A004 OVERALL DEMOLITION FLOOR PLANA005 DEMOLITION FLOOR PLAN - AREA AA006 DEMOLITION FLOOR PLAN - AREA BA007 DEMOLITION FLOOR PLAN - AREA C&DA100 OVERALL FLOOR PLANA101 FLOOR PLAN - AREA AA102 FLOOR PLAN - AREA BA103 FLOOR PLAN AREA - C&DA150 ENLARGED TOILET PLANSA151 ENLARGE CONCRETE RAMP PLANS & DETAILSA160 OVERALL ROOF PLANA201 REFLECTED CEILING PLAN AREA AA202 REFLECTED CEILING PLAN AREA BA203 REFLECTED CEILING PLAN AREA C&DA220 REFLECTED CEILING PLAN DETAILSA260 FINISH PLAN AREA AA261 FINISH PLAN AREA BA262 FINISH PLAN AREA C&DA600 WINDOW ELEVATIONS & DETAILSA650 ROOFING DETAILSA700 INTERIOR ELEVATIONSA800 CASEWORK DETAILSA900 FINISH SCHEDULEA905 WALL TYPES & PLAN DETAILSA906 EXISTING WALL TYPES & PLAN DETAILSA910 DOOR & PANEL SCHEDULES & DETAILSA911 DOOR & FRAME TYPES & DETAILS
P001 GENERAL NOTES - PLUMBING P100 BASEMENT PART "A" DEMOLITION PARTIAL FLOOR PLAN - PLUMBING P101 BASEMENT PART "B" DEMOLITION PARTIAL FLOOR PLAN - PLUMBING P102 BASEMENT PARTS "C" & "D" DEMOLITION PARTIAL FLOOR PLAN - PLUMBINGP103 FIRST FLOOR PART "A" DEMOLITION PARTIAL FLOOR PLAN - PLUMBINGP104 FIRST FLOOR PART "B" DEMOLITION PARTIAL FLOOR PLAN - PLUMBINGP105 FIRST FLOOR PARTS "C" & "D" DEMOLITION PARTIAL FLOOR PLAN - PLUMBINGP200 BASEMENT PART "A" PARTIAL FLOOR PLAN - PLUMBING P201 BASEMENT PART "B" PARTIAL FLOOR PLAN - PLUMBINGP202 BASEMENT PARTS "C" & "D" PARTIAL FLOOR PLANS - PLUMBINGP203 FIRST FLOOR PART "A" PARTIAL FLOOR PLAN - PLUMBINGP204 FIRST FLOOR PART "B" PARTIAL FLOOR PLAN - PLUMBINGP204ALT ALTERNATIVE PLANS - PLUMBINGP205 FIRST FLOOR PARTS "C" & "D" PARTIAL FLOOR PLAN - PLUMBINGP300 ROOF PART "A" PARTIAL PLAN - PLUMBING P301 ROOF PART "B" PARTIAL PLAN - PLUMBINGP302 ROOF PARTS "C" & "D" PARTIAL PLAN - PLUMBINGP400 SCHEDULES - PLUMBING P500 DETAILS - PLUMBINGP501 DETAILS - PLUMBING
M001 SYMBOLS, NOTES & ABBREVIATIONS - MECHANICALM100 DEMOLITION BASEMENT PLAN AREA A - MECHANICALM101 DEMOLITION BASEMENT PLAN AREA B - MECHANICALM102 DEMOLITION BASEMENT PLAN AREA C&D - MECHANICALM103 DEMOLITION FLOOR PLAN AREA A - MECHANICALM104 DEMOLITION FLOOR PLAN AREA B - MECHANICALM105 DEMOLITION FLOOR PLAN AREA C&D - MECHANICALM106 DEMOLITION ROOF PLAN - MECHANICALM107ALT DEMOLITION MECHANICAL (ALTERNATE)M200 BASEMENT PLAN AREA A - MECHANICALM201 BASEMENT PLAN AREA B - MECHANICALM202 BASEMENT PLAN AREA C&D - MECHANICALM203 ROOF PLAN AREA A - MECHANICALM204 ROOF PLAN AREA B - MECHANICALM205 ROOF PLAN AREA C&D - MECHANICALM206 ROOF PLAN AREA A - MECHANICALM207 ROOF PLAN AREA B - MECHANICALM208 ROOF PLAN AREA C&D - MECHANICALM209ALT FLOOR AND ROOF PLAN - MECHANICAL (ALTERNATIVE)M300 DETAILS - MECHANICALM301 DETAILS - MECHANICALM302 DETAILS - MECHANICALM400 SCHEDULES - MECHANICALM401 SCHEDULES - MECHANICALM402 DETAILS - MECHANICAL
