Giovanni Polese 1
RPC Detector Control Systemfor MTCC
Pierluigi Paolucci, Anna Cimmino I.N.F.N. of NaplesGiovanni Polese
Lappeenranta University
Giovanni Polese 2
Hardware Structure
BARREL• 1 Mainframe• 2 branch• 2 LV Easy• 1-2 HV Easy• 3 LV Boards ( 1 per sector)• 4 HV Boards (8 ch. for sector)
• The final Hardware configuration for MTCC has been upload into PVSS, using the barrel hardware already delivered and tested at 904
ENDCAP• 1 branch• 1 LV Easy• 1 LV boards• 2-4 HV boards
Giovanni Polese 3
FSM Hierarchy structure
Endcap RPC
En
dca
p
Su
perv
isor
Disc
Ring
Chamber
Barrel RPC
Barr
el Su
perv
isor
Devic
e
level
Wheel
Sector
Chamber
Channel
HV/LV Sys
CMS_RPC
•The Endcap and Barrel have two different tree structures under a single top node as required by the CMS DCS Integration guidelines. This two systems can still work completely in standalone.
•The endcap is up to date with the barrel and the two systems are proceeding in parallel
• A branch in both system trees describes the hardware view.
• The system is now divided in 3 parts and spitted in 2 PCs on a distributed network, as required into guidelines.
Device
le
velChannel
HV/LV Sys
NEW LEVEL
CU
LU
PC01
PC02..03
Giovanni Polese 4
RPC System for MTCC
Giovanni Polese 5
Sector & Ring Trending Plot
• A set of history plot panels allow to follow the evolution of the main chamber parameters.
• Different history panels for HV and LV
•For every plot it’s possible to change axis, zoom, freeze and export the data in cvs
Giovanni Polese 6
Hardware view• Available from the top node• Show a complete mapping of all crates connected to every branch controllers• Historical plot allows to see the temperature evolution for every boards in the crates• Clicking on each board it’s possible to see board details and the logic channels name
Giovanni Polese 7
Configuration DB
The hardware configuration for MTCC has been upload into DB: the hardware and logical structure with settings and alarm thresholds for the entire system.
We have created two different recipes for ON and STANDBY states with different V0 settings (6000 V for standby and 9500 V for ON)
We have a problem with the JCOP Configuration db tools in the CAEN EASY Crate archiving. When we fix it, with new DB Component version, we will be able to create the CMS_RPCfwHardware Component
Giovanni Polese 8
Condition DB
Now we are able to write in and read from devdb database where has been created the same Condition db structure for PVSS, thanks to Angela Brett.
We are in contact with RPC DB team and with M. Abbrescia to have to possibility to move it on final SX5 server. We hope that in a couple of days we will move to it , create the DB structure and test the performance.
Parameters to archive for all channels: V0, I0, Vmon, Imon, Actual_status (info about main alarm conditions: trip, Ovc, UnV, OvV), board temp with deadband to 1-2%
Giovanni Polese 9
What we have done
The DCS system is almost ready for the MTCC and it will be moved on PCs in the Green Barrack in the third week of May. Supervisor Component is ready and works correctly, the hardware component is under test All sectors and chambers for the Cosmic Challenge have been created in the hardware and logical system view. Communication and running tests have been performed at 904 using real hardware. Everything is working properly. Integration with CMS DCS is almost ready, some common problems will be fix with new JCOP framework release
Giovanni Polese 10
To be done for MTCC
Move to RPC condition db on SX5 and test the performance. Release the CMS_RPCfwHardware Component Help our Warsaw friends, creating a control and monitoring system of the LB low voltage, and integrate it into the RPC DCS. Do we want to integrate it in the FSM ?? It will be also discussed tomorrow in the DCS working group. Test all the system when the hardware will be ready at SX5 (June 06). Write documentation and organize training in order to have more people ready to take data.