582 Gable Rd. PO Box 2 Harriet, Ar. 72639 Cell (716) 579-3240 [email protected] Glenn E. Martin November 2016 to December 2016 M. A. Patout and Sons / FSE Energy Jeanerette, La. Operations Support Operated and then trained Operators on a 300 KPPH FSE Energy bagasse boiler. Also helped tune the boiler for emissions testing. April 2016 to October 2016 Kendall Reconfiguration Project Cambridge, Mass. Power Energy Systems Mechanical Commissioning Engineer Commissioned a Shin Nippon back pressure steam turbine with an Air Cooled Heat Exchanger and an Aux Cooling System with an Alfa Laval Fin Fan Cooler. February 2015 to June 2015 Lutech Resources-CBI Entergy MATS projects at Newark and Red Bluffs, AR Mechanical Commissioning Lead Commissioned the CBR and Activated Carbon systems. August 2014 to February 2015 Bluewater Energy Solutions-Kiewit IPL Units 1-4 Environmental Project

Glenn Martin

Embed Size (px)

Citation preview

Page 1: Glenn Martin

582 Gable Rd. PO Box 2Harriet, Ar.

72639Cell (716) 579-3240

[email protected]

Glenn E. Martin November 2016 to December 2016M. A. Patout and Sons / FSE EnergyJeanerette, La.Operations SupportOperated and then trained Operators on a 300 KPPH FSE Energy bagasse boiler.Also helped tune the boiler for emissions testing.

April 2016 to October 2016Kendall Reconfiguration ProjectCambridge, Mass.Power Energy SystemsMechanical Commissioning EngineerCommissioned a Shin Nippon back pressure steam turbine with an Air Cooled Heat Exchanger and an Aux Cooling System with an Alfa Laval Fin Fan Cooler.

February 2015 to June 2015Lutech Resources-CBIEntergy MATS projects at Newark and Red Bluffs, AR Mechanical Commissioning LeadCommissioned the CBR and Activated Carbon systems.

August 2014 to February 2015Bluewater Energy Solutions-KiewitIPL Units 1-4 Environmental Project Petersburg, Indiana Loto, Commissioning, Operations SpecialistManaged the Loto office during Precipitator upgrades, Activated Carbon, CBR system, SBS system and Bag house commissioning.

June 2013 to April 2014Bluewater Energy Solutions

Page 2: Glenn Martin

Allandale, SCStartup Mechanical Lead-Control Room SupervisorThe plant consists of an FSE Biomass Boiler and a 23MW GE Turbine. Commissioned the plant and then supervised the control room for the duration of The project.

April 2012 to May 2013 Precision Resources Co. -ZacheryPiedmont Green Power Barnesville, GAOperations EngineerPlant consists of one EPI 60 MW Biomass boiler with a Siemens axial flow turbine generator. Duties included Mechanical Commissioning, Control Room Supervisor, and Operator Training.

August 2011 to April 2012CaliperVCHEC Hybrid Energy CenterVirginia City, VACommissioning Engineer 5Plant consists of two Foster Wheeler Gob/Biomass fired CFBs, supplying steam to a Toshiba 660MW turbine/air cooled condenser. Duties include Mechanical Commissioning, Control Room Supervisor and Operator Training.

August 2010 to April 2011 Headway Corp.TVA Lagoon Creek Combined Cycle ProjectBrownsville, TNCombined Cycle TechThe plant is a two on one with Mitsubishi 501F combustion turbines, Nooter/Eriksen boilers and a GE D11 steam turbine. The controls are Ovation and Mark 6.

March 2010 to April 2010 LuminantLuminant Sandow Unit 5Rockdale, TXOutage Loto CoordinatorSet up the Loto program for the first annual plant major outage in a Taglink System. The plant consisted of two Foster Wheeler CFB boilers, burning lignite and an Alstom 630 MW turbine generator.

October 2009 to February 2010 Bechtel Power CorporationTrimble County Unit 2Bedford, KYStartup Operations Shift EngineerCoordinated work between construction, startup and the clients plant operators. Filled in as Loto Coordinator in his absence. Directed the plant operators. The plant consisted of one 750 MW babcock and Doosan supercritical boiler and a Mitsubishi 750 MW turbine generator.

Page 3: Glenn Martin

August 2008 to October 2009 Bechtel Power CorporationLuminant’s Sandow Unit 5 ProjectRockdale, TXStartup Operations Shift EngineerCoordinated work between Construction, Startup and the Client’s plant operators. Filled in as Loto Coordinator in his absence. Directed the plant operators in the operation of the plant. I was also the designated safety representative. Plant consisted of two Foster Wheeler CFB boilers, burning lignite and an Alstom 630 MW turbine generator.

October 2007 to April 2006, TASC-CH2M Hill Sierra Pacific Tracey Combined Cycle ProjectMcCarren, NVMechanical Commissioning, Startup Shift SupervisorAssisted with the startup of a GE 7FA two into one. The steam turbine is a D11 and the boilers are Nooter-Ericson. The feed pumps and the condensate pumps are Flowserve. I commissioned the feed pumps, condensate pumps and the SCR System. I worked with Vieolia on the Boiler chem clean, ACC cleanup and steam blows.

August 2007 to October 2007 Rev. 1 Power StaffingFlorida Power and Light, Port Everglades PlantFort Lauderdale, FLAOutage Contract CoordinatorSupervised contractors working on Unit 2 outage while overseeing the change out of condenser, circulating water pump and feed water heater level control valves and transmitters. I also supervised valve repairs and circ water intake cleaning and concrete repairs. Responsible for Scope Changes and Safety.

