50 32
ii) Winter Season 36 0.4
iii) Rainy Season 42 18
8
Details of infrastructure in the project areas
Parameters Status
(i) No. of villages connected to the main road by an all-weather road
13
(ii) No. of villages provided with electricity 13
(iii) No. of households without access to drinking water
(iv) No. of educational institutions : (P) 20
(S) 19
(HS) 10
(VI) 7 Primary(P)/ Secondary(S)/ Higher Secondary(HS)/
vocational institution(VI)
(v) No. of villages with access to Primary Health Centre 1
(vi) No. of villages with access to Veterinary Dispensary 2
(vii) No. of villages with access to Post Office 6
(viii)
No. of villages with access to Banks 2
(ix) No. of villages with access to Markets/ mandis 13
(x) No. of villages with access to Agro-industries -
(xi) Total quantity of surplus milk 25 Qt per day
(xii) No. of milk collection centres (U)
(S) 1
(PA) 17
(O)
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(xiii)
No. of villages with access to Anganwadi Centre 13
(xiv)
Any other facilities with no. of villages (please specify) -
(xv) Nearest KVK Fatehpur
(xvi)
Cooperative society Gokulpura
(xvii)
NGOs --
(xviii)
Credit institutions --
(i) Bank 2
(ii) Cooperative Society 1
(xix)
Agro Service Centre's --
9
Institutional arrangements (SLNA,WCDC,PIA,WDT,WC, Secretary)
WCDC Details
PIA particulars
WDT Particulars:
1 2 3
S.No Particulars Details of WCDC
1. PM ,WCDC Zila Parishad Sikar
2. Address with contact no., website Zila Parishad Sikar
3. Telephone 01572-270669
4. Fax 01572-259527
5. E-mail [email protected]
1 2 3
S.No Particulars Details of PIA
6. Name of PIA Assistant Engineer , WDSC P.S. Piprali
7. Designation Assistant Engineer
8. Address with contact no., website P.S.Piprali, dist- sikar, (Raj.)
9. Telephone 01572-226002
10. Fax 01572-226442
11. E-mail [email protected],
1 2 3 4 5 6
7 8
S.No
Name of
WDT
member
M/F Age
Qualification
Experience in
watershed(Yrs)
Description of
professional
training
Role/ Function
1 Madan lal M 33 M.A (social) 5 years M.A (social) All social
activities
2 Ashok M 23 10+2 3 years LSA All live stock
activities
10
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/
BF Name of UG/SHG
Educational qualification
1 Chainpura
29.9.2011 President LAL CHAND M SBC MF UG 5th pass
Secretary SOHAN LAL M SBC MF UG B.A pass
Member MANGEJA RAM M SBC SF UG 8th pass
BABULAL MEENA M ST MF UG 8th pass
MANGILAL M OBC SF UG 8th pass
SHASHI KUMAR M SC MF UG 8th pass
SHEEMA DEVI F GEN MF SHG 10th pass
BIMLA DEVI F SC MF SHG -
SITA DEVI F GEN MF SHG 10th pass
SANTOSH DEVI F SBC MF SHG 12th pass
MANBHARI F OBC SF SHG 10th pass
KALU RAM M SBC Landless UG 8th pass
11
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/
BF
Name of UG/SHG
Educational qualification
2 Chandpura
29-08-2011
President MOHAN RAM M OBC MF UG 10th Pass
Secretary DINESH M OBC MF UG 12th Pass
Member MENSHA RAM M OBC SF UG 5th Pass
MOHAN LAL SAINI M OBC MF UG 8th Pass
SUDHA SHARMA F GEN Landless SHG 12th Pass
BODI DEVI F SC Landless SHG Shakshar
SUNITA F SC Landless SHG 10th Pass
MANOHARI F OBC MF SHG 10th Pass
SUMAN F OBC MF SHG 10th Pass
USHA F OBC MF SHG 10th Pass
HARPHOOL M SC Landless UG Shakshar
12
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/
BF
Name of UG/SHG
Educational qualification
3 Gokul pura
21-09-2011
President RAVINDRA SINGH M OBC SF UG 12th Pass
Secretary VIKASH KUMAR M GEN Landless UG B.A PASS
Member GOVIND RAM M OBC SF UG B.A Pass
KURDA RAM M OBC BF UG 08th Pass
HEERA RAM M OBC BF UG 05th Pass
BHAGAWANA RAM M OBC MF UG 08th Pass
PUSHPA DEVI F OBC MF SHG B.A Pass
ANITA DEVI F SC Landless SHG 12th Pass
MANJU DEVI F OBC BF SHG 12th Pass
MANJU DEVI F OBC SF SHG 12th Pass
SARITA F SC SF SHG 10th Pass
ARJUN LAL M SC Landless UG Nirakshar
13
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/
BF
Name of UG/SHG
Educational qualification
4 NANI 21-09-2011
President SUBHASH CHAND BAJIYA M OBC BF UG 10th Pass
Secretary ROHITASH M OBC MF UG B.A pass
Member SULTAN M GEN MF UG 10th Pass
PRAKASH CHAND M OBC SF UG 12th Pass
GOPAL RAM M SC MF UG 05th Pass
KISHOR SINGH M GEN SF UG 10th Pass
SHARDA DEVI F OBC MF SHG 10th Pass
SUMITRA F OBC MF SHG Shakshar
MANJU DEVI F SC MF SHG 05th Pass
SUMAN DEVI F SC MF SHG 10th Pass
POONAM DEVI F GEB MF SHG 10th Pass
BHADUR MAL M SC Landless UG 12th Pass
14
Details of Watershed Committees (WC)
S.N.
Name of WCs
Date of Gram
Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/
BF
Name of UG/SHG
Educational qualification
5 Radhakishan pura
23-07-2011
President Shethan Singh M OBC MF UG 5th Pass
Secretary Mahipal Gurjar M SBC MF UG 12th Pass
Member Sita Devi F OBC Landless SHG 5th Pass
Sharwan M OBC MF UG 10th Pass
Jagdish Prasad M OBC MF UG 8th Pass
Parhlad M OBC MF UG 10th Pass
Kanta devi F OBC MF SHG 5th Pass
Nanki devi F SC MF SHG
Prabhati devi F OBC MF SHG Shakshar
Rukama devi F OBC MF SHG 5th Pass
Gulab devi F OBC MF SHG 2th Pass
Prabhat M SC Landless UG 8th Pass
15
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased production which
can be achieved through expansion in cultivated area and productivity enhancement. 226 ha land
is arable wasteland and 4543 ha is fallow can be brought under cultivation.
1319 ha is only irrigated and with efforts this can be increased to better recharging of ground
water. The productivity gap of major crops in the area as compared with district and with areas in
the same agro climatic zones indicate potential to increase the productivity. The demonstration of
improved package of practices, improved varieties, increased irrigation facilities and soil
conservation measures under the project can bridge this gap. Due to small land holdings in the
area focus of the project would be on diversification in agriculture (horticulture, vegetables, green
houses, Agro forestry, fodder crops) and diversification in Livelihoods (Agriculture, Animal
husbandry, self employment)
1000 Quintal fodder scarcity can be met out through Pasture development .Improved animal
Husbandry practices can increase the productivity of livestock. 900 no of persons migrate due to
Unemployment this migration can be checked through creation of employment opportunities in the
project area through increase in production and diversification in agriculture and Livelihoods as
mentioned above.
16
Table 2.3 Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total
Agriculture Land
5863.29
- - - 5863.29
Temporary fallow
200 - - - 200
Permanent Fallow
- - - - -
Cultivated Rainfed
4543.57
- - - 4543.57
Cultivated irrigated
1319.72
- - - 1319.72
Net Sown Area 5863.29
- - - 5863.29
Net Area sown more than once
1319.72
- - - 1319.72
Forest Land - - - - -
Waste Land - - 0.12 0.12
Pastures - - 225.98 - 225.98
Others - - - - -
The project area has no ha of cultivable wasteland. 200 ha of fallow land (total 6401.95 ha) can be
brought under cultivation if some irrigation source can be provided through Construction of WHS
like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops.
Construction of WHS can also increase in area under irrigation which is only 10%
0.12 ha. is under wastelands and can be brought under vegetative cover, with reasonable effort.
Activities like Earthen check dams, Vegetative filter strip, V-ditches, staggered trenches, WHS
(Johad) Afforestation of wastelands and Pasture development will be taken up on these lands.
Pasture development the land use table shows that there is 225.98 hectare pasture land
(3.52%).
17
Table 2.4 .a Agriculture and Horticulture status and fuel availability.
Crop Rotation**will vary from project to project
Bajra - Wheat Bajra - Fallow Moong - Mustered Moong - Fallow Fallow - Isabgoal Fallow - Lucern Cluster Bean - Fallow Til - Fallow Caster - Caster Moth - Fallow
The table shows that only 1319.72 ha is double cropped area. Also the crop rotation shows that
fallow lands are there. This indicates that there is scope for change in crop rotation in fields where
there are fallow lands through Soil and Water conservation measures, crop demonstration and
diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under cultivation can
change the area under single cropping to double and multiple cropping.
Table 2.4.b Abstract of cropped Area(ha)
Area under Single crop 4543.57
Area under Double crop 1319.72
Area under Multiple crop -
18
Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)
These Data sources are Rajasthan Agricultural Statistics at a glance 2009-10 (Average Last 5 year up to 2008-09) Krishi Marg Darshika 2009. Analysis of the above table indicate that besides national gap there is wide gap in productivity
within state and even within same agro climatic zones.
The productivity gap and reasons of it indicate potential to increase the productivity through crop
demonstration. Crop demonstrations would be carried out on improved crops/ varieties, improved
agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration
of improved methods and economics of fodder crops cultivation and also distribution foundation
seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop
rotations.
Name of the crop
Productivity kg/ha
India
Highest Average in Rajasthan
Highest Average of Agro climatic zone District Project Area
Bajara 802 692 888 950 447
Cluster bean NA 305 351 394 386
Mung 317 325 322 304 280
Chawla NA 359 361 365 350
Groundnut 1700 1400 1750 1710 1550
Wheat 2620 2750 2915 2750 2260
Gran 809 656 980 1035 849
Mustered 1107 1178 1096 994 698
Barley 2720 2518 2325 2284 1735
Mathi NA 1145 966 915 809
Onion 950 9015 11210 10114 980
19
Table 2.6 Land holding Pattern in project area
Type of Farmer
Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total
General SC ST OBC BPL
(i)Large farmer 2154 189.57 1922.42 2111.99 998.45
19.45 12.40 1081.69
-
(ii) Small farmer 2498 411.70 1892.90 2304.60
817.50 296.10 8.15 1182.85
-
(iii) Marginal farmer 730 704.20 636.30 1340.50
448.45 287.50 14.20 590.35 -
(iv) Landless person 146 - - -
- - - - -
(V)No. of BPL households 170 14.25 91.95 106.20
41.15 12.15 1.25 51.65 -
Total 3698 1319.72 4543.57 5863.29 2305.55 615.20 36.00 2906.5
4 -
87.29% land holdings belong to small and marginal farmers who own 62.15% of total cultivated
area. Horticulture/vegetables could be more economical to Small and Marginal farmers with
irrigation source. For Large farmers with no irrigation facility Horticulture/vegetables will be
promoted in a part of land with farm pond/Tanka construction.
The following activities will be more beneficial for small land holdings and for diversification and
income for large farmers.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier .
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation
source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi,
Isabgol, Ashwagandha, Khus, Mehandi etc.
Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation
as wind velocity is high in the project area.
Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and
fertilizers on human health the emphasis would be on cultivation of organic produce through
motivating farmers and providing assistance for production of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good quality seed is
available for cultivators for which adequate seed production would be initiated in watershed areas
with the assistance of private sector and agriculture department technologies
Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like
mushroom cultivation, floriculture, etc which are in negligible existence at present, can be
implemented by individual farmers / private companies.
20
Table 2.7 Livestock Status - animals/milk production / average yield.
S.No.
Description of animals
Population in No.
Yield(milk/mutton/Wool)
Equ. cow units
Dry matter requirement
per year (7Kg per animal.)
Total requirement
in M.T.
1 Cows -
Indigenous 5660 22700 14433
Crossbreed 2470 24700 6345
2 Buffaloes 5408 31300 13650
3 Goat 7533 7000 population /2 14840
4 Sheep 527 500 population /2 612
5 Camel 103 360 340
6 Poultry 26500 NA
7 Piggery 46 NA
Total 48247 50220
In spite of the large number of livestock, production is less hence increase in productivity
across all species, is a major challenge. To enhance production of unproductive cattle and
improve the productivity following activities will be taken up:-
,Demonstration of improved methods of conservation and utilization of Forage crops are proposed.
21
Table 2.8 Existing area under fodder (ha)
S.No Item Unit Area/Quantity
1 Existing Cultivable area under Fodder
Ha 220
2 Production of Green
fodder
Tonns/year 760
3 Production of Dry fodder Tonns/ Year 50200
4 Area under Pastures Ha 100
5 Production of fodder Tonns/year 600
6 Existing area under Fuel
wood
Ha 710
7 Supplementary feed Kgs/ day 39280
8 Silage Pits No
9 Availability of fodder quintals 41400
10 Deficiency/excess of
fodder
quintals 8820
The table above shows there is fodder deficiency (Requirement is 50220 and
availability 41400)
To minimize the large and expanding gap between feed and fodder resource availability and
demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by few but
productive animals
22
Table 2.9 Agriculture implements
Farm mechanization and seed banks: As discussed earlier 87.29% land holdings belong to
small and marginal farmers who own only 62.15 % of total cultivated area so owning of big
farm implements by individual farmers is not economical so SHG would be promoted to buy
farm implements and rent to farmer
S. No Implements Nos.
1 Tractor 141
2 Sprayers-manual/ power 259
3 Cultivators/Harrows 108
4 Seed drill 115
5 Any Other 125
23
Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment
status.
Sr. no. Name Of Village
Total No .of job cards
Employment Status
Activity taken up so far
1 Chainpura 300 1990 days
Desilting of Nadi, Cat iv, BNRGSK Works
2 Charan Ka Bas 315 1620 days
3 Hardayalpura 280 1017 days
4 Dadli 58 330 days
5 Gokulpura 655 2555 days
6 Dasa Ki Dhani 180 1060 days
7 Radhakishanpura 113 -
8 Dula Ki Dhani 188 58 days
9 Chandpura 318 18 days
10 Dhani Salam Singh Ki 175 -
11 Bajaj Gram 93 -
12 Nani 305 3650 days
13 Nathawatpura 330 2588 days
24
Table 2.11 Migration Details
Name of village
No. of persons migrating
No. of days per year of migration
Major reason(s) for
migrating
Distance of destination of migration
from the village (km)
Occupation during
migration
Income from such occupation
(Rs. in lakh)
Chainpura 18 260 Not Enough
Livelihood
10 to 15 Km Labour Work
13.50
Dadali 5 260 Not Enough Livelihood
10 to 15 Km Labour Work
3.75
Hardayalpura 8 260 Not Enough Livelihood
10 to 15 Km Labour Work
6.08
Charan ka Bass 8 260 Not Enough Livelihood
10 to 15 Km Labour Work
6.08
Radhakishanpura 25 260 Not Enough Livelihood
05 to 07 Km Labour Work
16.75
Dula ki dhani 12 260 Not Enough Livelihood
05 to 07 Km Labour Work
7.20
Gokul pura 18 260 Not Enough Livelihood
05 to 07 Km Labour Work
13.50
Dasa ki dhani 09 260 Not Enough Livelihood
05 to 07 Km Labour Work
5.40
Chandpura 13 260 Not Enough Livelihood
05 to 07 Km Labour Work
7.85
Bajaj garam 06 260 Not Enough Livelihood
05 to 07 Km Labour Work
3.60
Salam singh ki
dhani
05 260 Not Enough Livelihood
05 to 07 Km Labour Work
3.02
Nani 20 260 Not Enough Livelihood
03 to 05 Km Labour Work
14.05
Nathawat pura 09 260 Not Enough Livelihood
05 to 08 Km Labour Work
5.40
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods .
25
The existing livelihoods Village are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income from
the
Cultivators 3412 30000
Dairying 250 40000
Poultry 05 200000
Piggery - -
Landless Agri. Labourers
139 20000
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income from
the
Artisans 18 30000
Carpenter 28 32000
Blacksmith 20 21000
Leather Craft 06 16000
Porter 22 19000
Mason 83 27000
Others specify (Cycle Repair ,STD,Craft etc)
28 17000
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
26
Table 2.13( a ) Status of Existing SHG
S.No Name of SHG Members Activity involved
Monthly income
Fund available
Assistance available
Source of assistance
Training received
1 DADA JI SHG
RADHAKISHANPURA 10 SILAI 500 8000 YES
2 SANTOSH SHG
RADHAKISHANPURA 10 AGARBATI 200 3000 YES
3 DHENU SHG
CHANDPURA 10 SILAI 500 7000 YES
4 GEETA SHG
CHANDPURA 10
PASU
PALAN 200 4000 YES
5 YOGI SHG
GOKULPURA 10 BHANDEJ 200 3500 YES
6 MANJU SHG
GOKULPURA 10 SILAI 500 13000 YES
7 SEEMA SHG
CHAINPURA 10 SILAI 500 10000 YES
8 POOJA SHG
CHAINPURA 10 AGARBATI 300 4000 YES
9 SANGEETA SHG
NANI 10 SILAI 500 8000 YES
10 SHARDA SHG
NANI 10
BAKRI
PALAN 100 2500 YES
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
27
II. Technical Features Table 2.14 Ground Water
S.No Source No. Functional depth
Dry Area irrigated
Water availability(days)
i) Dug wells - - - - -
ii) Shallow tube wells -
iii) Pumping sets -
iv) Deep Tube Wells 457 300ft. - 1319 365
Total 457 - 1319 365
Table 2.15 Availability of drinking water
S.No
Name of the village
Drinking water requirement Ltrs/day
Present availability of drinking water Ltrs/day
No. of drinking water sources available
No. functional
No. requires repairs
No. defunct
1 Chainpura 59440 68432 30 30 - -
2 Dadali 51760 56715 25 25 - -
3 Hardayalpura 45880 85400 52 52 - -
4 Charan ka Bass 71720 85262 42 42
5 Radhakishanpura 106360 116900 50 50 - -
6 Dula ki dhani 17520 25200 25 25 - -
7 Gokul pura 183280 199200 80 80 - -
8 Dasa ki dhani 40960 47400 15 15 - -
9 Chandpura 87960 98300 35 35 - -
10 Bajaj garam 40080 51200 15 15 - -
11 Salam singh ki
dhani
16240 26560 5 5 - -
12 Nani 93760 107300 53 53 - -
13 Nathawat pura 52920 65430 30 30 - -
28
Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% 6000
2 3 to 8% 401.95
3 8 to 25% 350
4 > 25% -
As most of the area has slope less than 3% construction of contour bunds can solve the problem
of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers.
Table 2.18 Soil details
Soil Profile
S.No. Major Soil Classes Area in hectares
1 Sandy 6401.95
2 Stone -
Soil Depth :
B Depth (Cms.) Area in hectares
1 0.00 to 7.50 -
2 7.50 to 45.00
3 > 45.00 6401.95
C Soil fertility Status Kg/ha Recommended
N 60 70-120
P 43 40-60
K 330 144-336
Micronutrients PPM Zink6 PPm
Iron 4.00 PPm Iron 4.50PPm
Mn 1.8 PPm Mn 2 PPm
The analysis of table shows need to improve and maintain soil fertility. Soil health card to every
farmer every crop season will be provided, which will include the recommendation for Application
micro nutrient and fertilizers
29
CHAPTER - III Proposed Development Plan:
The Activities are indicative addition /deletion in activities will be as per local conditions
A) Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and
wall writings etc. were carried out in all the habitations of Chainpura Micro Watershed.
A series of meetings were conducted with GP members, community and discussed
about the implementation of IWMP programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the
watershed committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama
Sabha approved EPA
1 Chainpura 29-9-2011
2 Chandpura 29-8-2011
3 Gokulpura 21-9-2011
4 Nani 29-9-2011
5 Radhakishanpura 23-7-2011
1 2 3 4 5 6 7 8 9
S. No.
Names of village Amount
earmarked for EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred
Balance Expected outcome
Actual outcome
1 Chainpura 2.99 Glr & Pipe Line
2.99 - 2.99 Use of Drinking
water
Use of Drinking
water
2 Charan Ka Bas 4.53 Glr & Pipe Line
4.53 0.85 2.14 Use of Drinking
water
Use of Drinking
water
3 Hardayalpura 1.53 Glr & Pipe Line
1.53 0.85 3.68 Use of Drinking
water
Use of Drinking
water
4 Dadli 2.05 Glr & Pipe Line
2.05 - 2.05 Use of Drinking
water
Use of Drinking
water
5 Gokulpura 2.28 Glr & Pipe Line
2.28 2.0 0.28 Use of Drinking
water
Use of Drinking
water
6 Dasa Ki Dhani 0.75 Glr & Pipe Line
0.75 0.75 0.75 Use of Drinking
water
Use of Drinking
water
30
7 Radhakishanpura 2.82 Glr & Pipe Line
2.82 2.0 0.82 Use of Drinking
water
Use of Drinking
water
8 Dula Ki Dhani 1.02 Glr & Pipe Line
1.02 - 1.02 Use of Drinking
water
Use of Drinking
water
9 Chandpura 3.56 Glr & Pipe Line
3.56 1.0 2.56 Use of Drinking
water
Use of Drinking
water
10 Dhani Salam Singh Ki
0.40 Glr & Pipe Line
0.40 - 0.40 Use of Drinking
water
Use of Drinking
water
11 Bajaj Gram 0.42 Glr & Pipe Line
0.42 - 0.42 Use of Drinking
water
Use of Drinking
water
12 Nani 5.29 Glr & Pipe Line
5.29 4.10 1.19 Use of Drinking
water
Use of Drinking
water
12 Nathawatpura 2.45 Glr & Pipe Line
2.45 - 2.45 Use of Drinking
water
Use of Drinking
water
31
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the
village/Habitation
Date on which PRA
conducted
1 Chainpura 24-06-2013
2 Charan Ka Bas 25-06-2013
3 Hardayalpura 26-06-2013
4 Dadli 27-06-2013
5 Gokulpura 28-06-2013
6 Dasa Ki Dhani 29-06-2013
7 Radhakishanpura 29-06-2013
8 Dula Ki Dhani 01-07-2013
9 Chandpura 02-07-2013
10 Dhani Salam Singh Ki 03-07-2013
11 Bajaj Gram 04-07-2013
12 Nani 05-07-2013
13 Nathawatpura 05-07-2013
Transact walk were carried out involving the community for Social mapping, Resource
mapping. Detailed discussions and deliberations with all the primary stakeholders were carried
out.
Socio-economic survey was carried out during one year months (dates) period covering all the
households and primary data on demography, Land holdings, Employment status, Community
activities etc. was collected as mentioned in chapter 2.
32
. CAPACITY BUILDING
Table- List of approved Training Institutes@ for Capacity Building in the project area
1 2 3 4 5 6 7 8
S.
No.
Name of
Stakeholders
Name of the
Training Institut
e
Full
Address with
contact no.,
website & e-
Name & Designat
ion of the
Head of Institute
Type of Institute#
Area(s) of
speciali-zation$
Accredita-tion details
1 PIAs
2 WDTs
3 UGs
4 SHGs
5 WCs
6 GPs
7 Community
8 PM/SLNA
# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/
Universities/ Others (pl. specify)
$ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/
Remote Sensing/ Water conservation/ Ground water/ Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)
@ The training institutes must fulfill the conditions mentioned in the operations guidelines.
33
Table- Capacity Building activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST.
1 2 3 5 6 7
S.
No.
Project
Stakeholders
Total
no. of
persons
No. of persons to be trained during
project period
No. of Training to be organized during
project period
No. of person days to be trained during
project period
I
year
II
year
III
year
IV
year
V
year Total
I
year
II
year
III
year
IV
year
V
year Total
I
year
II
year
III
year
IV
year
V
year Total
1 PIAs 1 1 1 1 1 1 1
2 WDTs 4 4 4 1 1 4 4
3 UGs 50 50 50 5 5 50 50
4 SHGs 50 6 50 50 5 5 6 50 50
5 WCs 5 5 5 1 1 5 5
6 GPs 5 5 5 1 1 5 5
7 Community 1300 800 500 1300 3 5 8 800 500 1300
8 EXPOSURE
TOUR
(INTER
STATE)
100 100 - 100 1 1 100 - 100
9 EXPOSURE
TOUR
(INTRA
STATE)
100 - 100 100 2 2 - 100 100
10 PM/SLNA 2 2 2 1 1 2 2
11 TOTAL
PHYSICAL
1617 955 662 1617 10 14 24 955 662 1617
12 TOTAL
FINANCIAL
30.096 20.0 10.096 13.096 20.0 10.096 30.096 20.0 10.096 13.096
34
Table-, Education & Communication (IEC) activities in the project area (1% of total Project cost.)
1 2 3 4 5 6
S. No. Activity Executing
agency
Allocation
out of 1%
of total
Project
cost
Allocation in lacs Expected
Outcome (may
quantify,
wherever
possible)
I
year
II
year
III
year vI year
V
year Total
1 ekWMy #QVkWi okVj
gkjosZfVx LVªDplZ ¼iapk;r
lfefr, jktho xkW/kh lsok
dsUnz ;k vU; iapk;r lfefr
Lrjh; utnhdh ljdkjh
Hkou ½A
0-20 .30 .30 .90 1.50
2 tyxzg.k {ks= xfrfof/k;kas dks
n’kkZrk gqvk POP / CLAY /
WOOD / PLASTIC ls cuk
gqvk ekWMyA
0-10
.25
.25
.25
.75
3 MhLiys cksMZs@IysxDlh
cksMZ@
35
4 okWy isfUVax&tyxzg.k
xfrfof/k;ksa] y{;ks o izkfIr
vkfn dks n’kkZrh gqbZ A
0-25 .06 1.75 .07 1.88
5 tyxzg.k fodkl laca/kh
eqfnzr iEiysVl@fyQ
ysVl@pkVZ@iksLVj@v
kfnA
6 Ukkjk ys[ku
7 lQyrk dh dgkuh;ksa dh
ohfM;ksaxzkQh@QksVksxzkQh@
y?kqfQYe ,oa d`"kdks ls
lk{kjkrdkj @ okrkZ A
0-15
.37 .38 .38 1.13
8 fucU/k o okn&fookn
izfr;ksfxrk
9 jsfM;ksa@nwjn’kZu ij okrkZ o
foKkiu
10 lkaLd`frd R;kSgkj @ esys
vkfn ds volj ij iznZ’kuh
0-10 .25 .25 .25 .75
11 uqDdM+ ukVd
36
12 dViqryh izn’kZu
13 jkf= xks"Bh 0-20 .51 .50 .50 1.51
14 Hkw laj{k.k lIrkg
15 psruk jSyh
16 tyxzg.k fodkl dk lans’k
nsus okys lkaLd`frd dk;ZØe
17 d`"kd fnol dk vk;kstu
,oa {ks= Hkze.k fnol dk
vk;kstu bR;kfn
18 dqy 1-00 1.74 3.43 2.35 7.52
37
State Remote Sensing Application Centre was assigned the work of preparing various thematic
layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of
geo-spatial database depicting present conditions of land (terrain), water and vegetation with
respect to watershed under different ownerships at village level
Various thematic layers provided by SRSAC are :
Delineation of Macro/Micro watershed boundaries.
Digitised Khasara maps of the villages falling in project area.
Network of Drainage lines, existing water bodies, falling in the project area.
Base maps (transport network, village/boundaries, and settlements).
Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been
framed. Thus each intervention identified has been marked on revenue map (map enclosed
in DPR as annexure a).The GIS based intervention map, PRA based intervention map are
annexed as b
B)Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the
funds under the livelihood component. LAP has been prepared by the PIA in consultation with
WDT, WC & the members of SHG,SC/ST, women, landless/ assetless households. Details of
funds available & their utilisation is as under :
(i) Total project cost Rs.752.40 Lacs.
(ii) Funds available under livelihood component is 9% of total project cost= Rs.67.72 Lacs.
(a) Seed money for SHGs as revolving fund = Rs 41.79 Lacs.
(minimum 60% of livelihood component)
No. Of SHG to be formed 170Nos.
No of persons (members) in SHGs 1640 Nos.
(b) Seed money for enterprising individuals = Rs 5.75 Lacs
(maximum 10% of livelihood component)
No of persons identified as enterprising individuals 23 Nos.
38
S.
N Item Numbers
Revolving
fund/Seed
money % of LAP
1 SHG
a Existing 120 30.00
b New 50 11.79
Sub Total 170 41.79 61.71
2 Enterprising individuals 23 5.75 8.50
3
Enterprising SHG/Federations
of SHG 13 20.18 29.79
Total
67.72
Proposed Activities (On Farm)*
Name of activity* No of SHGs Revolving fund
Fisheries
Dairying 4 1.00
Poultry 11 2.75
Piggery
Goatry 1 0.25
Bee keeping
Sericulture
Nursery
Maize dehusker
Dal mill
Oil mill
Others (specify)
Total
Proposed Major activities (Off Farm)**
Name of activity* No of SHGs Revolving fund
39
Artisans
Carpenter
Blacksmith
Leather Craft
Porter
Mason
Eco tourism
Agro processing
Blacksmith
Candle making
Dona Pattal
Sewing / Knitting
Tea Stall
General Store
Mobile repair
Mechanic shop 5 1.25
Others (Photo studio) 2 0.50
Total
List of persons & Proposed Activities. . ( 10% of (9%)
S.No Watershed Committee Name of Person Activity Proposed
1 Radhakishnpura Bhanwar lal Dairy farming
2 Radhakishnpura Dharmendra Poultry
3 Radhakishnpura Dholuram Two vehicle service
4 Radhakishnpura Yogesh jangid Motor and Pampset Repairing
5 Radhakishnpura Madhuram Goatry
6 Chainpura Manoj Dairy farming
7 Chainpura Mahesh kumar Dairy farming
8 Chainpura Rafik Poultry
40
9 Chainpura Rajendra Photo studio
10 Chainpura Kaluram Poultry
11 Nani Mahendra kumar Poultry
12 Nani Rohitash kumar Photo studio
13 Nani Nemichand rewad Poultry
14 Nani Kanaram bajiya Two vehicle service
15 Nani Ajaypal Poultry
16 Chandpura Parhlad Poultry
17 Chandpura Mohan lal Poultry
18 Chandpura Tarachand Poultry
19 Chandpura Nemichand Poultry
20 Chandpura Vikash gora Two vehicle service
21 Gokulpura Himanshu Sharma Poultry
22 Gokulpura Bhanwar lal Dairy faming
23 Gokulpura Hiralal Two vehicle service
(c) Funds for Enterprising SHG/Federations of SHG
(Maximum 30 % of livelihood activities)= Rs 20.18 Lacs
The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to
avail a composite loan for undertaking major livelihood activities or to upscale activities as
recommended by the WC & approved by WCDC in consultation with line departments.
Details of enterprising SHG/federation is given below :
S.No. Name of SHG/ SHG
federation
Project Name Project Cost in
lacs
Grant in aid
50% of project
cost or 2 lacs
whichever is
less
Bank loan
1 Yet not applicable
2
Total
Details of project activities can be prepared in coming years after formation of SHG federation or
as the case may be.
41
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Production System & micro enterprises Action Plan is pre-
requisite for availing the funds under the Production System & micro enterprises component.
Production plan has been prepared by the PIA in consultation with WDT, WC & the members of
Users Group. Details of funds available & their utilisation is as under :
(iii) Total project cost Rs 752.40 Lacs.
(iv) Funds available under Production System & Micro enterprises component is 10% of total
project cost= Rs 75.23 Lacs.
(v) Proposed Activities for production system & Micro enterprises
Name of activity*
No. of house
holds Cost of activity
WDF
A Production
System
1 Fisheries
2 Dairying
3 Poultry
4 Piggery
5 Goatry
6 Bee keeping
7 Sericulture
8 Bio fuel , Medicinal
plantation
B Others
1 Crop Demontration
a Integrated Nutrient
Management
b Integrated
PestManagement
c Distribution of seed /
Mini kit of HYV
17.43
42
2 Introduction of
Innovative Agril
Activities
3 Distribution of Seed
cum ferti. drill
4 Distribution of other
Agricultural & plant
protection
equipment
5.80
5 Fodder production 5.20
6 Agro forestry 1.42
7 Agro Horticulture 19.74
8 Floriculture
9 Vegetable cultivation
10 Organic farming
(Green Manuaring,
Vermicompost,
Nadep Compost)
6.30
11 Green House
12 Shed net
13 Nursery
Others (specify)
Total
C Microenterprises
1 Agro processing
2 Value Addition
3 Fruit preservation
( Chatni, Achar,
Murabba, Jam,
Jelly, Etc.)
4 Flour Mill
43
Awareness Programme
-Slogan Wall Painting,
Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
Broadcasting / Telecasting Film Show
Visit- intra/ inter/ out of State/ Abroad
Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation Of Disease Free Zone: Livestock’s health coverage
Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
Distribution of mineral mixture. (Convergence with peer department)
Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)
5 Dal mill
6 Oil mill
7 Maize dehusker
8 Para Vetnery
services
a AI
b Castration
c Demo. Urea
Molasis
9 Manger 5.40
10 Animal Shed 2.4
Others 11.74
44
Construction of Animal Sheds with Manger and Portable Manger With accessories
Provision of Cattle Water Troughs.
Infertility Management: To ensure Livestock’s Productivity
Expansion of AI Coverage/ reduction in no.of infertile females.
PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
Breed Improvment: To ensure Livestock’s Productivity enhancement
A.I. (Convergence with peer department)
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January indicating
outgoing liabilities as well as new projects which they wish to take during next financial years & will
submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of
Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While
preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased
changed rates will be applicable for preparing AAP & the effect of same can be met by converging
the remaining works with other schemes.
