29
DATE: REVISIONS: DRAWN BY: CHECKED BY: JB 02.01.18 DS SHEET #: A1.0 BUILDING 1 DEMOLITION PLAN REVISIONS NO. DATE DESCRIPTION BY -- MILWAUKEE ELECTRIC TOOL EXPANSION PHASE III Greenwood, MS 1 scale: 3/16" = 1' BUILDING 1 DEMOLITION FLOOR PLAN GENERAL DEMOLITON NOTES DEMOLITION LEGEND DEMOLITION KEYED NOTES A. THE DEMOLITION PLAN IS INTENDED TO SHOW THE GENERAL CONDITIONS WHICH ARE EXPECTED TO OCCUR. VERIFY ALL CONDITIONS BEFORE PROCEEDING WITH THE WORK. B. WHERE DEFICIENCIES INVOLVE STRUCTURAL ITEMS, REPORT SUCH DEFICIENCIES TO THE ARCHITECT BEFORE PROCEEDING IN THE AREA IN QUESTION. C. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE THE SALVAGE OF LIGHT FIXTURES, FURNISHINGS, DOORS, AND OTHER MISCELLANEOUS EQUIPMENT. D. REFER TO CIVIL, MECHANICAL, ELECTRICAL, AND PLUMBING FOR ADDITIONAL DEMOLITION DRAWINGS AND NOTES. E. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT THE OWNER'S PERSONNEL, OCCUPANTS, AND THE GENERAL PUBLIC FROM INJURY DUE TO WORK. F. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, DAMAGES CAUSED TO ADJACENT AREAS BY DEMOLITION WORK. D# DENOTES KEYED ITEM

GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A1.0

BUILDING 1

DEMOLITION

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 3/16" = 1'

BUILDING 1 DEMOLITION FLOOR PLAN

GENERAL DEMOLITON NOTES

DEMOLITION LEGEND

DEMOLITION KEYED NOTES

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS

WHICH ARE EXPECTED TO OCCUR.

VERIFY ALL CONDITIONS BEFORE

PROCEEDING WITH THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT

BEFORE PROCEEDING IN THE AREA IN

QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE

THE SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL,

ELECTRICAL, AND PLUMBING FOR

ADDITIONAL DEMOLITION DRAWINGS

AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED

TO PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES

CAUSED TO ADJACENT AREAS BY

DEMOLITION WORK.

D#

DENOTES KEYED ITEM

Page 2: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A1.1

BUILDING 1

RENOVATION

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 3/16" = 1'

BUILDING 1 RENOVATION FLOOR PLAN

RENOVATION LEGEND

RENOVATION KEYED NOTES

R#

DENOTES KEYED ITEM.

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING; KINETEX,

STRATA (#1826) IN FELDSPAR (#1848)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE 0121,

RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE LIGHT

SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL PANEL

CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

Page 3: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

1

scale: 3/16" = 1'

BUILDING 1 REFLECTED CEILING PLAN

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A1.2

BUILDING 1

R.C.P.

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

R01 RE-MOUNT EXISTING DIGITAL

PROJECTOR

R02 G.W.B. CEILING TO BE 2" LOWER

THAN A.C.T. CEILING

2x2 LAY-IN FIXTURE

2X2 A.C.T.

R#

DENOTES KEYED ITEM

2'x4" LAY-IN

FIXTURE

NEW G.W.B. CEILING

6" RECESSED CAN

LIGHT

4" COVE LIGHT

RENOVATION LEGEND

GENERAL REFLECTED CEILING

PLAN NOTES

RENOVATION KEYED NOTES

A. ALL A.C.T. CEILINGS TO BE MAINTAINED

AT CURRENT HEIGHT OF 8' +/-

NEW RETURN AIR

GRILL

NEW SUPPLY

DIFFUSER

NEW SPRINKLER

HEAD

DIGITAL PROJECTOR

B. COORDINATE WITH ALL APPLICABLE

ENGINEERING DRAWINGS.

4" ANGLED DOWNLIGHT

EXISTING G.W.B. CEILING

REMAINS, ALL NEW ACCESSORY

ELEMENTS.

Page 4: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DEMOLITION LEGEND

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.0

BUILDING 2 -

AREA A

DEMOLITION

FLOOR & ROOF

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 3/32" = 1'

BLDG. 2 - AREA A 1ST FLOOR DEMOLITION FLOOR PLAN

2

scale: 3/32" = 1'

BLDG. 2 - AREA A MEZZANINE DEMOLITION FLOOR PLAN

4

scale: 3/32" = 1'

BLDG. 2- AREA A FACTORY OFFICE DEMOLITION FLOOR PLAN

3

scale: 1/64" = 1'

BUILDING 2 DEMOLITION ROOF PLAN

GENERAL DEMOLITION NOTES

D# DENOTES KEYED ITEM

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

DEMOLITION KEYED NOTES

Page 5: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.1

BUILDING 2 -

AREA B

DEMOLITION

FLOOR PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 3/32" = 1'

BUILDING 2 - AREA B DEMOLITION FLOOR PLAN

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

D# DENOTES KEYED ITEM

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

DEMOLITION KEYED NOTES

Page 6: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.2

BUILDING 2 -

AREA C

DEMOLITION

FLOOR PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 3/32" = 1'

BUILDING 2 - AREA C DEMOLITION FLOOR PLAN

GENERAL DEMOLITON NOTES

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

A. THE DEMOLITION PLAN IS INTENDED TO SHOW THE

GENERAL CONDITIONS WHICH ARE EXPECTED TO OCCUR.

VERIFY ALL CONDITIONS BEFORE PROCEEDING WITH THE

WORK.

B. WHERE DEFICIENCIES INVOLVE STRUCTURAL ITEMS,

REPORT SUCH DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE WITH THE

OWNER'S REPRESENTATIVE THE SALVAGE OF LIGHT

FIXTURES, FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL, AND

PLUMBING FOR ADDITIONAL DEMOLITION DRAWINGS AND

NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY

BARRICADES AND OTHER FORMS OF PROTECTION AS

REQUIRED TO PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC FROM INJURY

DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE

OWNER, DAMAGES CAUSED TO ADJACENT AREAS BY

DEMOLITION WORK.

