2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a h and-held Atlas Copco drill driving l and 1/4" rods. Upon reaching bedrock the drill string was withdrawn for two feet, opening the sampler by releasing a pointed stainless steel plug. A basal overburden sample was then collected by pushing the open sampler back down to bedrock. The sample thus collected ranged in weight from 1/2 to l and 1/2 pounds of unconsolidated basal overburden material. The samples were sieved to -80 mesh and analysed for gold in Cominco's Toronto Laboratory using a bromide extraction technique (see attached description of technique). The depths of holes and analytical results are attached. Submitted by: (j N.L. Szabo( Project Geologist Exploration, E. D. /ml c iivH)

GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

  • Upload
    lyxuyen

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

2.9355 SATTERLY LAKE 010

EXIT BAY OVERBURDEN DRILLING

The equipment used for overburden sampling on the property consisted of a hand-held Atlas Copco drill driving l and 1/4" rods. Upon reaching bedrock the drill string was withdrawn for two feet, opening the sampler by releasing a pointed stainless steel plug. A basal overburden sample was then collected by pushing the open sampler back down to bedrock. The sample thus collected ranged in weight from 1/2 to l and 1/2 pounds of unconsolidated basal overburden material.

The samples were sieved to -80 mesh and analysed for gold in Cominco's Toronto Laboratory using a bromide extraction technique (see attached description of technique). The depths of holes and analytical results are attached.

Submitted by:(jN.L. Szabo(

Project Geologist Exploration, E. D.

/ml

c iivH)

Page 2: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

J l L E 0 K

•1ELD

SAKPLE TY?E: J3 SILT U) WATER (E) SOIL (tj5)) BIOCKEH (r) ROCK (C) OTHER (0) HEAVY (D)

OMX^i^ fe-Ok-O^-TN

DAT

PRO 1 _

JECT CODE: jiii^^\T i^f^V

5-A5 GROUP NO: -r ftS^-* O ^O

*

t

L3t. _ B

^.jC.

V/l?

— ~— -.

V

Y-7g

4

FIELD KO. LAB NO.

I&'K'S 00©}

'

J.'STRl.REE F

TYPE:

©Ccd

Ono^lrv^ovl

occfJGo oilOodRboefclOMdoo MOoidOoftlCb\i|00 Koolklool^l

COOI^IJCT1CNS AJ.'O NOTES:OR. ".A T INFO:

.-..UTn ZONE

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGESy f( j ^^

A rt-{ f t

^ /z -t ^^:S /9 ~^/, /t* J s-cf^ /x -t ^fA /9 -F l/ 'i 7 i-So-j^

Ait i see.^ f? -t- f Of

A /s ~fZ /9 f f o/?A,. /# /- &Z

t ti "^A. /ft fg#gA, /# -^Z/2 -^ -

00 - NO COORDINATES -j' - .FOR .GRID -2 - FOR'DRILLHOL.E

-3.- FOR OTHER

i - I*;AMPI rp,'s INITIA-.S ir cor.-:,~(-v)i, t ' 1 ) STAR.till (-0

.~

F INITIALS NOT CON'5: TING N'jr.SER IF IN S-

IF NOT !H SERIES.

DETERMINATIONS REQUIRED:

METHOD CODES:

^^

o - s- 6 x II ^**-* /' \\ ?2.5'- sS ^ X//.^ -s- / x

r2,5-

j^^-^s" ^ x li A?/^y-^., -s' f X2,y-2,r-s' X '

?,ry

?* W "? 3 I I ' 2,5"^7. r1 Z.^-^ /X^/^c?5 o, xX A 2-^3 ^ X

^^^.^e,^

x ^^^s x x II ^'^z.y^6 ^/ x !l ^r/y-^T5 3 y

7 ' -^ ...*^"

*!? ^ ^*^ ^r *?3v-/ ^5 3 7//^5 ^ 7

L1

z. s-2.^Z-f?^^"2.S^

3^sr-.~i ,j~ s? s s'/y/A/'?'/? tt-v /^

C^i

-

'

fi^h(2^^ftf

Z. /f,/ td

A.r*A7

Arts

AssL f oA /o

A f"

A f ̂X^

A r*

/zA/^C/^^7

'\^*a?s? '7~zi -s/- o /^7/-H/9.S/ '- t/^s? s(^y\

'•^^j

C-3& ^)

,

I

JT—— .

