57 A Report On The Mechanical Stripping At the Porphyry Ridge Showing Mine Centre Property For Numax Resources Inc. By lVED R.A. Bernatchez, P. Eng. SE P U 7 2007 Consulting Geologist GGOSCfENCE ASSESSMENT OFFICE Date August 31,2007 ttY

GEOLOGY OVERBURDEN STRIPPING RPT

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • 57 • • • • • • • A Report

• • On The

• • Mechanical Stripping • • • At the

• • Porphyry Ridge Showing

• • Mine Centre Property • • For • • • Numax Resources Inc.

• • • • By lVED • R.A. Bernatchez, P. Eng. SEP U 7 2007 • • Consulting Geologist GGOSCfENCE ASSESSMENT • OFFICE

• Date • • August 31,2007

• • • • ~ • ttY • • •

Page 2: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Summary

A program of mechanical stripping was carried out on Numax's Mine Centre property to uncover a sulphide zone discovered during a reconnaissance program of channel sampling in proximity of airborne electromagnetic anomalies.

A cannel sample was obtained from a sulphide zone discovered during this program on claim numbered 4207779. Anomalous values in zinc, platinum and palladium was obtained from this sample.

Part of the 2007 exploration program was carried out on claim numbered 4207779. This work consisted of mechanical stripping, channel sampling and geological mapping of 4 trenches totaling approximately 617 square meters. The four trenches have been established along a 200 meter strike length at an approximate Azimuth of 140 degrees. A total of 92 channel samples were cut and sent for analysis.

The stripping program resulted in uncovering a new sulphide bearing base metal horizons over significant widths. The mineralization is contained within a bi-modal sequence of mafic and felsic volcanic rocks of Achaean age. The sulphide horizon contains variable concentrations of sphalerite, chalcopyrite, pyrrhotite and pyrite along four (4) separate and approximately parallel strata. The stripping and samlding program may have confirmed the presence of a significant base metal horizon which appears to lay on strike with other base metal occurrences to the NE and to the SW. The sulphide zone also coincides with several airborne input anomalies identified in the OGS 1980 airborne survey.

Up to four parallel sulphide zones were exposed by stripping in this area of the property. The first sulphide zone is located about 100 meters east of the Barber road. Significant sphalerite and chalcopyrite mineralization was observed in the channel samples collected from this trench. The second and third trench also uncovered rocks containing chalcopyrite mineralization. The fourth trench exposed a wide zone of sulphide mineralization containing pyrrhotite, chalcopyrite and pyrite.

The sulphide mineralization discovered is inter-bedded with extrusive mafic and felsic volcanic and intrusive rocks. The mineralization is consistent with a massive sulpbide environment. The significant platinum value obtained in the 2005 channel in the trenched area, may suggest that a magmatic system may be located nearby.

This discovery may indicate that a Cu-Zn VMS and a Cu-Ni-PGM Magmatic system is present on the Bliss Lake Claim Group.

The new discovery is located approximately 5 kilometers south from Highway 11 on the Barber Lake Road which is located 9 km west from the community of Mine Centre.

Page 3: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Property Showing Description and Location

The northern boundary of claim 4207779 is located approximately 5 km south along the Barber Road located 9 kilometers west of Mine centre, Ontario. Mine Center is located 80 km west of the town of Atikokan and 280 km west of Thunder Bay, Ontario on Highway 11. The Porphyry Ridge showing, trench #1, is located approximately 100 meters east from the Barber Lake road at about 5 kilometers south on this road from Highway 11, on the slope of a high ridge.

Figure 1 - Claim map Showing location of claims and stripping area.

Stripping Areas

F our separate areas were stripped of its overburden, resulting in the exposing of about 617 square meters of bedrock along a total strike length of 175 meters. A total of 92 samples were cut averaging 1 meter in length. The channel samples were sent to Accurassay Laboratories in Thunder Bay for gold, platinum, palladium and multi element analysis. Most samples were 1 m long, 2 em wide and about 5 em deep.

Page 4: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Stripping Areas

Stripping area #1 consisted of exposwg an area 52 meters long and about 5 meters wide, exposing approximately 250 square meters of bedrock. A total of 53 channel samples were taken from this trench.

Stripping area # 2 is about 8 meters wide and 3 meters long. Only one sample was taken from this trench and sent for analysis. The total area stripped is about 25 square meters.

Stripping area # 3 is 35 meters long a,nd about 6 meters wide. A total of 17 samples were cut and sent for analysis, from this trench.

The stripping area # 4 is 33 meters long and up to 4.5 meters wide. A total of 17 samples were taken from this trench.

Maps of this stripping are enclosed with this report.

t" .. £ -SCALE 1:10,8.8

--.3" .....

B ••• Hne ~N&eE

Figure 2 - Map showing area of stripping on Porphyry Ridge on claim numbered 4207779.

Page 5: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Regional Geology

The regional geology of the Mine Centre is composed of Precambrian rocks and is meso* Archean of age. The rocks of the area form part of the southern edge of the Wabigoon Sub-province. The rocks of the Mine Centre area consists of a sequence of inter-bedded mafic and felsic volcanic rocks, clastic and volcanically derived sedimentary rocks intruded by felsic and mafic intrusive rocks.

Local Geology

The rocks found in the vicinity of the showing are varied and complex. They consist mainly of inter-layered mafic to intermediate to felsic volcanic rocks which also contain inter-bedded tuff, lapilli tuff, tuff breccia and chert.

The mafic flows are massive and pillowed. The massive flows show flow-top breccia structure. Both the massive and pillowed flows contain amygdales filled with quartz andlor calcite. The mafic volcanic rocks are generally green to dark green to black in colour and are generally fine to medium grained.

The intermediate to felsic rocks are generally massive and tuffaceous. They are fine grained and vary in colour from light grey to beige. Some of the flows are porphyritic and contain quartz eyes and feldspar 2 to 4 mrn in size.

The sediments consist mainly of tuff and chert with variable amounts of sulphides. The main sulphides contained within the tuffaceous beds consists of pyrite, pyrrhotite with variable quantities of visible sphalerite, chalcopyrite. The total content of sulphide present varies from I to 60% and averages about 15%. The sulphide zones exposed vary in width from a meter up to 34 met

Page 6: GEOLOGY OVERBURDEN STRIPPING RPT

I~

~

-----.. - ~ -- - - -- ---- - -- -

--

. , .

- ~

\ \. \ .,.~\

1\

1

--

\ \ ..

