43
CABINDA GULF OIL COMPANY LTD. Mafumeira Sul Project Central Processing Complex TECHNICAL BID EVALUATION FIREWATER PUMPS PACKAGE 8700/8705/8710 MSP-CP00-MEC-EVA-PAR-0000-00020-00 Document No.: A9066-00-052006-0024 E01 11/8/2011 FEED COMPANY Review DMW HTR D01 11/2/2011 FEED Interdisciplinary Design Check/Office Check DMW REV DATE DESCRIPTION ORIG CHK APPROVED BY: COMPANY APPROVAL: DATE: Project Area Discipline Type Originator Package Sequence-Sht DATE: DOCUMENT CONTROL NO.

FW-PUMP_TBE

Embed Size (px)

DESCRIPTION

FW-PUMP_TBE

Citation preview

Page 1: FW-PUMP_TBE

CABINDA GULF OIL COMPANY LTD.

Mafumeira Sul ProjectCentral Processing Complex

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE 8700/8705/8710

MSP-CP00-MEC-EVA-PAR-0000-00020-00

Document No.: A9066-00-052006-0024

E01 11/8/2011 FEED COMPANY Review DMW HTR

D01 11/2/2011 FEED Interdisciplinary Design Check/Office Check DMW

REV DATE DESCRIPTION ORIG CHK

APPROVED BY: COMPANY APPROVAL:

DATE:

Project Area Discipline Type Originator Package Sequence-Sht

                       

DATE:      

DOCUMENT CONTROL NO.

Page 2: FW-PUMP_TBE

MSP CP00 MEC EVA PAR 0000 00020-00

DOCUMENT CONTROL NO.

Page 3: FW-PUMP_TBE

CABINDA GULF OIL COMPANY LTD.

Mafumeira Sul ProjectCentral Processing Complex

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE 8700/8705/8710

MSP-CP00-MEC-EVA-PAR-0000-00020-00

Document No.: A9066-00-052006-0024

CS

BD

APPR

Revision

     

Page 4: FW-PUMP_TBE

D01

Page 5: FW-PUMP_TBE

Signature Page

Page 6: FW-PUMP_TBE

A9066-00-052006-0024 Page 6 of 43

Mafumeira Sul Project Firewater Pumps Technical Bid EvaluationMSP-CP00-MEC-EVA-PAR-0000-00020-00

REV E01

Change Log

REV SECTION CHANGE DESCRIPTION

Document Holds

None.

Page 7: FW-PUMP_TBE

A9066-00-052006-0024 Page 7 of 43

Page 8: FW-PUMP_TBE

A9066-00-052006-0024 Page 8 of 43

Firewater Pumps Technical Bid EvaluationMSP-CP00-MEC-EVA-PAR-0000-00020-00

REV E01

CHANGE DESCRIPTION

Page 9: FW-PUMP_TBE

A9066-00-052006-0024 Page 9 of 43

Page 10: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020 CBA Worksheet Page 10 of 43

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

SPECIFICATIONSSupplier

REMARKSDXP Fluid-Power Equipment

1 Proposal Reference No. HQ-88808-11-JJ Tech QOTE2 Proposal Date 8/17/2011 8/17/20113 Location Angola Angola4 Exceptions (Y/N) N N

5 TECHNICAL ACCEPTANCE (Y/N) QTY

6 ADDERS7 Optional Optional8 Commissioning Spares Optional No Response9 Spare 9000 GPM Firewater Pump (Bowl Assembly Only w/ Perf & Hydro) 1 Optional No Response

10 Spare 9000 GPM Firewater Pump (Bowl, CS Discharge Head, Column, Shafting) 1 Optional No Response11 Spare Diesel for 9000 gom Pump 1 Optional No Response12 Spare Right Angle Gear Drive for 9000 gpm Pump 1 Optional No Response13 Spare 2250 GPM Firewater Pump (Bowl Assembly Only w/ Perf & Hydro) 1 Optional No Response

14 Spare 2250 GPM Firewater Pump (Bowl, CS Discharge Head, Column, Shafting) 1 Optional No Response

15 Spare Diesel for 2250 gom Pump 1 Optional No Response16 Spare Right Angle Gear Drive for 2250 gpm Pump 1 Optional No Response17 SS Enclosure for 9000 gpm Pump 1 Optional Optional18 SS Enclosure for 2250 gpm Pump 1 Optional Optional19 900 Gallon Fuel Tank 1 Optional No Response20 507 Gallon Fuel Tank 1 Optional No Response21 Super Duplex Head for 9000 gpm Pump 1 Optional No Response22 For both 9000 gpm and 2250 gpm, Plate and Frame Heat Exch 1 Not Available Optional23 Pre-Post Lube Oil Pump 1 No Response Optional24 NEMA 4X Enclosure 1 No Response Optional25 20 Amp Charging Circuit 1 No Response Optional26 Pressure Transducer 1 No Response Optional27 5150 Module 1 No Response Optional28 String Test 1 No Response Optional

29 1 By Others Optional

30 For 9000 gpm, supervised valves 1 By Others Optional31 9000 gpm Pump Listed 1 Y Optional32 2250 gpm Skid Pressure Relief Valve Listed 1 By Others Optional

33 1 No Response Optional

34 For 2250 gpm Skid, supervised valves 1 By Others Optional35 For 2250 gpm Skid, Engine Listed 1 Y Optional36 For 2250 gpm Skid, NFPA 20 Fuel Tank 1 Y Optional37 2250 gpm Pump Listed 1 Y Optional

38For 2250 gpm Skid, Equipment to meet T# area temperature classification EEMUA #107

1 No Response Optional

3946

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

PBE - 8700 / 8705 / 8710

Purchaser REQUIREMENTS

Two Year Spares

For 9000 gpm skid, discharge piping, relief valve piping, MPRV piping, and flowmeter piping installed on common skid.

For 2250 gpm skid, discharge piping, relief valve piping, MPRV piping, and flowmeter piping installed on common skid.