__ i—j-j

~

'

i **

y 'ifaty ' /^s.1 '/~*(. n- x/ i'-^; ~

7-9-c -f

Page 3: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

0 &E SAMPLE TYPE: P) :LLIO S!LT (A) WATER (E)

IN SOIL (B) BIOCKEM (F) MELD ROCK (C) OTHER (0)

. HEAVY. (D)

LAS GROUP NO: ^y.-^'/O* f

Z

fi\

U

^'LI.

IAt^

4iZ/

yL*V;J'J

li

n?43 U

.?i— -^*,

ft;

ri -ID i;o. l IU.-.UN1U1 LAS NO.

IBRS ooiq-

11

00^-0ai^

DAT ^: ,cX,^ ,S:\ NTS: , , , , , , , ??- I

PROJECT CODE: l i t i iexrr rsp^y

TYPE:

' ^

MO.SM

' All^1^

oo^ol^\^a.^12W-I^sl

OO^G,

.-..yT/i ZONE " 2, *

-3.-

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGES

//^ A^^T

^y 7? /^^t/ff i- S'C'fA /# -^t/x-g'sL/'t-Z/~ / ?-vf/C /^-/f^ '/^/^t~ /z /zts#t? '

/-^ /^ IfO^t /*? -gA/ T-&/^/'7^A s t t rev*"x: /^ 7^ ^v^/- f? •/•S'o^

NO COORDINATES FOR. .GRID FOR 'DRILLHOLE

FOR OTHER

/V^'S-\ ' iSA^.PI. :

{-0 I il ',i| STA?, . l i 1 (-0

• -

ts

•R 1 S INITIALS IF COJJSI F INITIALS NOT CO.'o 1; TING NUMBER IF IN S :

IF NOT IN SERIES.

DETERMINATIONS REQUIRED:METHOD CODES:

fS?WL.t U l^ti

/tZ?S 9' \ z.*'; i- 03-^5 2, *//^^ / y 1

\ ,S

\ l*

X/^^IT ' // X l 2^2-^2^,5 /X iS'7 1 60S /'s f-Zs-3 Z'\

\ Z.S\ t*'1 f 755 f 7 1 — /yo/ f 00 /? /'/^5tfJT / X |a /-y^vS ^/ 7

\ /r0'W

-L.*

//-.CCLS ,? X ^5X^ /JT^// ?/

7 /-^r.5 ^ x l^y-^^5- 9-'vt co 3'Z^i S'#S 7^/ie&s y/

\ ?^'/r

i ^wt*S

\ Z,*

-

^^

-

/?tj/^(/v9 1/i. 1/, 1

•//•^

/y

/^ / 0 \'t- 1

/^/^ —— ""

^1 /*

^/c; i

//^

^/t/^

//^

^/O

(?^2^y<

>j

^10

: -ll

.

*

1

—— -

^

n^H

~*

tt

j.V'S T AUCTIONS AND NOTES; f."EE FORMAT INFO:

Page 4: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

0- BE:LLEO

IN: 1 ELD

.

SAMPLE TYPE: fi SILT (A) WATER (E) SOIL (S) BIOCHEH ( 7} ROCK (C) OTHER (o) HEAVY. (D)

DAT . - OV 00 - E: ,3k. ,^ ,X\ NTS: , , , , , , , .T .

PROJECT CODE: t t i j ip-v-i-r ft fry

l-AS CROUP NO: -..s-^^o

. ^^..-,

?7l3*\ 3?\**W^J ^

FIELD NO.

--

^^y/- /?t'̂i't'^

-̂s'J'W1 /'

70P.UMO LAS NO.

teKco-^^

TYPE:

'^\ .

( OoM-olM-\MQCj-^S44-Ms

- ufcM̂-RIM^l

ooSoi5^1̂,c^l.5^-

.-..UT;\ ZONE " 2, *

-3.-

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGES

A /7 -/r^ /-?-^A /o~trA, /^-^c^A /S~ J-fu/*"

/./r / - srv/ZZ. /C -f Ff/Z

A /.s" Y- ^o ̂/-/*r ^^/c /^/^/rx. -/c/r-^ -/r/rx /^ -vr^•/•r -/rA /^- r Pot?Z./S- j sof

\ A /f -fX /^ fro f.