E '" N

Figure 3 - Map showing new base metal discovery and geology of the western part of the Mine Centre Meta Volcanic Belt.

Page 7: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Sampling Procedures

After the area was stripped and washed, channel samples were taken at 1 meter interval unless other wise warranted. All cuts and surface area around the channel cuts were washed prior to chipping out the sample section to prevent any contamination.

Figure 4 - Edward Burkholder Cutting Channel Samples.

Page 8: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Figure 5 - Max Reiter collecting channel samples.

Channel Sampling

The following sample numbers represent the samples taken at Porphyry Ridge and Bear Patch showing (Old pit 2x2 m). Samples have been sent for analysis at Accurassay Laboratory in Thunder Bay. Samples are being analyzed via fire assay for gold, platinum, palladium and by ICP - 42 multi-element analyses. The samples are numbered 123901 to 124000.

Work Completed at the Porphyry Ridge stripping area.

Men - Max Reiter-site supervisor and Excavator operator Edward Burkholder-excavator operator, washing and channel cutting and sampling. Ray Bematchez - Consultant

Exeavator - Cat 320 - 14.5 days or 116 hours @ $ 125.001hour - $14,500.00

Total number of man-hours -Max Reiter 21.5 days @ I50/day ............... ... .................... $3,225.00 Edward Burkholder-7 days @ $150.00 ............................. $1,050.00

Page 9: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Consultation Ray Bematchez 9 days @ $500.00/day ............................... $ 4,500.00

Accommodations and meals 22 days @ $100.00/day ............... $ 2,200.00

Travel expenses 2,100 Ian @ $0.501km ................................ $ 1,050.00

Diamond Cutting Blades 3 @ $300.00/blade .......................... $ 900.00

Total Costs ................................................................ $ 27,425.00

The mechanical stripping on claim # 4207779 resulted in the discovery of a significant new base metal occurrence that is on strike with to the northeast and southwest with other previously discovered base metal (Cu-Zn) occurrences.

The 2005 channel sampling program in the stripping area has also shown that this new occurrence potential for significant values of gold, platinum and palladium and ICP 42 multi-dement analysis. Assays are pending.

Conclusions

A new base metal zone of mineralization was discovered during this work program.

The zone of mineralization contains potential for gold, silver, copper, zinc, platinium and palladium.

The zone of mineralization may represent a combined magmatic and volcanic massive environment.

Recommendations

Further work is definitely recommended.

The following program is proposed:

Line cutting - 50 Ian @ 650.001km .......................................... $ 32,000.00

Magnetic and Electromagnetic Surveys

50 Ian ~~ $300.00 ............................................................... $ 15,000.00

Page 10: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Geological Mapping

60 days @ $ 500.00/day ................ , ....... , ............. , .. , ... , .......... $ 30,000.00

Drilling

2,500 meters @ $100.00/m .................................................. $ 250,000.00

Tota.I ................................................................................................................................................... $ 327,000.00

Page 11: GEOLOGY OVERBURDEN STRIPPING RPT

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • -

Mining Lands - Mining Divisions of Ontario Page lof2

® Ontario Minislty of orthern

Development and Mine

Location: Mjn~trY_Hom~ > Mines and Mi~l]!l DivisLon > Mining Lands> Mining Claims Infonnation

Tuesday, September 4th, 2007

Mining Claim Abstract I Main Menu I Back I

Due Date: Work Required:

Total Work: Total Reserve: Present Work Assignment: Claim Bank:

Claim Holders

2007 -Sep-06

$ 6,400

$0

ll035

$ 1,005

$0

Recorded: Staked:

Township/Area: Lot Description:

Claim Units:

2005-Sep-06

2005-Aug-0915:20

BLISS LAKE (G-2668)

16

Rccol'dcd Holder(s) Percentage Client Number NUMAX RESOURCES INC. ( 100.00 %) 402424

Transaction Listing Type Date Applied J)escription Performed Number STAKER 2005-Sep-06

STAKER 2005-Sep-06

TRAN 2005-0ct-21

OTHER 2007-Jun-07

Claim Reservations

RECORDED BY BJORKMAN, KATARINA EDITH (E34605) BJORKMAN, KATARINA EDITH (392987) RECORDS 100.00 % IN THE NAME OF REITER, MAXIMILLIAN JOSEPH (186768) REITER, MAXIMILLIAN JOSEPH (186768) TRANSFERS 100.00 % TO NUMAX RESOURCES INC. (402424) WORK PERFORMED (GEOL, LC, MAG, VLF) $ 4,040 APPROVED: 2007-AUG-14

01 400' surface rights reservation around all lakes and rivers 02 Sand and gravel reserved 03 Peat reserved 04 Other reservations under the Mining Act may apply 05 Including land under water

Last Web Design Change: dimly 31105/2006

R051O.03598

R0510.03599

T05l0.00288

htto://W\WI.mci.mndm.!!ov.on.ca/Claims/Cf Claims/clm cssm.cfm?Claim View Claim ... 04/09/2007

Page 12: GEOLOGY OVERBURDEN STRIPPING RPT

Daily Log for Porphyry Ridge-July 10 to September 3, 2007

Max Reiter - Supervisor and prospector Edward Burkholder Machine operator Anthony Burkholder Helper Ray Bernatchez - Consultant

Machine Supervision Prospecting Helper Consulting (wash, sampling, bag)

July 10 10 10 July 20 10 10

21 8 (selecting areas for stripping) 22 10 10 23 10 10 24 8 10 25 8 8 26

July 27 10 10

Aug. 3 10 (selecting areas for stripping) 10 Aug. 4 10 10 Aug. 5 8 8 Aug. 6 10 10 10 Aug, 7 11 8 Aug. 8 9 8 8 Aug. 9 9 8 8 Aug. 10 8 8 Aug. 11 8 8 Aug. 12 8 8 Aug. 13 9 8 8 ~k~ Aug. 14 10 8 4 Aug. 15 ~ Aug. 20 8. Aug. 21 8 Aug. 22 8 Aug. 23 8

Total 116 hr 16 days Aday~s __ . 8.5 days 9 days

Page 13: GEOLOGY OVERBURDEN STRIPPING RPT

cfb """.,'OAIE>

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources Date Received: Aug 14,2007 385 Riviera Drive Thunder Bay, ON, CAN Date Completed: Sep 14,2007

P7B6K2 Ph#: (651) 430-9446 Fax#: (651) 251-l242 Job#: 200742899

Reference:

Sample#: 46 Core

Ace # Client ID Au Pt Pd Rh Ag Co Cu Fe Ni Pb Zn

ppb ppb ppb ppb ppm ppm ppm ppm ppm ppm ppm

211947 123901 26 <15 <10

211948 123902 <5 <15 <10

211949 123903 9 <15 <10

211950 123904 8 <15 14

211951 123905 5 <15 <10

211952 123906 31 <15 <10

211953 123907 21 <15 <}O

211954 123908 27 <15 <10

211955 123909 17 <15 <10

211956 123910 26 17 <10

211957 Dup 123910 21 <15 <10

211958 123911 <5 <15 <10

211959 123912 6 <15 <10

211960 123913 19 <15 <10

211961 123914 10 <15 <10

211962 123915 6 <15 <10

211963 123916 14 <15 <10

211964 123917 16 <15 <10

211965 123918 19 <15 <10

211966 123919 <5 <15 16

211967 123920 12 <15 12

211968 Dup 123920 10 <15 <10

211969 123921 9 <15 <10

211970 123922 10 <15 <10

Page 14: GEOLOGY OVERBURDEN STRIPPING RPT

rfb u ! 480-RAtOP.i(:!Ii

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources Date Received: Aug 14,2007 385 Riviera Drive Thunder Bay, ON, CAN Date Completed: Sep 14,2007

P7B6K2 Ph#: (651) 430-9446 Fax#:(651)251-1242 Job#: 200742899

Reference:

Sample #: 46 Core

Ace # ClientID Au Pt Pd Rb Ag Co Cu Fe Ni Ph Zn

ppb ppb ppb ppb ppm ppm ppm ppm ppm ppm ppm

211971 123923 5 <15 <10

211972 123924 8 <15 16

211973 123925 14 <15 17

211974 123926 7 <15 16

211975 123927 <5 <15 22

211976 123928 10 <15 20

211977 123929 <5 18 14

211978 123930 29 <15 14

211979 Dup 123930 30 <15 24

211980 123931 29 <15 10

211981 123932 6 <15 19

211982 123933 39 <15 <10

211983 123934 19 <15 <10

211984 123935 10 <15 12

211985 123936 20 <15 15

211986 123937 <5 <15 <10

211987 123938 <5 <15 <10

211988 123939 <S <15 <10

211989 123940 <5 <15 22

211990 Dup 123940 <5 <15 18

21199] 123941 7 <15 <10

211992 123942 <5 <15 14

211993 123943 <5 20 17

211994 123944 <5 <15 15

Page 2

Page 15: GEOLOGY OVERBURDEN STRIPPING RPT

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources 385 Riviera Drive Thunder Bay, ON, CAN P7B6K2 Ph#: (651) 430-9446 Fax#: (651) 251-1242

Date Received:

Date Completed:

Job#:

Reference:

Sample#:

Aug 14,2007

Sep 14,2007

200742899

46 Core

Acc # ClientID Au

ppb Pt

ppb Pd Rh Ag Co Cu Fe Ni Pb Zn

ppb ppb ppm

211995 123945 <5 <15 13

211996 123946 <5 <15 <10

PROCEDURE CODES: AL4APP, AL4ICPAR

Certifit:d By:

Derek Demlanill\\ H.Bsc. \...abora~ory "/:anager

ppm ppm ppm ppm ppm ppm

The results included on this report relate only to the items tested The Certificate of Analysis should not be reproduced except in full, without the written approval of the laboratory

AL917-04]]-I2110/2007 3:09 PM

Page 3

Page 16: GEOLOGY OVERBURDEN STRIPPING RPT

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources 385 Riviera Drive Thunder Bay, ON, CAN P7B6K2 Ph#: (651) 430-9446 Fax#: (651) 251-1242

Ace # Client ID

221636 123947

221637 123948

221638 123949

221639 123950

221640 123951

221641 123952

221642 123953

221643 123954

221644 123955

221645 123956

221646 Dup 123956

221647 123957

221648 12395&

221649 123959

221650 123960

221651 123961

221652 123962

221653 123963

221654 123964

254207 123983

Au Pt ppb ppb

<5 33

28 <15

18 22

14 <15

17 <15

11 16

23 <15

27 23

18 <15

21 25

30 <15

19 <15

18 23

29 23

17 <15

18 <]5

16 <15

21 29

28 <IS

20 <15

Pd Rh ppb ppb

<10

<10

<10

<10

<10

<10

<10

<10

<10

12

<10

<10

<10

<10

<10

<10

<10

13

<10

<10

Date Received: Aug 17,2007

Oct 3,2007 Date Completed:

Job#: 200743054

Reference:

Sample#: 19 Rock

Ag Co Cu Fe Ni Ph ppm ppm ppm ppm ppm ppm

PROVINCIAL, RECORDING OF"'IC£ ,,",UD6URY

RECEIVED " '1

) <,

Zn ppm

Page 1

Page 17: GEOLOGY OVERBURDEN STRIPPING RPT

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources Date Received: Aug 17,2007 385 Riviera Drive TImnder Bay, ON, CAN P7B6K2

Date Completed: Oct 3,2007

Ph#: (651) 430-9446 Fax#: (651) 251-1242

Ace # Client ID Au

ppb Pt

ppb Pd Rh Ag

ppb ppb ppm

PROCEDURE CODES: AL4AU3, AL4ICPAR

Certified By:

Derek OemianiliK H.Bsc. Laboratory Manager

Page 2

Job#: 200743054

Reference:

Sample #: 19

Co Cn Fe ppm ppm ppm

Rock

Ni ppm

Pb ppm

Zn ppm

The results included on this report relate only to the items tested The Certificate of Analysis should not be reproduced except in full, without the written approval of the laboratory

AL917-0411-l2I10f2007 3:10 PM

Page 18: GEOLOGY OVERBURDEN STRIPPING RPT

cfb ... " . .,.>R,..