DEMOLITION LEGEND

D# DENOTES KEYED ITEM

DEMOLITION KEYED NOTES

Page 7: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.3

BUILDING 2 -

AREA A

RENOVATION

FLOOR & ROOF

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 3/16" = 1'

BUILDING 2 - AREA A MEZZANINE OFFICES RENOVATION FLOOR PLAN

3

scale: 3/16" = 1'

BLDG. 2 - AREA A FACTORY OFFICE RENO. FLOOR PLAN

2

scale: 1/64" = 1'

BUILDING 2 RENOVATION ROOF PLAN

RENOVATION LEGEND

R# DENOTES KEYED ITEM

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING;

KINETEX, STRATA (#1826) IN FELDSPAR

(#1848)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE

0121, RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE

LIGHT SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL

PANEL CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

4

scale: 3/16" = 1'

BUILDING 2 - FIRST FLOOR AREA A CANOPY RENOVATION FLOOR PLAN

GENERAL RENOVATION NOTES

A. INSTALL NEW 1/2" TUNG AND GROOVE

SUBFLOOR THROUGHOUT SPACE,

EXCEPT IN STAIRWELLS

B. PAINT EXPOSED STRUCTURAL STEEL

RENOVATION KEYED NOTES

Page 8: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.4

BUILDING 2 -

AREA B

RENOVATION

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 3/32" = 1'

BUILDING 2 - AREA B RENOVATION FLOOR PLAN

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

RENOVATION LEGEND

GENERAL RENOVATION NOTES

A. PRESSURE WASH EXPOSED

STRUCTURAL STEEL

B. PAINT EXISTING BOLLARDS AND SAFETY

BARRIERS, AND STRUCTURAL COLUMNS

UP TO 7' FROM FLOOR "SAFETY"

YELLOW

C. REMOVE BLUE PAINTED AISLES FROM

CONCRETE FLOOR

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING;

KINETEX, STRATA (#1826) IN FELDSPAR

(#1848)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE

0121, RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE

LIGHT SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL

PANEL CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

Page 9: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.5

BUILDING 2 -

AREA C

RENOVATION

FLOOR PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 3/32" = 1'

BUILDING 2 - AREA C RENOVATION FLOOR PLAN

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

RENOVATION LEGEND

GENERAL RENOVATION NOTES

A. PRESSURE WASH EXPOSED

STRUCTURAL STEEL

B. PAINT EXISTING BOLLARDS AND SAFETY

BARRIERS, AND STRUCTURAL COLUMNS

UP TO 7' FROM FLOOR "SAFETY"

YELLOW

2

scale: 3/32" = 1'

BLDG.2- AREA C MEZZANINE RENOVATION FLOOR PLAN

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING;

KINETEX, TIMBER IN CATALPA (1924)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE

0121, RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE

LIGHT SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL

PANEL CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

Page 10: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.6

BUILDING 2 -

AREA A & C

REFLECTED

CEILING PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

2

scale: 3/16" = 1'

BLDG. 2 - AREA A FACTORY OFFICE R.C.P.

1

scale: 3/16" = 1'

BUILDING 2 - AREA A MEZZANINE OFFICES REFLECTED CEILING PLAN

3

scale: 3/16" = 1'

BLDG. 2 - AREA C RESTROOM R.C.P.

R01 ELECTRICAL POWER COLUMN

R02 NEW SQUARE FIXED CURB MOUNTED

SKYLIGHT TO FIT BETWEEN PURLINS

R03 PAINT EXPOSED STEEL BEAM

R04 TRIM CORRUGATED METAL CEILING

AROUND COLUMN

2'x2' LAY-IN

FIXTURE

2X2 A.C.T. CEILING

R#

DENOTES KEYED ITEM

2'x4" LAY-IN

FIXTURE

G.W.B. CEILING

6" RECESSED CAN

LIGHT

4" COVE LIGHT

CORRUGATED METAL

PANEL CEILING

8' LONG HANGING

LED STRIP LIGHT

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

RENOVATION LEGEND

GENERAL RENOVATION NOTES

RENOVATION KEYED NOTES

A. PAINT EXPOSED STEEL STRUCTURE,

DUCTS, CONDUITS, PIPING, AND

INSULATION

NEW RETURN AIR

GRILL

NEW SUPPLY

DIFFUSER

NEW SPRINKLER

HEAD

NEW SUPPLY

DIFFUSER IN DOUBLE

WALL SPIRAL DUCT

2'x4' LAY-IN

FIXTURE

I.H.P. UNIT

Page 11: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A2.7

BUILDING 2

EXTERIOR

ELEVATIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

1

scale: 1/8" = 1'

BUILDING 2 - TYPICAL WEST DEMOLITION/ RENOVATION ELEVATION - BUILDING 1 SIMILAR

RENOVATION KEYED NOTES

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

R01 PAINT EXISTING STONE FACADE

R02 NEW METAL SIDING AND INSULATION ON

ENTIRE SOUTH ELEVATION

R03 INFILL OPENING TO MATCH ADJACENT

R04 NEW ALUMINUM AWNING WITH COLORS TO

MATCH EXISTING AWNING AT BUILDING #1

ENTRANCE, ALTERNATE #1

R05 NEW RAKE TRIM

R06 PAINT METAL PANELS TO MATCH

ADJACENT PANELS

R07 EXISTING LOGO SIGN TO REMAIN

R08 NEW ELEVATOR ROOF CAP

R09 NEW SKYLIGHTS

R10 NEW LOUVRE, COORDINATE WITH MEP

R# DENOTES KEYED ITEM

D# DENOTES KEYED ITEM

A. THE DEMOLITION PLAN IS INTENDED

TO SHOW THE GENERAL CONDITIONS

WHICH ARE EXPECTED TO OCCUR.

VERIFY ALL CONDITIONS BEFORE

PROCEEDING WITH THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT

BEFORE PROCEEDING IN THE AREA IN

QUESTION.

C. THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER'S

REPRESENTATIVE THE SALVAGE OF

LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL,

ELECTRICAL, AND PLUMBING FOR

ADDITIONAL DEMOLITION DRAWINGS

AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE

ALL NECESSARY BARRICADES AND

OTHER FORMS OF PROTECTION AS

REQUIRED TO PROTECT THE

OWNER'S PERSONNEL, OCCUPANTS,

AND THE GENERAL PUBLIC FROM

INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT

NO COST TO THE OWNER, DAMAGES

CAUSED TO ADJACENT AREAS BY

DEMOLITION WORK

G. DEMOLISH ALL GUTTERS AND

DOWNSPOUTS

3

scale: 1/8" = 1'

BUILDING 2 - PARTIAL NORTH DEMOLITION/ RENOVATION ELEVATION

2

scale: 1/8" = 1'

BUILDING 2 - SOUTH DEMOLITION/ RENOVATION ELEVATION

DEMOLITION LEGEND

GENERAL DEMOLITION NOTES

DEMOLITION KEYED NOTES

A. PAINT ALL EXISTING STONE FACADE

ON BUILDING 1 & 2

B NEW GUTTER AND DOWNSPOUTS

C. NEW RAKE TRIM

GENERAL RENOVATION NOTES

RENOVATION LEGEND

Page 12: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

1

scale: 3/32" =1'

BUILDING 3 DEMOLITION PLAN

D#DENOTES KEYED ITEM.

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.0

BUILDING 3

DEMOLITION

PLAN

BY

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

N

GENERAL DEMOLITION NOTES DEMOLITION KEYED NOTESDEMOLITION LEGEND

Page 13: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

RENOVATION LEGEND

1

scale: 3/32" =1'

BUILDING 3 RENOVATION FLOOR PLAN

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.1

BUILDING 3

RENOVATION

PLAN

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

R01 NEW DOOR AND FRAME

R02 NEW LOADING DOCK, SEE STRUCTURAL

R03 NEW MANUAL COILING OVERHEAD DOOR

R04 NEW DOCK LEVELER & BUMPERS

R05 NEW 5' x 5' CONCRETE LANDING

R06 NEW EYEWASH STATION

R07 NEW FORKLIFT CHARGING STATION,

SEE ELECTRICAL

R08 ACOUSTIC BATT INSULATION ABOVE A.C.T.

R09 NEW COMPACTOR SLAB, SEE STRUCTURAL

R10 RELOCATE DOOR TO CENTERLINE OF

EXISTING COLUMNS

R11 INFILL SECTION OF EXISTING DRAIN

R#

DENOTES KEYED ITEM

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING; KINETEX,

TIMBER IN CATALPA (1924)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL CC68,

GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT &

CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O. LIGHT

SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL WALL PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE 0121,

RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE LIGHT

SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL PANEL

CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

RENOVATION KEYED NOTESGENERAL RENOVATION NOTES

A. PROVIDE CLEAN SMOOTH CONTINUOUS

FLOOR SURFACE AT ALL DEMOLISHED

WALLS

B. PRESSURE WASH/CLEAN ENTIRE

BUILDING EXTERIOR.

Page 14: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

1

scale: 3/16" =1'

BUILDING 3 OFFICE AREA RENOVATION FLOOR PLAN

R#

DENOTES KEYED ITEM.

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

--

02.01.18

DS

SHEET #:

A3.1a

BUILDING 3

ENLARGED

RENOVATION

PLAN

RE

VIS

IO

NS

DA

TE

DE

SC

RIP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

RENOVATION LEGEND

GENERAL RENOVATION NOTES

RENOVATION KEYED NOTES

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING;

KINETEX, STRATA (#1826) IN FELDSPAR

(#1848)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE

0121, RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE

LIGHT SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL

PANEL CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

Page 15: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

1

scale: 3/16" =1'

BUILDING 3 MEZZANINE RENOVATION FLOOR PLAN

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.1b

BUILDING 3

RENOVATION

MEZZANINE

PLAN

RE

VIS

IO

NS

DA

TE

DE

SC

RIP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

R01 NEW DOOR AND FRAME

R02 NEW STEEL HANDRAILS BOTH SIDES

R03 NEW RUBBER TREAD AND RISER ON

EXISTING WOOD STAIRCASE

DENOTES KEYED ITEM.

RENOVATION LEGEND

GENERAL RENOVATION NOTES

RENOVATION KEYED NOTES

R#

FINISH LEGEND

ABBR. DISCRIPTION

TC1

TEXTILE COMPOSITE FLOORING;

KINETEX, TIMBER IN CATALPA (1924)

CT1

AMERICAN OLEAN ELEGANT GRAY CC67,

GLAZED PORCELAIN

CT2

AMERICAN OLEAN STYLISH CHARCOAL

CC68, GLAZED PORCELAIN

VCT1 VINYL COMPOSITE TILE

CWO1

CARPET WALK OFF; INCOGNITO IN

INTELLIGENCE (1841)

EC1

EXPOSED CONCRETE; REMOVE PAINT

AND CLEAN

WB11X4" WOOD BASE, PTD.

RB1 4" RUBBER BASE

CB1

4" CERAMIC TILE SANITARY BASE, A.O.

LIGHT SMOKE 00A2

GWB1

5

8

" IMPACT RESISTANT GWB, PTD.

GWB2EXISTING GWB, PTD., SKIM COAT

GWB3

5

8

" GWB, PTD.

CM1 CORRUGATED METAL PANELS

MW1

METAL LINER PANEL SYSTEM, TO MATCH

EXISTING

CT3

AMERICAN OLEAN BRIGHT & MATTE

0121, RUBY RED ACCENT STRIPE

CT4

AMERICAN OLEAN BRIGHT & MATTE

LIGHT SMOKE 0042

CMU1CMU BLOCK, PTD.

ACT1 2'X2' ACOUSTICAL CEILING TILE

OPS1OPEN TO STRUCTURE ABOVE, PTD.