Page 11: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project:

Client:

Job Number:

MR #

MR Rev #

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSVENDOR VENDOR VENDOR

1 Proposal Reference No.2 Proposal Date3 Location4 Description5 Required Options6 Process Data Sheet7 Exceptions (Y/N)

8 TECHNICAL ACCEPTANCE (Y/N) Disqualified

9 SCOPE OF SUPPLY10 GENERAL

11 Packaged Fire Pump Assembly No12 Rated Capacity gpm13 Applicable Specs and Standards14 PumpType15 Protective Enclosure16 Number of stages17 Fluid19 Specific Gravity @ pumping Temp

20 Corrosive/Erosive21 Caisson Btm Depth ft22 Constant Speed Y/N24 Valves25 Pressure Control Valve Y/N26 Pressure Reducing Valve Y/N27 Relief Valve28 Circulation Relief29 Listed Y/N30 Discharge OS&Y31 Supervised32 Listed Y/N33 Discharge Butterfly34 Supervised35 Listed Y/N36 Check37 Listed Y/N38 Metering Devices39 Listed Y/N40 Supervised Y/N41 Backflow Devices42 Supervised43 Listed Y/N44 Automatic Air Release Y/N45 Line Shaft Critical Speed rpm46 Open47 Material48 Hollow49 Sequence Starting of Pumps Y/N

50 DESIGN DATA

51

ft

52 NPSHa ft53 NPSHr ft54 Total Rated Head ft55 Total Disch Head ft

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

COMPANY

REQUIREMENTS

Net Pressure (Total Differential Head)

Page 12: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project:

Client:

Job Number:

MR #

MR Rev #

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSVENDOR VENDOR VENDOR

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

COMPANY

REQUIREMENTS

56

ft

57 Shutoff Head ft58 Velocity Head ft

59

ft

60 Pressure Discharge psig61 Packing, if applicable Stuffing Box62 Transportation Loading63 Marine Growth in

64 COUPLING AND FLEXIBLE CONNWECTING SHAFT65 Make66 Flexible Connecting Shaft Y/N67 Listed Y/N68 Directly Connected to Flywheel Y/N69 Guard70 ANSI B15.1 Y/N

71 RIGHT ANGLE GEAR DRIVE72 Gear Drive Listed Y/N73 Torsional Anaslysis Y/N74 Critical Speed

75 Watercooled Y/N

76 Nonreversing Ratchet Y/N77 Safety Factor78 Output Shaft rpm79 Head80 Material81 Lined82 Noise

83 ENGINE DRIVER

84 Engine 85 Ambient Temperature °F86 Listed Y/N87 4 Hour Minimum HP Rating88 Manufacturer/Model89 Rated HP hp90 Rated RPM rpm91 Primary Starting System92 Air 20sec max

93

Air Tank Capacity

94 ASME Stamped95 Electric 20sec max96 Battery Contactors97 Listed Y/N98 Manual Operator99 Listed Y/N

100 Two Independent Battery Chargers101 Listed Y/N102 Secondary Starting System Air / Electric / Hydraulic103 Hydraulic 20sec max104 Fuel System Fuel consumption @rated HP gpm105 Fuel Type DF#1/DF#2106 Lube Oil System

Total Head Vertical Turbine Pumps

Head @150% design flow condition

Horsepower Rating /Site Rating @ 77°F

180 sec cont. starting

Page 13: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project:

Client:

Job Number:

MR #

MR Rev #

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSVENDOR VENDOR VENDOR

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

COMPANY

REQUIREMENTS107 Water Supply From Disch of Pump Y/N

108 Lube Oil Cooler109 Maximum Ambient Cooling Water °F110 DP Across Exch Psi111 Engine Cooling System112 Water Cooled Exchanger113 Plate and Frame / Shell and Tube114 Maximum Ambient Cooling Water °F115 Supply Taken From Disch of Pump Y/N116 DP Across Exch Psi117 Automatic Valve Y/N118 Air Cooled119 Jacket Water Heater120 120°F121 Exhaust Silencer122 Expansion joint123 Material124 Governor Y/N125 Electronic Control Module (ECM)126 Primary Y/N127 Secondary Y/N128 Primary to Secondary Manual Operation Y/N129 Speed130 Engine Speed rpm131 Critical Speed rpm132 Full Load

133 FUEL SUPPLY

134 Tank135 ≤ 1320 g136 > 1320 g137 Capacity138 Grade of Fuel139 Horsepower Derated Y/N140 List Hose Y/N141 PIPING

142 Materials143 Nominal Diameter in

144 FIRE PUMP

145 Type Vertical Shaft Turbine Vertical Shaft Turbine Vertical Shaft Turbine Submersible146 Rated Capacity147 Rated Speed

148

Listed

149 Pumping Temperature °F150 Column151 Material152 Max Section Length153 Schedule Lb/ft154 Suction Screens155 Number156 Clearning157 Corrosion Resistant Material

158

Flow gpm

159 Lubrication

150% of Rated Capacity @ ≥ 65% of Total Rated Head

Page 14: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project:

Client:

Job Number:

MR #

MR Rev #

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSVENDOR VENDOR VENDOR

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

COMPANY

REQUIREMENTS160 Oil ≥ 50 ft161 Water162 Brake Horsepower Rating hp163 Discharge Size nominal164 Suction Size nominal165 Impellers Number166 Diameter in167 Material168 Bowl Material

169 ELECTRICAL

170 Electrical Classification171 Instrument Panel Y/N172 NFPA 70 Y/N173 Controller174 Listed Y/N175 Pressure Recording Device Y/N176 Timer Start and Run Engine Once Week Y/N177 Enclosure

178 STRUCTURAL SKID

179 Lift Lugs for the Skid180 Coaming for the Skid 181 Skid Drain182 Painting

183 GENERAL STANDARDS

184 Noise Level 85 @ 3'

185 QUALITY ASSURANCE

186 Inspection Testing Plan

187 Inspection Matrix

188 TESTING

189 Hydrostatic test190 Field Acceptance Testing191 Factory Authorized Representatives Present Y/N192 SPARE PARTS193 Spare Parts Start-up and commissioning194 Spare Parts 2 year operation195 Firewater Pump196 Diesel Engine197 Right Angle Gear198 Manuals Y/N