NO COORDINATES .FOR .GP.IO FOR' DRILLHOLE

FOR OTHER

AJJ^Si. .f., tSAr.PL

(-0 1t I., l ! J STA?, . i i t (-0

^TP, 'S fW/TIA'.S IT COf,'S7 F INITIALS NOT CONj- T1NG NUf.SSR IF IN S :

IF NOT IN SERIES.*

DETERMINATIONS REQUIRED:

METHOD CODES:K-'/ i ; / '

y/SAi/i Crv t-/'

//•A-v?5 2, X II 2^"^ /^6^ X X

/^—^/^' 7

1 ^,/z,1 a,.s-

^ /Co// / X II Z,#/y-^-^A/ a x ll -y^ZiV e ̂ 5 .? xX y^^/v' JT X

1 E, ^1 ^^x

^,icc& ?J\\ ' /-92, y- 5^,5 ^y3,y-^o.s z/aVA?.5~ 2*ey.^'^/v / y 1a y- ̂ 5, s ^ x

2.^x

1 /^| W

W1 ^5X

X T1 -To/V ^ X Zx C^ /^ y x•a ^- ^o/v^ ^ x/y ^cs y x

^^^xs-

^ /-^^ / x l ^'-*/

;,,,

-

'

/?*//^ 1/6

t/0.^o

(̂TtfjV^fO

/./o/2-

IV2,0/o^

A r**

^^z,^

x r^1 L.fO

-

,

1 .11

f—————J:

~~]

^—— -j

—i

^-i

^^

a

j .'.'STRUCT IONS AMD NOTES; F?, i E FCr^AT INFO:

Page 5: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

5LLEO S ILT (A) WATER (E) IN SOIL (E) B10CHEH (F)

MELD ROCK (C) OTHER (0) . HEAVY. (D)

LAS GROUP NO:

c F! ELD NO.

7-5''- ^'X

TORONTO LAS NO.

\9^ oos^ ^ Z'-p

^

*

2:1

I Y

v^

Z

^

J ~l

*-^vO

Si

si

DATE: ,^~,^ ?\ NTS: , , , , , , ,

PROJECT CODE:I.I \ 3 1

o

TYPE:

CT~* 1

CO(oCol610d" 6^

/nMlS^l(oh

fillCoKfe^)

QTjon l

J *~* ~}4~\

l ff^-

.-..UT/J ZONE

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGES

X /5" -g:

^ yr -/rt/t^tofA/6 f COt?

X /^ 1-fe/^

/. /6-/Z./. /A-g"

/, /S f ?of?x. y^" -/"z /^ ~*^^ y^- ^^

x / r t- so e/ /^- f?x . y^ -^*y/ /^y -^~t?/^"S- /t' -^X A-^y 5'c^^/^ y^/^-

00 - NO COORDINATES -j' - FOR .GRID -2 - FOR' DRILLHOLE

-3.- FOR OTHER

,NLS|(, .(-0

i t i t 1 STAR

, . t i l (-1)..

LS

IR 1 S INITIALS J" COJ.'Sr! F INITIALS NOT CONST TING N'JXSER IF IN S t

IF NOT IN SERIES.

DETERMINATIONS REQUIRED:

METHOD CODES: ~~1

X M ^

y/ 5??^ ?y li /^x y 75-1-5 ^ x7 X O& t/ *C

?,r

l^

j y r^s '̂ ^L ZS

A +00/J' t* I I ^/y?c^ y x li- /x'/fees y x II /-z?^A/*^ 5 2, Ml ^^ -Af^5 yy x# y ^~o3 2,

^ y

^ y T'^/V ^y y ax5~ ,rxy i . X

y y ^s j?1/V75:^ ^ x

L^

J S

2 S

iSZ.*,'

3,Sl^

^0

,j /?^w/)L /e

AfO

/Z,

,/^-

^/^

C^^'jy /ot (0

A/oA (OA f*

Ate

C,T^^r^^xy//ot,fO

,

,

1

.

-^

^*

~*

- -

I .'.'S TRUG T IONS AND NOTES: . . 'FORMAT INFO:

Page 6: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

!LLEOin

~!ELD

S A.".? L E TYPE: SILT (A) WATER (E) SOIL (B) B10CHEM (?) RO'CK (C) OTHER (0) HEAVY (D)

HE- 3- ^ 8^ NTS:

^OJECT CODE: ** '..UTM ZONE

^IT f^p*y

00 -

-2 -

-3,-

NO COORDINATES .FOR .GRIDFOR 'DRILLHOLE

FOR OTHER

\/ER'S INITIALS IT COf.'S'

(-1) I F INITIALS NOT COKV t t ' l. ? STARTING NUMBER IF IN S-, , l y J (-1) IF NOT IN SERIES,

LAS GROUP NO: .^.^,

, TORONTO NO. LAS NO. TYPE:

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGES

DETERMINATIONS REQUIRED:METHOD CODES

^

fo/y

7C77

/seas.