ED100 FIRST FLOOR ELECTRICAL DEMO PLAN - PART AED101 FIRST FLOOR ELECTRICAL DEMO PLAN - PART BED102 FIRST FLOOR ELECTRICAL DEMO PLAN - PART C & DED103 BASEMENT ELECTRICAL DEMO PLAN - PART A & DED104 ROOFTOP ELECTRICAL DEMO PLANE100 FIRST FLOOR LIGHTING PLAN - PART AE100ALT FIRST FLOOR LIGHTING PLAN - PART A (ALTERNATE)E101 FIRST FLOOR LIGHTING PLAN - PART BE101ALT FIRST FLOOR LIGHTING PLAN - PART B (ALTERNATE)E102 FIRST FLOOR LIGHTING PLAN - PART C & DE102ALT FIRST FLOOR LIGHTING PLAN - PART C & D (ALTERNATE)E103 BASEMENT LIGHTING PLAN - PART A & DE200 FIRST FLOOR POWER PLAN - PART AE200ALT FIRST FLOOR POWER PLAN - PART A (ALTERNATE)E201 FIRST FLOOR POWER PLAN - PART BE201ALT FIRST FLOOR POWER PLAN - PART B (ALTERNATE)E202 FIRST FLOOR POWER PLAN - PART C & DE202ALT FIRST FLOOR POWER PLAN - PART C & D (ALTERNATE)E203 POWER PART PLANS BASEMENTE204 ROOFTOP POWER PLAN - PART AE205 ROOFTOP POWER PLAN - PART BE206 ROOFTOP POWER PLAN - PART C & DE300 LIGHTING SCHEDULE AND LEGENDE301 ONE-LINE DIAGRAME302 PANEL SCHEDULESE303 FA RISER DIAGRAM & EQUIPMENT SCHEDULEE304 DETAILS
PIN EXISTING CONCRETE SIDEWALKTO NEW , PATCH AND INFILL ASREQUIRED, MATCH EXISTINGCONSTRUCTION
AutoCAD SHX Text
A151
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
A151
AutoCAD SHX Text
HANDRAIL DETAIL
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
FINISHED SLAB
AutoCAD SHX Text
2'-10"
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
@ BOTT. OF RAMP
AutoCAD SHX Text
SCALE 1" = 1'-0"
AutoCAD SHX Text
1]" nps STEEL PIPE RAIL
AutoCAD SHX Text
SCALE 3" = 1'-0"
AutoCAD SHX Text
HANDRAIL DETAIL
AutoCAD SHX Text
1["
AutoCAD SHX Text
EXPANSION BOLTS
AutoCAD SHX Text
AT MASONRY WALLS
AutoCAD SHX Text
1["
AutoCAD SHX Text
C
AutoCAD SHX Text
A151
AutoCAD SHX Text
NEW METAL BRACKETS
AutoCAD SHX Text
1]" painted METAL HANDRAIL WELD EXTENSIONS ONTO EXiSTING AS REQ'D
AutoCAD SHX Text
exist.
AutoCAD SHX Text
B
AutoCAD SHX Text
A151
AutoCAD SHX Text
SCALE: 1[" = 1'-0"
AutoCAD SHX Text
HANDRAIL DETAIL
AutoCAD SHX Text
{"
AutoCAD SHX Text
4"
AutoCAD SHX Text
6"
AutoCAD SHX Text
4'-0" O.C. MAX.
AutoCAD SHX Text
LINE OF WALL
AutoCAD SHX Text
PLATE CLOSURE @
AutoCAD SHX Text
END WELD AND
AutoCAD SHX Text
GRIND SMOOTH
AutoCAD SHX Text
EQUALLY SPACED
AutoCAD SHX Text
A151
AutoCAD SHX Text
C
AutoCAD SHX Text
1]" painted METAL HANDRAIL RELOCATE & WELD EXTENSIONS ONTO ExISTING AS REQ'D
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
BITUMINOUS CONC.