SCM1

SUSPENDED CORRUGATED METAL

PANEL CEILING SYSTEM

GBC1

5

8

" GWB CEILING PTD.

XXXXXX

XXX XXX

FLOOR

CEILINGWALL

BASE

Page 16: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

1

scale: 3/16" =1'

REFLECTED CEILING PLAN

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.2

BUILDING 3

R.C.P.

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

2

scale: 3/16" = 1'

R.C.P. COMPRESSOR +JANITOR ROOM

3

scale: 3/16" = 1'

R.C.P. MEZZANINE SERVER ROOM

R01 INSTALL ACOUSTIC BATT INSULATION ABOVE

COMPRESSOR ROOM A.C.T.

2x2 LAY-IN FIXTURE

2X2 A.C.T.

DENOTES KEYED ITEM

2'x4" LAY-IN

FIXTURE

G.W.B. CEILING

6" RECESSED CAN

LIGHT

RENOVATION LEGEND

GENERAL RENOVATION NOTES

RENOVATION KEYED NOTES

A. ALL A.C.T. CEILINGS TO REMAIN AT

EXISTING HEIGHT OF 8'-10" +/-1"

NEW RETURN AIR

GRILL

NEW SUPPLY

DIFFUSER

NEW SPRINKLER

HEAD

R#

Page 17: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

2

scale: 1/8" =1'

BUILDING #3 EXTERIOR WEST ELEVATIONS DEMOLITION + RENOVATION

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.3

BUILDING 3

EXTERIOR

ELEVATIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

GENERAL DEMOLITION NOTES

1

scale: 1/8" =1'

BUILDING #3 EXTERIOR EAST ELEVATION DEMOLITION + RENOVATION

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

G. PRESSURE WASH/CLEAN ENTIRE BUILDING

EXTERIOR.

RENOVATION KEYED NOTES

DEMOLITION KEYED NOTES

GENERAL RENOVATION NOTES

A. REPAINT ALL EXISTING BOLLARDS AND

STEEL HANDRAILS

R#

DENOTES KEYED ITEM. KEYED NOTES

D01 DEMOLISH WALL FOR DOOR

D02 DEMOLISH BOLLARD

D03 DEMOLISH EXISTING RETAINING WALL, SEE

STRUCTURAL

D04 DEMOLISH EXISTING LOUVER

D#DENOTES KEYED ITEM

Page 18: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

2

scale: 1/8" =1'

BUILDING #3 NORTH ELEVATION: PART B DEMOLITION + RENOVATION

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

--

02.01.18

DS

SHEET #:

A3.4

BUILDING 3

EXTERIOR

ELEVATIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 1/8" =1'

BUILDING #3 NORTH ELEVATION: PART A DEMOLITION + RENOVATION

PART APART B

GENERAL DEMOLITION NOTES

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

RENOVATION KEYED NOTES

DEMOLITION KEYED NOTES

D01 DEMOLISH WALL FOR DOOR

D02 DEMOLISH BOLLARD

D03 DEMOLISH EXISTING RETAINING WALL, SEE

STRUCTURAL

D04 DEMOLISH EXISTING LOUVER

D#DENOTES KEYED ITEM

GENERAL RENOVATION NOTES

A. REPAINT ALL EXISTING BOLLARDS AND

STEEL HANDRAILS

ELEVATION LEGEND

R#

DENOTES KEYED ITEM. KEYED NOTES

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

G. PRESSURE WASH/CLEAN ENTIRE BUILDING

EXTERIOR.

Page 19: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

2

scale: 1/8" =1'

BUILDING #3 SOUTH ELEVATION: PART B DEMOLITION + RENOVATION

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A3.5

BUILDING 3

EXTERIOR

ELEVATIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 1/8" =1'

BUILDING #3 SOUTH ELEVATION: PART A DEMOLITION + RENOVATION

PART APART B

GENERAL DEMOLITION NOTES

A. THE DEMOLITION PLAN IS INTENDED TO

SHOW THE GENERAL CONDITIONS WHICH

ARE EXPECTED TO OCCUR. VERIFY ALL

CONDITIONS BEFORE PROCEEDING WITH

THE WORK.

B. WHERE DEFICIENCIES INVOLVE

STRUCTURAL ITEMS, REPORT SUCH

DEFICIENCIES TO THE ARCHITECT BEFORE

PROCEEDING IN THE AREA IN QUESTION.

C. THE CONTRACTOR SHALL COORDINATE

WITH THE OWNER'S REPRESENTATIVE THE

SALVAGE OF LIGHT FIXTURES,

FURNISHINGS, DOORS, AND OTHER

MISCELLANEOUS EQUIPMENT.

D. REFER TO CIVIL, MECHANICAL, ELECTRICAL,

AND PLUMBING FOR ADDITIONAL

DEMOLITION DRAWINGS AND NOTES.

R#

DENOTES KEYED ITEM. KEYED NOTES

RENOVATION KEYED NOTES

DEMOLITION KEYED NOTES

GENERAL RENOVATION NOTES

A. REPAINT ALL EXISTING BOLLARDS AND

STEEL HANDRAILS

ELEVATION LEGEND

D01 DEMOLISH WALL FOR DOOR

D02 DEMOLISH BOLLARD

D03 DEMOLISH EXISTING RETAINING WALL, SEE

STRUCTURAL

D04 DEMOLISH EXISTING LOUVER

D05 DEMOLISH EXISTING SIGNAGE

D#DENOTES KEYED ITEM

E. THE CONTRACTOR SHALL PROVIDE ALL

NECESSARY BARRICADES AND OTHER

FORMS OF PROTECTION AS REQUIRED TO

PROTECT THE OWNER'S PERSONNEL,

OCCUPANTS, AND THE GENERAL PUBLIC

FROM INJURY DUE TO WORK.

F. THE CONTRACTOR SHALL REPAIR, AT NO

COST TO THE OWNER, DAMAGES CAUSED

TO ADJACENT AREAS BY DEMOLITION

WORK.

G. PRESSURE WASH/CLEAN ENTIRE BUILDING

EXTERIOR.