Certificate of Analysis

Monday, December J 0, 2007

NuMax Resources Date Received: Aug 17,2007 385 Riviera Drive Thunder Bay, ON, CAN Date Completed: Oct 2, 2007

P7B6K2 Ph#: (651)430-9446 Fax#: (651) 251-1242 Job#: 200743052

Reference:

Sample#: 19 Rock

Ace # Client ID Au Pt Pd Rh Ag Co Co Fe Ni Pb Zn

ppb ppb ppb ppb ppm ppm ppm ppm ppm ppm ppm

221608 258162 <5 <15 <10

221609 123965 24 <15 14

221610 123966 25 <15 <10

221611 123967 <5 <15 <10

221612 123968 <5 <15 <10

221613 123969 16 <15 <10

221614 123970 13 <15 11

221615 123971 27 <15 <10

221616 123972 32 <15 <10

221617 123973 23 <IS <10

221618 Dup 123973 46 <IS <10

221619 123974 32 <15 <10

221620 123975 16 <15 <10

221621 123976 10 <15 <10

221622 123977 12 <15 <10

221623 123978 25 <15 10

221624 123979 7 <15 <10

221625 123980 10 <15 <10

221626 123981 7 <15 <10

221627 123982 <5 <15 <10

Page 1

Page 19: GEOLOGY OVERBURDEN STRIPPING RPT

.. •

Certificate of Analysis

Monday, December 10, 2007

NuMax Resources 385 Riviera Drive Thunder Bay, ON, CAN P7B6K2 Ph#: (651) 430-9446 Fax#: (651) 251-1242

Date Received: Aug 17, 2007

Date Completed: Oct 2, 2007

Job #: 200743052

Reference:

Sample#: 19 Rock

Ace # Client ID ~ ~ N AA ~ ~ ~ ~ ~ A h

ppb ppb ppb ppb ppm ppm ppm ppm ppm ppm ppm

PROCEDURE CODES: AL4APP, AL4ICPAR

Certified By:

Derek Oem;aniuK H.Bsc .. Laboratory Manager

Page 2

The results included on this report relate only to the items tested The Certificate of Analysis should not be reproduced except in full, without the written approval of the laboratory

AL917-0411-12/10!2007 3:09 PM

Page 20: GEOLOGY OVERBURDEN STRIPPING RPT

NuMax Resources

Date Created: 07-09-14 04:38:24 PM

Job Number: 200742899

Date Received: Aug 14, 2007

Number of Samples: 46

Type of Sample: Core

Date Completed:

Project ID:

Accur. # Client Tag Ag

ppm

211947

211948

211949

211950

211951

211952

211953

211954

211955

211956

211957

211958

211959

211960

211961

211962

211963

211964

211965

211966

211967

211968

123901 3

123902 <1

123903 2

123904 2

123905 <1

123906 <1

123907 2

123908 1

123909 1

123910 <1

123910 <1

123911

123912 <1

123913 <1

123914

123915 <1

123916 <1

123917 <1

123918 <1

123919 <1

123920 <1

123920

AI

%

3.83 1.32

2.10

3.83 2.89

2.14

2.19

2.16

2.26

1.93

1.89

1.49

1.29

1.01

1.29 1.02

1.12

0.81

0.71

2.51

0.83

0.85

As

ppm

12

<2

<2

4 <2

3

3

3

2

<2

<2

<2 <2

<2 3 <2 <2 <2

<2

<2

<2

<2

1046 Gorham Street Thunder Bay, ON Canada P7B 5X5

B Ba Be Bi Ca

% ppm ppm ppm ppm

47

46

47

47

51

49

43

46

43

43

44

46

44 47 53

62

43

48

43 48

46

44

37 233

149

146

106

40

33

46

42

71

71

298

152

56

238

185 119

81

48

1013

51 52

3

<1

<1

2

1

2

2

3

<1

<1

<1 <1 <1 <1 <1 <1

<1 <1

15

<1

<1

14

6

13

8

15

6

10

<1

2

4

3

5

3

4

4

3

6

<1

3

0.15

0.63

1.28

0.15

0.11

0.06

0.05

0.05

0.20

0.13

0.13

0.84

0.75

0.31

0.35

0.46

0.33

0.32

0.25

1.46

0.48

0.48

Tel: (807) 626-1630 Fax: (807) 622·7571

www.accurassay.com [email protected]

.. The results included on this report relate only to the items tested

.. This Certificate of Analysis should not be reproduced except in full, without the written approval of the laboratory.

"The methods used for these analysis are not accredited under !SOIlEC 17025

Cd Co Cr Cu

ppm ppm ppm ppm

Fe %

K Li

ppm

Mg

%

Mn

ppm

Mo

ppm

Na Ni P

ppm

Pb Sb Se Si

%

Sn Sr

ppm ppm

Ti TI V W

29

<4

<4

19

7

7

7

10

5

5

5

<4 <4 <4 <4

<4

<4 <4 <4 <4 <4

<4

58

12

17

38

13 26

33

25

19

14 13 10

B 7

9

11

6

6

3

28

12

13

726

177

574

475

122

223

68

117 37

232

232

415 134

153

210

122

208

156 121

368

257

258

%

269 >10.00 0.36

75 2.45 0.53

34 3.75 0.65

422 >10.00 0.62

222 8.13 0.61

494 >10.00 0.36

407 >10.00 0.19

618 >10.00 0.26

124 8.56 0.19

134 7.85 0.27

135 7.68 0.27

23 2.28 0.88

26 2.48 0.57

45 2.84 0.18

37 2.67 0.71

27 2.39 0.73

40 2.86 0.63

38 2.28 0.42

28 2.05 0.28

16 3.44 2.03

66 3.21 0.19

67 3.32 0.20

12

11

15

11

13

9

8

8 8 7

7

11 8

6 12

10

8

7

6

31

5

5

2.37

0.77

1.48

2.01

1.50

1.33

1.42

1.31 1.46

1.14

1.12

0.79

0.74

0.64

0.77

0.70

0.64

0.50

0.45

2.48 0.40

0.40

910

300

553

934

794

454

438

470

538 462

455 308

344

339

375

371

431 372

455

590

697

713

Certified By: ~l cLc. Derek Demianiuk, H.Bsc.