199 PACKAGE INFORMATION

200 For Pump Skid with Main pump, engine, hydraulics201 Dimensions L, W, H ft202 Weight Dry lb

203 ADDITIONAL COMMENTS:

204

205

206

Page 15: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project:

Client:

Job Number:

MR #

MR Rev #

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSVENDOR VENDOR VENDOR

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE

COMPANY

REQUIREMENTS

Page 16: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSDXP Fluid-Power Equipment Framo

1 Proposal Reference No. HQ-88808-11-JJ Tech QOTE 20100732 Proposal Date 17-Aug-11 17-Aug-11 02-Aug-113 Location Angola Angola Angola4 Description Firewater Pump Firewater Pump Firewater Pump5 Required Options 6 Process Data Sheet N Y Y7 Exceptions (Y/N) Y Y N8 Others

9 TECHNICAL ACCEPTANCE (Y/N) Disqualified Does not comply with Data Sheet MSP-PP02-MER-DAS-CHV-0000-00121-00

10 SCOPE OF SUPPLY

11 GENERAL

12 Packaged Fire Pump Assembly No 1 1 113 Rated Capacity gpm 2250 2340 Optional See DXP clarification 1 and Fluid-Power clarification 7114 Applicable Specs and Standards NFPA 20 N Optional See DXP clarification 77 and Fluid-Power clarification 7215 PumpType Vertical Lineshaft Turbine Pump Y Y Submersible16 Protective Enclosure Y Optional Optional Y See DXP clarification 2 and Fluid-Power clarification 217 Number of stages By Supplier 4 4 118 Fluid Seawater Seawater Seawater Seawater

19

Pumping Temperature 84 Ocean Ambient Temperature 84 Not Provided See DXP clarification 3

20 Specific Gravity @ pumping Temp 1.03 1.03 1.03 Not Provided

21 Corrosive/Erosive Y Y Y Not Provided22 Caisson Btm Depth ft -50 -49 -50 Not Provided23 Constant Speed Y/N By Supplier Y Y Not Provided See DXP clarification 530 Valves Not Provided31 Pressure Control Valve Y/N By Supplier NA Optional Not Provided32 Pressure Reducing Valve Y/N By Supplier By others Optional Not Provided33 Relief Valve Pilot or Spring Loaded By others Y Not Provided See DXP clarification 8 and Fluid-Power clarification 634 Circulation Relief Y By others NA Not Provided See DXP clarification 8 and Fluid-Power clarification 635 Listed Y/N Y By others NA Not Provided See DXP clarification 8 and Fluid-Power clarification 636 Discharge OS&Y Y By others Optional Not Provided See DXP clarification 9 and Fluid-Power clarification 737 Supervised Y NA Optional Not Provided See DXP clarification 10 and Fluid-Power clarification 838 Listed Y/N Y By others Optional Not Provided See DXP clarification 9 and Fluid-Power clarification 739 Discharge Butterfly Y By others Optional Not Provided See DXP clarification 9 and Fluid-Power clarification 740 Supervised Y NA Optional Not Provided See DXP clarification 10 and Fluid-Power clarification 841 Listed Y/N Y By others Optional Not Provided See DXP clarification 9 and Fluid-Power clarification 742 Check Y By others Optional Duo-Check See DXP clarification 11 and Fluid-Power clarification 943 Listed Y/N Y By others Optional N See DXP clarification 11 and Fluid-Power clarification 944 Metering Devices Y By others Optional Not Provided See DXP clarification 12 and Fluid-Power clarification 1045 Listed Y/N Y By others Optional Not Provided See DXP clarification 12 and Fluid-Power clarification 1046 Supervised Y/N Y By others Optional Not Provided See DXP clarification 13 and Fluid-Power clarification 1147 Backflow Devices Y By others Optional Not Provided See DXP clarification 11 and Fluid-Power clarification 948 Supervised Y NA Optional Not Provided See DXP clarification 10 and Fluid-Power clarification 849 Listed Y/N Y By others Optional Not Provided See DXP clarification 11 and Fluid-Power clarification 950 Automatic Air Release Y/N Y By others Y Not Provided See DXP clarification 14 and Fluid-Power clarification 1251 Line Shaft Critical Speed rpm Y N Y NA See DXP clarification 15 and Fluid-Power clarification 1352 Enclosed NA NA NA NA53 Open Y Y Y NA54 Material Super Duplex Super Duplex Super Duplex55 Hollow Y Y Y NA56 Sequence Starting of Pumps Y/N Y NA NA Not Provided See DXP clarification 16 and Fluid-Power clarification 15

57 DESIGN DATA

58

ftBy Supplier Supplier to Provide 465

Not ProvidedSee DXP clarification 17

59 NPSHa ft By Supplier 80.7 Flooded

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE PBE -

8710

AMEC

REQUIREMENTS

oF

Net Pressure (Total Differential Head)

Page 17: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSDXP Fluid-Power Equipment Framo

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE PBE -

8710

AMEC

REQUIREMENTS60 NPSHr ft By Supplier 23.8 25.261 Total Rated Head ft By Supplier 457.0 61662 Total Disch Head ft By Supplier 457.0 616 Not Provided See DXP clarification 18 and Fluid-Power clarification 16

63

ftBy Supplier No response 465 Not Provided See DXP clarification 18 and Fluid-Power clarification 16

64 Shutoff Head ft By Supplier Y 625.000 Not Provided See DXP clarification 19 and Fluid-Power clarification 1765 Velocity Head ft By Supplier No response 465.000 Not Provided See DXP clarification 18 and Fluid-Power clarification 16

66

ftBy Supplier Y No response

Not ProvidedSee DXP clarification 20 and Fluid-Power clarification 18

67 Pressure Discharge psig 180 179.5 180.068 Packing, if applicable Stuffing Box NON ASBESTOS YARN Accrylic yarn and graphite Non Asbestos yarn NA69 Transportation Loading Y Later Later Not Provided See DXP clarification 21 and Fluid-Power clarification 1970 Marine Growth in 4 Y Y Not Provided See DXP clarification 22 and Fluid-Power clarification 20