45
CHAPTER – VI EXPECTED OUT COMES
1 2 3 4 5 6
S. No. Item Unit of
measurement Pre-project
Status Expected Post-project Status
Remarks
1 Status of water table (Depth to Ground water level)
Meters 90 85
2 Ground water structures repaired/ rejuvenated
No. 3 8
3 Quality of drinking water Description Good Good
4 Availability of drinking water Description Potable Potable
5 Change in irrigated Area Ha 1319.72 1500
6 Change in cropping/ land use pattern Description
7 Area under agricultural crop Ha
I Area under single crop Ha 4543.58 4600
Ii Area under double crop Ha 1319.72 1500
Iii Area under multiple crop Ha 0 50
8 Change in cultivated Area Ha 0 350
9 yield of major crops of area
Yield of Bajra q/ha 447 610
Yield of Wheat q/ha 2260 2500
Yield of Gram q/ha 849 900
Yield of Mustard q/ha 698 950
10 production of major crops of area
Production of Bajra ton 1280 1325
Production of Wheat ton 1620 1800
Production of Gram ton 370 410
Production of Mustard ton 300 350
11 Area under vegetation Ha 50 100
12 Area under horticulture Ha 2 17
13 Area under fuel Ha - -
14 Area under Fodder Ha 220 2900
15 Fodder production Q 41400 51000
16 Milk production Litres/day 78700 850000
17 SHGs Active No. 10 150
18 No. of enterprising individuals No. 3 25
19 Income Rs.in la
46
20 Migration No. 155 50
21 SHG Federations formed No. - 5
Critical Assumption
No severe droughts/ unexpected floods/ natural disasters
Adequate funds are allocated for the same and released on time.
There is no significant pest/ disease attack, and if so, then it will have been contained before irreversible damage is done.
Adverse market conditions do not persist long.
Sound macro-economic and growth conditions continue and the benefits are widely distributed particularly in the rural areas.
Facilitating agencies and resource providers have the required competent staff so that timely and appropriate technical advice and services
are provided to farmers whenever required.
The Capacity Building Plan is implemented, monitored and modified to address evolving needs and feedback from participants.
Means of Verification of indicators
Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-term and end of the project period
Annual participatory assessment by communities during project period.
Regular project monitoring reports prepared by project monitoring teams/ agencies.
Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual beneficiaries/project-related village and local
bodies/PRIs.
External review missions
Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal Husbandry
47
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
Technical designs and estimates for proposed activities.
For Estimates GKN of the districts should be used. For Production System activities, rates
provided by the Department is to be used & if not vailable than rates of Agriculture/Horticulture/
Animal Husbandry should be used.
For Livelihood activities, project norms provided by the Department is to be used & if not available
than cost norms of NABARD, NRLM etc can be used.
48
CHAPTER - VIII Enclosures -
i. Location –District, block, village, watershed location map
j. Map of CHAINPURA IWMP Project (Watershed Boundary demarcation in cadastral
& Topo Sheet)
k. PRA Map (along with photos & paper drawing)
l. Treatment map (Indicate proposed works)
m. Cadastral Map on watershed boundary
n. Information on Soils, Soil fertility, Land capability, Soil chemical problems like
salinity, alkalinity
o. Land Use Land Cover map
p. Information on existing water harvesting structures & well inventory along with GPS
co-ordinates.
q. High resolution, latest Remote Sensing Satellite data
Documents of Agreements: Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Proceedings of gram sabha for DPR approval
Proceeding of Standing Committee of P.S. for DPR approval.
Proceeding of Standing Committee of Z.P. for DPR approval.
Assistant Engineer, PIA
WD&SC P.S PIPRALI
Project Manager, WCDC
WD&SC.Distt.SIKAR
49
50
51
52
53
54
IWMP CHAINPURA
PRA EXERCISE
55
Name of Watershed Chainpura
Villagewise Land details
Sno Name of village Grampanchayat Arable Land Nonarable Land Panchayat and Govt
Land
Forest Land
Total Area
Inirrigated Irrigated Total wasteland pasture Total
1 2 3 4 5 6=4+5 7 8 9=7+8 10 11 12=6+9+10+11
1 Chainpura Chainpura 512.07 28.60 540.67 0.00 13.81 13.81 7.03 0.00 561.51
2 Dadli Chainpura 324.23 20.94 345.17 0.00 29.72 29.72 10.57 0.00 385.46
3 Hardayalpura Chainpura 247.77 80.24 328.01 0.00 10.10 10.10 18.05 0.00 356.16
4 Charan Ka Bass Chainpura 730.61 51.78 782.39 0.00 37.47 37.47 8.74 0.00 828.60
Total Chainpura 1814.68 181.56 1996.24 0.00 91.10 91.10 44.39 0.00 2131.73
5 Radhakisanpura Radhakisanpura 443.84 129.83 573.67 0.00 10.32 10.32 17.80 0.00 601.79
6 Dulla ke Dhani Radhakisanpura 162.91 21.52 184.43 0.00 3.99 3.99 6.87 0.00 195.29
Total Radhakisanpura 606.75 151.35 758.10 0.00 14.31 14.31 24.67 0.00 797.08
7 Chandpura Chandpura 395.85 349.92 745.77 0.00 50.28 50.28 72.01 0.00 868.06
8 Dhani SalamSingh Chandpura
38.42 8.94 47.36 0.00 0.00 0.00 7.27 0.00 54.63
9 Bajaj Gram Chandpura 49.25 18.89 68.14 0.00 0.00 0.00 28.73 0.00 96.87
Total Chandpura 483.52 377.75 861.27 0.00 50.28 50.28 108.01 0.00 1019.56
10 Nani Nani 776.45 141.30 917.75 0.00 14.87 14.87 53.18 0.00 985.80
11 Dhani Nathawatan Nani
380.04 29.08 409.12 0.00 21.33 21.33 9.94 0.00 440.39
Total Nani 1156.49 170.38 1326.87 0.00 36.20 36.20 63.12 0.00 1426.19
12 Gokulpura Gokulpura 342.88 378.88 721.76 0.12 27.53 27.65 69.26 0 818.67
13 Dassa ke Dhani Gokulpura 139.25 59.80 199.05 0 6.56 6.56 3.11 0 208.72
Total Gokulpura 482.13 438.68 920.81 0.12 34.09 34.21 72.37 0.00 1027.39
Grand Total 4543.57 1319.72 5863.29 0.12 225.98 226.10 312.56 0.00 6401.95
56
(1)Arable land-5863.29Ha
Name of Grampanchayat- Treatable area-5016 Ha (a)Unirrigated-4543.57Ha
Chainpura ,Radhakisanpura Estimated cost-752.40 Lacs (b)Irrigated-1319.72Ha
Chandpura,Nani,Gokulpura (2)Nonarable land-226.1 Ha
Name of Block-Piprali (a)Wasteland-0.12Ha
Name of District-Sikar (b)Pastureland-225.98Ha
Total Geographical Area of watershed-6401.95Ha Govt.&Panchayat land-312.56 Ha
Approval date of watershed by GramSabha- Forest land-0.00 Ha
Unitcost Quantity TotalcostConvergance
Fund
Beneficiary
Contribution*
Activity Lab Material Total
(A)
Admn. 10% 75.24 0.00 75.24 75.24 0.00
Monitoring 1% 7.52 0.00 7.52 7.52 0.00
Evaluation 1% 7.52 0.00 7.52 7.52 0.00
EPA 4% 30.09 0.00 30.09 30.09 0.00
I & CB 5% 37.62 0.00 37.62 37.62 0.00
DPR 1% 7.53 0.00 7.53 7.53 0.00
Total (A) 22% 165.52 0.00 165.52 165.52 0.00
(B)
Conservation measures for arable land
Contour Bund/Field Bund Ha 0.29 227 65.83 13.00 52.83 65.83 0.00
EarthenCheckDam No 200 43.25 8.60 34.65 43.25 0.00
Tanka No 0.92 18 16.56 5.60 10.96 16.56 0.00
Roof Top Rain water harvesting Str. No 190 142.50 35.00 107.50 142.50 0.00
Water Harvesting Structure No 3.11 5 15.55 4.00 11.55 15.55 0.00
Runoff Management Structure No 44 58.28 14.00 44.28 58.28 0.00
Conservation measures for non arable land
Pasture Development Ha 1.71 10 17.10 7.50 9.60 17.10 0.00
Plantation on Road side No 5.54 5 27.70 4.00 23.70 27.70 0.00
Tanka No 1.35 11 14.85 4.30 10.55 14.85 0.00
Drainage line treatment 0.00
Nalla Bank Stabilisation Km 6.00 1.93 1.50 0.43 1.93 0.00
EarthenCheckDam No 10 2.35 0.50 1.85 2.35 0.00
Runoff Management Structure No 6 5.66 1.25 4.41 5.66 0.00
Munja Plantation Km 0.05 9 0.45 0.40 0.05 0.45 0.00
Water Harvesting Structure No 3.11 3 9.33 2.00 7.33 9.33 0.00
Total (B) 421.34 101.65 319.69 421.34 0.00
( C ) 10%
Production measures for arable land
Horticulture plantation near tanka/roof top str. No 0.07 208 14.56 8.00 6.56 14.56 0.00
Only Horticulture Ha 0.00264 1961 5.18 2.70 2.48 5.18 0.00
Agroforestory No 0.00104 1368 1.42 1.00 0.42 1.42 0.00
Vermi compost No 0.24 20 3.90 1.50 2.40 3.90 0.00
Crop Demostration No 0.005 3486 17.43 0.00 17.43 17.43 0.00
Distribution of PP equipments 0.015 389 5.80 0.00 5.80 5.80 0.00
Livestock Management & Fodder
demostration
Animal Health Camps No 0.24 14 3.04 0.00 3.04 3.04 0.00
Fodder Production No 0.01 1040 5.20 0.00 5.20 5.20 0.00 Purchasing of Bulls etc,Others No 0.50 7 2.40 0.00 2.40 2.40 0.00
Compost Pits No 0.02 111 2.20 0.20 2.00 2.20 0.00
Distributins of chaff cutter No 0.06 147 8.70 0.00 8.70 8.70 0.00
Distributins of mangers No 0.01 540 5.40 0.00 5.40 5.40 0.00
Total (C) 75.23 13.40 61.83 75.23 0.00
(D)Micro Enterprise(9%)
Revolving found to SHG No 0.25 170 41.79 0.00 41.79 41.79 0.00
Revolving found to indivisual enterpreneurs No 0.25 23 5.75 0.00 5.75 5.75 0.00
Grant in aid to federation of SHG's No 2.00 13 20.18 0.00 20.18 20.18 0.00
Total(D) 67.72 0.00 67.72 67.72 0.00
(E) Consolidation 22.59 0.00 22.59 22.59 0.00
Grand Total 752.40 115.05 637.35 752.40 0.00
*Tentative and will vary during execution according to beneficiary
WD&SC.Distt.Sikar
Chapter IV Activity wise Total Abstruct of cost
Unit
Name of Watershed-Chainpura(IWMP 18)
20-40%
towards WDF
5-10% towards
WDF
Cost from Project Fund
Assistant Engineer, PIA Project Manager, WCDC
WD&SC P.S.Piprali
57
Chapter V Proposed Development Plan
Name of Watersher-Chainpura(IWMP 18) Total Geographical Area of watershed-6401.95Ha (1)Arable land-5863.29Ha
Name of Grampanchayat-Chainpura,Radhkisanpura,Chandpura,Nani,Gokulpura Treatable area-5016 Ha (a)Unirrigated-4543.57Ha
Name of Block-Piprali Estimated cost-752.40 Lacs (b)Irrigated-1319.72Ha
Name of District-Sikar (2)Nonarable land-226.1 Ha
(a)Wasteland-0.12Ha
(b)Pastureland-225.98Ha
Govt.&Panchayat land-312.56 Ha
Forest land-0.00 Ha
Unit
costQty Total cost
Cost from
Project
Fund
Conver
gance
Fund
Benefi
ciary
Contri
bution
Unit
costQty
Total
cost
Cost from
Project
Fund
Conver
gance
Fund
Benefi
ciary
Contri
bution
Unit
costQty Total cost
Cost from
Project
Fund
Conver
gance
Fund
Benefi
ciary
Contri
bution
Unit cost Qty Total cost
Cost from
Project
Fund
Converg
ance
Fund
Beneficiary
Contribution
Unit
costQty
Total
cost
Cost from
Project
Fund
Conver
gance
Fund
Beneficiary
ContributionUnit cost Qty Total cost
Cost from
Project
Fund
Conver
gance
Fund
Beneficiary
Contribution
(A)
Admn. 10% 27.76 27.76 0.00 9.60 9.60 0.00 10.95 10.95 0.00 19.35 19.35 0.00 7.58 7.58 0.00 75.24 75.24 0.00
Monitoring 1% 2.77 2.77 0.00 0.96 0.96 0.00 1.09 1.09 0.00 1.94 1.94 0.00 0.76 0.76 0.00 7.52 7.52 0.00
Evaluation 1% 2.77 2.77 0.00 0.96 0.96 0.00 1.09 1.09 0.00 1.94 1.94 0.00 0.76 0.76 0.00 7.52 7.52 0.00
EPA 4% 11.10 11.10 0.00 3.84 3.84 0.00 4.38 4.38 0.00 7.74 7.74 0.00 3.03 3.03 0.00 30.09 30.09 0.00
I & CB 5% 13.88 13.88 0.00 4.80 4.80 0.00 5.48 5.48 0.00 9.68 9.68 0.00 3.78 3.78 0.00 37.62 37.62 0.00
DPR 1% 2.77 2.77 0.00 0.96 0.96 0.00 1.10 1.10 0.00 1.94 1.94 0.00 0.76 0.76 0.00 7.53 7.53 0.00
Total (A) 22% 61.05 61.05 0.00 21.12 21.12 0.00 24.09 24.09 0.00 42.59 42.59 0.00 16.67 16.67 0.00 165.52 165.52 0.00
(B)
Conservation measures
for arable land
Contour Bund/Field Bund Ha 0.29 167 48.43 48.43 0.00 0.29 20 5.80 5.80 0.00 0.29 20 5.80 5.80 0.00 0.29 10 2.90 2.90 0.00 0.29 10.00 2.90 2.90 0.00 0.29 227 65.83 65.83 0.00
EarthenCheckDam No 115 27.35 27.35 0.00 0.00 0.00 0.00 35 5.40 5.40 0.00 25 5.25 5.25 0.00 25.00 5.25 5.25 0.00 200 43.25 43.25 0.00
Tanka No 0.92 10 9.20 9.20 0.00 0.92 2 1.84 1.84 0.00 0.92 2 1.84 1.84 0.00 0.92 2 1.84 1.84 0.00 0.92 2.00 1.84 1.84 0.00 0.92 18 16.56 16.56 0.00
Roof Top Rain water
harvesting Str. No 0.75 50 37.50 37.50 0.00 0.75 30 22.50 22.50 0.00 0.75 40 30.00 30.00 0.00 0.75 40 30.00 30.00 0.00 0.75 30.00 22.50 22.50 0.00 190 142.50 142.50 0.00
Water Harvesting Structure No 3.11 5 15.55 15.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.11 5 15.55 15.55 0.00
Runoff Management
Structure No 39 52.40 52.40 0.00 0.00 0.00 0.00 0.00 5 5.88 5.88 0.00 0.00 0.00 0.00 44 58.28 58.28 0.00
Conservation measures
for non arable land
Pasture Development Ha 1.71 10 17.10 17.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.71 10 17.10 17.10 0.00
Plantation on Road side Km 5.54 2 11.08 11.08 0.00 5.54 1 5.54 5.54 0.00 5.54 1 5.54 5.54 0.00 0.00 5.54 1.00 5.54 5.54 0.00 5.54 5 27.70 27.70 0.00
Tanka No 1.35 3 4.05 4.05 0.00 1.35 2 2.70 2.70 0.00 1.35 2 2.70 2.70 0.00 1.35 2 2.70 2.70 0.00 1.35 2.00 2.70 2.70 0.00 1.35 11 14.85 14.85 0.00
Drainage line treatment
Nalla Bank Stabilisation Km 6.00 0.17 1.03 1.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 0.15 0.90 0.90 0.00 0.00 0.00 0.00 6.00 0 1.93 1.93 0.00
EarthenCheckDam No 10 2.35 2.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 2.35 2.35 0.00
Runoff Management
Structure No 6 5.66 5.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 5.66 5.66 0.00
Munja Plantation Km 0.05 5 0.25 0.25 0.00 0.05 1 0.05 0.05 0.00 0.05 1 0.05 0.05 0.00 0.05 1 0.05 0.05 0.00 0.05 1.00 0.05 0.05 0.00 0.05 9 0.45 0.45 0.00
Water Harvesting Structure No 3.11 1 3.11 3.11 0.00 0.00 0 0 0.00 3.11 1 3.11 3.11 0.00 3.11 1.00 3.11 3.11 0.00 3.11 3 9.33 9.33 0.00