AutoCAD SHX Text
EXIST. OR NEW
AutoCAD SHX Text
6" CONC. PAD - SEE
AutoCAD SHX Text
PROJECT MANUAL
AutoCAD SHX Text
3"
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
8"
AutoCAD SHX Text
4"
AutoCAD SHX Text
1'-0"
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
PROJECT MANUAL
AutoCAD SHX Text
AGREGATE
AutoCAD SHX Text
6" PROCESSED
AutoCAD SHX Text
2 LAYERS 6X6
AutoCAD SHX Text
10/10 W.W.F.
AutoCAD SHX Text
3"
AutoCAD SHX Text
Notes: 1. the surface of ramp shall have a transverse the surface of ramp shall have a transverse broomed surface texture rougher than the surrounding sidewalk.
AutoCAD SHX Text
MARCH 19, 2019
AutoCAD SHX Text
15-198
AutoCAD SHX Text
ramp - office 09 PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
1
AutoCAD SHX Text
09
AutoCAD SHX Text
help program office
AutoCAD SHX Text
03
AutoCAD SHX Text
gymnasium
AutoCAD SHX Text
MHM
AutoCAD SHX Text
as noted
AutoCAD SHX Text
ramp PLAN - GYMNASIUM 03
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
2
AutoCAD SHX Text
concrete pads
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
3
AutoCAD SHX Text
ramp 1:12 slope max
AutoCAD SHX Text
A151
AutoCAD SHX Text
5
AutoCAD SHX Text
A151
AutoCAD SHX Text
6
AutoCAD SHX Text
A151
AutoCAD SHX Text
6
AutoCAD SHX Text
ramp SECTION - office 09
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
4
AutoCAD SHX Text
ramp SECTION - GYMNASIUM 03
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
5
AutoCAD SHX Text
A151
AutoCAD SHX Text
4
AutoCAD SHX Text
ramp SECTION - TYPICAL
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
6
AutoCAD SHX Text
ramp 1:12 slope max
AutoCAD SHX Text
mechanical pad @ south 32e
AutoCAD SHX Text
mechanical pad @ west 32h
AutoCAD SHX Text
mechanical pad @ north 32h
AutoCAD SHX Text
A151
AutoCAD SHX Text
D
AutoCAD SHX Text
A151
AutoCAD SHX Text
D
AutoCAD SHX Text
A151
AutoCAD SHX Text
D
AutoCAD SHX Text
CONCRETE PAD DETAIL
AutoCAD SHX Text
SCALE: 1" = 1'-0"
AutoCAD SHX Text
A151
AutoCAD SHX Text
D
AutoCAD SHX Text
PROVIDE FILL IN AREA FOR NEW MECHANICAL PAD AND EQUIPMENT. provide level area for pad. DO NOT EXCEED A 2:1 SLOPE at all sides.
Alice Peck Early Learning CenterBuilding Improvements
35 Hillfield RoadHamden, Connecticut 06518 STATE PROJECT NO. 062-0095 A/RR/CV
A160OVERALL ROOF PLAN
AutoCAD SHX Text
March 19, 2019
AutoCAD SHX Text
15-198
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL flat ROOFS TO RECEIVE ]" PER FOOT TAPERED RIGID INSULATION MINIMUM UNLESS ALL flat ROOFS TO RECEIVE ]" PER FOOT TAPERED RIGID INSULATION MINIMUM UNLESS OTHERWISE NOTED. 2. FIELD VERIFY ALL DIMENSIONS & PERFORM TEST CUTS AT EACH ROOF PRIOR TO THE BID. FIELD VERIFY ALL DIMENSIONS & PERFORM TEST CUTS AT EACH ROOF PRIOR TO THE BID. 3. ALL MATERIALS ARE NEW UNLESS OTHERWISE NOTED "EXISTING". ALL MATERIALS ARE NEW UNLESS OTHERWISE NOTED "EXISTING". 4. ALL WOOD BLOCKING, PLYWOOD & NAILERS TO BE PRESSURE TREATED. (P.T.) ALL WOOD BLOCKING, PLYWOOD & NAILERS TO BE PRESSURE TREATED. (P.T.) 5. ALL WOOD BLOCKING INDICATED IN DETAILS ARE TO BE ANCHORED TO THE EXISTING ALL WOOD BLOCKING INDICATED IN DETAILS ARE TO BE ANCHORED TO THE EXISTING STRUCTURE. 