71 COUPLING AND FLEXIBLE CONNWECTING SHAFT72 Make By Supplier AR Centra or Vulkan (2) CentaFlex73 Flexible Connecting Shaft Y/N Y Y N Not Provided See DXP clarification 23 and Fluid-Power clarification 2174 Listed Y/N Y N N NA See DXP clarification 31 and Fluid-Power clarification 2675 Directly Connected to Flywheel Y/N Y Y Y NA See DXP clarification 30 and Fluid-Power clarification 2576 Guard Y77 ANSI B15.1 Y/N Y Y Y Not Provided See DXP clarification 24 and Fluid-Power clarification 22

78 RIGHT ANGLE GEAR DRIVE79 Gear Drive Listed Y/N Y Y Y NA See DXP clarification 25 and Fluid-Power clarification 2380 Torsional Anaslysis Y/N Y Y Y NA81 Critical Speed By Supplier Y Y NA See DXP clarification 27 and Fluid-Power clarification 2482 Watercooled Y/N By Supplier Internal Cooling Coil Shell and Tube Exch See DXP clarification 28 and Fluid-Power clarification 7383 Nonreversing Ratchet Y/N Y Y Y NA See DXP clarification 2984 Safety Factor 1.5 1.6 1.585 Output Shaft rpm 1750 1780 173286 Head NA87 Material By Supplier CS/SS driver stand CS w/CP and CE4 NA88 Lined By Supplier Epoxy Coated NA89 Noise 85 db @ 3' N 85 db @ 3' See DXP clarification 32

90 ENGINE DRIVER

91 Engine Diesel Diesel Diesel Diesel Framo's diesel is a 2 cycle Detriot Diesel92 Ambient Temperature °F 55 - 95 Y 55 - 95 Not Provided See DXP clarification 33 and Fluid-Power clarification 2993 Listed Y/N Y Y N Not Provided See DXP clarification 34 and Fluid-Power clarification 3094 4 Hour Minimum HP Rating Y Y Y Not Provided See DXP clarification 35 and Fluid-Power clarification 3195 Manufacturer/Model By Supplier CAT / 3516 CAT / 3516 MTU 12V4000P83 Framo is a 2 cycle Detriot Diesel96 Rated HP hp By Supplier 1985 1985 Not Provided See DXP clarification 33 and Fluid-Power clarification 2997 Rated RPM rpm 1800 1750 1900 180098 Primary Starting System99 Air 20sec max Y Y Y Y See DXP clarification 36 and Fluid-Power clarification 32

100

Air Tank Capacity YNA 180 Not Provided See DXP clarification 37

101 ASME Stamped Y NA Y Not Provided See DXP clarification 38 and Fluid-Power clarification 33102 Electric 20sec max Y Y Y Not Provided See DXP clarification 36 and Fluid-Power clarification 32103 Battery Contactors NA NA NA Not Provided104 Listed Y/N NA NA NA Not Provided105 Manual Operator NA NA NA Not Provided106 Listed Y/N NA NA NA Not Provided107 Two Independent Battery Chargers Y Y Y Not Provided See DXP clarification 39 and Fluid-Power clarification 34108 Listed Y/N Y Y Y Not Provided See DXP clarification 40 and Fluid-Power clarification 35109 Secondary Starting System Air / Electric / Hydraulic Electric Electric Electric Electric See DXP clarification 41110 Hydraulic 20sec max NA NA NA NA

111 Fuel System Fuel consumption @rated HP gpm By Supplier Later 0.37 Not Provided See DXP clarification 42

Total Head Vertical Turbine Pumps

Head @150% design flow condition

Horsepower Rating /Site Rating @ 77°F

180 sec cont. starting

Page 18: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSDXP Fluid-Power Equipment Framo

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE PBE -

8710

AMEC

REQUIREMENTS112 Fuel Type DF#1/DF#2 #2 Y #2 Not Provided See DXP clarification 43 and Fluid-Power clarification 36113 Lube Oil System114 Water Supply From Disch of Pump Y/N By Supplier Y Y Not Provided See DXP clarification 44 and Fluid-Power clarification 37

115 Lube Oil Cooler By Supplier Shell and Tube Shell and Tube Not Provided See DXP clarification 45

116 Maximum Ambient Cooling Water °F 87 87.0 87.0 87.0 See DXP clarification 78

117 DP Across Exch Psi 10 No response 10.0 10.0 See DXP clarification 46118 Engine Cooling System119 Water Cooled Exchanger Y Y Y Not Provided120 Plate and Frame / Shell and Tube Plate and Frame Shell and Tube Optional See DXP clarification 47 and Fluid-Power clarification 38121 Maximum Ambient Cooling Water °F 87 87.0 87.0 87.0122 Supply Taken From Disch of Pump Y/N By Supplier Y Y Not Provided See DXP clarification 44 and Fluid-Power clarification 37123 DP Across Exch Psi 10 No response No response Not Provided See DXP clarification 48 and Fluid-Power clarification 39124 Automatic Valve Y/N NA NA NA Not Provided125 Air Cooled NA NA NA Not Provided126 Jacket Water Heater Y Y Y Y127 120°F Y Y N Not Provided See DXP clarification 49 and Fluid-Power clarification 40128 Exhaust Silencer Y Y Y Y129 Expansion joint Y Y Y N130 Material SS SS SS SS131 Governor Y/N Y NA Y Not Provided See DXP clarification 50 and Fluid-Power clarification 41132 Electronic Control Module (ECM) By Supplier NA NA Not Provided See DXP clarification 51 and Fluid-Power clarification 42133 Primary Y/N Y NA NA Not Provided See DXP clarification 51 and Fluid-Power clarification 42134 Secondary Y/N Y NA NA Not Provided See DXP clarification 51 and Fluid-Power clarification 42135 Primary to Secondary Manual Operation Y/N Y Y Y Not Provided See DXP clarification 52 and Fluid-Power clarification 43136 Speed137 Engine Speed rpm By Supplier 1750 1750 1800138 Critical Speed rpm By Supplier Y Y Not Provided See DXP clarification 53 and Fluid-Power clarification 44139 Start 20 s Y Y Not Provided See DXP clarification 54 and Fluid-Power clarification 45