Total (B) 235.06 235.06 0.00 38.43 38.43 0.00 51.33 51.33 0.00 52.63 52.63 0.00 43.89 43.89 0.00 421.34 421.34 0.00
5-10%
towards
WDF
5-10%
toward
s
WDF
5-10%
toward
s WDF
Preparatory phase activities capacity building trainings & EPA
Total
5-10%
towards
WDF
5-10%
towards
WDF
5-10%
towards WDF
Activity Unit
Approval date of watershed by GramSabha-
ChandpuraNani
Radhakisanpura GokulpuraChainpura
58
( C ) 10%
Production measures for
arable land
Horticulture plantation near
tanka/roof top str.No 0.07 60 4.20 4.20 0.00 0.07 32 2.24 2.24 0.00 0.07 42 2.94 2.94 0.00 0.07 42 2.94 2.94 0.00 0.07 32 2.24 2.24 0.00 0.07 208 14.56 14.56 0.00
Only Horticulture Ha 0.00264 697 1.85 1.85 0.00 0.00264 281 0.74 0.74 0.00 0.00264 281 0.74 0.74 0.00 0.00264 561 1.48 1.48 0.00 0.00264 141 0.37 0.37 0.00 0.00264 1961 5.18 5.18 0.00
Agroforestory No 0.00104 481 0.50 0.50 0.00 0.00104 164 0.17 0.17 0.00 0.00104 193 0.20 0.20 0.00 0.00104 385 0.40 0.40 0.00 0.00104 145 0.15 0.15 0.00 0.00104 1368 1.42 1.42 0.00
Vermi compost No 0.24 7 1.50 1.50 0.00 0.24 3 0.50 0.50 0.00 0.24 3 0.60 0.60 0.00 0.24 6 1.20 1.20 0.00 0.24 1 0.10 0.10 0.00 0.24 20 3.90 3.90 0.00
Crop Demostration No 0.005 1200 6.00 6.00 0.00 0.005 400 2.00 2.00 0.00 0.005 460 2.30 2.30 0.00 0.005 1026 5.13 5.13 0.00 0.005 400 2.00 2.00 0.00 0.005 3486 17.43 17.43 0.00Distribution of PP equipments
No 0.015 167 2.50 2.50 0.00 0.015 47 0.70 0.70 0.00 0.015 47 0.70 0.70 0.00 0.015 94 1.40 1.40 0.00 0.015 34 0.50 0.50 0.00 0.015 389 5.80 5.80 0.00
Livestock Management &
Fodder demostration
Animal Health Camps No 0.24 5 1.21 1.21 0.00 0.24 2 0.40 0.40 0.00 0.24 2 0.42 0.42 0.00 0.24 4 0.80 0.80 0.00 0.24 1 0.21 0.21 0.00 0.24 14 3.04 3.04 0.00
Fodder Production No 0.005 400 2.00 2.00 0.00 0.005 140 0.70 0.70 0.00 0.005 140 0.70 0.70 0.00 0.005 280 1.40 1.40 0.00 0.005 80 0.4 0.4 0.00 0.005 1040 5.20 5.20 0.00
Purchasing of Bulls etc,OthersNo 0.50 2 1.00 1.00 0.00 0.50 1 0.30 0.30 0.00 0.50 1 0.30 0.30 0.00 0.50 2 0.60 0.60 0.00 0.50 1 0.2 0.2 0.00 0.50 7 2.40 2.40 0.00
Compost Pits No 0.02 50 1.00 1.00 0.00 0.02 13 0.25 0.25 0.00 0.02 13 0.25 0.25 0.00 0.02 25 0.50 0.50 0.00 0.02 10 0.2 0.2 0.00 0.02 111 2.20 2.20 0.00
Distributins of chaff cutter No 0.06 67 4.00 4.00 0.00 0.06 17 1.00 1.00 0.00 0.06 17 1.00 1.00 0.00 0.06 34 2.00 2.00 0.00 0.06 12 0.7 0.7 0.00 0.06 147 8.70 8.70 0.00
Distributins of mangers No 0.01 200 2.00 2.00 0.00 0.01 60 0.60 0.60 0.00 0.01 80 0.80 0.80 0.00 0.01 150 1.50 1.50 0.00 0.01 50 0.5 0.5 0.00 0.01 540 5.40 5.40 0.00
Total (C) 27.76 27.76 0.00 9.60 9.60 0.00 10.95 10.95 0.00 19.35 19.35 0.00 7.57 7.57 0.00 75.23 75.23 0.00
(D)Micro Enterprise(9%)
Revolving found to SHG No 0.25 62 15.28 15.28 0.00 0.25 22 5.31 5.31 0.00 0.25 25 6.16 6.16 0.00 0.25 43 10.72 10.72 0.00 0.25 18 4.32 4.32 0.00 0.25 170 41.79 41.79 0.00
Revolving found to
indivisual enterpreneurs No 0.25 9 2.25 2.25 0.00 0.25 3 0.75 0.75 0.00 0.25 3 0.75 0.75 0.00 0.25 6 1.5 1.5 0.00 0.25 2 0.5 0.5 0.00 0.25 23 5.75 5.75 0.00
Grant in aid to federation of
SHG's No 2.00 4 7.45 7.45 0.00 2.00 2 2.58 2.58 0.00 2.00 2 2.95 2.95 0.00 2.00 3 5.2 5.2 0.00 2.00 2 2 2 0.00 2.00 13 20.18 20.18 0.00
Total(D) 24.98 24.98 0.00 8.64 8.64 0.00 9.86 9.86 0.00 17.42 17.42 0.00 6.82 6.82 0.00 67.72 67.72 0.00
(E) Consolidation 8.33 8.33 0.00 2.88 2.88 0.00 3.29 3.29 0.00 5.81 5.81 0.00 2.28 2.28 0.00 22.59 22.59 0.00
Grand Total 357.18 357.18 0.00 80.67 80.67 0.00 99.52 99.52 0.00 137.80 137.80 0.00 77.23 77.23 0.00 752.40 752.40 0.00
20-40%
towards
WDF
20-
40%
toward
s WDF
20-
40%
toward
s
WDF
Assistant Engineer, PIA Project Manager, WCDC
WD&SC P.S.Piprali WD&SC.Distt.Sikar
20-40%
towards
WDF
20-40%
towards
WDF
20-40%
towards WDF
59
ANNUAL ACTION PLAN WATERSHED CHAINPURA(A)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 75.24 0.00 7.52 7.52 30.10 30.10 75.24
Monitoring 7.52 0.00 0.00 1.50 3.01 3.01 7.52
Evaluation 7.52 0.00 0.00 0.75 3.01 3.76 7.52
EPA 30.09 0.00 24.07 6.02 0.00 0.00 30.09
I & CB 37.62 0.00 9.41 9.41 9.41 9.41 37.62
DPR 7.53 0.00 0.00 6.02 0.75 0.75 7.53
Total (A) 165.52 0.00 41.00 31.23 46.27 47.02 165.52
(B)
Contour Bund/Field BundHa 0.29 227 65.83
0.00 0.0045 12.90 92 24.23 110 28.70 247 65.83
EarthenCheckDam No 200 43.25 0.00 0.00 5 9.08 74 15.51 84 18.66 200 43.25
Tanka No 0.92 18 16.56 0.00 0.00 4 3.68 12 11.04 2 1.84 18 16.56Roof Top Rain water
harvesting Str. No 0.75 190 142.50 0.00 0.00 30 22.50 70 52.50 90 67.50 190 142.50Water Harvesting
Structure No 5 15.55 0.00 0.00 1 3.11 2 6.22 2 6.22 5 15.55Runoff Management
Structure No 44 58.28 0.00 0.00 8 11.00 17 21.40 19 25.88 44 58.28
Pasture Development Ha 10 17.10 0.00 0.00 5 7.50 5 7.00 2.60 10 17.10
Plantation on Road side Km 5.54 5 27.70 0.00 0.00 0.00 4 22.16 1 5.54 5 27.70
Tanka No 1.35 11 14.85 0.00 0.00 3 4.05 5 6.75 3 4.05 11 14.85
Nalla Bank Stabilisation Km 0.32 1.93 0.00 0.00 0.00 0.00 1.93 1.93
EarthenCheckDam No 10 2.35 0.00 0.00 4 1.00 4 0.85 2 0.50 10 2.35Runoff Management
Structure No 6 5.66 0.00 0.00 2 2.00 2 2.34 1.32 6 5.66
Munja Plantation Km 0.05 9 0.45 0.00 0.00 0.00 9 0.45 0.00 9 0.45Water Harvesting
Structure No 3.11 3 9.33 0.00 0.00 0.00 0.00 9.33 3 9.33
Total(B) 421.34 0.00 0.00 76.82 170.45 174.07 421.34
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnitco
stQty Totalcost
1stYear 2ndYear 3rdYear 4thYear 5thYear Total
Natural resource management(56%)
Conservation measures for non arable land
Conservation measures for arable land
Drainage line treatment
60
\
©Horticulture plantation
near tanka/roof top str. No 0.0700 208 14.56 0.00 0.00 32 2.24 80 5.60 94 6.72 206 14.56
Only Horticulture Ha 0.00264 1961 5.18 0.00 0.00 4 1.48 9 3.33 1 0.37 14 5.18
Agroforestory No 0.0010 1368 1.42 0.00 0.00 0.60 0.62 0.20 1.42
Vermi compost No 0.2400 20 3.90 0.00 0.00 1.25 1.40 1.25 3.90
Crop Demostration No 0.0050 3486 17.43 0.00 0.00 6.50 7.00 3.93 17.43Distribution of PP
equipments No 0.0150 389 5.80 0.00 0.00 0.30 2.10 3.40 5.80
Livestock Management
& Fodder demostration 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Animal Health Camps No 0.2400 14 3.04 0.00 0.00 1.09 1.00 0.95 3.04
Fodder Production No 0.0050 1040 5.20 0.00 0.00 1.55 2.55 1.10 5.20 Purchasing of Bulls
etc,Others No 0.5000 7 2.40 0.00 0.00 0.10 1.25 1.05 2.40
Compost Pits No 0.0200 111 2.20 0.00 0.00 0.70 0.85 0.65 2.20Distributins of chaff
cutter No 0.0600 147 8.70 0.00 0.00 0.00 3.20 5.50 8.70
Distributins of mangers No 0.0100 540 5.40 0.00 0.00 2.14 1.16 2.10 5.40
Total (C) 75.23 0.00 0.00 17.95 30.06 27.22 75.23
Revolving found to SHG No 0.25 170 41.79 0.00 0.00 62 15.28 68 16.82 40 9.69 170 41.79Revolving found to
indivisual enterpreneurs No 0.25 23 5.75 0.00 0.00 8 2.00 10 2.50 5 1.25 23 5.75Grant in aid to federation
of SHG's No 2.00 13 20.18 0.00 0.00 0.00 7 14.00 6 6.18 13 20.18
Total(D) 67.72 0.00 0.00 17.28 33.32 17.12 67.72
(E) Consolidation 22.59 0.00 0.00 0.00 0.00 22.59 22.59
Grand Total 752.40 0.00 41.00 143.28 280.10 288.02 752.40
(D)Micro Enterprise(9%)
Production measures for arable land(10%)
61
ANNUAL ACTION PLAN GRAM PANCHAYAT GOKULPURA(A)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 7.58 0.00 0.76 0.76 3.03 3.03 7.58
Monitoring 0.76 0.00 0.00 0.15 0.30 0.30 0.76
Evaluation 0.76 0.00 0.00 0.08 0.30 0.38 0.76
EPA 3.03 0.00 2.42 0.61 0.00 0.00 3.03
I & CB 3.78 0.00 0.95 0.95 0.95 0.95 3.78
DPR 0.76 0.00 0.00 0.61 0.08 0.08 0.76
Total (A) 16.67 0.00 4.13 3.15 4.66 4.74 16.67
(B)
Contour Bund/Field Bund Ha 0.29 10.00 2.90 0.00 0.00 0.00 10 1.45 10 1.45 20 2.90
EarthenCheckDam No 25.00 5.25 0.00 0.00 5 1.00 10 2.00 10 2.25 25 5.25
Tanka No 0.92 2.00 1.84 0.00 0.00 0.00 2 1.84 0.00 2 1.84
Roof Top Rain water harvesting
Str. No 0.75 30.00 22.50 0.00 0.00 0.00 10 7.50 20 15.00 30 22.50
Water Harvesting Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasture Development Ha 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation on Road side Km 5.54 1.00 5.54 0.00 0.00 0.00 1 5.54 0.00 1 5.54
Tanka No 1.35 2.00 2.70 0.00 0.00 1 1.35 1 1.35 0.00 2 2.70
Drainage line treatment
Nalla Bank Stabilisation Km 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EarthenCheckDam No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Munja Plantation Km 0.05 1.00 0.05 0.00 0.00 0.00 1 0.05 0.00 1 0.05
Water Harvesting Structure No 3.11 1.00 3.11 0.00 0.00 0.00 0.00 1 3.11 1 3.11
Total(B) 43.89 0.00 0.00 2.35 19.73 21.81 43.89
Natural resource management(56%)
Conservation measures for non arable land
Conservation measures for arable land
5thYear
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnitcos
tQty Totalcost
1stYear 2ndYear 3rdYear 4thYear Total
62
( C )
Horticulture plantation near
tanka/roof top str. No 0.0700 32 2.24 0.00 0.00 0.00 12 0.84 20 1.40 32 2.24
Only Horticulture Ha 0.00264 141 0.37 0.00 0.00 0.00 1 0.37 0 0.00 1 0.37
Agroforestory No 0.0010 145 0.15 0.00 0.00 0.00 0.15 0.00 0 0.15
Vermi compost No 0.2400 1 0.10 0.00 0.00 0.00 0.00 0.10 0 0.10
Crop Demostration No 0.0050 400 2.00 0.00 0.00 1.00 1.00 0.00 0 2.00
Distribution of PP equipments No 0.0150 34 0.50 0.00 0.00 0.00 0.00 0.50 0.50
Livestock Management &
Fodder demostration
Animal Health Camps No 0.2400 1 0.21 0.00 0.00 0.10 0.00 0.11 0 0.21
Fodder Production No 0.0050 80 0.4 0.00 0.00 0.00 0.40 0.00 0 0.40
Purchasing of Bulls etc,Others No 0.5000 1 0.2 0.00 0.00 0.00 0.20 0.00 0 0.20
Compost Pits No 0.0200 10 0.2 0.00 0.00 0.00 0.10 0.10 0 0.20
Distributins of chaff cutter No 0.0600 12 0.7 0.00 0.00 0.00 0.20 0.50 0 0.70
Distributins of mangers No 0.0100 50 0.5 0.00 0.00 0.00 0.30 0.20 0 0.50
Total (C) 7.57 0.00 0.00 1.10 3.56 2.91 7.57
(D)Micro Enterprise(9%)
Revolving found to SHG No 0.25 18 4.32 0.00 0.00 10 2.50 8 1.82 0.00 18 4.32
Revolving found to indivisual
enterpreneurs No 0.25 2 0.5 0.00 0.00 2 0.50 0.00 0.00 2 0.50
Grant in aid to federation of SHG'sNo 2.00 2 2 0.00 0.00 0.00 1 2.00 1 0.00 2 2.00
Total(D) 6.82 0.00 0.00 3.00 3.82 0.00 6.82
(E) Consolidation 2.28 0.00 0.00 0.00 0.00 2.28 2.28
Grand Total 77.23 0.00 4.13 9.60 31.77 31.74 77.23
Assistant Engineer, PIA
WD&SC P.S.Piprali
Production measures for arable
land(10%)
63
ANNUAL ACTION PLAN GRAM PANCHAYAT NANI(A)
Phy Fin PhyFin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 19.35 0.00 1.94 1.94 7.74 7.74 19.35
Monitoring 1.94 0.00 0.00 0.39 0.78 0.78 1.94
Evaluation 1.94 0.00 0.00 0.19 0.78 0.97 1.94
EPA 7.74 0.00 6.19 1.55 0.00 0.00 7.74
I & CB 9.68 0.00 2.42 2.42 2.42 2.42 9.68
DPR 1.94 0.00 0.00 1.55 0.19 0.19 1.94
Total (A) 42.59 0.00 10.55 8.04 11.91 12.10 42.59
(B)
Contour Bund/Field Bund Ha 0.29 10 2.90 0.00 0.00 0.00 10 1.45 10 1.45 20 2.90
EarthenCheckDam No 25 5.25 0.00 0.00 5 1.00 10 2.00 10 2.25 25 5.25
Tanka No 0.92 2 1.84 0.00 0.00 0.00 2 1.84 0.00 2 1.84
Roof Top Rain water
harvesting Str. No 0.75 40 30.00 0.00 0.00 0.00 20 15.00 20 15.00 40 30.00
Water Harvesting StructureNo 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management
Structure No 5 5.88 0.00 0.00 0.00 2 2.00 3 3.88 5 5.88
Pasture Development Ha 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation on Road side Km 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tanka No 1.35 2 2.70 0.00 0.00 1 1.35 1 1.35 0.00 2 2.70
Drainage line treatment
Nalla Bank Stabilisation Km 6.00 0.15 0.90 0.00 0.00 0.00 0.00 0.90 0.90
EarthenCheckDam No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management
Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Munja Plantation Km 0.05 1 0.05 0.00 0.00 0.00 1 0.05 0.00 1 0.05
Water Harvesting StructureNo 3.11 1 3.11 0.00 0.00 0.00 0.00 1 3.11 1 3.11
Total(B) 52.63 0.00 0.00 2.35 23.69 26.59 52.63
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnit
costQty Totalcost
1stYear 2ndYear 3rdYear 4thYear 5thYear Total
Natural resource management(56%)
Conservation measures for non arable land
Conservation measures for arable land
64
( C )
Horticulture plantation near
tanka/roof top str. No 0.0700 42 2.94 0.00 0.00 0.00 20 1.40 20 1.54 40 2.94
Only Horticulture Ha 0.00264 561 1.48 0.00 0.00 1 0.37 3 1.11 0.00 4 1.48
Agroforestory No 0.0010 385 0.40 0.00 0.00 0.20 0.10 0.10 0.40
Vermi compost No 0.2400 6 1.20 0.00 0.00 0.30 0.30 0.60 1.20
Crop Demostration No 0.0050 1026 5.13 0.00 0.00 1.00 2.00 2.13 5.13
Distribution of PP
equipments No 0.0150 94 1.40 0.00 0.00 0.00 0.50 0.90 1.40
Livestock Management &
Fodder demostration
Animal Health Camps No 0.2400 4 0.80 0.00 0.00 0.32 0.32 0.16 0.80
Fodder Production No 0.0050 280 1.40 0.00 0.00 0.50 0.50 0.40 1.40
Purchasing of Bulls
etc,Others No 0.5000 2 0.60 0.00 0.00 0.00 0.30 0.30 0.60
Compost Pits No 0.0200 25 0.50 0.00 0.00 0.30 0.10 0.10 0.50
Distributins of chaff cutterNo 0.0600 34 2.00 0.00 0.00 0.00 0.00 2.00 2.00
Distributins of mangers No 0.0100 150 1.50 0.00 0.00 0.67 0.25 0.58 1.50
Total (C) 19.35 0.00 0.00 3.66 6.88 8.81 19.35
(D)Micro Enterprise(9%)
