Upload
shoshana-reynolds
View
33
Download
0
Embed Size (px)
DESCRIPTION
GISFI #5 Meeting Report: SIG (Special Interest Group). Company: VNL Author(s): Krishna Sirohi Contact information: [email protected] , +919899488800 Purpose: Approval. SIG Sub-Working Group : QoS. Progress - PowerPoint PPT Presentation
Citation preview
Doc. number GISIF#XX, Date 1
GISFI #5 Meeting Report: SIG(Special Interest Group)
Company: VNLAuthor(s): Krishna SirohiContact information: [email protected],
+919899488800 Purpose: Approval
GE-2010xxxx GISFI#XX, Date 2
SIG Sub-Working Group : QoS
• Progress– Scope and the progress so far was presented by Ashutosh
(NIKSUN), SWG Chair.– The baseline document is planned to be converted into Tec
hnical Report on QoS.– QoS Requirements of the emerging carrier grade WLAN an
d its interworking with Cellular networks is added as new work item.
– Indian ISP’s specific requirements are expected to be address under this SWG.
• Decisions– QoS will continue to be as SWG. – All the work related to QoS in any other WG are to be addre
ss by SWG-QoS in SIG.– At some appropriate time later (on achieving critical mass) S
WG-QoS will be converted as WG-QoS.
GE-2010xxxx GISFI#XX, Date 3
SIG Sub-Working Group : Security
• Progress– Scope and the progress so far was presented by Anand(NEC), SW
G Chair.– A technical report on current state of Security mechanisms in WLA
N (based on 802.11x technology) is to be prepared and will be submitted to interest user groups.
– NEC and VNL committed their contribution in this regard. Others have been requested to contribute.
– IIIT-A is requested to come further contribution on child cyber security.
– Security requirement with regard to WLAN and its interworking with Cellular Network interworking are to be further studied in this SWG
• Decisions– Security SWG in SIG will continue in current form.– All the work related to QoS in any other WG are to be address by S
WG-Security in SIG.– At some appropriate time later (on achieving critical mass) SWG-S
ecurity will be converted as WG-QoS.
GE-2010xxxx GISFI#XX, Date 4
SIG Sub-Working Group : Food Security
• Progress– No Progress in this meeting
• Decisions– Continue to be SWG on Food Security but
activity is suspended till the further contributions are received on this topic.
GE-2010xxxx GISFI#XX, Date 5
SIG Sub-Working Group : Wireless Robotics
• Proposed to introduce new SWG in SIG on the standardization on Wireless Robotics
• TCS presented the details of ETSI meeting held on this subject.
• Various aspects on potential standardization scope in wireless robotics were discussed,
• TCS will present more details on the subject during the next meeting.
• Depending on the discussion, decision to form a SWG on this topic.