140 FUEL SUPPLY

141 Tank142 ≤ 1320 g NFPA 20 507 N See DXP clarification 55 and Fluid-Power clarification 46143 > 1320 g NFPA 37 Y N Not Provided See DXP clarification 55 and Fluid-Power clarification 46144 Capacity 1 g / hp +5% exp + 5% sump Y Optional Not Provided See DXP clarification 56 and Fluid-Power clarification 47145 Grade of Fuel #2 Y #2 Not Provided See DXP clarification 57 and Fluid-Power clarification 48146 Horsepower Derated Y/N Y Y No response Not Provided See DXP clarification 43 and Fluid-Power clarification 36147 List Hose Y/N Y Y Y Not Provided See DXP clarification 79 and Fluid-Power clarification 49

148 PIPING

149 Materials NA NA NA NA

150 Nominal Diameter in NA NA NA NA

151 FIRE PUMP

152 Type Vertical Shaft Turbine Vertical Shaft Turbine Vertical Shaft Turbine Submersible153 Rated Capacity154 Rated Speed 1800 1780 1732 Not Provided

155

ListedY Y Optional

156 Pumping Temperature °F 84 77 80.000 See DXP clarification 3 and Fluid-Power clarification 3157 Column158 Material FRP FRP FRP159 Max Section Length 10 10.000 10.000 Not Provided See DXP clarification 4 and Fluid-Power clarification 4160 Schedule Lb/ft ≥ Table7.3.2.1(a) N N Not Provided See DXP clarification 26 and Fluid-Power clarification 1161 Suction Screens Not Provided162 Number 2 N N Not Provided See DXP clarification 75 and Fluid-Power clarification 69163 Clearning Y Y N Not Provided See DXP clarification 76 and Fluid-Power clarification 70164 Corrosion Resistant Material Y Super Duplex SS Not Provided

See DXP clarification 58 and Fluid-Power clarification 50. Framo meets NFPA 20 but not listed

Page 19: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSDXP Fluid-Power Equipment Framo

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE PBE -

8710

AMEC

REQUIREMENTS

165

Flow gpmBy Supplier Y Supplier to Provide Y See DXP clarification 20 and Fluid-Power clarification 18

166 Lubrication167 Oil ≥ 50 ft NA NA NA NA168 Water Y Y Y Not Provided169 Brake Horsepower Rating hp By Supplier 381 378 Not Provided170 Discharge Size nominal By Supplier Y Optional NA See DXP clarification 80 and Fluid-Power clarification 14171 Suction Size nominal By Supplier Y Optional NA See DXP clarification 80 and Fluid-Power clarification 14172 Impellers Number By Supplier 4 4 1173 Diameter in By Supplier 11.5 12.6174 Material Super Duplex Super Duplex Super Duplex See Fluid-Power clarification 51175 Bowl Material Super Duplex 2507 Super Duplex Super Duplex See Fluid-Power clarification 51

176 ELECTRICAL

177 Electrical Classification CL1 Group C&D DIV 2 Y CL1 Group C&D DIV 2 Not Provided See DXP clarification 59178 Instrument Panel Y/N Y Y Y Not Provided See DXP clarification 60 and Fluid-Power clarification 53179 NFPA 70 Y/N Y N Y Not Provided See DXP clarification 61 and Fluid-Power clarification 54180 Controller By Supplier Firetrol Firetrol Allen Bradley181 Listed Y/N Y Y Y N See DXP clarification 62 and Fluid-Power clarification 55182 Pressure Recording Device Y/N Y Y Y Not Provided See DXP clarification 63 and Fluid-Power clarification 56183 Timer Start and Run Engine Once Week Y/N Y Y Y Not Provided See DXP clarification 64 and Fluid-Power clarification 57184 Enclosure NEMA 4X NEMA 4X NEMA 4X NEMA 4X See DXP clarification 65 and Fluid-Power clarification 58

185 STRUCTURAL SKID

186 Lift Lugs for the Skid Y Y Y Not Provided See DXP clarification 67 and Fluid-Power clarification 60187 Coaming for the Skid Y Y Y Not Provided See DXP clarification 67 and Fluid-Power clarification 60188 Skid Drain Y Y Y Not Provided See DXP clarification 67 and Fluid-Power clarification 60

189Painting

YN Not Provided See DXP clarification 66 and Fluid-Power clarification 59

190 GENERAL STANDARDS

191 Noise Level 85 @ 3' N Optional Enclosure 85 @ 3' See DXP clarification 68 and Fluid-Power clarification 61

192 QUALITY ASSURANCE

193 Inspection Testing Plan By Supplier No response Y Not Provided See DXP clarification 69 and Fluid-Power clarification 62194 Inspection Matrix By Supplier No response Y Not Provided See DXP clarification 69 and Fluid-Power clarification 62

195 TESTING

196 Hydrostatic test Y Y Y Not Provided See DXP clarification 70 and Fluid-Power clarification 63197 Field Acceptance Testing Y Y Y Not Provided See DXP clarification 71 and Fluid-Power clarification 64198 Factory Authorized Representatives Present Y/N Y Y Y N See DXP clarification 71 and Fluid-Power clarification 64

199 SPARE PARTS200 Spare Parts Start-up and commissioning Y Later Y Not Provided See DXP clarification 72 201 Spare Parts 2 year operation Y Later Optional Not Provided See DXP clarification 72 and Fluid-Power clarification 66202 Firewater Pump Y Optional Optional Not Provided See DXP clarification 73203 Diesel Engine Y Optional Optional Not Provided See DXP clarification 73204 Right Angle Gear Y Optional Optional Not Provided See DXP clarification 73205 Manuals Y/N Y Y Y Not Provided See DXP clarification 74 and Fluid-Power clarification 68