Revolving found to SHG No 0.25 43 10.72 0.00 0.00 10 2.50 20 5.00 13 3.22 43 10.72
Revolving found to
indivisual enterpreneurs No 0.25 6 1.5 0.00 0.00 2 0.50 3 0.75 1 0.25 6 1.50
Grant in aid to federation of
SHG's No 2.00 3 5.2 0.00 0.00 0.00 2 4.00 1 1.20 3 5.20
Total(D) 17.42 0.00 0.00 3.00 9.75 4.67 17.42
(E) Consolidation 5.81 0.00 0.00 0.00 0.00 5.81 5.81
Grand Total 137.80 0.00 10.55 17.05 52.23 57.98 137.80
Assistant Engineer, PIA
WD&SC P.S.Piprali
Production measures for arable land(10%)
65
ANNUAL ACTION PLAN GRAM PANCHAYAT CHANDPURA(A)
Phy Fin PhyFin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 10.95 0.00 1.10 1.10 4.38 4.38 10.95
Monitoring 1.09 0.00 0.00 0.22 0.44 0.44 1.09
Evaluation 1.09 0.00 0.00 0.11 0.44 0.55 1.09
EPA 4.38 0.00 3.50 0.88 0.00 0.00 4.38
I & CB 5.48 0.00 1.37 1.37 1.37 1.37 5.48
DPR 1.10 0.00 0.00 0.88 0.11 0.11 1.10
Total (A) 24.09 0.00 5.97 4.55 6.73 6.84 24.09
(B)
Contour Bund/Field Bund Ha 0.29 20 5.80 0.00 0.00 5 1.45 5 1.45 10 2.90 20 5.80
EarthenCheckDam No 35 5.40 0.00 0.00 7 1.08 14 2.16 14 2.16 35 5.40
Tanka No 0.92 2 1.84 0.00 0.00 0.00 2 1.84 0.00 2 1.84
Roof Top Rain water harvesting
Str. No 0.75 40 30.00 0.00 0.00 10 7.50 10 7.50 20 15.00 40 30.00
Water Harvesting Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management StructureNo 0.00 0.00 0.00 0.00 0.00 0.00
Pasture Development Ha 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation on Road side Km 5.54 1 5.54 0.00 0.00 0.00 1 5.54 0.00 1 5.54
Tanka No 1.35 2 2.70 0.00 0.00 0.00 1 1.35 1 1.35 2 2.70
Drainage line treatment
Nalla Bank Stabilisation Km 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00
EarthenCheckDam No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management StructureNo 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Munja Plantation Km 0.05 1 0.05 0.00 0.00 0.00 1 0.05 0.00 1 0.05
Water Harvesting Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total(B) 51.33 0.00 0.00 10.03 19.89 21.41 51.33
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnit
costQty Totalcost
1stYear 2ndYear 3rdYear 4thYear 5thYear Total
Natural resource management(56%)
Conservation measures for non arable land
Conservation measures for arable land
66
( C )
Horticulture plantation near
tanka/roof top str. No 0.0700 42 2.94 0.00 0.00 10 0.70 12 0.84 20 1.40 42 2.94
Only Horticulture Ha 0.00264 281 0.74 0.00 0.00 1 0.37 1 0.37 0.00 2 0.74
Agroforestory No 0.0010 193 0.20 0.00 0.00 0.10 0.10 0.00 0.20
Vermi compost No 0.2400 3 0.60 0.00 0.00 0.15 0.30 0.15 0.60
Crop Demostration No 0.0050 460 2.30 0.00 0.00 1.00 1.00 0.30 2.30
Distribution of PP equipments No 0.0150 47 0.70 0.00 0.00 0.00 0.40 0.30 0.70Livestock Management &
Fodder demostration
Animal Health Camps No 0.2400 2 0.42 0.00 0.00 0.14 0.14 0.14 0.42
Fodder Production No 0.0050 140 0.70 0.00 0.00 0.35 0.35 0.00 0.70
Purchasing of Bulls etc,OthersNo 0.5000 1 0.30 0.00 0.00 0.00 0.15 0.15 0.30
Compost Pits No 0.0200 13 0.25 0.00 0.00 0.00 0.15 0.10 0.25
Distributins of chaff cutter No 0.0600 17 1.00 0.00 0.00 0.00 0.50 0.50 1.00
Distributins of mangers No 0.0100 80 0.80 0.00 0.00 0.35 0.14 0.31 0.80
Total (C) 10.95 0.00 0.00 3.16 4.44 3.35 10.95
Revolving found to SHG No 0.25 25 6.16 0.00 0.00 10 2.50 10 2.50 5 1.16 25 6.16
Revolving found to indivisual
enterpreneurs No 0.25 3 0.75 0.00 0.00 0.00 3 0.75 0.00 3 0.75
Grant in aid to federation of
SHG's No 2.00 2 2.95 0.00 0.00 0.00 1 2.00 1 0.95 2 2.95
Total(D) 9.86 0.00 0.00 2.50 5.25 2.11 9.86
(E) Consolidation 3.29 0.00 0.00 0.00 0.00 3.29 3.29
Grand Total 99.52 0.00 5.97 20.24 36.31 37.00 99.52
WD&SC P.S.Piprali
(D)Micro Enterprise(9%)
Assistant Engineer, PIA
Production measures for arable land(10%)
67
ANNUAL ACTION PLAN GRAM PANCHAYAT RADHAKISANPURA(A)
Phy Fin PhyFin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 9.60 0.00 0.96 0.96 3.84 3.84 9.60
Monitoring 0.96 0.00 0.00 0.19 0.38 0.38 0.96
Evaluation 0.96 0.00 0.00 0.10 0.38 0.48 0.96
EPA 3.84 0.00 3.07 0.77 0.00 0.00 3.84
I & CB 4.80 0.00 1.20 1.20 1.20 1.20 4.80
DPR 0.96 0.00 0.00 0.77 0.10 0.10 0.96
Total (A) 21.12 0.00 5.23 3.98 5.90 6.00 21.12
(B)
Contour Bund/Field Bund Ha 0.29 20 5.80 0.00 0.00 5 1.45 5 1.45 10 2.90 20 5.80
EarthenCheckDam No 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Tanka No 0.92 2 1.84 0.00 0.00 0 0.00 2 1.84 0.00 2 1.84
Roof Top Rain water
harvesting Str. No 0.75 30 22.50 0.00 0.00 10 7.50 10 7.50 10 7.50 30 22.50
Water Harvesting Structure No 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Runoff Management
Structure No 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Pasture Development Ha 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation on Road side Km 5.54 1 5.54 0.00 0.00 0.00 1 5.54 0.00 1 5.54
Tanka No 1.35 2 2.70 0.00 0.00 0 0.00 1 1.35 1 1.35 2 2.70
Drainage line treatment 0.00
Nalla Bank Stabilisation Km 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EarthenCheckDam No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Runoff Management
Structure No 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Munja Plantation Km 0.05 1 0.05 0.00 0.00 0.00 1 0.05 0.00 1 0.05
Water Harvesting StructureNo 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00
Total(B) 38.43 0.00 0.00 8.95 17.73 11.75 38.43
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnit
costQty Totalcost
1stYear 2ndYear 3rdYear 4thYear 5thYear Total
Natural resource management(56%)
Conservation measures for non arable land
Conservation measures for arable land
68
( C )
Horticulture plantation near
tanka/roof top str. No 0.0700 32 2.24 0.00 0.00 10 0.70 12 0.84 10 0.70 32 2.24
Only Horticulture Ha 0.00264 281 0.74 0.00 0.00 1 0.37 1 0.37 0.00 2 0.74
Agroforestory No 0.0010 164 0.17 0.00 0.00 0.10 0.07 0.00 0.17
Vermi compost No 0.2400 3 0.50 0.00 0.00 0.20 0.20 0.10 0.50
Crop Demostration No 0.0050 400 2.00 0.00 0.00 0.50 1.00 0.50 2.00
Distribution of PP equipmentsNo 0.0150 47 0.70 0.00 0.00 0.30 0.20 0.20 0.70
Livestock Management &
Fodder demostration
Animal Health Camps No 0.2400 2 0.40 0.00 0.00 0.13 0.14 0.13 0.40
Fodder Production No 0.0050 140 0.70 0.00 0.00 0.20 0.30 0.20 0.70
Purchasing of Bulls etc,
Others No 0.5000 1 0.30 0.00 0.00 0.10 0.10 0.10 0.30
Compost Pits No 0.0200 13 0.25 0.00 0.00 0.00 0.20 0.05 0.25
Distributins of chaff cutter No 0.0600 17 1.00 0.00 0.00 0.00 0.50 0.50 1.00
Distributins of mangers No 0.0100 60 0.60 0.00 0.00 0.23 0.14 0.23 0.60
Total (C) 9.60 0.00 0.00 2.83 4.06 2.71 9.60
Revolving found to SHG No 0.25 22 5.31 0.00 0.00 10 2.50 10 2.50 2 0.31 22 5.31
Revolving found to indivisual
enterpreneurs No 0.25 3 0.75 0.00 0.00 2 0.50 1 0.25 0.00 3 0.75
Grant in aid to federation of
SHG's No 2.00 2 2.58 0.00 0.00 0.00 1 2.00 1 0.58 2 2.58
Total(D) 8.64 0.00 0.00 3.00 4.75 0.89 8.64
(E) Consolidation 2.88 0.00 0.00 0.00 0.00 2.88 2.88
Grand Total 80.67 0.00 5.23 18.76 32.44 24.23 80.67
WD&SC P.S.Piprali
(D)Micro Enterprise(9%)
Assistant Engineer, PIA
Production measures for arable land(10%)
69
ANNUAL ACTION PLAN GRAM PANCHAYAT CHAINPURA(A)
Phy Fin PhyFin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 27.76 0.00 2.78 2.78 11.10 11.10 27.76
Monitoring 2.77 0.00 0.00 0.55 1.11 1.11 2.77
Evaluation 2.77 0.00 0.00 0.28 1.11 1.39 2.77
EPA 11.10 0.00 8.88 2.22 0.00 0.00 11.10
I & CB 13.88 0.00 3.47 3.47 3.47 3.47 13.88
DPR 2.77 0.00 0.00 2.22 0.28 0.28 2.77
Total (A) 61.05 0.00 15.13 11.51 17.07 17.34 61.05
(B)
Contour Bund/Field Bund Ha 0.29 167 48.43 0.00 0.00 35 10.00 62 18.43 70 20.00 167 48.43
EarthenCheckDam No 115 27.35 0.00 0.00 25 6.00 40 9.35 50 12.00 115 27.35
Tanka No 0.92 10 9.20 0.00 0.00 4 3.68 4 3.68 2 1.84 10 9.20
Roof Top Rain water
harvesting Str. No 0.75 50 37.50 0.00 0.00 10 7.50 20 15.00 20 15.00 50 37.50
Water Harvesting Structure No 3.11 5 15.55 0.00 0.00 1 3.11 2 6.22 2 6.22 5 15.55
Runoff Management StructureNo 39 52.40 0.00 0.00 8 11.00 15 19.40 16 22.00 39 52.40
Pasture Development Ha 1.71 10 17.10 0.00 0.00 5 7.50 5 7.00 0 2.60 10 17.10
Plantation on Road side Km 5.54 2 11.08 0.00 0.00 0.00 1 5.54 1 5.54 2 11.08
Tanka No 1.35 3 4.05 0.00 0.00 1 1.35 1 1.35 1 1.35 3 4.05
Nalla Bank Stabilisation Km 6.00 0.17 1.03 0.00 0.00 0.00 0 0.00 1.03 1.03
EarthenCheckDam No 10 2.35 0.00 0.00 4 1.00 4 0.85 2 0.50 10 2.35
Runoff Management StructureNo 6 5.66 0.00 0.00 2 2.00 2 2.34 2 1.32 6 5.66
Munja Plantation Km 0.05 5 0.25 0.00 0.00 0.00 5 0.25 0.00 5 0.25
Water Harvesting Structure No 3.11 1 3.11 0.00 0.00 0.00 0.00 1 3.11 1 3.11
Total(B) 235.06 0.00 0.00 53.14 89.41 92.51 235.06
Preparatory phase activities capacity building training & EPA(22%)
Activity UnitUnit
costQty Totalcost
1stYear 2ndYear 3rdYear 4thYear 5thYear Total
Natural resource management(56%)
Conservation measures for non arable land
Drainage line treatment
Conservation measures for arable land
70
( C )
Horticulture plantation near
tanka/roof top str. No 0.07 60 4.20 0.00 0.00 12 0.84 24 1.68 24 1.68 60 4.20
Only Horticulture Ha 0.00264 697 1.85 0.00 0.00 1 0.37 3 1.11 1 0.37 5 1.85
Agroforestory No 0.00104 481 0.50 0.00 0.00 0.20 0.20 0.10 0.50
Vermi compost No 0.24 7 1.50 0.00 0.00 0.60 0.60 0.30 1.50
Crop Demostration No 0.005 1200 6.00 0.00 0.00 3.00 2.00 1.00 6.00
Distribution of PP equipmentsNo 0.015 167 2.50 0.00 0.00 0.00 1.00 1.50 2.50
Livestock Management &
Fodder demostration
Animal Health Camps No 0.24 5 1.21 0.00 0.00 0.40 0.40 0.41 1.21
Fodder Production No 0.005 400 2.00 0.00 0.00 0.50 1.00 0.50 2.00 Purchasing of Bulls
etc,Others No 0.50 2 1.00 0.00 0.00 0.00 0.50 0.50 1.00
Compost Pits No 0.02 50 1.00 0.00 0.00 0.40 0.30 0.30 1.00
Distributins of chaff cutter No 0.06 67 4.00 0.00 0.00 0.00 2.00 2.00 4.00
Distributins of mangers No 0.01 200 2.00 0.00 0.00 0.89 0.33 0.78 2.00
Total (C) 27.76 0.00 0.00 7.20 11.12 9.44 27.76
(D)Micro Enterprise(9%) 0.00
Revolving found to SHG No 0.25 62 15.28 0.00 0.00 22 5.28 20 5.00 20 5.00 62 15.28
Revolving found to indivisual
enterpreneurs No 0.25 9 2.25 0.00 0.00 2 0.50 3 0.75 4 1.00 9 2.25
Grant in aid to federation of
SHG's No 2.00 4 7.45 0.00 0.00 0.00 2 4.00 2 3.45 4 7.45
Total(D) 24.98 0.00 0.00 5.78 9.75 9.45 24.98
(E) Consolidation 8.33 0.00 0.00 0.00 0.00 8.33 8.33
Grand Total 357.18 0.00 15.13 77.63 127.35 137.07 357.18
WD&SC P.S.Piprali
Production measures for arable
land(10%)
Assistant Engineer, PIA
71
Name of G.P :-NANI
Arrable conservation measuresSno. Cost for ECD No of ECD Total amount
1 5 0.50
2 5 0.80
3 5 0.90
4 5 1.45
5 5 1.60
25 5.25
Sno. Cost for RMS No of RMS Total amount
1 2 1.28
2 2 2.40
3 1 2.20
5 5.88
0.32
Abstract of EARTHEN Check Dam & RMS
0.10
0.16
0.18
0.29
Total
Total
0.64
1.20
2.20
72
Name of G.P CHANDPURA
Abstract of EARTHEN Check Dam
Arrable conservation measures
Sno. Cost for ECD No of ECD Total amount
1 0.10 20 2.00
2 0.18 10 1.80
3 0.32 5 1.60
Total 35 5.40
73
Name of G.P CHAINPURA
Arrable conservation measuresSno. Cost for ECD No of ECD Total amount
1 20 2.00
2 20 3.20
3 20 3.60
4 15 4.35
5 20 6.40
6 20 7.80
115 27.35
Sno. Cost for RMS No of RMS Total amount
1 5 3.20
2 10 11.60
3 10 12.00
4 4 5.36
5 4 7.08
6 6 13.20
39 52.44
Sno. Cost for WHS No of WHS Total amount
1 1 3.11
Nonarrable conservation measuresSno. Cost for ECD No of ECD Total amount
1 5 0.90
2 5 1.45
10 2.35
Sno. Cost for RMS No of RMS Total amount
1 3 1.92
2 2 2.40
3 1 1.34
6 5.66
Total
0.10
0.16
0.18
0.29
0.32
0.39
Total
0.64
1.16
1.20
1.34
Total
1.77
2.20
1.34
3.11
0.18
0.29
0.64
1.20
Total
74
Silvi Pasture Development
Area 5 ha
Abstruct of Cost Name of work Cost
V ditches 297000
Planation 468000
Fencing 175000
940000
Say 855000 Lacs
75
Length Width Area
Plant to pant Spacing 5 5 25 Sqm No of plant 2000
Avalable Area 5 Ha Gap filling 20% 400
Total no of Plants 2400
Plantation Cost per plantItem no
YearNo./
Year
1Diging of pit in Hard
soil
112
1 0.45 0.45 0.45 1 No 7.5 7.50 18000
2Mixing with soil &
filling pit
5
1 0.45 0.45 0.3 0 cum. 45 2.73 6561
3
Cost of Plant
including 20%gap
filling
As per
forest
1 No. 5 5.00 12000
4 Planting tree 113(b) 1 No. 3.7 3.70 8880
5 Making thavla 117(b) 3 2 6 No. 2.2 39.60 79200
6 Hoeing & weeding 116 3 2 6 No. 1.5 9.00 18000
7Insectiside treatment Market
rate3
3 5 ml 0 Ltr 300 13.50 27000
8 Watering 115 3 6 18 no 2.2 39.60 79200
9 Watch & ward Minimum
weges3
26 26 Month 4316 56 112216
10
Proction of plant from
frost using pulla or
other locally available
material
As per
forest2
1 2 no 4.8 9.60 19200Water
requir
e per
wateri
Waterring
per year
No of
plant
Water
requireme
nt
11Supply of water tanker
3 156 1 270 per3000lt 340 30.60 61200
12grass seed sowing by
Tractor
As per
forest 4 Ha 2532.5 10130
13Cost of Seed
5x4=20kg
Ls
20 120 2400
TOTAL 217 453987
Cost per plant 113.50 Contengency 3% 13620
Grand total 467607
Say 468000
Problem & solution:- NEEL GAY ( Roz) can destroy all plantation work. Such that Watch and ward require on agriment
Note :- We have Chokidar for this Area in this estimate. We supplying water by Tanker .
