FORT CARSON CONSTRUCTION PROJECTS 1 FY20 Iron Horse Park Electrical Project Under Construction FY20 Iron Horse Park Improvement Project Under Construction FY20 Pedestrian Bridge Replacement Project Under Construction FY21 Iron Horse Park Trail Project Planned summer 2021 For more information on the construction projects outlined, email the Directorate of Public Works Engineering Division point of contacts: [email protected], [email protected], or [email protected]. As of 23 SEP 2020

FY20 Iron Horse Park Electrical Project FY20 Iron Horse ...FY20 IRON HORSE PARK ELECTRICAL OUTLET PROJECT • New electrical outlets at Iron Horse Park to support food vendors at events

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • FORT CARSON CONSTRUCTION PROJECTS

    1

    FY20 Iron Horse Park Electrical Project • Under Construction

    FY20 Iron Horse Park Improvement Project• Under Construction

    FY20 Pedestrian Bridge Replacement Project• Under Construction

    FY21 Iron Horse Park Trail Project• Planned summer 2021

    For more information on the construction projects outlined, email the Directorate of Public Works Engineering Division point of contacts: [email protected],

    [email protected], or [email protected].

    As of 23 SEP 2020

  • FY20 IRON HORSE PARK ELECTRICAL OUTLET PROJECT

    • New electrical outlets at Iron Horse Park to support food vendors at events. Minimal impact to the public – minor excavation at outlet sites.

    • Estimated completion date: Nov. 24, 2020• Project POC: Jeff Morris, [email protected]

    New electrical hook-upFor food vendors, etc.

  • New concrete stairs

    New concrete sidewalk

    • Replace asphalt trail with concrete trail and install new concrete stairs east side of berm. Impact to the public will be no access to highlighted trails during construction.

    • Estimated completion date: Nov. 25, 2020• Project POC: Brett Sichmeller, [email protected]

    FY20 IRON HORSE PARK IMPROVEMENT PROJECT

  • FY20 PEDESTRIAN BRIDGE REPLACEMENT PROJECT

    Bridge replacement

    Detour

    Detour

    • Pedestrian bridge will be removed/replaced. Impact to the public will be no access until new bridge is installed. Yellow highlighted routes are detours.

    • Estimated project start and completion date: Sept. 28 to Nov. 26, 2020• Project POC: James Bohall, [email protected]

  • • Approved FY21 project to install new concrete sidewalk at Iron Horse Park entrance and replace existing asphalt walking trail. Impact to the public will be no or limited access to highlighted trail during construction.

    • Estimated completion date: Summer 2021• Project POC: Brett Sichmeller, [email protected]

    Asphalt trail milled and replaced

    New concrete sidewalk

    FY21 IRON HORSE PARK WALKING TRAIL REPLACEMENT PROJECT