206 PACKAGE INFORMATION

207 For Pump Skid with Main pump, engine, hydraulics208 Dimensions L, W, H ft 8' / 15' / TBD 165" / 78" / 136" 31.8 / 10.2 / 13.1209 Weight Dry lb 9297 15400 Not Provided

210 ADDITIONAL COMMENTS:

211

212

213

150% of Rated Capacity @ ≥ 65% of Total Rated Head

MSP-GN00-CRR-SPC-CHV-0000-00001-00

Page 20: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev E01

A9066-00-052006-0020

Project: MSP

Client: Chevron

Job Number: A9066

MR # A9066-00-052006-0020

MR Rev # E01

INQUIRY NO. :

SPECIFICATIONSVENDORS

REMARKSDXP Fluid-Power Equipment Framo

TECHNICAL BID EVALUATIONFIREWATER PUMPS PACKAGE PBE -

8710

AMEC

REQUIREMENTS

Page 21: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

1 11/17/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Data Sheet General (2) pumps @ 9000 gpm req'd 9000 GPM plus cooling requirement

2 11/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Data Sheet General NFPA 20 NFPA 20 Intent

3 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3 Supplier provide. Which is it?

4 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3.1 …Variable speed pressure limiting control…shall be listed…

5 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.18.4.1 Pressure relief valves shall be…listed spring loaded or pilot operatred… Supplier provide MPRV offered is pilot operated.

6 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.11.1.1 Supplier provide

7 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.7 Supplier provide

8 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.1 Supplier provide

9 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.6 Supplier provide

10 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.20.2.1.1 Metering devices or fixed nozzles for pump testing shall be listed Supplier provide

11 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.2 The test outlet control valves shall be supervised closed. Supplier provide

12 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.5.2.1 …automatic air release valve shall be provided to vent air from the column Supplier provide Included.

13 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.2.7 Supplier verify

Variable Speed Pressure Limiting Control or Variable Speed Suction Control

This section of NFPA 20 refers to ECM modules of UL Listed engines. This size engine is not UL Listed and as it is a mechanical engine, it does not have ECM's.

Supplier to provide commercial impact to comply with NFPA 20

There are currently no UL Listed engines of this size. This mechanical engine is in accord with the intent of NFPA 20, but not listed.

Unless the requirements of 4.11.1.7 are met, each pump shall have an automatic relief valve listed…

Section 4.11.1.7 says that 4.11.1.1 does not apply to engine driven units.

A listed indicating gate valve or butterfly valve shall be installed on the fire protection system side of the pump discharge check valve.

Noted, we can offer an Option for this valve, however, the MOC of listed valves and the Approved Vendor List are to be discussed. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

Where provided, the suction valve, discharge valve… shall be supervised…

Noted, this will be with the Options for Valves.

A listed check valve or backflow preventer shall be installed in he pump discharge assembly

Noted, we can offer an Option for this valve, however, the MOC of listed valves and the Approved Vendor List are to be discussed. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

Noted, we include an FM Approved flowmeter. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

A position indicator will be provided for the control valve.

The pump line shafting shall be sized so ctitical speed shall be 25 percent above the operating speed of the pump.

Confirmed. Also please note that the shaft is sized as per FPM-SU-15.04, 3.2.11, 20% greater than required.

Page 22: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

14 11/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Data Sheet Material Super Duplex 2507

15 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 12.7.2.4 A sequential device is included.

16 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps A.3.3.23 Head Supplier provide

17 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.2 Supplier provide

18 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.1 Supplier provide

19 11/18/2011 Motion Analysis Accelerations

20 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.1.2 Supplier provide Noted; we comply.

21 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.2.1 Supplier provide

22 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.12.8 …coupling guard in accordance with Section 8 of ANSI B15.1… Supplier provide Noted.

23 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.4 All gear drives shall be listed and rated… Supplier provide

24 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.6.1 …torsional analysis to ensure no damaging stresses or critical speeds… Supplier provide

25 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.1.2 Supplier verify

26 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.8.1 The flexible connecting shaft shall be listed… Supplier verify

27 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Gear Remarks Gears shall have a minimum service factor of 1.5… Supplier verify Confirmed.

28 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Gear Max sound level pressure level 85 dba Supplier provide

Supplier to provide commercial impact to comply with Purchaser's specification

The casting material offered is Super Duplex SS ASTM A890, Grade 6A (SDSS 2507) from American vendors. The equivalent UNS number for Super Duplex SS castings is UNS J93380.

Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-0000-00121-00 under operating conditions. The controller for each unit of multiply pump units shall incorporate a sequential timing device…

Supplier to provide commercial impact to comply with NFPA 20

Noted. Please refer to our Bid Calculation Worksheet.

The total shutoff head shall not exceed 140 percent of the total rated head…

Noted; we comply. Please refer to Calculation Worksheet in the Bid.

Pumps shall furnish not less than 150 percent of the rated capacity at a total head of not less than 65 percent of the total rated head.

Noted; we comply. Please refer to Calculation Worksheet in the Bid.

MSP-GN00-MAR-SPC-CHV-0000-00007-00MSP-GN00-MAR-SPC-CHV-0000-00008-00

25.27.10

Supplier to provide commercial impact to comply with Purchaser's specification

We do not see these specification in the Technical Folder nor do we see them listed in MSP-CP00-MEC-SPC-PAR-0000-00006-00 (Firewater Pumps) as applying to this equipment.. Please forward for our review.

The pump head shall be designed to support the driver, pump, column assembly…

…engines shall be connected to vertical shaft pumps by means of a right angle gear drive with a listed flexible connecting shaft…

The engine is connected to the gearbox by a universal driveshaft but there are none listed for this size engine. Please refer to the UL website for confirmation.

There are no UL Listed right angle gear drives for this application.

FPE will provide a torsional vibration analysis during engineering submittal.

The flexible coupling shall be directly attached to the engine flywheel adapter…

The engine is connected to the gearbox by a universal driveshaft with hubs provided for engine stub shaft and gear shaft.