Estimate include gap filling 20 %
Discription
Total
S.No
Amount for 5 ha.
Model estimate
Rate AmountUnitLength Width Hight Qty
76
Fencing post
S.No Discription Item no. No Quantity Unit Rate Amount
1 Cement concrete(1:2:4) post
(15+25)/2x30=0.0127cum
123 350 4.445 cum 3307 14699.615
2 Loading & unloading of blocks Forest BSR item 350 350.00 No 1.35 472.50
3 Digging of pits including local
transportation size.3x.3x.35
Forest BSR item 350 550.00 No 8.15 4482.50
4 Supplying of angle iron 2m length
30mmx30mmx5mm size
79 350 1540.00 kg 72.3 111342.00
5 Supply of barberbed wire fencing 14
gauge 550x6=3300m,3300x0.1=330kg
2 6 330 Kg 60 19800.00
6 Tidening of barberded wire Forest BSR item 6 6300 mtr 1.3 8190.007 Interlocking of barbedwire with locally
available bussy material
Forest BSR item 1 1050.00 No 9.2 9660.00
8 Planting of forest seed of tree species
along the fancing at spacing of 30cm
Forest BSR item 1 1050 No 0.4 420.00
9 Cost of seed Ls 8 kg 120 960.00
Total 170026.62
Add 3% contengency 5100.80
175127.41
Say 175000
Model estimate
77
Estimate for V.Ditch
Area Length Width Interwell No of row Length
Ha mtr mtr mtr mtr
5 400 125 5 80 10000
25 Kg
5 mtr
15 Cm
1.2
0.3
Sr. no. Name of work Item no. No Length Width Hight Qty Unit Rate Amount
1 Jungal clearence July flora 87 10000 1.5 15000 Sqm 6.37 955502 Earth work Excavation in hard soil
up to 1.5 mt Hight and deposited
excavated meterial lead op to 50
119(b) 0.5 10000 1.20 0.3 1800.00 Cum 104 187200.0
Kg
3 Sowing of grass seed over bund 10000 Rm 0.25 2500.0
4 Cost of seed LS 25 Kg 120 3000.0
288250.0
Add 3% contengecy 8647.5
Total 296897.5
Say 297000
Dhaman require =5 kg/ha
Spacing
Spacing of grass seed
78
Length per ha = 1.3x100x100/HI
= 1.3x100x100/100
130RM
Maximum cross section
0.6
US
DS 2:1 0.75 2:1
1.5 1.5
3.6
CS (Tw+Bw) *Hight
2
CS 1.575
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 130 1.575 204.75 Cum 104 21294.00
2 Dry stone pitching 23cm thick 124 13.00 1.70 5.08 Cum 1062 5398.15
3 Ls 1500
28192.15
3% contengency 845.76
Total 29037.91
Say 29000/=
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
CHAINPURA IWMPContur Bund
79
ChainpuraIWMPEarthen chack dam
Length in m 39
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1 3:1
2:1 0.45 3:1
2 3 0.9 1.35
6 3.25
CS (Tw+Bw) *Hight
2
CS 3.5 CS 0.95625
Average Cross section 1.804167
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 39 1.80 70.36 Cum 104 7317.70
2 Dry stone pitching 23cm thick 124 39.00 2.00 17.94 Cum 1062 19052.28
3 Ls 2000
28369.98
3% contengency 851.10
Total 29221.08
Say 29000
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
80
ChainpuraIWMPEarthen chack dam
Length in m 38
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.5 3:1
2:1 0.75 3:1
3 4.5 1.5 2.25
8.5 4.75
CS (Tw+Bw) *Hight
2
CS 7.125 CS 2.15625
Average Cross section 3.8125
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 38 3.81 144.88 Cum 104 15067.00
Dry stone pitching 23cm thick 124 38.00 2.00 17.48 Cum 1062 18563.76
Ls 4000
37630.76
3% contengency 1128.92
Total 38759.68
Say 39000
Name of work
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
81
ChainpuraIWMPEarthen chack dam
Length in m 30
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.2 3:1
2:1 0.75 3:1
2.4 3.6 1.5 2.25
7 4.75
CS (Tw+Bw) *Hight
2
CS 4.8 CS 2.15625
Average Cross section 3.0375
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 30 3.04 91.13 Cum 104 9477.00
2 Dry stone pitching 23cm thick 124 30.00 2.25 15.53 Cum 1062 16487.55
3 Ls 5200
31164.55
3% contengency 934.94
Total 32099.49
Say 32000
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
82
ChainpuraIWMPEarthen chack dam
Length in m 19
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1 3:1
2:1 0.45 3:1
2 3 0.9 1.35
6 3.25
CS (Tw+Bw) *Hight
2
CS 3.5 CS 0.95625
Average Cross section 1.804167
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 19 1.80 34.28 Cum 104 3565.03
2 Dry stone pitching 23cm thick 124 19.00 2.00 8.74 Cum 1062 9281.88
3 Ls 2500
15346.91
3% contengency 460.41
Total 15807.32
Say 16000
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
83
ChainpuraIWMPEarthen chack dam
Length in m 17
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.2 3:1
2:1 0.75 3:1
2.4 3.6 1.5 2.25
7 4.75
CS (Tw+Bw) *Hight
2
CS 4.8 CS 2.15625
Average Cross section 3.0375
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 17 3.04 51.64 Cum 104 5370.30
2 Dry stone pitching 23cm thick 124 17.00 2.25 8.80 Cum 1062 9342.95
3 Ls 2800
17513.25
3% contengency 525.40
Total 18038.64
Say 18000
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
84
ChainpuraIWMPEarthen chack dam
Length in m 10
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.2 3:1
2:1 0.75 3:1
2.4 3.6 1.5 2.25
7 4.75
CS (Tw+Bw) *Hight
2
CS 4.8 CS 2.15625
Average Cross section 3.0375
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 10 3.04 30.38 Cum 104 3159.00
2 Dry stone pitching 23cm thick 124 10.00 2.00 4.60 Cum 1062 4885.20
3 Ls 1700
9744.20
3% contengency 292.33
Total 10036.53
Say 10000
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation& Pipe outlet
85
ekud ykxr vuqeku
1- dk;Z dk uke % tydq.M dk fuekZ.k
2- xfrfof/k dk uke % Ñf"k Hkqfe laj{k.k dk;Z
3- ;kstuk dk uke % vkbZ- MCyw- ,e- ih- pSuiqjk] iapk;r lfefr & fiijkyh ¼lhdj½
4- ty dq.M dk fooj.k % dq.M dk O;kl ¼ckgj½ 3-50 eh
dq.M dk O;kl ¼vUnj½ 3-05 eh
dq.M dh [kqnkbZ 3-20 eh
dq.M dh fpukbZ 3-65 eh
dq.M dh {kerk 22000 yh-
ik;Fku 9-50 eh-
Ø-
la-
dk;Z dk fooj.k la[;k y- pkS- ma- ek=k bZdk
bZ
nj dqy jkf’k
1 uhao esa 1-5 ehVj xgjkbZ rd feV~Vh dh
[kqnkbZ djuk]ry dks dwVuk ikuh
Mkyuk] [kqnh ehV~Vh dks ckgj fudkyuk]
uhao Hkjus ds ckn [kyh LFkkuksa dks iqu%
feV~Vh ls Hkjuk rFkk cph gqbZ feVh dks
50 ehVj dh nqjh rd fuLrkj.k djuk
l[r feV~Vh esa
3.14/4X3.50X3.50X1.50=14.42
14.42 ?k-
eh-
113 1629.46
2. uhoa dh [kqnkbZ ,d vfrfjDr mBku
lfgr 1-5 ls 3 eh- rd
3.14/4X3.50X3.50X1.50=14.42
14.42 ?k-
eh-
126-30 1821.24
3. vfrfjDr mBku 3 eh- ls 3-5 eh- rd
3.14/4X3.50X3.50X0.20=1.92 1.92 ?k-
eh-
139-60 268.03
4. dq.M esa lhesaV dadjhV 1%5%10 esa iRFkj
dh feV~Vh 40 eheh ds lkFk feykdj
Mkyuk] dwVuk o rjkbZ djukA
0.785X3.502X0.15=1.44
1.44 ?k-
eh-
2211 4584.72
5. uhao ,a dqlhZ esa izFke Js.kh dh bZaV dh
fpukbZ lhesaV ctjh 1%6 esa e; cxy dh
>hjh cUn djus rFkk rjkbZ lesr
0.785X(3.502-3.05
2)X3.65=7.52
7.52 ?k-
eh-
2720 20454.44
6. iRFkj dk fyaVu yxkus dk dk;Z 7-50
lseh eksVkbZ
2X3.50X.30=2.10
2.10 o-
eh-
933 1959.30
7. vOo; ntZs dh iRFkj dh iVVh;ksa dh
Nr Mkyuk] mij o uhps dh tksMksa ds
iRFkj ds fpi ds lkFk 1%4 esa lhesaV
elkys ls Hkjuk
0.785X3.50 =9.61
9.61 o-
eh
1141 10965.01
8. 50 eheh eksVkbZ esa Q’kZ esa lheasvV
dadjhV 1%2%4 esa iRFkj dh xhVh 12
eheh ds lkFk feykdj Mkyuk dwVuk o
rjkbZ djuk
3.14/4*9.50*9.5=70.84
70.84 o-
eh-
258 18276.00
9. Ukhoa ,oa dqlhZ esa izFke Js.kh dh bZV dh
fpukbZ lheasV ctjh 1%6 esa e; cxy dh
>hjh cUn djus rFkk rjkbZ lesr 112
eheh eksVkbZ 3.14*9.5*.30=8.95
8.95 o-
eh-
355 3177.25
10. ik;Fku gsrq iRFkj dk [kjtk dk;Z 1%3 9.18 o- 959-60 8809.12
86
flesaV jsr elkyk esa o tksM+ks dks Hkjuk
.785(9.52-3.50
2)*.15=9.18
eh-
11. dq.M esa lheasV IykLVj dk dk;Z 1%4 esa
lhesaV ctjh feydkj tksM+ks dks dqjsnuk
rFkk rjkbZ lfgr 20 eheh eksVkbZ esa
iSans ij 0.785 3.05 3.05 7.30 o-
eh
vUnj 3.14 3.05 3.50 33.51 o-
eh-
ckgj 3.14 3.50 0.50 5.49 o-
eh-
Åij 0.785 9.50 9.50 70.84 o-
eh
LdfVZx 3.14 9.50 .45 13.42 o-eh dqy ek=k 130.5
6
o-
eh
126 16450.56
12. ,yqequh;e <Ddu o yksgs dh tkyh
ykuk o yxkus dk dk;Z
1000
;ksx 89395.13
daVhtsUlh pktsZt @3% 2681.85
egk;ksx 92076.98
Say : 92000/-
87
ekud ykxr vuqeku
1- dk;Z dk uke % :Q okVj gkosZLfVax LVªsDpj
2- xfrfof/k dk uke % Ñf"k Hkqfe laj{k.k dk;Z
3- ;kstuk dk uke % vkbZ- MCyw- ,e- ih- pSuiqjk] iapk;r lfefr & fiijkyh ¼lhdj½
4- ty dq.M dk fooj.k % dq.M dk O;kl ¼ckgj½ 3-50 eh
dq.M dk O;kl ¼vUnj½ 3-05 eh
dq.M dh [kqnkbZ 3-20 eh
dq.M dh fpukbZ 3-65 eh
dq.M dh {kerk 22000 yh-
lks[krk x<+k dk O;kl ¼ckgj½ 1-20 eh-
lks[kr x<s+ dh xgjkbZ 9-00eh-
Ø-
la-
dk;Z dk fooj.k la[;k y- pkS- ma- ek=k bZdkbZ nj dqy jkf’k
Hkkx v 1. uhao esa 1-5 ehVj xgjkbZ rd feV~Vh dh
[kqnkbZ djuk]ry dks dwVuk ikuh Mkyuk]
[kqnh ehV~Vh dks ckgj fudkyuk] uhao Hkjus
ds ckn [kyh LFkkuksa dks iqu% feV~Vh ls
Hkjuk rFkk cph gqbZ feVh dks 50 ehVj dh
nqjh rd fuLrkj.k djuk l[r feV~Vh esa
3.14/4X3.50X3.50X1.50=14.42
14.42 ?k- eh- 113 1629.46
2. uhoa dh [kqnkbZ ,d vfrfjDr mBku lfgr
1-5 ls 3 eh- rd
3.14/4X3.50X3.50X1.50=14.42
14.42 ?k- eh- 126-30 1821.24
3. vfrfjDr mBku 3 eh- ls 3-5 eh- rd
3.14/4X3.50X3.50X0.20=1.92 1.92 ?k- eh- 139-60 268.03
4. dq.M esa lhesaV dadjhV 1%5%10 esa iRFkj dh
feV~Vh 40 eheh ds lkFk feykdj Mkyuk]
dwVuk o rjkbZ djukA
0.785X3.50X0.15=1.44
1.44 ?k- eh- 2211 4584.72
5. uhao ,a dqlhZ esa izFke Js.kh dh bZaV dh
fpukbZ lhesaV ctjh 1%6 esa e; cxy dh
>hjh cUn djus rFkk rjkbZ lesr
0.785X(3.50-3.05)X3.65=7.52
7.52 ?k- eh- 2720 20454.44
6. iRFkj dk fyaVu yxkus dk dk;Z 7-50 lseh
eksVkbZ
2X3.50X.30=2.10
2.10 o- eh- 933 1959.30
7. vOo; ntZs dh iRFkj dh iVVh;ksa dh Nr
Mkyuk] mij o uhps dh tksMksa ds iRFkj ds
fpi ds lkFk 1%4 esa lhesaV elkys ls Hkjuk
0.785X3.502 =9.61
9.61 o- eh 1141 10965.01
8. 50 eheh eksVkbZ esa Q’kZ esa lheasV dadjhV
1%2%4 esa iRFkj dh xhVh 12 eheh ds lkFk
feykdj Mkyuk dwVuk o rjkbZ djuk
3.14/4*3.50*3.50=9.61
9.61 o- eh- 258 2479.38
9. dq.M esa lheasV IykLVj dk dk;Z 1%4 esa
lhesaV ctjh feydkj tksM+ks dks dqjsnuk
rFkk rjkbZ lfgr 20 eheh eksVkbZ esa
iSans ij 0.785 3.05 3.05 7.30 o- eh vUnj 3.14 3.05 3.50 33.51 o- eh- Åij 3.14 3.50 3.50 9.61 o- eh-
88
dqy ek=k 50.42 o- eh 126 6352.92 10. ,yqequh;e <Ddu o yksgs dh tkyh ykuk
o yxkus dk dk;Z
1000
Hkkx c 1. uhao esa 1-5 ehVj xgjkbZ rd feV~Vh dh
[kqnkbZ djuk]ry dks dwVuk ikuh Mkyuk]
[kqnh ehV~Vh dks ckgj fudkyuk] uhao Hkjus
ds ckn [kyh LFkkuksa dks iqu% feV~Vh ls
Hkjuk rFkk cph gqbZ feVh dks 50 ehVj dh
nqjh rd fuLrkj.k djuk l[r feV~Vh esa
3.14/4X1.20X1.20X1.50=1.69
1.69 ?k- eh 113 190.97
2. uhoa dh [kqnkbZ ,d vfrfjDr mBku lfgr
1-5 ls 3 eh- rd
3.14/4X1.20X1.20X1.50=1.69
1.69 ?k- eh 126.30 213.44
3. vfrfjDr mBku 3 eh- ls 4-5 eh- rd
3.14/4X1.20X1.20X1.50=1.69 1.69 ?k- eh 139.60 235.92
4. vfrfjDr mBku 4-50 eh- ls 6-00 eh- rd
3.14/4X1.20X1.20X1.50=1.69 1.69 ?k- eh 152.90 258.40
5. vfrfjDr mBku 6-00 eh- ls 7-50 eh- rd
3.14/4X1.20X1.20X1.50=1.69 1.69 ?k- eh 166.20 280.87
6.
vfrfjDr mBku 7-50 eh- ls 9-00 eh- rd
3.14/4X1.20X1.20X1.50=1.69 179.50 ?k- eh 179.50 303.35
7. dq.M esa lhesaV dadjhV 1%2%4 esa iRFkj dh
feV~Vh 12 eheh ds lkFk feykdj Mkyuk]
dwVuk o rjkbZ djukA
0.785X(1.22-1.0
2) X9=3.10
3.10 ?k- eh 3307 10251.70
8. lsVfjax bR;kfn
3.14X1X9=28.26 28.26 o-eh 190 5369.40
9. vOo; ntZs dh iRFkj dh iVVh;ksa dh Nr
Mkyuk] mij o uhps dh tksMksa ds iRFkj ds
fpi ds lkFk 1%4 esa lhesaV elkys ls Hkjuk
0.785X1.202 =1.13
1.13 o-eh 1141 1289.33
10. 50 eheh eksVkbZ esa Q’kZ esa lheasV dadjhV
1%2%4 esa iRFkj dh xhVh 12 eheh ds lkFk
feykdj Mkyuk dwVuk o rjkbZ djuk
0.785X1.202 =1.13
1.13 o-eh 258 291.54
11. LVªsDpj dks Nr ls ihohlh ikbi ls tksM+uk
bR;kfn
2500
;ksx 72699.42
daVhtsUlh pktsZt @3% 2180.98
egk;ksx 74880.40
Say : 75000/-
89
Model Estimate
Water Harvesting StructureCHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 1 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 267699
maximum hight 2 mtr. Total 310978
maxi
mum
lenth
of
treval 80 mtr. Say 3.11 lacs
90
Water Harvesting Structure Data to put A C L H h I Df
1 0.3 80 1 0.3 10 30
Structural Design Hydrologic Design
Q=0.0276 CIA Q= Peak rate run off in Cum/Sec.