If

Z. t

x / x

3

. t

JN'STRUCTICNS AND NOTES; r .ri E" 'FORMAT INFO;:

/.sX X r y -^

?

z r

X

Page 7: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

0 BE - tLUtO

IN -IELD

S Art? L E TYPE: s^ SILT (A) WATER U) SOIL (B) BIOCKEH (r) ROCK (C) OTHER (0)

. HEAVY. (0)

DAT E: .-2-,^ ^, NTS: , , , , , , ,

PROJECT CODE: i i ^ j je\T~r f^pv

t AB GROUP NO: / ~-tf ̂ ~ ~- # cfCJ

*

/^

FIELD NO.TOFlONiO LAB NO.

fe&TooQ j921—-^

^ ̂

. _ ̂

^^^^

^,,^

^

— -

*

TYPE:

oo9su

'-

.-..IUT/I ZONE

v

NO. OF ENTRIES FER SAMPLE:

COORDINATES OR DRILL FOOTAGES

/~ /r ifo/z

.*

t m

00 - NO COORDINATES -]' - FOR .GRID -2 - FOR'' DRILLHOLE

-3.- FOR OTHER

.^^^MO,

(-0i 1 l l 1 STA?i . i i l M)

/i•R 1 S INITIALS IT COf.'ST F INITIALS NOT COKiT T1NG NUMBER 1? IN Si

IF NOT IN SERIES.

DETERMINATIONS REQUIRED:METHOD CODES:^W-

?,/ 2,rs /' II A^7 y ^ c- 5 ^ /rliliII -

'II-IIli

II

-

-

-

X? y"/v/6

*

'

-

B

- -

"

J

ijl

^"^

t

AND NOTES;F ?.re~ FORMAT" IN'FO:

Page 8: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

APPENDIX I

DETERMINATION OF GOLD ON LARGE WEIGHT SAMPLES

(GEOCHEMICAL PROCEDURE)

1. Weigh 50 - 100 g. of the sample into a suitable size Coors porcelain evaporating dish.

2. Place it on the halo support of a Fisher burner. Start heating it slowly, to prevent the dish from cracking. Increase the gas flow gradually, until the flame burns at its highest temperature. Stir the sample frequently with a spatula or glass rod to insure thorough contact with the air. At this point the sample should reach 550 - 600 0C. Continue the heating until it is thoroughly roasted. Complete roasting is very important. All traces of organic material (including residual carbon) and sulphides must be burnt out, or they strongly inter fere in the following steps. On an average the roasting takes 15 - 30 minutes. For high sulphide samples it could take as long as 45 minutes.

3. After the roasting, cool and transfer the sample into a 250 mL wide mouth Erlenmeyer flask. Slowly add 25 mL cone. IICL, to decompose the carbonates. For more than 50 g. carbonates a larger volume of HC1 may be needed. In this case record the volume of HC1 added. The carbon ates must be completely decomposed and the sample must be thoroughly moistened with the HC1. Dolomite samples have a tendency to start the decomposition on heating only. In this case they could froth out of the flask.

4. When the carbonates are decomposed and the sample isthoroughly moistened with the HC1, from a dispenser add 25 mL HBr-Br2 solution (50mL BR2 in 950mL HBr). Stopper with the polyprophylene hollow stopper outfitted with a glass vent tube. Place it into the sleeve of a microwave oven and connect the vent tube to the exhaust tube passing through the back wall of the oven. For the exhaust tube use a combination of glass and Fluoran tubing.

5. Heat the sample to boiling and boil for not more than 5-10 seconds. Determine the time needed to boil the sample, by experiment. Remove the flask from the oven and cool. At this point it is absolutely necessary to have an excess of Br 2 in the solution. If all the Br 2 has been consumed, which is indicated by the bleaching of the strong brown-red color, add some more HBr-Br 2 and heat again and record the volume of acid mix added, or better still, start the analysis with a fresh sample and insure a better roasting. The sulphides left in the sample after roasting consume the Br 2 .