Page 20: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

A4.0

ENLARGED PLANS

+INT. ELEVATIONS

+DETAILS

RESTROOMS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

6

scale: 1/4" = 1'

BLDG 2 - MEN'S RESTROOM

11

scale: 1/4" = 1'

BLDG 3 - MEN'S RESTROOM

ACCESSORY LEGENDINTERIOR ELEVATION KEYED NOTES

A. TOILET TISSUE DISPENSER

B. ELECTRIC HAND DRYER

C. GRAB BAR

D. WALL MOUNTED HALF WALL PARTITION

E. TOILET PARTITION

F. 1'-6" X 3'-0" MIRROR

G. SOAP DISPENSER (N.I.C. BY OWNER,

INSTALLATION BY GENERAL CONRACTOR)

H. SANITARY NAPKIN RECEPTACLE

I. STAINLESS STEEL BACKSPLASH

J. ELECTRIC DRINKING FOUNTAIN

DENOTES KEYED ACCESSORY ITEMS.K EYED

NOTES ARE SPECIFIC & ARE KEYED TO ITEMS

LOCATED ON THE INTERIOR ELEVATIONS

A

DENOTES KEYED ELEVATION ITEM

01 NEW CERAMIC TILE BASE

02 NEW CERAMIC TILE ACCENT STRIPE, SEE

FINISH LEGEND

03 NEW CERAMIC TILES, SEE FINISH LEGEND

04 NEW ADA ACCESSIBLE TOILET/URINAL

05 NEW ADA ACCESSIBLE WALL MOUNTED

LAVATORY

06 NEW HAND WASHING BASIN

07 NEW HOLLOW METAL DOOR AND FRAME

08 NEW WOOD DOOR IN HOLLOW METAL FRAME

##

7

scale: 1/4" = 1'

BLDG 2 - MEN'S RESTROOM

8

scale: 1/4" = 1'

BLDG 2 - MEN'S RESTROOM

9

scale: 1/4" = 1'

BLDG 2 - MEN'S RESTROOM

2

scale: 1/4" = 1'

BLDG 2 - WOMEN'S RESTROOM

3

scale: 1/4" = 1'

BLDG 2 -WOMEN'S RESTROOM

4

scale: 1/4" = 1'

BLDG 2 - WOMEN'S RESTROOM

5

scale: 1/4" = 1'

BLDG 2 - WOMEN'S RESTROOM

12

scale: 1/4" = 1'

BLDG 3 - MEN'S RESTROOM

13

scale: 1/4" = 1'

BLDG 3 - MEN'S RESTROOM

14

scale: 1/4" = 1'

BLDG 3 - MEN'S RESTROOM

15

scale: 1/4" = 1'

BLDG 3 - WOMEN'S RESTROOM

16

scale: 1/4" = 1'

BLDG 3 - WOMEN'S RESTROOM

17

scale: 1/4" = 1'

BLDG 3 - WOMEN'S RESTROOM

18

scale: 1/4" = 1'

BLDG 3 - WOMEN'S RESTROOM

25

scale: 3" = 1'

HAND DRYER BACKSPLASH PLAN DETAIL

10

scale: 1/4" = 1'

BLDG 3 - 125 / 126 RESTROOM PLAN

1

scale: 1/4" = 1'

BLDG 2 - 218 /219 RESTROOM PLAN

24

scale: 1" = 1'

HAND DRYER BACKSPLASH ELEVATION

20

scale: 1/4" = 1'

GUARD STATION RESTROOM

21

scale: 1/4" = 1'

GUARD STATION RESTROOM

22

scale: 1/4" = 1'

GUARD STATION RESTROOM

23

scale: 1/4" = 1'

GUARD STATION RESTROOM

19

scale: 1/4" = 1'

GUARD STATION RESTROOM TYP.

Page 21: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A5.0

INTERIOR

ELEVATIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

scale: 1/4" = 1'

BLDG. 2- SECTION A BREAK RM. ELEVATION

INTERIOR ELEVATION KEYED

NOTES

scale: 1/4" = 1'

BUILDING 2 - SECTION A OFFICE MEZZANINE ELEVATION

scale: 1/4" = 1'

BLDG. 1 BREAK ROOM ELEV.

DENOTES KEYED ELEVATION ITEM.

KEYED NOTES ARE SPECIFIC &

ARE KEYED TO ITEMS LOCATED ON

THE INTERIOR ELEVATIONS

01 NEW HOLLOW METAL DOOR AND

FRAME

02 NEW G.W.B. PTD.

03 NEW CORRUGATED METAL PANEL

04 NEW H.M. WINDOW

05 NEW PLYWOOD PANEL PARTITION

06 NEW WOOD BASE BOARD

07 NEW METAL WIRE PARTITION, SEE

DETAILS

08 TIMBER HEADER, PTD. TO MATCH H.M.

TRIM

09 PAINT EXPOSED STRUCTURE

10 NEW SINK WITH SWIVEL FAUCET

11 NEW LAMINATE BASE CABINETS

12 NEW LAMINATE UPPER CABINETS

13 NEW SOLID FORMED LAMINATE

COUNTER

14 NEW EMPLOYEE MARKET CABINETS,

N.I.C.

15 WALL PTD. MILWAUKEE RED

16 NEW CURB MOUNTED SKYLIGHT

17 NEW ALUMINUM STOREFRONT WITH

SUN PROTECTIVE FILM

18 NEW ALUMINUM STOREFRONT WITH

TRANSPARENT GLASS

19 BOARD FORMED CONCRETE WALL

20 NEW BRACKET MOUNTED DESK

20 HVAC ELEMENT

##

1

scale: 1/4" = 1'

BUILDING 2 - SECTION A OFFICE MEZZANINE ELEVATION

2

scale: 1/4" = 1'

BUILDING 2 - SECTION A OFFICE MEZZANINE ELEVATION

3

scale: 1/4" = 1'

BLDG. 2 - SECTION A OFFICE MEZZANINE ELEVATION

4

5

7

scale: 1/4" = 1'

BUILDING 3 CLINIC ELEVATION

9

scale: 1/4" = 1'

BLDG. 3 BREAK RM. ELEVATION

10

scale: 1/4" = 1'

BLDG. 2- SECTION A COPY RM. ELEVATION

6

scale: 1/4" = 1'

BLDG. 1 BREAK ROOM ELEV.