H h d p
C= Weighted cofficient of run off
1 0.3 0.5 2.3
I= Intencity of rain fall in Cm./hr.
for equal to time of constration at a given Frequency 1
Top width of head wall a a=h/(p-1)
0.5 h p p-1 (p-1)
0.5
A= Catchment area in Hectares
0.26 0.3 2.3 1.3 1.14
Q Cofficient I A C
Say 0.45
0.232 0.0276 28 1 0.3
2 Bottom width of head wall b b=h+H/(p-1)
0.5 h H H+h p p-1
(p-1)
0.5
1.140 0.3 1 1.3 2.3 1.3 1.14
TC=0.0195 K0.77
TC=Time of constration in minute
Say 1.20
TC=Time of constration in minute
3 Length of head wall ext l l=H+d+1 H d cofficient
K= L3/2
/H½
2.5 1 0.5 1
L= Max. length of travel in Mtr.
4 Hight of head wall ext H+d H d H=Diffrence elevation in Mtr.
1.5 1 0.5
K L L3/2
H H½
5 Bottom width of head wall ext 0.5(H+h) H h H+h cofficient
715.5 80 715.5 1 1.000
0.65 1 0.3 1.3 0.5
0.75
6 Top width of head wall ext 0.4*H H cofficient
TC Cofficient K K.77
0.4 1 0.4 3.077 0.0195 715.5 157.8
7 Length of basin LB 0.75(H+d)+H H d H+d 0.75(H+d)
28 Use this As I As Reference
2.13 1 0.5 1.5 1.125
10 I=one hour rain fall intensity in cm/hour
8 Thickness of basin t
Hydraulic Design
0.5
Q Cofficient L h h1.5
h=head over the crest in mtr 9 Hight of the side wall at head H+d H d 0.232 1.71 0.83 0.3 0.164
L=length of the crest wall in mtr wall joint 1.5 1 0.5
2.706
10 Hight of the side wall at toe 1.5*h cofficient h F Cofficient hw
F=free board in mtr
wall joint 0.45 1.5 0.3
0.115 1.5 0.077
11 Length of wing wall 2.25*h cofficient h 0.2
0.675 2.25 0.3
hw Cofficient Df Df0.5
Df=fatch length in mtr
12 Height of wing wall 1.5*h cofficient h
91
0.077 0.014 30 5.48
hw=wave length in mtr
0.45 1.5 0.3
d h F
13 Top width of toe wall 0.35 0.5 0.3 0.2
14 Height of toe wall 0.3
15 Thickness of side wall 0.45
92
a = Top width of head wall in m. CHAINPURA IWMP
b = Bottom width of head wall in m. 0 0 0 0 0 0
Fa = Water force in Kg
Fb = Water force in Kg
Fc = Water force in Kg
U = uplift force in Kg h
r = Specific gravity of dam material kg/cum(2300kg/cum) Fc
w = Unit weight of water in kg/cum(1000 kg/cum) wh
H = Height of head wall
h = head over the crest
C = Coefficient in uplift (0.5) Fa X1
m = Coefficient of friction (0.65 to 0.75) Fb H
a b H h r C w H/3 H/2 W1
0.45 1.20 1 0.3 2300 0.5 1000 W2
W1 = a Hr a H r w(h+H) b
1035 0.45 1 2300
U
W2 = ½(b-a)Hr b a H r cofficient
862.5 1.20 0.45 1 2300 0.5
cw(h+H)
U = ½Cw(H+h)b w H h H+h b cofficient
390 1000 1 0.3 1.3 1.20 0.5
Fa = whH w h H H 1.00
300 1000 0.3 1 h 0.3 W1 1035
a 0.45 W2 862.5
Fb = wH2 / 2 w H H H
2cofficient b 1.20 U 390
500 1000 1 1 1 0.5 w 1000 Fa 300
Fb 500
Fc = wah w a h Fc 135
135 1000 0.45 0.3
b/3 2b/3
a
93
Safety against overturning
W1 x1 Fc Fa Fb U a b
1035 0.975 135 300 500 390 0.45 1.20
H U
1 390
RM W1x1+Fcx1+W2.2(b-a)/3
W1x1 Fcx1 W2.2(b-a)/3b a b-a coffi
1567.69 1009.125 131.625 426.94 1.20 0.45 0.75 0.66
OM FaxH/2+FbxH/3+Ux2b/3
FaxH/2 FbxH/3 Ux2b/3
628.6667 150 166.6667 312
RM OM RM/OM
1567.69 628.6667 2.49367 >1.5 Hance safe
Safety against sliding
Tv W1 W2 Fc U
1642.5 1035 862.5 135 390
Th Fa Fb Frictional cofficient
800 300 500 0.8
C.F*Tv/Th 1.64 >1.3 Hence safe
Safety against tension at base
X=(RM-OM)/Tv RM-OM Tv
0.572 939.02 1642.5
E=b/2-X b/2 X
0.028 0.6 0.572
e b/6
0.028 0.200 b/6>e
Hance safe
94
Structural Design 0
Top Plan 0.5
0.83
0.45
1.20
0.75
2.93
1.38 2.13
0.7
0.6
Elivation
Head wall extention
1.73
1.25
Head wall
1.38 0.35 0.45
Land Level
0.3
Apron
0.6
0.6
Foundation
0.3
1.20
2.93
0.75
0.9
cc 1:4:8
0.4
1.20
0.45
1.20
Side wall
1.5
0.9
0.5
1
2.5
0.75
0.4
0.35
0.3
95
Estimate 0 0 0 0 0 0
Head wall H.W.E Side wall Toe Wall
Average 0.825 0.575 2.06 0.625
Sr. no. Name of work Item no. No Length Width Hight Qty rate amount
1
Earth work Excavation in hard soil up to 1.5 mt Hight and deposited excavated
meterial lead op to 150 2B
Head wall 1 0.83 1.20 0.9 0.89
Head wall extention 2 2.5 0.75 0.9 3.38
side wall 2 2.93 0.45 0.9 2.37
Appron 1 0.83 1.38 0.9 1.02
Toe wall 1 0.83 0.9 0.9 0.67
Wing Wall 1 0.675 0.6 0.6 0.24
8.57 113 968.1583
2
Cement concrete 1:4:8 (1cement:4 sand:8 concrete) 40/25 mm
concrete Using mixture & vibrater 11B
Head wall 1 0.83 1.20 0.3 0.30
Head wall extention 2 2.5 0.75 0.3 1.13
side wall 2 2.93 0.45 0.3 0.79
Appron 1 0.83 1.38 0.3 0.34
Toe wall 1 0.83 0.9 0.3 0.22
Wing Wall 1 0.68 0.6 0.3 0.12
2.90 2419 7006.45
3RR stone mesonary in Cement sand mortar 1 : 6
Head wall 1 0.83 1.20 0.6 0.59
Head wall extention 2 2.5 0.75 0.6 2.25
side wall 2 2.93 0.45 0.6 1.58
Appron 1 0.83 1.38 0.15 0.17
Toe wall 1 0.83 0.9 0.6 0.45
Wing Wall 1 0.68 0.6 0.3 0.12
5.16 2061 10636.44
4 RR stone mesonary in Cement sand mortar 1 : 6 121
Head wall 1 0.83 0.825 1 0.68
Head wall extention 2 2.5 0.575 1.5 4.31
side wall 2 2.06 0.45 1.05 1.95
side wall 2 2.93 0.45 0.45 1.18
Appron 1 0.83 1.38 0.00
Toe wall 1 0.83 0.625 0 0.00
Wing Wall 1 0.68 0.6 0.45 0.18
8.31 2061 17125.16
cf 35736.21
121
96
Sr. no. Name of work Item no. No Length Width Hight Qty rate amount
5
Cement concrete 1:3:6 (1cement:3 sand:6 concrete) 40/25 mm
concrete Using mixture & vibrater
122A
bf 35736.205
Head wall 1 0.83 0.45 0.1 0.037
Head wall extention 2 2.50 0.4 0.08 0.16
side wall 2 1.20 0.45 0.08 0.0864
side wall 2 1.73 0.45 0.08 0.125
Appron 1 0.83 1.38 0.08 0.091
Toe wall 1 0.83 0.35 0.08 0.023
Wing Wall 1 0.68 0.6 0.08 0.032
0.554 2598 1440.2255
6 Cement Plaster 1 : 6 ( 1 cement : 6 sand) 25 mm thick 68A
Head wall 1 0.83 0.45 0.371
Head wall 1 0.83 1 0.83
Head wall extention 2 2.50 0.4 2.00
Head wall extention 2 2.50 1.5 7.50
side wall 2 1.20 0.45 1.08
side wall 2 1.73 0.45 1.56
side wall 2 2.93 0.45 2.63
side wall 2 2.06 1.05 4.33
side wall 2 0.45 1.5 1.35
Appron 1 0.83 1.38 1.13
Toe wall 1 0.83 0.95 0.78
Wing Wall 2 0.68 0.6 0.81
Wing Wall 2 0.68 0.45 0.6075
Wing Wall 2 0.45 0.6 0.54
25.52 165 4211.3096
7
Cement concrete 1:2:4 (1cement:2 sand:4 concrete) 25 mm concrete
Using mixture & vibrater
Appron 123 1 0.83 1.375 0.15 0.17 3307 562.77983
8 Pointing 1:3 (1 Cement : 3 Sand) 70A
Head wall 1 0.83 1.25 1.03 65.6 67.65879
Total 42018.179
3% contengency 1261
TOTAL 43278.72
97
ChainpuraEarthen bund
Length in m 147
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 2 3:1
2:1 1 3:1
4 6 2 3
11 6
CS (Tw+Bw) *Hight
2
CS 12 CS 3.5
Average Cross section 6.333333
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 147 6.33 931.00 Cum 104 96824.00
Dry stone pitching 23cm thick 123 147.00 4.50 152.15 Cum 1062 161577.99
Ls 1500
259901.99
3% contengency 7797.06
Total 267699.05
Name of work
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
98
Model Estimate
Runoff Management StructureCHAINPURA IWMP
CHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 20755
maximum hight 2 mtr. Total 64034
maximum
lenth of
treval 125 mtr. Say 0.64 lacs
99
CHAINPURA IWMPEarthen bund
Length in m 10
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.8 3:1
2:1 1 3:1
3.6 5.4 2 3
10 6
CS (Tw+Bw) *Hight
2
CS 9.9 CS 3.5
Average Cross section 5.633333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 10 5.63 56.33 Cum 104 5858.67
2 Dry stone pitching 23cm thick 123 10 4.50 10.35 Cum 1062 10991.70
3 Ls 3300
20150.37
3% contengency 604.51
Total 20754.88
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
100
Model Estimate
Runoff Management StructureCHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 72823
maximum hight 2 mtr. Total 116102
maximum
lenth of
treval 125 mtr. Say 1.16 lacs
101
10 6
CS (Tw+Bw) *Hight
2
CS 9.9 CS 3.5
Average Cross section 5.633333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 40 5.63 225.33 Cum 104 23434.67
2 Dry stone pitching 23cm thick 123 40 4.50 41.40 Cum 1062 43966.80
3 Ls 3300
70701.47
3% contengency 2121.04
Total 72822.51
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
102
Model Estimate
Runoff Management StructureCHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 77042
maximum hight 2 mtr. Total 120321
maximum
lenth of
treval 125 mtr. Say 1.20 lacs
103
CHAINPURA IWMPEarthen bund
Length in m 45
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.5 3:1
2:1 1 3:1
3 4.5 2 3
8.5 6
CS (Tw+Bw) *Hight
2
CS 7.125 CS 3.5
Average Cross section 4.708333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 45 4.71 211.88 Cum 104 22035.00
2 Dry stone pitching 23cm thick 123 45 4.50 46.58 Cum 1062 49462.65
3 Ls 3300
74797.65
3% contengency 2243.93
Total 77041.58
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
104
Model Estimate
Runoff Management StructureCHAINPURA IWMP
CHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 90178
maximum hight 2 mtr. Total 133457
maximum
lenth of
treval 125 mtr. Say 1.34 lacs
105
CHAINPURA IWMPEarthen bund
Length in m 50
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.8 3:1
2:1 1 3:1
3.6 5.4 2 3
10 6
CS (Tw+Bw) *Hight
2
CS 9.9 CS 3.5
Average Cross section 5.633333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 50 5.63 281.67 Cum 104 29293.33
2 Dry stone pitching 23cm thick 123 50 4.50 51.75 Cum 1062 54958.50
3 Ls 3300
87551.83
3% contengency 2626.56
Total 90178.39
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
106
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 133568
maximum hight 2 mtr. Total 176847
maximum
lenth of
treval 125 mtr. Say 1.77 lacs
107
CHAINPURA IWMPEarthen bund
Length in m 75
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.8 3:1
2:1 1 3:1
3.6 5.4 2 3
10 6
CS (Tw+Bw) *Hight
2
CS 9.9 CS 3.5
Average Cross section 5.633333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 75 5.63 422.50 Cum 104 43940.00
2 Dry stone pitching 23cm thick 123 75 4.50 77.63 Cum 1062 82437.75
3 Ls 3300
129677.75
3% contengency 3890.33
Total 133568.08
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
108
Model Estimate
Runoff Management StructureCHAINPURA IWMP
0.83
Design as per field topography Abstruct of cost
Area 10 ha. Cost of waste weir 43279
Slope 1 to 2 % Cost of earthen bund 176958
maximum hight 2 mtr. Total 220237
maximum
lenth of
treval 125 mtr. Say 2.20 lacs
109
CHAINPURA IWMPEarthen bund
Length in m 100
Maximum cross section Minimum cross section on both sides
1.0
1.0
US
DS 2:1 1.8 3:1
2:1 1 3:1
3.6 5.4 2 3
10 6
CS (Tw+Bw) *Hight
2
CS 9.9 CS 3.5
Average Cross section 5.633333
Sr.no.
BSR Itam
No Length
Cross
secction Qty Unit Rate Amount
119 B 100 5.63 563.33 Cum 104 58586.67
2 Dry stone pitching 23cm thick 123 100 4.50 103.50 Cum 1062 109917.00
3 Ls 3300
171803.67
3% contengency 5154.11
Total 176957.78
Name of work
1
Earth work Excavation in hard soil up to 1.5
mt Hight and deposited excavated meterial
lead op to 50
Vegetation
110
Model Estimate
CHAINPURA IWMP
waste weir
0.83
Design as per field topography Abstruct of cost
Area 1 ha. Cost of waste weir 43279
Slope 1 to 2 %
maximum hight 2 mtr.
maxi
mum
lenth
of
treval 80 mtr.