6. Add from a dispenser 150 mL H2 0, mix well and letsettle (see: Note). Pour about 40 mL of the supernatant solution into a 50 mL centrifuge tube and centrifuge. Pipet 20 mL into a 20 x 150 mm screw cap test tube. The screw cap should have a teflon liner. Add 4 mL NaCl solution and from a dispenser add exactly l mL DIBK extracting solution. Cap the tube tight.

Page 9: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

Appendix 1-2

7. Shake the tube on a shaker for 5 minutes. Let the phases separate. Centrifuge if emulsified. If Fe is present as indicated by the strong brown color of the DIBK layer, decant into another tube and backwash the Fe with 10 mL 0.1M HBr and 2 mL NaCl solution.

8. Determine the Au by aspirating the upper organic layer into the air-acetylene flame of an atomic absorption spectro meter at 242.8 nm wavelength.

9. Calibrate the instrument against synthetic calibration standards as described below.

Note; Because of the volume of the large sample itself, which varies with its specific gravity, diluting to a precise volume is not recommended. Instead, tlie volume of the reagents added should be as precise as possible. Add together the volumes of the reagents to gain the final volume of the sample solution. Using the above procedure, the final volume is 200 mL and if 50 g. sample is weighed, the 20 mL aliquot represents 5g sample.

Calibration: Prepare by dilution, from a 1000 mg mLAu stock solution a 25 mg mL standard solution. To a set of 6 screw caps test tubes (20xl50mm) add the volumes specified in the following table, of the diluted standard solutions. Then add 2.5 mL HC1, 2.5 mL HBr-Br,, mix, 4 mL NaCl solution. Add exactly 5 mL DIBK. Cap the tubes and shake on a shaker for 5 rain. Let the phases separate. Calibrate the atomic absorption spectrometer by aspirating the upper organic layer into the air- acetylene flame at 242.8 nm wavelength and recording the absorbances.

Page 10: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

Cominco Ltd./Suite 1500, 120 Adelaide St. W./Toronto, Ont., Canada/MSH 1T1 Tel. (416) 869-1850/Telex 06-22912/Cable (Comtor)

Exploration Suite 2200

S2Neesweis36 2.9355 SATTERLY LAKE

REGISTERED MAIL

Mr. S. RivettMining RecorderOntario Government BuildingP.O. Box 324Red Lake, OntarioPOV 2MO

August 15, 1986

900

Cominco

Dear Mr. Rivett:

Re; Mining Claims KRL 697056 et.al. Satterly Lake Area

Attached hereto is our Report of Work requesting a total assessment work credit of 640 d^ys for overburden drilling sampling.

The required reports and other data have been delivered to R. Pichette in Toronto for approval.

Yours truly,

R.C. LaRoche Records Technician Exploration, E.D.

"cc: R. Pichette Toronto

M C riVlDy-•••r. ? i w

Page 11: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

Mmistryof R eport of WorkNatural ,- -n ., ueopnysica , ueo oqicn ,Resources ' ' ^

Ontario v Jjgochemical and Expenditures)

Type of Surv^^

__ OVERBURDEN DRILLING SAMPLINGClaim~Holcier(s)~" "

COMINCO LTD^ _ ^ __ _ __Add ross

2200-120 ADELAIDE ST.W., TORONTO, ONTARIO3.11 e of Surl

05- 031Day Mo.

Survey Company

NORTHLAND EXPLORATION LTD.Name and Address of Author (of Geo-Technical reportl

N.L. SZABO COMINCO LTD.Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse sideO C

and enter total(s) here

MINING

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

** **Electromagrfetic

.- MBgnejCJffeter

- Radiometric

WJSr SECTIONGeological

Geochemical

Electromagnetic

Magnetometer

Radiometric

Days oer Claim

Days perClaim

Days per Claim

Expenditures (excludes power stripping)

Mining Claims Traversed (L.J

Type of Work Performed

Overburden Drilling 6 SamplingPerformed on Claim(s)

KRL697076, 697077, 697080,

697081

Calculation of Expenditure Days Credits

Total Expenditures -3f

S /0,25-J2 .04 H- 15

Total Days Credits^

= 683.Instructions

Total Days Credits may bo apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

uPrefix

KRL

ining ClaimNumber

697056697057697058697059697060697061697062697076697077697078697079697080697081697082697083

4̂^46464b464fe464b45"46'

4545454545

;

!