8

scale: 1/4" = 1'

BUILDING 3 - BREAK ROOM MARKET STATION

12

scale: 1/4" = 1'

BLDG. 3 - BREAK ROOM KITCHEN

11

RENOVATION LEGEND

scale: 1/4" = 1'

GUARD STATION TYP. ELEV.

13

scale: 1/4" = 1'

GUARD STATION TYP. ELEV.

14

scale: 1/4" = 1'

GUARD STATION TYP. ELEV.

15

scale: 1/4" = 1'

GUARD STATION TYP. ELEV.

16

Page 22: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A6.0

DOOR AND

WINDOW

SCHEDULE

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1

scale: 1/4" = 1'

DOOR TYPES

DOOR SCHEDULE

ABBREVIATIONS

NUMBER

NEW OR EXIST.

DOOR

DOOR

TYPE

DOOR

WIDTH

DOOR

HEIGHT

DOOR

MATERIAL

NEW OR EXIST.

FRAME

FRAME

MATERIAL

HEAD

DETAIL

JAMB

DETAIL

HARDWARE

SET

REMARKS

200 NEW A EXIST. EXIST. TFFD EXIST. N/A N/A N/A 1EMERGENCY PUSH BAR, 20 MIN. FIRE RATING

201 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 2

202 NEW B 3'-0" 7'-0" TFFD NEW H.M. 1 1 3 STOREFRONT SURROUND

203 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 4 PAIR

204 NEW B 3'-0" 7'-0" TFFD NEW H.M. 1 1 3 STOREFRONT SURROUND

205 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 2

206 NEW E 3'-0" 7'-0" TFFD NEW H.M. 1 1 5 PAIR

207 NEW C 3'-0" 6'-8" TFFD NEW H.M. 12 12 6PAIR, STOREFRONT SURROUND

208 NEW B 3'-0" 7'-0" TFFD NEW H.M. 3 3 3 STOREFRONT SURROUND

209 NEW B 3'-0" 7'-0" TFFD NEW H.M. 3 3 3 STOREFRONT SURROUND

210 NEW B 3'-0" 7'-0" TFFD NEW H.M. 3 3 3 STOREFRONT SURROUND

211 NEW B 3'-0" 7'-0" TFFD NEW H.M. 3 3 3 STOREFRONT SURROUND

212 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 4 PAIR

213 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 7

214 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 7

215 NEW A EXIST. EXIST. TFFD EXIST. N/A N/A N/A 1EMERGENCY PUSH BAR, 20 MIN. FIRE RATING

216 NEW B EXIST. EXIST. TFFD NEW H.M. 13 13 8

217 NEW B EXIST. EXIST. TFFD NEW H.M. 1 1 3

218 NEW B EXIST. EXIST. TFFD NEW H.M. 1 1 3

219 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

220 NEW D EXIST. EXIST. H.M. NEW H.M. 11 11 9

DIMENSIONS TO FIT EXISTING OPENING,

EXTERIOR DOOR ALARM

221 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 10PAIR, EXTERIOR DOOR ALARM

222 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

223 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

224 NEW F EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MANUAL COIL OVERHEAD DOOR

225 NEW F EXIST. EXIST. ALUM. EXIST N/A N/A N/A MANUAL COILOVERHEAD DOOR

226 NEW D 3'-0" 7'-0" H.M. NEW H.M. 4 4 2

227 NEW F 8'-0" 8'-0" ALUM. NEW ST. 14 14 MANUAL COIL OVERHEAD DOOR

228 NEW D 3'-0" 7'-0" H.M. NEW H.M. 4 4 8

229 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

230 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MOTORIZED SECTIONAL OVERHEAD DOOR

231 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MOTORIZED SECTIONAL OVERHEAD DOOR

232 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MOTORIZED SECTIONAL OVERHEAD DOOR

233 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MOTORIZED SECTIONAL OVERHEAD DOOR

234 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A MOTORIZED SECTIONAL OVERHEAD DOOR