May 2006 to July 2007 Bluewater Energy SolutionsCorn Products, Bedford Park, III.Startup Shift Supervisor, Mechanical Commissioning Tech, Operator TrainerAssisted with startup of a Foster Wheeler 1100 KPPH CFB Boiler. Performed piping completion surveys, system punch lists, and worked with Mechanical Commissioning doing equipment checkout, startup, system flushes and hydro testing.

September 2005 to March 2006 North American Contract Employee ServicesSan Juan Generating StationWaterflow, NMProcedure WriterReviewed and updated operation procedures at the San Juan Generating Station in Farmington, NM. The boilers were Foster Wheeler PC; fired units and the turbines-Westinghouse and GE. Station Capacity – 1700 MW.

Page 4: Glenn Martin

August 2005 to September 2005 North American Contract Employee ServicesBenning Generating StationControl Room OperatorEmployed as a Control Room Operator at the Benning Generating Station in Washington, DC. The plant was a peaking plant with two 275 MW oil burning units, supplying steam to teo General Electric turbine generators.

August 2003 to August 2005 Buffalo Fuel Corp.Trigen Syracuse EnergyOperations and Maintenance ManagerManaged the alternative fuels processing plant at Trigen Syracuse Energy Corp. Processed paper, wood and plastic to be burned in the plants Babcock and Wilcox PC boilers. Managed the coal-handling department.

May to July 2003 Think Energy GroupJohn H. Warden StationL’anse, MichiganControl Room OperatorThe plant was restarted due to a need for power caused by the temporary shutdown of a large plant. The boiler was a Riley PC that was converted into gas.

December 2002 to April 2003 Buffalo Fuel CorpTrigen Energy Corp.Syracuse, NYPlant Improvements ConsultantInitiated improvements to Trigen’s ash system and control air system. Made recommendations to lower their high LOI problem, to reduce plugging problems in generating tubes and coal bunkers. Worked in Alternative Fuels Department making improvements to dust collection System. The plant consisted of five, 20 MW B-W, PC boilers, a 90 MW Toshiba turbine and a 10 MW Elliot back pressure turbine.

August to October 2002 Universal EnergyBlack Hills PowerDenver, COStartup Control Room OperatorConversation from simple to combined cycle. NEM boilers and a Dresser-Rand steam turbine were added to the two existing LM6000 gas turbines. The DCS is Yokogawa and the steam turbine is controlled by a 505 Woodward turbine control.

May to August 2002 TMP WorldwideKendall County Generation FacilityMinooka, Ill.Operations and Maintenance Support

Page 5: Glenn Martin

Plant consisted of four GE 7FA gas turbines, Foster Wheeler HRSG’s. GE steam turbines and GE air cooled, and Hydrogen cooled generators. Put in charge of the water treatment plant which consisted of raw and wastewater clarifiers, carbon filters, media filters, RO units and mixed beds.

Nov 2001 to May 2002 Power Industry ConsultantsAES Total Energy ProjectGuayama, PRCommissioning Shift SupervisorI completed a contract as a commissioning shift supervisor for Power Industry Consultants and the AES Total Energy Project. We commissioned two 250 MW Alstom CFB boilers and two Alstom 250 MW Alstom reheat turbines with Alstom air cooled generators. The Water Treatment Department consists of media filters, makeup and side stream RO units, a clarifier for cooling tower makeup, Anion units and mixed beds. In addition, I worked with mechanical commissioning through turbine oil flushes, feed pump oil flushes, condensate and feed water line flushes, boiler chemical cleaning and steam blows. I also administered the lock-out, tag-out process.

July 1999 to Nov 2001 CH Resources IncorporatedNiagara Falls, NYOperations and Maintenance ManagerThis facility consists of one 500 KPPH Pyroflow circulating fluidized bed boiler which supplies steam to a 53 MW Imo-Delaval turbine/generator. The fuel used was a bituminous coal and petroleum coke and tire chip mixture. The plant is controlled by a Johnson-Yokogawa DCS. The feed water system is fed by three 250 KPPH KSB electric driven barrel pumps. I assisted in startup of the plant after it had been idle for two years. I oversaw all aspects of plant maintenance and operations including: setting up training programs, procedures and policies for all personnel, scheduling and planning of outages, coordinating with contractors and ensuring all parts needed were on site. I assisted the plant manager with verifying that operations and maintenance were within budget and in planning and carrying out various tests for alternate fuels. I investigated and recommended various process upgrades.

March 1991 to Sept 1998 Southern Energy, Inc.Niagara Falls, NYControl Room Operator/Shift SupervisorWhile assisting with Mechanical Commissioning and Start Up of this facility my duties included: completion of punch lists on new systems and equipment, writing equipment startup and operating procedures; administration of the lock-out tag-out procedure. Operated a 500 KPPH Pyroflow circulating fluidized bed boiler which supplied steam to a 52 MW Imo-Delaval turbine/generator. The fuel used was a bituminous coal and petroleum coke mixture. A Johnson-Yokogawa DCS controlled the plant and the feed water system was fed by three 250 KPPH KSB electric driven barrel pumps.

EducationUnited States Navy, Great Lakes, Ill.

Boiler Technician A SchoolTrained in Boiler Operation, Maintenance, E-5 BT completion of my enlistmentTrott Vocational High School

Page 6: Glenn Martin

Niagara Falls, NY

Major course of study was Welding

Licenses:

Chief Engineer, Buffalo, NYChief Engineer, Niagara Falls, NY