^ -

/^Cy^fV

WMB

/fe'\

-..^

4 ^XP^-'-H) -\

^ m ' d

Total number of mining claims covered by this -t j- feport of work. " J-~)

DAugust 18/86 .Agen t-*S i g na

Certification Verifying Report of Work

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed he^o, havift^^Jerformed the work or witnessed same during and/or after us completion and the annexed report is true.

Name and Postal Address of Person Certifying

N.L.Szabo, 2200-120 Adelaide St.W., Toronto, Ontario M5H 1T1Date Certified

Aug. 18/86by (Signature)

(KKU 6976/6b)136? (81/9)

Page 12: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

"V

,CO x"

" ^r v. , ~ - - -Jr "f^i \ ' "'f v ' *'-*'-''- ^ ;^^.

Cd summit^ Lake

' :\

Vi5I —— 5! 0 2Z 3O

- , ,;X V

-. V-

5I 0 I5 —

u l KRL KRL -t K RL i KRL l t RL' l KRL— l KRL IKRL^ 4^

776001776006)776077600^ 77600^ |6jT5 ,r .4^13.77605&. i 776055 I776O54

KUL \KRLKHL IKKL ,RHL l KRL ' KRL

646156 i 646 i 55^ 646 154 646155 l 646 I*C

i Y \IKBI l l ( 1- /'i i— " l

u . l 167I4M I&46I56 i e^Bl^-H 17015591701555 .671451 IS7I448 ^--B^i-r-rti————H- —

j KRL— IKRL . -~nt l

szss^em5

fc. uartrn... ,.l •••wu j i i j t.oi— — — - -

KflL

701561 J7QI562

.- -

——-- 696615, 697047 69704 f ___ _ . J ^^ ^_**^ ' , l _"' "—rrl A .

r-^(———i——-T-- -69ea j 4 ,697D50 69705Iea j 4 , J , v ^347*7 , ^1*;**T^" ^"L" \i~"KRL~'~"KRL~i \ TT —— T~T — ~t/-^

776O87 i77S088 1776089I t ;

J776IOO .776101 17761OZ-———h-:

697)16"697H7 l .77el05 776106 776107 7.76108\ - - -~~ "~~

776/002 1776001 1776000.773999-696990-~- T ;-' - j-™--.- --p-^-- ————l" -- "j

— l. ' — \Lrw3^TaVL0M~

i — — --a/-!--- - ^— -^-. — -

.--—- -r- r-^*

—— ———— -,

1 l. -

j.^^^-a*te*.^

, .MCNAUGHTON A TWPFOR" STATUS REFER TO TWR PLAN ' No.

* t

-4*

27 ' -*i ^L. 26' ^ 25' .24'23 V ir

-r-Jf- --.V? ii''.V^-*^;-t"fr ..-^i-.^,^ rA - .ve ^- iH,--"'- ^---:

.- -'' i.. *-" -., --'-.* * -J L. -- ; :' " - -' t "''- -A ''

^4B" ^ -r-

k. k.52N*6SWW36 2.9356 SATTERLY LAKE

- — i *i ^ A .j,-. - r-., ^ -A '^^ ' -TV ---" -~ * ' - -**' "" " - * i A ' - ii - i' i - - /"* i r1* /v-r* - - - j t* "*^ . - -- - ~' f ~ -~ -- T V- -a - ^ -^ -^ r-V^ -*- -,^i;::a.:'-^ s. ^ Latreille Lake 0-1806-^^ ^ s/. -v-. -\^-v \ x-^-./-- iy . l *y y.^VV^.,;-1 y:-^i^, r -r- '•V*v *.5*"4...,..-rA.:.' irX, X--J^r i;. •i-./J^:.'-"-. ^-".-'.-:' ••••^ !- " -•^•T.^V'':'..riJ---.T^^"-'^

v - -T 1 P- jC,^-*-? : .;\^V f\-- . f .

7- v * R E F E R E N aE St •.x ^ j ; ^v* '

AREAS WITHDRAWN FROM ^DtSPOSITION71* T i ^ T~^^ ~ 7~~-.

. WLR.6.-MINING RIGHTS ONLY . . ,T j y . - . . -C-—

S.R.O.-SURFACE^RIGMTSONLY '

.-MINI) ID SURFACE RIGHTS x .