235 NEW G EXIST. EXIST. ALUM. EXIST. N/A N/A N/A NEW MOTOR ONLY

236 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

237 N/A N/A N/A N/A NEW H.M. 10 10 8

FRAME ONLY, SIZED TO FIT 3' WIDE BY 7' TALL

DOOR

300 NEW C 3'-0" 7'-0" H.M. NEW H.M. 13 13 11 PAIR

301 NEW B EXIST. EXIST. H.M. EXIST. N/A N/A N/A 11PAIR, EMERGENCY PUSH BAR

302 EXIST. N/A N/A N/A N/A EXIST. N/A N/A N/A 9 EXTERIOR DOOR ALARM

303 NEW A 3'-0" 7'-0" H.M. NEW H.M. 13 13 12

304 NEW A 3'-0" 7'-0" H.M. NEW H.M. 13 13 12

305 NEW A 3'-0" 7'-0" WBSM NEW H.M. 1 1 8 PTD. TO MATCH EXISTING

306 NEW D 3'-0" 7'-0" H.M. NEW H.M. 11 11 9 EXTERIOR DOOR ALARM

307 NEW F 8'-0" 8'-0" ALUM. NEW STEEL 15 15 MANUAL COIL OVERHEAD DOOR

308 NEW A 3'-0" 7'-0" H.M. NEW H.M. 11 11 4 PAIR

309 NEW F 12'-0" 12'-0" ALUM. NEW STEEL 15 15 MANUAL COIL OVERHEAD DOOR

310 NEW D 3'-0" 7'-0" H.M. NEW H.M. 11 11 9 EXTERIOR DOOR ALARM

311 NEW D 3'-0" 7'-0" H.M. NEW H.M. 11 11 9 EXTERIOR DOOR ALARM

312 NEW F 8'-0" 10'-0" ALUM. NEW STEEL 16 16 MANUAL COIL OVERHEAD DOOR

313 NEW F 8'-0" 10'-0" ALUM. NEW STEEL 16 16 MANUAL COIL OVERHEAD DOOR

314 NEW A 3'-0" 7'-0" TFFD NEW H.M. 1 1 2

400 NEW C 3'-0" 7'-0" ALUM. NEW ALUM. 17 18 13

401 NEW C 3'-0" 7'-0" ALUM. NEW ALUM. 17 18 13

402 NEW A 3'-0" 7'-0" WBSM NEW H.M. 1 1 14

403 NEW A 2'-6" 7'-0" WBSM NEW H.M. 1 1 15 PAIR

404 NEW C 3'-0" 7'-0" ALUM. NEW ALUM. 17 18 13

405 NEW C 3'-0" 7'-0" ALUM. NEW ALUM. 17 18 13

406 NEW A 3'-0" 7'-0" WBSM NEW H.M. 1 1 14

407 NEW A 2'-6" 7'-0" WBSM NEW H.M. 1 1 154 PAIR

TFFD- THERMAL FUSED FLUSH DOOR

ALUM.- ALUMINUM

HM- HOLLOW METAL

NOTE:

-DIMENSIONS ARE APPROX. CONTRACTOR MUST VERIFY DIMENSIONS BEFORE ORDERING.

-TOOL EXISTING H.M. FRAME TO RECEIVE NEW DOOR AND HARDWARE WHERE INDICATED

ON SCHEDULE.

-EXTERIOR DOOR ALARM TO BE VALUE SERIES - ALARMED RIM EXIT DEVICE (V40XEB)

WINDOW SCHEDULE

WINDOW

TYPE

MTL. FINISH REMARKS

HEAD

DETAIL

JAMB

DETAIL

SILL

DETAIL

MULLION

DETAIL

GLAZ.

TYPE

A H.M. PTD. INSERT DOOR TYPE B 5 5 5 9 1

B H.M. PTD. INSERT DOOR TYPE B 6 6 6 9 1

C H.M. PTD. INSERT DOOR TYPE C 7 5/ 7 7 8/ 9 1

D ALUM. - INSERT DOOR TYPE C 2 2 2 - 2/ 3

TYPE 1 - PLATE GLASS

TYPE 2 - INSULATED GLASS

TYPE 3 - INSULATED GLASS W/SOLAR CONTROL WINDOW FILM

GLAZING TYPE

2

scale: 1/4" = 1'

WINDOW TYPES

ALUM.- ALUMINUM

HM- HOLLOW METAL

ABBREVIATIONS

NOTE: PROVIDE TEMPERED GLAZING AS

PER APPLICABLE CODES

ST. - STEEL

WBSM- R/C WHITE BIRCH SLIP MATCHED PAINT GRADE DOOR

Page 23: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

--

02.01.18

DS

SHEET #:

A7.0

ELEVATOR PLANS

AND SECTIONS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

3

scale: 1/2" = 1'

ELEVATOR SECTION

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

2

scale: 1/2" = 1'

ELEVATOR SECOND FLOOR PLAN

1

scale: 1/2" = 1'

ELEVATOR FIRST FLOOR DEMOLITION AND RENOVATION PLAN

Page 24: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

SHEET #:

BUILDING

SECTIONS

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

scale: 3/4" = 1'

BLDG 2 - SECTION @ COMPRESSOR

1

scale: 3/4" = 1'

BLDG 2 - SECTION @ COMPRESSOR ROOM ADDITION

2

scale: 3/4" = 1'

BLDG 2 - TYP. SECTION @ EXTERIOR WALL

3

scale: 3/4" = 1'

BLDG 2 - SECTION @ MEZZ. OFFICE

4

A8.0

Page 25: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

DS

SHEET #:

CANOPY/

STAIR DETAILS

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

3

scale: N.T.S

BUILDING 2 - AWNING FOOTING DETAIL

2

scale: 1/2" = 1'

BUILDING 2 - AWNING SECTION

1

scale: 1/2" = 1'

BUILDING 2 - METAL STAIR DETAILS

4

scale: N.T.S

BUILDING 2 - AWNING BEAM DETAIL

5

scale: 3'=1-0"

BUILDING 2 - FLASHING DETAIL

A9.0

GENERAL RENOVATION NOTES

R01 4" x 4" ALUMINUM COLUMN, WHITE

R02 ALUMINUM FASCIA, RED

R03 ALUMINUM ROOFING/CEILING, WHITE

RENOVATION KEYED NOTES

R#

DENOTES KEYED ITEM

A. MATERIALS AND FINISH OF NEW AWNING

AT BUILDING #2 TO MATCH EXISTING

AWNING AT BUILDING #1.

Page 26: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A9.1

DETAILS-

INTERIOR

HOLLOW METAL

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

scale: 3" = 1'

2" H.M. FRAME DOOR DETAIL

1

scale: 3" = 1'

GUARD STATION ALUM. WINDOW DETAIL

2

scale: 3" = 1'

WOOD TRIM H.M. FRAME DOOR DETAIL

3

scale: 3" = 1'

CMU DOOR DETAIL

4

scale: 3" = 1'

2" H.M. WINDOW DETAIL

5

scale: 3" = 1'

4" H.M. WINDOW DETAIL

6

scale: 3" = 1'

4" H.M. WINDOW DETAIL

7

scale: 3" = 1'

GLAZED H.M. MULLION DETAIL

9

scale: 3" = 1'

WOOD PANEL H.M. MULLION DETAIL

8

scale: 3" = 1'

H.M. FRAME DOOR AT CONF. RM. DETAIL

12

scale: 3" = 1'

FACTORY OFF. H.M. FRAME DOOR DETAIL

13

scale: 1-1/2" = 1'

INTERIOR OVERHEAD COILING DOOR TO CMU WALL DETAIL

14

scale: 1-1/2" = 1'

INTERIOR OVERHEAD COILING DOOR TO METAL BLDG. WALL DETAIL

15

scale: 3" = 1'

INTERIOR MTL. STUD H.M. FRAME DETAIL

10

scale: 3" = 1'