% ppm

29 0.01 249

6 0.09 43

6 0.04 195

18 0.03 138

13 0.02 45

18 0.02 135

17 0.01 111

23 0.02 167

15 0.01 66

13 0.02 56

14 0.02 55

5 0.11 34

8 0.05 29

14 0.02 26

11 0.06 27

6 0.04 24 7 0.06 19

6 0.03 17

6 0.02 11

6 0.13 141 7 0.02 31 7 0.02 33

338

689

694

403

237

118

190

223

212 219

212

744 522

299

691

734

348

287

236 2181

242

241

ppm ppm ppm

745

91

135

437

290

436

421

545

306

278 279 93

95

103 109

100

109

81

72

135

112 125

9

<5

<5

<5

<5

<5

5 <5

<5

<5

<5

<5

<5 <5

<5 <5 <5

<5

7

<5

<5 <5

<5 0.16 <10

<5 0.13 <10

<5 0.12 <10

<5 0.22 <10 <5 0.11 <10

<5 0.20 <10

<5 0.09 <10 <5 0.13 <10

<5 0.08 <10

<5 0.15 <10

<5 0.14 <10 <5 0.11 <10

<5 0.10 <10

<5 0.08 <10

<5 0.10 <10

<5 0.07 <10

<5 0.11 <10

<5 0.06 <10

<5 0.06 <10

<5 0.37 <10

<5 0.07 <10

<5 0.07 <10

ppm ppm ppm ppm

6 995 <1

41 1202 <1

53 1467 <1

9 1340 <1

9 1234 <1

5 615 <1

4 281 3

6 250 3

8 320 2

9 302 2

8 309 <1

78 1307· <1

42 . 787 <1

14 213 <1

50 1202 <1 40 1221 <1

27 1120 <1

17 741 <1

11 489 <1 183 3068 <1 21 309 <1

21 324 <1

99

17

61

80

26

20

9

11

7

15

15

31

12

3 22

21

8

5 2

91

11

12

42

<10

<10

49

11

<10

<10

<10

<10

<10

<10

<10

<10 <10

<10

<10

<10

<10

<10

<10

<10

<10

y

ppm

7

27

18

10

37 25

21

18 23 17

16

9

14

10

13

17

27 27 14 12

24 25

Zn

ppm

4207

101

210

4872

974

253

240

210

206

125

122

90

90

71

95

96

107

106

92

84

290

293

Page 1 of 3

Page 21: GEOLOGY OVERBURDEN STRIPPING RPT

NuMax Resources

Date Created: 07·09·1404:38:24 PM

Job Number: 200742899

Date Received: Aug 14, 2007

Number of Samples: 46

Type of Sample: Core

Date Completed: ,

Project ID:

Accur, # Client Tag Ag

ppm

211969

211970

211971

211972

211973

211974

211975

211976

211977

211978

211979

211980

211981

211982

211983

211984

211985

211986

211987

211988

211989

211990

123921 <1

123922

123923 <1

123924 <1

123925 <1

123926 <1

123927 <1

123928 <1

123929 <1

123930 <1

123930

123931 <1

123932 <1

123933 <1

123934 <1

123935 <1

123936 <1

123937 <1

123938 <1

123939 <1

123940 <1

123940 <1

AI %

0,96

1.08

0,81

0,93

1,66

1,23

1.14

0.74

2.05

0.59 0.52

1,66

1.25

0.95

0.89

1.50

0.75

1.27

1.42

2.00

1,94

2.25

As

ppm

<2

<2

<2

<2

2 <2

<2

<2

<2

3

<2

<2

<2

<2

<2

<2

<2

<2

3

<2 '<2

<2

1046 Gorham Street Thunder Bay, ON Canada P7B 5X5

B Ba Be Bi ppm ppm ppm ppm

43 67

38 78

39 65

50 51

48 57

49 37

45 60

49 102

48 258

48· 86

45 74

44 65

48 39

47 61

51 49

51 87

43 129

44 66

39 43

39 65

47 55

50 64

<1

<1

<1

<1

2 <1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

<1

1

4

5

9 <1

3

5

2

5

7

2

<1

3 <1

1

2

4

<1

2

3

Ca

%

0,09

0.11

0,13

0.15

0,13

0.15

0,36

0,70

1,89

0.55

0,51

0.14

0.60

0.59

1,09

0,71

2.05

0.53

0.50

0.49 0.46

0,52

Tel: (807) 625-1630 Fax: (807) 622,7571

www.accurassay.com assay@accurassay,com

* The results included on this report relate only to the items tested * This Certificate of Analysis should not be reproduced except in full, without the written approval

of the laboratory. "'The methods used for these analysis are not accredited under ISOIIEe 17025

Cd Co Cr Cu

ppm ppm ppm ppm

<4

<4

<4

<4

5 <4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

13

6

9

15

13

4

5

6

22

6

6

8

10

5

5

5

17

5 4

5

7

7

197

551

163

116

163

195

179

126

179

93

85

153

98

151

119

133

120

139

103

141

92

106

111

65

71

236

304

60 43

27

27

60

55 202

76

37

30

24

28

27

18

24

27

32

Fe

%

4.77

3.25

3.43

5.43 8.07

3.41

2.66

1.52

3.71

5.26

4.70

5.19

3.45 2.40 2.40

3.37

2.93

2.84

2.91 3.31

3,54

4.01

K

%

0.58

0.45

0.37

0.35

0.37

0.22

0.49

0.48 1.17

0.31

0.27

0.38

0.28

0.37

0.41

0.49

0,43

0.30

0.43

0,62

0,68

0.78

Li

ppm

5

5

4

5

6

7

7

7

12

5

5

10

8 6

7

9

7

10

10

12

13

15

Mg

%

0,34

0,32

0,27

0.31

0.77

0.51

0.45

0.41

1.69

0,52

0.48

0.78

0.78

0.51

0.74

1,11

1.07

0.85

0,98

1.35

1.43

1.63

Mn

ppm

460

1036

636

1112

1077

768

911

456

951

648

599

584

717

707

624

504

814

498

451

509

514

588

Mo

ppm

14

7

7

12

15

13

16

4

7

13

12

10

6 6

5

7

6

6

6

7

7

10

Certified By: ~2UCL Derek 6emianiuk, H.Bsc.