6. ALL MEMBRANE FLASHING INDICATED is TO EXTEND A MINIMUM OF 8". (VERTICAL OR HORIZONTAL) ALL MEMBRANE FLASHING INDICATED is TO EXTEND A MINIMUM OF 8". (VERTICAL OR HORIZONTAL) 7. CONTRACTOR IS TO SURVEY THE EXISTING ROOF DECKS w/A LEVEL (AFTER DEMOLITION) TO CONTRACTOR IS TO SURVEY THE EXISTING ROOF DECKS w/A LEVEL (AFTER DEMOLITION) TO VERIFY THE SLOPES INDICATED ON PLAN ARE ACCURATE. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY ADDITIONAL ROOFING OPERATIONS. 8. CONTRACTOR IS TO INSPECT THE UNDERSIDE OF ALL ROOF DECKS PRIOR TO ROOFING CONTRACTOR IS TO INSPECT THE UNDERSIDE OF ALL ROOF DECKS PRIOR TO ROOFING OPERATIONS TO INSURE THAT NO INTERIOR MATERIALS, EQUIPMENT, FINISHES OR OBJECTS WILL BE PIERCED OR DAMAGED. 9. CONTRACTOR ASSUMES ALL RESPONSIBILITY DURING PROJECT & WILL REPLACE ANY & ALL CONTRACTOR ASSUMES ALL RESPONSIBILITY DURING PROJECT & WILL REPLACE ANY & ALL DAMAGED EQUIPMENT w/NO ADDITIONAL COST TO OWNER. 10. SITE AREAS DISTURBED SHALL BE CLEANED & RE-LEVELED, w/LAWN AREAS MAGNETICALLY SITE AREAS DISTURBED SHALL BE CLEANED & RE-LEVELED, w/LAWN AREAS MAGNETICALLY RAKED TO REMOVE ANY METAL DEBRIS & RE-SEEDED AS REQUIRED TO MATCH ADJACENT CONDITIONS. 11. CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR CLEAN UP OF ROOFING MATERIALS & DEBRIS CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR CLEAN UP OF ROOFING MATERIALS & DEBRIS THAT PENETRATES THE INTERIOR ENVELOPE OF THE BUILDING W/NO ADDITIONAL COST TO THE OWNER. 12. SNAKE/CLEAN OUT ALL EXISTING VERTICAL & HORIZONTAL LEADERS OUT TO NEAREST SNAKE/CLEAN OUT ALL EXISTING VERTICAL & HORIZONTAL LEADERS OUT TO NEAREST MANHOLe outside of building. 13. ALL CRICKETS ARE TO BE SLOPED @ A MINIMUM OF [" PER FOOT & COORDINATE CRICKETS ALL CRICKETS ARE TO BE SLOPED @ A MINIMUM OF [" PER FOOT & COORDINATE CRICKETS AROUND EXIST. HVAC UNITS AS REQUIRED TO AVOID PONDING. 14. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL & RE-INSTALLATION OF ALL HVAC UNITS CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL & RE-INSTALLATION OF ALL HVAC UNITS INCLUDING ANY ELECTRICAL OR MECHANICAL CONNECTIONS. THIS MAY INCLUDE THE EXTENSION OF EXISTING ELECTRICAL & DUCTWORK SYSTEMS to accommodate new mechanical unit curbing & new roofing system. 15. SNAKE/CLEAN OUT ALL EXISTING VENT STACKS BEFORE THE INSTALLATION OF METAL SLEEVE. SNAKE/CLEAN OUT ALL EXISTING VENT STACKS BEFORE THE INSTALLATION OF METAL SLEEVE. 16. ALL drain piping is insulated above the ceilings. The exact route will be determined ALL drain piping is insulated above the ceilings. The exact route will be determined in the field. make minor adjustment in the route at no additional cost TO OWNER. 17. NEW roof INSULATION TO BE A MINIMUM of R-30 AT ALL NEW ROOF DRAINS & low points of NEW roof INSULATION TO BE A MINIMUM of R-30 AT ALL NEW ROOF DRAINS & low points of the roof areas 18. ALL ANTENNAE, CONDUITS & ANY OTHER OBJECTS TO REMAIN AFFECTED BY SCOPE OF WORK, ALL ANTENNAE, CONDUITS & ANY OTHER OBJECTS TO REMAIN AFFECTED BY SCOPE OF WORK, TO BE REMOVED & REINSTALLED.