The engine is connected to the gearbox by a universal driveshaft but there are none listed for this size engine. Please refer to the UL website for confirmation.

Operating Conditions

A noise level of 85 dBA cannot be achieved without using an acoustic enclosure, which can be offered, if desired. Please note that the engine and gear mechanical noise level exceeds 85 dBA.

Page 23: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

29 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.2.5 Supplier verify

30 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.1 Engines shall be listed for fire pump service. Supplier provide

31 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.2 Engine ratings Supplier verify Confirmed.

32 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.7.1 Supplier verify Confirmed.

33 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Air tank designed by vendor per ASME VIII Div1 and stamped

34 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.5.1 Two means for recharging storage batteries shall be provided. Supplier provide Confirmed.

35 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.6 (1) Chargers shall be specifically listed for fire pump…

36 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.4.5.2

37 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.11.1.7 Supplier verify

38 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Cooling System Plate and Frame Heat Exchanger

39 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Cooling System Plate and Frame Heat Exchanger Supplier provide See response to SL 38.

40 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.8.2 A means shall be provided to maintain 120°F Supplier verify

41 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3.3 Supplier verify

A deduction of 1 percent from engine horsepower rating as corrected to standard SAE conditions shall be made for diesel engines for every 10° F above 77°F ambient temperature.

Confirmed. Please refer to our Calculation Worksheet, page 27.

There are currently no UL Listed engines of this size.

Engines shall be equipped with a reliable starting device and shall accelerate to rated output speed within 20 sec.

Starting System-Remarks

Supplier to provide commercial impact to comply with Purchaser's data sheet

The air receivers included are as per Chevron Pressure Vessel Specification FPM-SU-8.00, ASME VIII, Div. 1, Stamped. If a standard ASME VIII, Div. 1 Stamped less expensive vessel (as Manchester, Hanson, etc.) is acceptable, a price reduction is available. To this date, the manufacturers of standard ASME vessels have decline to quote us to CVX specifications, including for our current CVX SNX project

Supplier to provide commercial impact to comply with NFPA 20

Chargers are integral within the UL Listed engine controller, and, by extension, are UL Listed.

…an engine listed for use with DF#2 shall be permitted to be used but shall have the nameplate and rated horsepower derated 10 percent…

Supplier to provide commercial impact to comply with NFPA 20

Please confirm that local air quality management regulations allow only the use of DF#1 fuel in order for this section to apply.

The requirements of 4.11.1 shall not apply to engine-driven pumps for which engine cooling water is taken from the discharge.

Confirmed. Cooling water for the engine and gearbox are taken from the pump discharge. Please refer to Calculation Worksheet.

Supplier to provide commercial impact to comply with Data Sheet

We do not see Document MSP-LQ02-MEC-DAS-PAR-0000-00213-00 in the Technical Folder. Noted, we will offer an Option for a plate and frame engine heat exchanger, but from our experiences with CABGOC, including our current SNX Project and past Tombua Landana, South Nemba, North Nemba, N'Dola, etc., the engine manufacturers' standard heat exchangers have been preferred.

We intrepret this as applying where an enclosure is provided in our Scope. If desired, an Optional Enclosure can be offered.

In event of a failure of the varible speeds control system, the engine shall be fully functional with the governor

These are mechanical engines without ECM's.

Page 24: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

42 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.2.1 Supplier verify

43 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.7.3.1.4 There shall be a manually operated switch or valve on the control panel Supplier provide

44 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver General Speeds Supplier provide

45 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.7.3.4 Supplier verify Confirmed.

46 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.4.1.2.3 Supplier provide

47 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.4.2.1 Fuel supply tank

48 18/19/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps 3.7 (1) Fuel supply tank

49 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.4.4.1 Flame resistant reinforced flexible hose listed for this service… Supplier provide Confirmed.50 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.7.1 Fire pumps shall be dedicated to and listed for fire protection. Supplier provide

51 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Material Super Duplex 2507

52 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Engine Electrical Area Classification

53 18/19/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps 3.10.3.10 Instrumentation

54 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.29.2

Engines that incorporate an electronic control module (ECM) to accomplish and control the fuel injection process shall have an alternate ECM permanently mounted and wired so that in the event of a failure of the primary ECM

These are mechanical engines without ECM's.

Confirmed. The engine can also be manually started from the start contactors.

We do not see Document MSP-LQ02-MEC-DAS-PAR-0000-00213-00 in the Technical Folder.

The diesel engine as installed shall be capable of carrying its full rated load within 20 seconds…

Tanks used in accordance with the rules of this standard shall be limited in size to 1320 gal. For situations where fuel tanks in excess of 1320 gal are used , the rules of NFPA 37…shall apply.

As per the data sheet and 3.7.2.c of Specification FPM-SU-15.04 (MSP-GN00-FGS-SPC-CHV-0000-00003-00), the fuel tank is sized for 8 hours operation, thus NFPA 37 would not apply. If a larger tank is desired, we will offer an Option.

Supplier to provide commercial impact to comply with NFPA 20

Noted, we will offer an Option for a larger diesel fuel tank.

Supplier to provide commercial impact to comply with specification

3.7.1 of FPM-SU-15.04 states that the engine is to operate with DF#2. Please clarify your request.

To the best of my knowledge, there are currently no UL Listed 9000 GPM pumps. At extra costs, it is possible to secure a special listing from UL, however the design and materials of construction must comply with NFPA 20 Standards and UL 448. Please advise.

Supplier to provide commercial impact to comply with Data Sheet

The casting material offered is Super Duplex SS ASTM A890, Grade 6A (SDSS 2507) from American vendors. The equivalent UNS number for castings is UNS J93380.

Supplier to provide commercial impact to comply with Data Sheet

In our Bid, all electrical equipment will be designed for a Class 1, Division 2, Groups C & D hazardous area. If desired, an Option can be provided for equipment to meet T3 area temperature classification, EEMUA #107¸ including such items as engine exhaust gas coolers, flame traps, etc.

Supplier to provide commercial impact to comply with specification

We comply with 3.10.3.10 of FPM-SU-15.04, except overspeed will be as per NFPA 20 Standards 11.2.4.4.2.