Na Ni

% ppm

0.02

0,03

0.02

0.02

0.01

0.02

0.02

0,03

0.05

0.02

0.02

0.02

0.02

0.04

0.02

0.04

0.04

0.03

0.02 0.03

0,02

0.02

44

23

17

32

39

19

16

18

58

23

21

16

12

11

11

9 39

10 7

14

9

9

P ppm

283

255

299

337

219

271

307

607

933

315

283

310

304

290

314

399

1255

293

256

341

290

334

Pb Sb Se Si

%

Sn Sr

ppm ppm ppm ppm ppm

141

116

125

178

267

120

90

49

159

197

173

167

118

82

85

120

113

99 98

121

127

152

<5 <5

<5 <5 <5

<5 <5

<5

<5 <5

<5 <5

<5 <5

<5 <5 <5

<5 <5

<5

<5 <5

<5 0.06 <10 10

<5 0.10 <10 11

<5 0.07 <10 13

<5 0.06 <10 10

<5 0.12 <10 5

<5 0.06 <10 5 <5 0.06 <10 14

<5 0,05 <10 66

<5 0,13 <10 172

<5 0.05 <10 43

<5 0.05 <10 39

<5 0,13 <10 10

<5 0.08 <10 31

<5 0.10 <10 26

<5 0.07 <10 55

<5 0.14 <10 47

<5 0.07 <10 185

<5 0.11 <10 14

<5 0.08 <10 18

<5 0.17 <10 17

<5 0.07 <10 14

<5 0.08 <10 16

Ti TI V W

ppm ppm ppm ppm

656 2 4

461 <1 3

372 <1 2

602 2 3

650 <1 4

344 <1 2

600 <1 2

656 <1 9

1734 <1 91

443 <1 8

391 <1 7

462 272 4

463 <1 3

518 <1 2 644 <1 3

722 2 5 534 <1 24

407 <1 4

771 <1 2

981 <1 3

1312 <1 3

1545 <1 4

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

y

ppm

5

7

5

5

6 5

6

10

10

4

3

7

9 7

7

8 9

8

15

27

34

41

Zn

ppm

170

70

72

100

171

80

63

50

132

82

98

490

206

76

83

109

45

59

74

90

95

107

Page 2 of 3

Page 22: GEOLOGY OVERBURDEN STRIPPING RPT

NuMax Resources

Date Created: 07-09-1404:38:24 PM

Job Number: 200742899

Date Received: Aug 14.2007

Number of Samples: 46

Type of Sample: Core

Date Completed:

Project 10:

Accur. # Client Tag Ag AI As

ppm % ppm

211991 123941 <1 2.45 <2 211992 123942 <1 1.69 <2 211993 123943 <1 1.66 <2 211994 123944 <1 1.82 <2 211995 123945 <1 1.72 <2 211996 123946 <1 1.48 <2

B ppm

51

44

52

57

49

49

Sa

1046 Gorham Street Thunder Bay, ON Canada P7B 5X5

Be Bi Ca

ppm ppm ppm %

176 <1 <1 0.51

88 <1 0.29

94 <1 <1 0,37

81 <1 1 0.38

63 <1 2 0.39

45 <1 <1 0.46

Tel: (807) 626-1630 Fax: (807) 622-7571

www.accurassay.com [email protected]

* The results included on this report relate only to the items tested * This Certificate of Analysis should not be reproduced except in full, without the written approval

Cd Co Cr

ppm ppm ppm

<4 10 160

<4 6 147

<4 5 128

<4 6 97

<4 5 133

<4 5 63

of the laboratory, "The methods used for these analysis are not accredited under ISOIIEC 17025

Cu

ppm

26

18

20

22

28

47

Fe K Li Mg Mn

% % ppm % ppm

4.15 1.29 16 1..69 663

2.92 0.98 12 1.05 475

2,85 1.07 12 0.93 388

3.33 1.10 13 1.10 467

3.63 0.65 11 0.96 727

4,19 0.53 10 0.85 879

Certified By: &",ch Derek 6emianiuk, H,Bsc.

Mo

ppm

8

6

6

6

6

6

Na Ni P Pb Sb Sa Si

% ppm ppm ppm ppm ppm %

0,05 26 376 139 <5 <5 0.16

0,02 8 274 110 <5 <5 0.07

0.04 8 288 105 <5 <5 0.10

0.02 9 342 118 <5 <5 0,06

0.04 8 313 139 <5 <5 0.13

0.02 7 285 159 <5 <5 0.06

Sn Sr Ti

ppm ppm ppm

<10 22 2253

<10 14 1783

<10 15 1693

<10 11 1863

<10 9 1244

<10 8 979

TI V W Y Zn

ppm ppm ppm ppm ppm

<1 13 <10 53 94

<1 3 <10 45 71

<1 3 <10 43 73

<1 4 <10 47 85

<1 4 <10 28 78

2 4 <10 14 72

Page 30f3

Page 23: GEOLOGY OVERBURDEN STRIPPING RPT

NuMax Resources

Date Created: 07-10-05 12:34:18 PM

Job Number: 200743054

Date Received: Aug 17, 2007

Number of Samples: 19

Type of Sample: Rock

Date Completed: Oct 3, 2007

Project 10:

Accur. # Client Tag Ag

ppm

221636

221637

221638

221639

221640

221641

221642

221643

221644

221645

221646

221647

221648

221649

221650

221651

221652

221653

221654

254207

123947 2

123948 <1

123949 <1

123950

123951 <1

123952 <1

123953 <1

123954 <1

123955 2

123956 <1

123956 <1

123957 <1

123958 <1

123959 <1

123960 <1

123961 <1

123962 <1

123963

123964 <1

123983 4

AI

%

2.50

1.73

1.99

2.51

2.92

1.19

0.77

1.39

2.14

1.64

1.59

0.93

2.00

2.38

2.59

2.26

1.41

1.10

0.55

3.39

As

ppm

3

8

5

6

5

3

<2

3

3

2

4

<2

<2

3

5

2 3

3

2

5

1046 Gorham Street Thunder Bay. ON Canada P7B 5X5

B Ba Be Bi Ca

% ppm ppm ppm ppm

45

41

44

43

46

41

33

44

43

46

42

40

39

42

45

38

47

42

39

41

141 3

165 3

207 3

234 4

263 4

191 3

123 3

196 3

145 3 110 . 3

107 3

89 3

168 3

211 3

227 3

180 4

120 3

123 3

91 3

186 3

8

7 10

14

9

6

7

5

5 4

<1

7

9

8

12

6

4

4

18

0.58

0.22

0.47

0.30

1.15

0.33

0.26

1.03

0.49

0.45

0.43

0.61

0.40

0.42

0.63

0.55

0.40

0.20

0.07

1.06

Tel: (807) 626-1630 Fax; (807) 622·7571

www.accurassay.com [email protected]

* The results included on this report relate only to the items tested * This Certificate of Analysis should not be reproduced except in full, without the written approval

of the laboratory. *The methods used for these analysis are not accredited under ISOIIEC 17025

Cd Co Cr Cu

ppm ppm ppm ppm

Fe %

K %

<4

<4

5

6

6

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

<4

6

9

9

8

11

11

5

5

6

8

7

7

4

7

8

8

7

6

6

4

27

252

185

238

205

226

168

245

159

122

155

151

103

225

81

195

78

88

240

93

150

36 4.32 1.97

45 6.16 1.56

49 8.84 1.86

80 >10.00 2.05

67 9.75 2.57

24 3.05 1.10

26 1.86 0.65

27 3.45 1.19

52 5.91 1.80

28 4.00 1.25

28 3.93 1.22

20 1.88 0.61

29 5.46 1.54

37 6.64 1.85

64 8.54 1.92

63 7.24 1.70

35 3.81 1.06

23 2.73 0.87

35 1.39 0.46

169 >10.00 1.85

Li ppm

14

11

12

15

20

8

5

7

13

10

10

5

13

15

15

14

9

7

4

13

Mg

%

1.16

0.56

0.69

0.72

0.70

0.16

0.10

0.20

0.39

0.26

0.26

0.13

0.31

0.42

0.44

0.40

0.26

0.14

0.06

1.50

Mn

ppm

1295

851

1177

1485

1826

571

402

863

980

680

660

440

997

1267

1414

1240

652

505

232

1626

Certified By: ~ ,,~ Derek Demlaniuk, H.Bsc.