. /'

ft

T~

. H IGHWAY AND ftOUTE No.

. OTHER ROADS/ i ^*

Vr TRAILS /' . ' ^ -

\ SURVEYED LINES:* ^ x ' ' ' TOWNSHIPS, BASE LINES, ETC. ,— LOTS.'MINING CLAIMS. PARCELS. ETC.'

UNSURVEYED LINES:LOT LJNES^ — PARCEL BOUNDARY ^ ~ -~ MINING-CLAfMS ETC. —

RAILWAY AND R(GHTOF^WAY \ -*-

UTILITY L INES , ^ ' -*

i NOW-PERtNNIAL STREAM^ ^. —

FLCfoDING OR^FLOODIPIG RIGHTS SUBDIVISION OR COMPOSITE RESERVATIONSORIGINAL SHORELINE VARSH OH MUSKEG ^MINES :^., "^

TRAVERSE MONUMENT

s

DISPOSITION OF CROWN LANDS r

TYr E OF DOCUMENT ' 4 SYMBOL

PA TENT, SURFACE fc M INING RIGHTS__._.\...^r^l-*^

. ' - , " , SURFACE R4GHTS ONLY-*...,;__.^___-^

•' . MINING R1GHTSONLY,_r^__L—,,——__ ^

LEASE. SURFACE A MINING RIGHTSi--.-^::---.^^^!!

-' " , SURFACE RIGHTS OWLY-LJ.™.^^....^^, B:

" - ^ MINING RIGHTS OHVf^—^—^L^..^.-'. BLICENCE OF OCCUPATION._fc,.;;____i____U^I- TORDER-IN-COUNCIL -____j.RESERVATION .1^___....^..

CANCELLED. ___.™jl.:——

SAND&CRAVEL —

-y—— OC

NOTE: MINING B IGHTS IN F AKCEtS ^ATENTtO F RIOB TO M AY 6?" 1913, V ESTED IN ORIGINAL PATENTEE BV THE PUBLIC f •LANDS ACT. R -S O. 1*70. CHAP, 3*0. SEC. 63, SUSStC ^'

SCALEfl INCH = 40 CHAINS"

FEETD 1OOO 20OO 40OO •ooo

O 200 METRES

1OOO d KM)

2000,[2KMJ

AREA' ^^j/ - .. . V^ ' '-

SATTERLYK* i - i *M.N.R. ADMINISTRATIVE DISTRICT * -

RED LAK E t S lOyX LOOKOUTMINING DIVISION ' -\ v r\

iX -RED LAKE ' ^.LAND TITLED/ REGISTRY DIVISION * ^ "

^ KENO RA/PATRICIA;; , \"

.'Ministry of. ̂'^Natural ~ ^

^Ontario * i^^i ••^.•gJ-.ttJ^- --^~r -) r—— rm r.

FEBRUARY "l5^.l98iv

Page 13: GOVER SAMP RPT SATTERLY L AREA - Ontario · 2.9355 SATTERLY LAKE 010 EXIT BAY OVERBURDEN DRILLING The equipment used for overburden sampling on the property consisted of a hand-held

HONEYWELL ?TWPVM

erf** ;'Mot- f^^MS^-^i^iji

:-^.- ,\-.-:i : "'"--t'f\f -'/''^V'

slTS-fe.^ iSS^K^.ferJV^lJ'!

ipvtii^i^^'•S*f )u;*"1 FJtlKSf-t ~.ft^*';**i,'- l

. w w IWVVT-WI w P l p^ |V* Wt 4. l J W*l

—" -i— *-i. v* JL. i~. M -4**— iii i-.'i' il *-i —' ^ ^' -- ,-:.:-",i .--:';,'v-'-'T'^i:.-'i- -."•'•x.-^--

awws^

S2N02NE(J(B33 2.9634 AGNEW

•s400', surface rights reservation along the shores of all

1 ' f. -' '~- ' M r'':.''.v-,j'i*- ..Snici., sai^Si j^'r'.TVj ?T*i;j'.Aii*a*jA.-A 63 "^.fe

LOCATED UNOCANCELLED

;ft^ MINING RIGHTS ONLY;XL, SURFACE RtGHTS ONLY

HIGHWAY ft ROADS

(W RAILWAYS^ .-:W. - -

used only with summer retort location* or whtaspace•'^'f^ZS^**^

?RED LAKE^i

DATE