111
waste weir
Data to put A C L H h I Df
1 0.3 80 1 0.3 10 30 Structural DesignHydrologic Design
Q=0.0276 CIA Q= Peak rate run off in Cum/Sec. H h d p
C= Weighted cofficient of run off 1 0.3 0.5 2.3
I= Intencity of rain fall in Cm./hr.
for equal to time of constration at a given Frequency 1 Top width of head wall a a=h/(p-1)0.5
h p p-1 (p-1)0.5
A= Catchment area in Hectares 0.26 0.3 2.3 1.3 1.14
Q Cofficient I A C Say 0.45
0.2318 0.0276 28 1 0.3 2 Bottom width of head wall b b=h+H/(p-1)0.5
h H H+h p p-1 (p-1)0.5
1.140 0.3 1 1.3 2.3 1.3 1.14
TC=0.0195 K0.77
TC=Time of constration in minute Say 1.20
TC=Time of constration in minute 3 Length of head wall ext l l=H+d+1 H d cofficient
K= L3/2
/H½
2.5 1 0.5 1
L= Max. length of travel in Mtr. 4 Hight of head wall ext H+d H d
H=Diffrence elevation in Mtr. 1.5 1 0.5
K L L3/2
H H½
5 Bottom width of head wall ext 0.5(H+h) H h H+h cofficient
715.54 80 715.54 1 1.000 0.65 1 0.3 1.3 0.5
0.75
6 Top width of head wall ext 0.4*H H cofficient
TC Cofficient K K.77
0.4 1 0.4
3.0768 0.0195 715.54 157.79 7 Length of basin LB 0.75(H+d)+H H d H+d 0.75(H+d)
28 Use this As I As Reference 2.13 1 0.5 1.5 1.125
10 I=one hour rain fall intensity in cm/hour 8 Thickness of basin t
Hydraulic Design 0.5
Q Cofficient L h h1.5
h=head over the crest in mtr 9 Hight of the side wall at head H+d H d
0.2318 1.71 0.83 0.3 0.164 L=length of the crest wall in mtr wall joint 1.5 1 0.5
2.7064 10 Hight of the side wall at toe 1.5*h cofficient h
F Cofficient hw F=free board in mtr wall joint 0.45 1.5 0.3
0.115 1.5 0.0767 11 Length of wing wall 2.25*h cofficient h
0.2 0.675 2.25 0.3
hw Cofficient Df Df0.5
Df=fatch length in mtr 12 Height of wing wall 1.5*h cofficient h
0.0767 0.014 30 5.48 hw=wave length in mtr 0.45 1.5 0.3
d h F 13 Top width of toe wall 0.35
0.5 0.3 0.2 14 Height of toe wall 0.3
15 Thickness of side wall 0.45
112
a = Top width of head wall in m. CHAINPURA IWMP
b = Bottom width of head wall in m. 0 0 0 0 0 0
Fa = Water force in Kg
Fb = Water force in Kg
Fc = Water force in Kg
U = uplift force in Kg h
r = Specific gravity of dam material kg/cum(2300kg/cum) Fc
w = Unit weight of water in kg/cum(1000 kg/cum) wh
H = Height of head wall
h = head over the crest
C = Coefficient in uplift (0.5) Fa X1
m = Coefficient of friction (0.65 to 0.75) Fb H
a b H h r C w H/3 H/2 W1
0.45 1.20 1 0.3 2300 0.5 1000 W2
W1 = a Hr a H r w(h+H) b
1035 0.45 1 2300
U
W2 = ½(b-a)Hr b a H r cofficient
862.5 1.20 0.45 1 2300 0.5
cw(h+H)
U = ½Cw(H+h)b w H h H+h b cofficient
390 1000 1 0.3 1.3 1.20 0.5
Fa = whH w h H H 1.00
300 1000 0.3 1 h 0.3 W1 1035
a 0.45 W2 862.5
Fb = wH2 / 2 w H H H
2cofficient b 1.20 U 390
500 1000 1 1 1 0.5 w 1000 Fa 300
Fb 500
Fc = wah w a h Fc 135
135 1000 0.45 0.3
b/3 2b/3
a
113
Safety against overturning
W1 x1 Fc Fa Fb U a b W2
1035 0.975 135 300 500 390 0.45 1.20 862.5
H U
1 390
RM W1x1+Fcx1+W2.2(b-a)/3
W1x1 Fcx1 W2.2(b-a)/3b a b-a coffi
1567.69 1009.125 131.625 426.94 1.20 0.45 0.75 0.66
OM FaxH/2+FbxH/3+Ux2b/3
FaxH/2 FbxH/3 Ux2b/3
628.6667 150 166.6667 312
RM OM RM/OM
1567.69 628.6667 2.49367 >1.5 Hance safe
Safety against sliding
Tv W1 W2 Fc U
1642.5 1035 862.5 135 390
Th Fa Fb Frictional cofficient
800 300 500 0.8
C.F*Tv/Th 1.64 >1.3 Hence safe
Safety against tension at base
X=(RM-OM)/Tv RM-OM Tv
0.572 939.02 1642.5
E=b/2-X b/2 X
0.028 0.6 0.572
e b/6
0.028 0.200 b/6>e
Hance safe
114
Structural Design 0
Top Plan 0.5
0.83
0.45
1.20
0.75
2.93
1.38 2.13
0.7
0.6
Elivation
Head wall extention
1.73
1.25
Head wall
1.38 0.35 0.45
Land Level
0.3
Apron
0.6
0.6
Foundation
0.3
1.20
2.93
0.5
1
2.5
0.75
0.4
0.35
0.3
0.75
0.9
cc 1:4:8
0.4
1.20
0.45
1.20
Side wall
1.5
0.9
115
Estimate 0 0 0 0 0 0
Head wall H.W.E Side wall Toe Wall
Average 0.825 0.575 2.06 0.625
Sr. no. Name of work Item no. No Length Width Hight Qty rate amount
1
Earth work Excavation in hard soil up to 1.5 mt Hight and deposited excavated
meterial lead op to 150 2B
Head wall 1 0.83 1.20 0.9 0.89
Head wall extention 2 2.5 0.75 0.9 3.38
side wall 2 2.93 0.45 0.9 2.37
Appron 1 0.83 1.38 0.9 1.02
Toe wall 1 0.83 0.9 0.9 0.67
Wing Wall 1 0.675 0.6 0.6 0.24
8.57 113 968.1583
2
Cement concrete 1:4:8 (1cement:4 sand:8 concrete) 40/25 mm
concrete Using mixture & vibrater 11B
Head wall 1 0.83 1.20 0.3 0.30
Head wall extention 2 2.5 0.75 0.3 1.13
side wall 2 2.93 0.45 0.3 0.79
Appron 1 0.83 1.38 0.3 0.34
Toe wall 1 0.83 0.9 0.3 0.22
Wing Wall 1 0.68 0.6 0.3 0.12
2.90 2419 7006.45
3RR stone mesonary in Cement sand mortar 1 : 6
Head wall 1 0.83 1.20 0.6 0.59
Head wall extention 2 2.5 0.75 0.6 2.25
side wall 2 2.93 0.45 0.6 1.58
Appron 1 0.83 1.38 0.15 0.17
Toe wall 1 0.83 0.9 0.6 0.45
Wing Wall 1 0.68 0.6 0.3 0.12
5.16 2061 10636.44
4 RR stone mesonary in Cement sand mortar 1 : 6 121
Head wall 1 0.83 0.825 1 0.68
Head wall extention 2 2.5 0.575 1.5 4.31
side wall 2 2.06 0.45 1.05 1.95
side wall 2 2.93 0.45 0.45 1.18
Appron 1 0.83 1.38 0.00
Toe wall 1 0.83 0.625 0 0.00
Wing Wall 1 0.68 0.6 0.45 0.18
8.31 2061 17125.16
cf 35736.21
121
116
Sr. no. Name of work Item no. No Length Width Hight Qty rate amount
5
Cement concrete 1:3:6 (1cement:3 sand:6 concrete) 40/25 mm
concrete Using mixture & vibrater
122A
bf 35736.205
Head wall 1 0.83 0.45 0.1 0.037
Head wall extention 2 2.50 0.4 0.08 0.16
side wall 2 1.20 0.45 0.08 0.0864
side wall 2 1.73 0.45 0.08 0.125
Appron 1 0.83 1.38 0.08 0.091
Toe wall 1 0.83 0.35 0.08 0.023
Wing Wall 1 0.68 0.6 0.08 0.032
0.554 2598 1440.2255
6 Cement Plaster 1 : 6 ( 1 cement : 6 sand) 25 mm thick 68A
Head wall 1 0.83 0.45 0.371
Head wall 1 0.83 1 0.83
Head wall extention 2 2.50 0.4 2.00
Head wall extention 2 2.50 1.5 7.50
side wall 2 1.20 0.45 1.08
side wall 2 1.73 0.45 1.56
side wall 2 2.93 0.45 2.63
side wall 2 2.06 1.05 4.33
side wall 2 0.45 1.5 1.35
Appron 1 0.83 1.38 1.13
Toe wall 1 0.83 0.95 0.78
Wing Wall 2 0.68 0.6 0.81
Wing Wall 2 0.68 0.45 0.6075
Wing Wall 2 0.45 0.6 0.54
25.52 165 4211.3096
7
Cement concrete 1:2:4 (1cement:2 sand:4 concrete) 25 mm concrete
Using mixture & vibrater
Appron 123 1 0.83 1.375 0.15 0.17 3307 562.77983
8 Pointing 1:3 (1 Cement : 3 Sand) 70A
Head wall 1 0.83 1.25 1.03 65.6 67.65879
Total 42018.179
3% contengency 1261
TOTAL 43278.72
117
Munja Plantation
Estimate for 1m
Total
1
Preparing of available
Munjatufts,digging of pits
& planting (Including
local transportation upto
1 km
5 tufts
in one
metre
Rm 5.00 1 5.00
TOTAL 5.00
Contengency 3% 0.15
TOTAL 5.15
Rates are taken from Forest BSR
AmountUnitS.No
Model estimate
RateDiscription Qty
118
ekud ykxr vuqeku
1- dk;Z dk uke % tydq.M dk fuekZ.k
2- xfrfof/k dk uke % vÑf"k Hkqfe laj{k.k dk;Z
3- ;kstuk dk uke % vkbZ- MCyw- ,e- ih- pSuiqjk] iapk;r lfefr & fiijkyh ¼lhdj½
4- ty dq.M dk fooj.k % dq.M dk O;kl ¼ckgj½ 4-45 eh
dq.M dk O;kl ¼vUnj½ 4-00 eh
dq.M dh [kqnkbZ 3-20 eh
dq.M dh fpukbZ 3-65 eh
dq.M dh {kerk 37500 yh-
ik;Fku 12-50 eh-
Ø-
la-
dk;Z dk fooj.k la[;
k
y- pkS- ma- ek=k bZdk
bZ
nj dqy jkf’k
1 uhao esa 1-5 ehVj xgjkbZ rd feV~Vh dh
[kqnkbZ djuk]ry dks dwVuk ikuh Mkyuk]
[kqnh ehV~Vh dks ckgj fudkyuk] uhao Hkjus
ds ckn [kyh LFkkuksa dks iqu% feV~Vh ls
Hkjuk rFkk cph gqbZ feVh dks 50 ehVj
dh nqjh rd fuLrkj.k djuk l[r feV~Vh
esa
3.14/4X4.45X4.45X1.50=23.31
23.21 ?k-
eh-
113 2634.03
2. uhoa dh [kqnkbZ ,d vfrfjDr mBku lfgr
1-5 ls 3 eh- rd
3.14/4X4.45X4.45X1.50=23.31
23.21 ?k-
eh-
126-30 2944.05
3. vfrfjDr mBku 3 eh- ls 3-5 eh- rd
3.14/4X4.45X3.50X0.20=3.10 3.10 ?k-
eh-
139-60 432.76
4. dq.M esa lhesaV dadjhV 1%5%10 esa iRFkj dh
feV~Vh 40 eheh ds lkFk feykdj Mkyuk]
dwVuk o rjkbZ djukA
0.785X4.452X0.15=2.33
2.33 ?k-
eh-
2211 5151.63
5. uhao ,a dqlhZ esa izFke Js.kh dh bZaV dh
fpukbZ lhesaV ctjh 1%6 esa e; cxy dh
>hjh cUn djus rFkk rjkbZ lesr
0.785X(4.452-4.45
2)X3.65=10.89
10.89 ?k-
eh-
2720 29620.80
6. iRFkj dk fyaVu yxkus dk dk;Z 7-50 lseh
eksVkbZ
2X4.45X.30=2.67
2.67 o-
eh-
933 2491.11
7. vOo; ntZs dh iRFkj dh iVVh;ksa dh Nr
Mkyuk] mij o uhps dh tksMksa ds iRFkj ds
fpi ds lkFk 1%4 esa lhesaV elkys ls Hkjuk
0.785X4.452 =15.54
15.54 o-
eh
1141 17731.14
8. 50 eheh eksVkbZ esa Q’kZ esa lheasvV dadjhV
1%2%4 esa iRFkj dh xhVh 12 eheh ds lkFk
feykdj Mkyuk dwVuk o rjkbZ djuk
3.14/4*12.50*9.5=93.21
93.21 o-
eh-
258 24048.18
9. Ukhoa ,oa dqlhZ esa izFke Js.kh dh bZV dh
fpukbZ lheasV ctjh 1%6 esa e; cxy dh
>hjh cUn djus rFkk rjkbZ lesr 112 eheh
eksVkbZ 3.14*12.50*.30=11.77
11.77 o-
eh-
355 4178.35
10.
ik;Fku gsrq iRFkj dk [kjtk dk;Z 1%3
flesaV jsr elkyk esa o tksM+ks dks Hkjuk
.785(12.52-4.45
2)*.15=16.06
16.06 o-
eh-
959-60 15411.17
119
11. dq.M esa lheasV IykLVj dk dk;Z 1%4 esa
lhesaV ctjh feydkj tksM+ks dks dqjsnuk
rFkk rjkbZ lfgr 20 eheh eksVkbZ esa
iSans ij 0.78
5
4.00 4.00 12.56 o-
eh
vUnj 3.14 4.00 3.50 43.96 o-
eh-
ckgj 3.14 4.45 0.50 6.98 o-
eh-
Åij 0.78
5
12.50 12.50 122.65
o-
eh
LdfVZx 3.14 12.50 .45 17.66 o-eh dqy ek=k 203.8
1
o-
eh
126 25680.06
12. ,yqequh;e <Ddu o yksgs dh tkyh ykuk
o yxkus dk dk;Z
1000
;ksx 131323.28
daVhtsUlh pktsZt @3% 3939.69
egk;ksx 135262.97
Say : 135000/-
120
121
122
123
124
Horticulture Cost per plant
Pit size 0.9x0.9x0.9
YearNo./
Year
1 Diging of pit 1 cum. 0.73 113 82.49
2 Apply of manure
(A) Compost Khad kg. 5.00 0.4 2.00
(B) S.S.P. (16%) kg. 1.00 5 5.00
(C) Endosulphan (4%) kg. 0.10 30 3.00
3Mixing with soil & filling
pit 1 cum. 0.73 45 32.81
4 Plant cost 1 No 1.00 25 25.00
5 Planting tree No. 1.00 5 5.00
6 Watering of Plant 3 12 No 36.00 2.2 79.20
7 Weeding & hoeing 3 2 No. 6.00 1.5 9.00
8 Sprey 5
(A) Endosulphan (35 ec) 3 0.01 Ltr. 0.03 280 8.40
(B) Sulpher 3 0.02 0.06 200 12.00
TOTAL 263.90
Say 264.00
For .5ha =139x264
Say 37000
Note :-
Farmer will ensured for Watch and Ward by himself
For Horticulture plantation is as per norms of Agriculture ext. Dept.
Farmer will be traind for Horticulture palntation in Treaning programme be
conducted by watershed (PIA)
AmountUnit
36696
S.No
Model estimate
Rate
Total
Discription Qty
125
Horticulture Cost per plant
Pit size 0.9x0.9x0.9
YearNo./
Year
1 Diging of pit 1 cum. 0.73 113 82.49
2 Apply of manure
(A) Compost Khad kg. 5.00 0.4 2.00
(B) S.S.P. (16%) kg. 1.00 5 5.00
(C) Endosulphan (4%) kg. 0.10 30 3.00
3Mixing with soil & filling
pit 1 cum. 0.73 45 32.81
4 Plant cost 1 No 1.00 25 25.00
5 Planting tree No. 1.00 5 5.00
6 Watering of Plant 3 12 No 36.00 2.2 79.20
7 Weeding & hoeing 3 2 No. 6.00 1.5 9.00
8 Sprey 5
(A) Endosulphan (35 ec) 3 0.01 Ltr. 0.03 280 8.40
(B) Sulpher 3 0.02 0.06 200 12.00
TOTAL 263.90
Say 264.00
For 25Plants =25x264
Say6600/=
Note :-
Farmer will ensured for Watch and Ward by himself
For Horticulture plantation is as per norms of Agriculture ext. Dept.
Farmer will be traind for Horticulture palntation in Treaning programme be
conducted by watershed (PIA)
6600
Rate Amount
Model estimate
S.No Discription
Total
Unit Qty
126
Name of Plant
Cost per plant
Year No./Year
1 Diging of pit 1 1.00 nos 7.5 7.50
2Mixing with soil & filling
pit 1 0.09 cum. 45 4.10
3 Plant cost 1 1 No 5 5.00
4 Warering of plant 3 12 36 no 2.2 79.20
5 Planting tree 1 No. 3.7 3.70
6 Weeding & hoeing 3 1 3 No. 1.5 4.50
TOTAL 104.00
104.00
Say 104.00
Farmer will ensured for Watch and Ward by himself
AmountUnitS.No
Model estimate
Agroforestry plant
Rate
Total
Discription Qty
Farmer will be traind for Agroforestory palntation in Treaning programme be conducted by
watershed (PIA)
Note :-
127