Mo ppm

Na

%

Ni

ppm

9 0.06 14

13 0.04 15

15 0.03 13

18 0.03 16

17 0.03 17

8 0.03 13

5 0.02 12

7 0.03 12

10 0.02 10

8 0.Q3 12

8 0.02 12

5 0.02 10

10 0.02 12

13 0.05 11

15 0.06 12

12 0.04 9

7 0.03 10

7 0.03 14

4 0.02 11

18 0.12 26

P

ppm

456

226

228

233

255

172

174

292

288

239

234

223

209

220

231

199

243

233

186

1503

Pb

ppm

135

161

257

328

278

101

56

105

152

123

118

52

134

173

231

201

112

85

45

370

Sb Se

ppm ppm

Si

% Sn Sr

ppm ppm

<5

<5

6

6

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

5

<5 0.08 <10 22

<5 0.08 <10 13

<5 0.11 <10 16

<5 0.25 <10 24

<5 0.10 <10 29

<5 0.03 <10 12

<5 0.03 <10 10

<5 0.03 <10 37

<5 0.04 <10 14

<5 0.06 <10' 14

<5 0.05 <10 13

<5 0.05 <10 15

<5 0.05 <10 18

<5 0.09 <10 18

<5 0.20 <10 16

<5 0.10 <10 11

<5 0.06 <10 15

<5 0.04 <10 7

<5 0.02 <10 3

<5 0.29 <10 12

n TI V W

ppm ppm ppm ppm

2314 <1 8 1823 <1 6

1779 <1 5

1839 5 8

2006 7

1445 <1 2

896 <1 <2

1505 <1 2

2321 <1 4

1874 <1 6

1815 <1 7

1022 <1 <2

1953 2 3

2095 <1 5

1908 2 6

1720 <1 3

1533 <1 3

1246 <1 2

639 <1 <2

3178 3 32

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

<10

y

ppm

46

43

40

26

49

30

36 81

84

62

59

60

57

54

53

47

46

49

38

21

Zn

ppm

125

378

297

277

600

109

66

162

280

163

162

92

163

187

203

438

352

81

46

116

Page 1 of 1

Page 24: GEOLOGY OVERBURDEN STRIPPING RPT

NuMax Resources

Date Created: 07-10-05 12:29:48 PM

Job Number: 200743052

Date Received: Aug 17,2007

Number of Samples: 19

Type of Sample: Rock

Date Completed: Oct 2, 2007

Project 10:

Accur. # Client Tag Ag

ppm

221608

221609

221610

221611

221612

221613

221614

221615

221616

221617

221618

221619

221620

221621

221622

221623

221624

221625

221626

221627

258162 <1

123965

123966 <1

123967 2

123968 <1

123969 2

123970 <1

123971

123972

123973 <1

123973

123974 1

123975 2

123976 3

123977 2

123978 1

123979 3

123980 3

123981 3

123982 3

AI

%

0.90

1.75

0.87

0.90

0.93

1.52

1.39

0.95

0.98

2.08

2.05

1.30

3.06

2.93

3.72

2.31

3.44

2.79

3.57

3.55

As

ppm

15

4

6

4

3

4

3

3

16

16

19

8

11

6

9

6

6

2

3 7

1046 Gorham Street Thunder Bay, ON Canada P7B 5X5

B Ba

ppm ppm

Be Bi ppm ppm

Ca

%

40

41

39

38

36

41

37

43

46

41

40

38

43

36

35

36

43

35

42

38

35

75

45

99 111

84

65

83

37

80

79

49

104

102

124

87

171

143

137

190

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3 3

3

3

5

4

4

4

2

8

2

<1

5

12

12

8

7

12

9

7

9 19

22

16

0.72

0.15

0.06

0.08

0.42

0.05

0.07

0.09

0.07

0.22

0.21

0.13

0.35

0.42

0.56

0.53

0.82

1.68

1.51

1.23

Tel: (807) 626-1630 Fax: (807) 6227571

www.accurassay.com [email protected]

Cd Co Cr

ppm ppm ppm

<4

<4

<4

<4

<4

<4

<4

<4

5

7

7

6

5

4

5

5

<4

4

<4

<4

16 190

6 328

8 189

6 354

5 109

11 481

6 110

7 366

9 159

25 343

25 339

22 120

36 155

33 95

38 176

35 96

22 121

18 73

23 159

19 43

,. The results included on this report relate only to the items tested * This Certificate of Analysis should not be reproduced except in full, without the written approval

of the laboratory. *The methods used for these analysis are not accredited under ISOIIEC 17025

Cu

ppm

Fe

%

K

%

65 2.51 0.21

34 4.73 1.49

144 3.65 0.64

47 3.03 0.85

22 1.93 0.42

123 5.96 0.97

42 3.95 1.11

74 3.29 0.75

78 3.22 0.54

117 6.56 1.17

114 6.50 1.16

120 5.51 0.93

187 >10.00 2.45

225 9.30 1.96

145 >10.00 2.12

231 6.22 1.24

142 >10.00 2.24

115 >10.00 1.54

70 9.25 1.43

67 9.49 2.03

Li

ppm

5

8 4

5

5 7

8 6

5

10

10

6

14

12

15

10

14

9

11

14

Mg

%

0.32

0.59

0.27

0.35

0.40

0.51

0.47

0.34

0.37

0.84

0.83

0.52

1.23

1.21

1.60

1.01

1.25

0.92

1.29

1.27

Mn

ppm

423

738

310

310

421

529

527

331

331

682

676

387

787

871

1695

1009

1377

1978

1852

1711

Certified By: £fe.ue:L. Derek"Demianiuk, H.Bsc.

