Business Segments
Implementation
Operation and Maintenance
Others
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 3/14
Implementation Telecom
MSC, BSC, IN/VAS Servers, IPT, BTS(i/d, o/d),
Microwave(i/d, o/d)
Non Telecom
Power, Environmental, Civil/Tower Structure
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 4/14
Operation and Maintenance
FLM BTS
FLM Power
FLM Microwave (Often Microwave is considered to be coupled with
BTS, hence BSS FLM)(FLM=First Line of Maintenance) or Simply the Field Ops in most cases
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 5/14
Others-1 BSS and/or RF Audit (i/d, o/d equipment)
BSS Preventative Maintenance
TRX Expansion (Continuous Processes) Technical Site Surveys (LOS, BTS, Power)
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 6/14
Others 2 Pre/Post-Launch Drive Test
RF Optimization (currently LCC, Aircom)
BSC/MGW Card Expansions BTS Antenna Tilt Modifications/Band Expansions
Microwave Antenna Re-Alignments(rare)
DDF Patchings (rare and often connected with
expansions segment)
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 7/14
Others 3 Media Patching/Route clearance
Equipment Delivery
Warehousing Dismantling/Packing/Transportation
Purchasing Telco scrap and auctioning
Manpower Leasing – project based/short term/longterm
Test Tools supply, Leasing
Telco/Non Telco Consumables supply
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 8/14
Team Structures 1Implementation:BTS (i/d): 1 Engineer 25k, 1 Technician 18-25k, 1 Helper 10-12k(precision minded with
sound drilling skills and pref. with Matriculation)BTS(o/d): add 2 riggers 8-18k each
BSC: 1 Engineer 25-70k, 2 Sr. Technicians 25k each) Engineer can be from in-house Expertpool, shall be present only before power up). The technicians must have skills on BSC standby powersource configuration and its offline testing.
Microwave (i/d): 1 Engineer or Sr. Technician 25k, 1 Helper 10-12k (1 or 2 teams:depends on speed of roll-out)
Microwave (o/d): 1 Engineer or Sr. Technician 25k and 2-4 Alignment Riggers 8-18keach
IPT: 1 Engineer 25-50k, 1 Helper 10-15k)MSC: 1 Engineer 25-70k, 2 Sr. Technicians 25k each – Depending upon delivery schedules,
Techs and
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 9/14
Team Structures 2Operation and Maintenance:FLM BTS/Microwave
Expert Pool: 01 Sr Engineer 50k-100k for each 500 sites
Field Team: 02 Engineers 25-100k each and Two Sr. Techs 25k each, 1 Sr.Rigger 25k for each 350 sites in a mixed Rural and Urban area. Indistant areas with Jr. but trained technicians could be sufficient to takecare of few sites.
Eventually the SLA dictates the Size of FLM teams
Client almost always dictates field office locations/no.
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 10/14
Market RatesImplementation
BTS(i/d+o/d): (25%)
Normal Area: 40-45k per site
BSC: 140-150k per BSC including power system (upto 50%)Difficult Area: Multiply by 1.5
Microwave(i/d+o/d) upto 30%
0.3/0.6: 25k, 1.2:30k, 1.8/2.5:35k
Operation and Maintenance
Microwave: 5-5.5k per hop per month (20%)BTS FLM +Power+MW: 14-15k per month (20-25%)
Transport
5-8k per 2 site equipment
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 11/14
Organograms 1(depends on size of business)
For a sizable operation following functions are required:
Business Development
PMO
Regional Offices/ManagersTransport and Fueling
HR
Finance and Accounts
Quality Assurance and Training Admin
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 12/14
Organogram 2(depends on size of business)
Implementation:
Director/GM, Technical Project Managers, Technical Teams throughRegional Managers
Central or technology wise Expert Pool shared by all PMs
O&M:
Director/GM, Senior Technical Project Managers for each project. Onemanager may handle more than one projects. Technical Teams through
Regional ManagersCentral or Technology specific Expert Pool shared by all PMs
7/27/2019 FWO - Wireless Telecom Business
http://slidepdf.com/reader/full/fwo-wireless-telecom-business 13/14
Shared DeliveryIt pays off and especially in difficult/war areas it will be
easy to monopolize.