AutoCAD SHX Text
SYMBOL LEGEND
AutoCAD SHX Text
XX
AutoCAD SHX Text
X
AutoCAD SHX Text
- PLAN, SECTION, DETAIL OR ELEVATION NUMBER - SHEET NUMBER. - EXISTING outline of building. - INDICATES SLOPE DIRECTION OF TAPERED INSULATION AT ]"/FT. MIN. - TAPERED INSULATION CRICKET SLOPED @ [" PER FOOT. - contractor to verify dimension in field. - INDICATES SLOPE DIRECTION & indicates existing roof pitch. - INDICATES HIGH POINT OF insulation. - EXISTING ROOF DRAIN TO BE REMOVED. SEE DEMOLITION NOTes. - ROOF DRAIN & SUMP TO BE INSTALLED. SEE detail a/a650 TO BE INSTALLED. SEE detail a/a650 - HORIZONTAL ROOF DRAIN LEADER. SEE CONSTRUCTION NOTE # 4 - emergency overflow scupper. see detail m/a650 - exist. vent stack. SEE detail d/a650 - roof top unit. see detail e/a650 - existing exhaust fan. see detail c/a650 - walkway pads. SEE CONSTRUCTION NOTE # 3 - expansion joint. see detail f/a650 f/a650 /a650 - exist skylight. see CONSTRUCTION NOTE # 5 - exist metal ladder to remain. - exist skylight to remain. - metal guard rail. see detail. h/a650
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
SL.
AutoCAD SHX Text
SL.
AutoCAD SHX Text
V.S.
AutoCAD SHX Text
N.R.D.
AutoCAD SHX Text
E.R.D.
AutoCAD SHX Text
h.p.
AutoCAD SHX Text
S.C.
AutoCAD SHX Text
e.j.
AutoCAD SHX Text
v.i.f.
AutoCAD SHX Text
PITCH
AutoCAD SHX Text
@X
AutoCAD SHX Text
X
AutoCAD SHX Text
r.t.u.
AutoCAD SHX Text
s.k.
AutoCAD SHX Text
e.l.
AutoCAD SHX Text
e.f.
AutoCAD SHX Text
R.L.
AutoCAD SHX Text
e.s.
AutoCAD SHX Text
m.g.
AutoCAD SHX Text
DEMOLITION NOTES
AutoCAD SHX Text
1. remove spray foam roofing & ballasted BUR roofing remove spray foam roofing & ballasted BUR roofing beneath 2. remove all indicated existing wood blocking. remove all indicated existing wood blocking. 3. remove all indicated existing metal flashing. remove all indicated existing metal flashing. 4. remove existing roof drains & sump. remove existing roof drains & sump.
AutoCAD SHX Text
x
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
x
AutoCAD SHX Text
1. Contractor to provide a specified quantity of metal deck Contractor to provide a specified quantity of metal deck repair & replacement. see project manual for additional information. 2. install ice & water shield, run 36" up width of roof, 18" up per install ice & water shield, run 36" up width of roof, 18" up per side, run up valley. see project manual. 3. walkway pads to be installed. see project manual for walkway pads to be installed. see project manual for additional information. 4. HORIZONTAL ROOF LEADER (match diameter of exist.) above HORIZONTAL ROOF LEADER (match diameter of exist.) above ceiling sloped @ 1/8"/ft min. tie VERTICAL LEADERS into exist. piping as req'D. seal all penetrations through walls W/fire putty as req'd. by code. patch & repair all areas damaged by installation of new piping. 5. contractor to remove existing skylight, infill existing deck contractor to remove existing skylight, infill existing deck to match the existing. see project manual.
AutoCAD SHX Text
%%UROOF AREAS
AutoCAD SHX Text
ROOF "A" 15,121 SF.
AutoCAD SHX Text
ROOF "B" 245 SF.
AutoCAD SHX Text
TOTAL roof: 50,984 sf.
AutoCAD SHX Text
THIS AREA IS APPROXIMATE- v.i.f.
AutoCAD SHX Text
ROOF "d" 64 SF.
AutoCAD SHX Text
%%UENERGY CONSERVATION
AutoCAD SHX Text
%%UCODE INFORMATION
AutoCAD SHX Text
IECC CODE REQUIREMENT R-VALUE TOTAL
AutoCAD SHX Text
USE GROUP : e CONSTRUCTION CLASS: 5B basic wind speed: 110 mph Risk Category #3: 134 mph factory mutual engineering & research corporation (FM): roof assembly classification of non-combustible construction, wind uplift requirement of i-60 for field, i-90 for perimeter and i-120 for corners, in accordance with fm property loss prevention data sheets 1-28.