Mo

ppm

Na

%

Ni

ppm

5 0.08 16

10 0.03 13

11 0.05 13

8 0.07 15

4 0.06 14

12 0.04 23

8 0.03 12

B 0.04 19

7 0.03 15

13 0.03 25

13 0.03 24

11 0.03 21

16 0.03 32

16 0.02 35

17 0.02 49

11 0.02 44

15 0.06 13

17 0.13 12

15 0.10 17

14 0.09 11

P

ppm

1244

408

129

249

519

292

172

229

284

989 982 744

2020

2170

1269

606

1715

1528

1915

1716

Pb ppm

65

168

427

113

107

137

91

167

209

'195

186

373

233

209

249 158

228

255

220

219

Sn Sr Ti TI V w Sb Se

ppm ppm

Si

% ppm ppm ppm ppm ppm ppm

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

<5

5

<5

<5

<5

5

<5

<5

<5

<5 0.07 <10

<5 0.04 <10

<5 0.03 <10

<5 0.11 <10

<5 0.04 <10

<5 0.04 <10

<5 0.03 <10

<5 0.03 <10

<5 0.04 <10

<5 0.05 <10

<5 0.04 <10

<5 0.04 <10

<5 0.08 <10

<5 0.04 <10

<5 0.10 <10

<5 0.05 <10

<5 0.18 <10

<5 0.19 <10

<5 0.21 <10

<5 0.16 <10

12

9 7

22

19

7

6

7

4

5

5

4

6

6

8

8

7

9

15

10

1350 <1 14 <10

1645 <1 4 <10

625 <1 4 <10

1130 <1 11 <10

680 <1 13 <10

1437 <1 20 <10

1227 <1 6 <10

721 <1 7 <10

695 <1 8 30

1937 <1 59 45

1921 <1 58 42

1463 <1 34 31

3488 3 108 <10

2921 3 92 <10

3210 <1 95 11

1712 <1 30 14

3222 3 9 <10

2525 2 11 <10

2746 <1 57 <10

3094 3 17 <10

y

ppm

Zn

ppm

26 248

30 120

25 796

13 89

19 102

42 614

63 209

30 329

33 2543

383728

38 3676

26 2625

38 743

37 524

18 850

10 1178

21 229

22 112

21 143

20 144

Page 1 of 1

Page 25: GEOLOGY OVERBURDEN STRIPPING RPT

/

SCAll

~.

~ ~ - 1+25E

( I \ J

/' / 1

D~75f:

I I \

\ \ \ I J

TrIA' \ +0 / 01' ecc..lc.. ~ '- I ZO()e ,, __ /

...... "-l \

\ \

O+50f"

Q) I ~ \

-l \

Q

-+-c o

l .'

\ \

Ia.

\

LEGEN D

)0. - "-'1<> '5- '5; vc -f';O L<) Ie. - tu.f'f

Z - i=e I sic.. Vol c C<. Vl, 'L .

20. - Oc,CI'+C /'11~s'5I\JI"'F!ot.<J 2b - Fe ldspo> Pc"-P}-'ji~j 2. c - Q",o r-/- z.. Pot ph.y "'j

4 ~ .1 Y1tul,A,€cf, 'vic TV1Tru5 1ve

5 - IVIa.+,·c I",+ vu. 51\)e.... 50... ·- Am .oh' bod , +1'" d, l<..e.. Sb- GcdobrO

SYM BOLS

cp - c. \,c.l co ej ('i +e sph- Spno Ie r:+e. p'y - Pj r I' +e. po - P.j rrho-t,·+e... m o. 'j - Me.. 'j fle+' + e

bDss-a.n

Zone

',,-"" I ,'JJ 56 m e..+re 'S

\ ;to Bar ber ROCld \

r-- -·------- - ------.: : ~\J un. Q?<' e50urces Inc. f--- ---

j'Vime Cen+er- 'PrDp.

i Porphy r)' R\dje Show1Vlj

i--~ BA~-e,e "~Q f chEZ- f £"5-1 I I\de Sep-/ 2., Z 007 1 !-~;t~pA~-l;('encJ, ·' 1 Qnd 2 : I I _ ___ --'1-. -------- --

35787

Page 26: GEOLOGY OVERBURDEN STRIPPING RPT

o

I

\ ,.

SCQ/e

/~

, \ ( I

\ I

\ ' I \.%' \ \ IJ' \

o \ >\

'\ A "\

\ "'9. '/

\ \ \ \ \

I em ~ 2 yne-t~e~

is

e uTrv\ SIG;,Z55E 53'15'>56 N

2-:::2S~

5b

\ ' \

\ '2.+ 0 pI:"

\ I \ \ \

\

I-t 75 6" + ~

II \.jiM

S'~2IBE .. 539559.3"l

Trench #3

\.liM 51<;~IOE

53QS bO~ N

\

\

I+SO~ Go S5a..n i ZOrle.

.it-----~----- ------ .-------.~.

----

\ C' \

IZB'V 6 ~ -q63 -90'2

~-----

\ \

-Cfbl~ _

-q (,,0

I

I I

I I

/ I !

'-" -'-"- -'-'-' --- - . . - ----- ---- ----,

LEG E 1'-1 0

Mo-r.c. Vot eQ rllCS

10.- Ma ss>i ve. t=low ~ I b - I'r - lu'1,

-- .,

2 - I n +-e 1" 1'1\ e ell i Ct t e.. Vo I c Ct If) Ie 5

20.- Dt:{c,+e..- me<sslve -rIoLO'S

2 b - re{cl'5>j)no.1' YOi'ph.j'Y

2 c... - QUo.v-tz. 'PDf pi\) f}

Lj - Fe [ SiC l vt+i"L.l... S i ve Lj a.. - Fe.[d-spczv- 'Poy- ph'!,y

5- f'-IIo."i\c Tn+l"lA'S/'ve Sa... - A YYl-ph. Do \ '+e. D~ ke.

50- Gc..bbl'o

~~J fYi bo \ 5

cp - Chcc\cop..:t'i +e.. sph- Spha ler-;+e

. p~ - P:::Jr,+e.

po - ?'j rdl\oTi+e.

"'Ct~ - IV' 0..9 n e+lte..

< Be&&1~1j- Strike,dip'

~ __ ~_\~_- ~_~ __ -_x ___ R._\ _e_s_o_l-l __ '{'_c._e_s_~_h_C_, -------.,j I HI n e Cel":Ter' P!'opef-lj I ! ___ !~~? fj~1 R(d~e ShowiY\5'