EXTERIOR MTL. STUD H.M. FRAME DETAIL

11

scale: 1-1/2" = 1'

EXTERIOR OVERHEAD COILING DOOR DETAIL

16

scale: 3" = 1'

GUARD STATION ALUM. DOOR HEADER

17

scale: 3" = 1'

GUARD STATION ALUM. DOOR JAM

18

Page 27: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A9.2

DETAILS-

INTERIOR TRIM

AND FINISHED

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

scale: 3" = 1'

PLYWOOD PANEL PLAN DETAIL

1

scale: 3" = 1'

FACTORY OFFICE WINDOW TRIM SECTION DETAIL

9

scale: 3" = 1'

CORRUGATED METAL PANEL FUR-OUT SECTION DETAIL

2

scale: 3" = 1'

REMOVABLE PLYWOOD PARTITION SECTION DETAIL

3

scale: 3" = 1'

CORR. MTL. PANEL SECTION DETAIL

4

scale: 3" = 1'

CORR. MTL. PANEL OVER BEAM SECTION DETAIL

5

scale: 3" = 1'

CORR. METAL PANEL CEILING MEETS A.C.T. CEILING SECTION DETAIL

8

scale: 3" = 1'

CORR. MTL.PANEL OVER BEAM SECTION DETAIL

6

scale: 3" = 1'

CORR. MTL. PANEL OVER BEAM SECT. DETAIL

7

scale: 3" = 1'

METAL WIRE PARTITION SECTION DETAIL - BUILDING 1

10

scale: 1/2" = 1'

ELEVATOR ROOF PARAPET DETAIL - BUILDING 2

11

Page 28: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.18

CB

SHEET #:

A9.3

DETAILS-

MILLWORK,

PARTITION,

SKYLIGHT,

GAURD STATION

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

--

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

scale: 1-1/2" = 1'

PLASTIC LAMINATE COUNTER SECTION DETAIL

2

scale: 1-1/2" = 1'

PLASTIC LAMINATE CABINET SECTION DETAIL

1

scale: 1-1/2" = 1'

METAL WIRE PARTITION PLAN DETAIL

3

scale: 3" = 1'

FURRED-OUT PROJECTOR WALL SECTION DETAIL

5

scale: 1-1/2" = 1'

METAL WIRE PARTITION ELEV. DETAIL

4

scale: 1-1/2" = 1'

SKYLIGHT SECTION DETAIL

6

scale: 1-1/2" = 1'

PLASTIC LAMINATE CABINET SECTION DETAIL @ GUARD STATION

7

scale: 1-1/2" = 1'

ROOF SECTION DETAIL @ GUARD STATION

8

scale: 1-1/2" = 1'

ROOF SECTION DETAIL @ GUARD STATION

9

scale: 1-1/2" = 1'

CEILING DETAIL @ GUARD STATION

10

scale: 1-1/2" = 1'

EAVE DETAIL @ GUARD STATION

12

scale: 1-1/2" = 1'

ROOF DETAIL @ GUARD STATION

11

Page 29: GENERAL DEMOLITON NOTES · 2018-03-23 · general demoliton notes demolition legend demolition keyed notes a. the demolition plan is intended to show the general conditions which

SHEET #:

GUARD STATION

PLANS

ELEVATIONS

SECTIONS

R.C.P.

RE

VIS

IO

NS

NO

.D

AT

ED

ES

CR

IP

TIO

NB

Y

7

scale: 1/4" = 1'

GUARD STATION SECTION TYP.

4

scale: 1/4" = 1'

GUARD STATION NORTH ELEVATION TYP.

DA

TE

:

RE

VIS

IO

NS

:

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

JB

02.01.2018

DS

--

9

scale: 1/4" = 1'

GUARD STATION R.C.P. PLAN

1

scale: 1/4" = 1'

GUARD STATION PLAN @ BUILDING #1 & #2

3

scale: 1/4" = 1'

GUARD STATION WEST ELEVATION TYP.

6

scale: 1/4" = 1'

GUARD STATION SOUTH ELEVATION TYP.

5

scale: 1/4" = 1'

GUARD STATION EAST ELEVATION TYP.

2

scale: 1/4" = 1'

GUARD STATION PLAN @ BUILDING #3

6" RECESSED CAN

LIGHT

R.C.P. LEGEND

SUPPLY DIFFUSER

CEILING FAN

1x4 T+G PINE CEILING

G.W.P. CEILING PTD.

8

scale: 1/4" = 1'

GUARD STATION SECTION TYP.

1x4 METAL SOFFIT

PANEL

A10.0

MILW

AU

KE

E E

LE

CT

RIC

T

OO

L

EX

PA

NS

IO

N P

HA

SE

III

Greenw

ood, M

S

1' LED DOWN LIGHT

METAL ANGLE SOFFIT

GENERAL RENOVATION NOTES

A. ALL WORK ON GUARD STATION TO BE

COMPLETED IN COORDINATION WITH

GENERAL CONTRACTOR RESPONSIBLE FOR

REPAVING EXISTING PARKING LOT IN

SEPARATE CONTRACT.

B. EXISTING GUARD STATION TO BE

RELOCATE BY OWNER PRIOR TO

CONSTRUCTION, N.I.C.

MATERIAL KEYED NOTES

DENOTES KEYED

ELEVATION ITEM. KEYED

NOTES ARE SPECIFIC &

ARE KEYED TO ITEMS

LOCATED ON THE

ELEVATIONS

##

01 BRICK WITH RUNNING BOND

02 STRUCTURAL STEEL, PTD.

03 ALUMINUM STOREFRONT WITH CLEAR

INSULATED GLASS

04 ALUMINUM STOREFRONT WITH SOLAR

CONTROL WINDOW FILM

05 R-PANEL METAL ROOF

06 SLIDING GLASS SERVICE WINDOW

07 ALUMINUM STOREFRONT DOOR

08 METAL SOFFIT

09 BOARD FORMED CONCRETE WALL

10 MINI-SPLIT CONDENSER

11 STRUCTURAL CABLE BRACING