All electrical components, clearances, and wiring shall meet the minimum requirements of the applicable NFPA 70,…

Supplier to provide commercial impact to comply with NFPA 20

Confirmed, we comply with NFPA 20 Standards in this regards.

Page 25: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

55 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.1.3.1 All controllers shall be specifically listed for diesel engine-driven service. Supplier provide

56 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.4.4.1 Supplier provide

57 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.7.2.7.1 Supplier provide Confirmed.

58 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 12.3.3.1.1

59 18/19/2011 MSP-GN00-CRR-SPC-CHV-0000-00001-00 Paint Specification All

60 18/19/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps 3.1 (10) (g), (h) Drains and lifting lugs Supplier provide

61 18/19/2011 MSP-GN00-TEC-SPC-CHV-0000-00002-01 Design Sheet for Noise All 85 dba @ 3' Supplier provide

62 18/19/2011 A9066-00-052006-0020 Firewater package All Supplier verify

63 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.22.2.1 Supplier verify Confirmed.

64 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 14.2.1

65 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Spare Parts Start-up & Comm

66 18/19/2011 MSP-LQ02-MEC-DAS-PAR-0000-00213-00 Firewater Pump Driver Spare Parts Normal 2 Yr Maintenance

67 18/19/2011 A9066-00-052006-0020 Firewater package Scope of Supply Item 8, 9, 10

68 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 14.3 Manuals, Special Tools, and Spare Parts Included.

Confirmed, the engine controller offered is UL Listed.

A listed pressure recording device shall be installed to sense and record the pressure in each fire pump controller pressure-sensing line at the input to the controller

The pressure recorder is part of the UL Listed engine controller, and by extension, meets NFPA 20 requirements.

To ensure dependable operation of the engine and its controller, the controller equipment shall be arranged to automatically start and run engine for at least 30 minutes once a week.

The structure or panel shall be securely mounted in , as a minimum, a NEMA Type 2 dripproof enclosure(s) or enclosure(s) with an ingress protection (IP) rating of IP 31.

Supplier to provide commercial impact to comply with NFPA 20

NEMA 2 enclosures are not normally used on an offshore platform. As per 3.3.10.1.b of FPM-SU-15.04, the enclosures are NEMA 4X (316SS).

Supplier to provide commercial impact to comply with specification

To the best of my knowledge, Caterpillar does not offer to sandblast the engines as required by 3.7. The coating systems offered are as FPE supplied for CABGOC S. Nemba, N. Nemba, Tombua Landana, etc., as well as being supplied for SNX.

If desired, we will supply a threaded drain, but the P&ID shows a flanged connection. The skid will be provided with four (4) lifting lugs.

A noise level of 85 dBA cannot be achieved without using an acoustic enclosure, which can be offered, if desired. Please note that the engine mechanical noise level exceeds 85 dBA.

Inspection and Test Plan

As per 2.7 of MSP-CP00-MEC-SPC-PAR-0000-00006-00, we are were to provide an ITP with our Bid, which we provided, starting on page 20.

Before shipment from the factory, each pump shall be hydrostatically tested by the manufacturer for a period of not less than 5 minutes.

The pump manufacturer, the engine manufacturer (when supplied), the controller manufacturer, and the transfer switch manufacturer (when supplied) or their factory-authorized representative shall be present for field acceptance tests.

Supplier to provide commercial impact to comply with NFPA 20

Our rates for site service were included with the commercial bid.

Supplier to provide commercial impact to comply with Data Sheet

We do not show MSP-LQ02-MEC-DAS-PAR-0000-00213-00 in the Technical Folder. Please clarify what you require.

Supplier to provide commercial impact to comply with Data Sheet

An Option will be provided for 2 Years of Maintenance spares.

Supplier to provide commercial impact to comply with MR

We do not understand the question. Our bid includes the submission of Items 8, 9, and 10, as applicable.

Supplier to provide commercial impact to comply with NFPA 20

Page 26: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11 SUBMITTED DATE: 27 OCT 2011SUBMITTED BY: AMEC TO FLUID POWER

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED BY: FLUID-POWER

RESPONSE - 9000 GPM UNIT

69 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.14.8.2 Double intake screens shall be provided at the suction intake. Supplier provide

70 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 4.14.8.3 Screens shall be removeable, or an in suti cleaning shall be provided Supplier provide

71

This does not apply to pumps. The pump is provided with a strainer as per 7.3.4 of NFPA 20.

A means to clean screens from marine growth need to be supplied. Screens are -50 feet below MWL

This does not apply to pumps. The pump is provided with a strainer as per 7.3.4 of NFPA 20.

A means to clean screens from marine growth need to be supplied. Screens are -50 feet below MWL

Page 27: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

1

11/27/2011 NFPA 20

Installation of Stationary Fire Pumps Table 7.3.2.1 (a) Pump Column Weights Supplier verify

211/27/2011 NFPA 20

Installation of Stationary Fire Pumps 4.12.1

3

10/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump

Liquid Pumping temperature Supplier provide

410/27/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater Pump

3.2 (4) Supplier verify Confirmed.

5

11/18/2011 NFPA 20 Installation of Stationary Fire Pumps

4.18.4.1 Supplier provide

611/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.11.1.1 Supplier provide

7

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.15.7 Supplier provide

811/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.16.1 Supplier provide

9

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.15.6 Supplier provide

10

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.20.2.1.1 Metering devices or fixed nozzles for pump testing shall be listed Supplier provide

1111/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.16.2 The test outlet control valves shall be supervised closed. Supplier provide

1211/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.3.5.2.1 …automatic air release valve shall be provided to vent air from the column Supplier provide Included.

Specification MSP-GN00-FGS-SPC-CHV-0000-00003-00 at 3.2.8.f says that the column is to be FRP. FRP does not meet NFPA 20 specified weights for column. For our previous CABGOC FWP's (S. Nemba, N'Dola, N. Nemba, Tombua Landana, as well as for our current project, SNX, all used FRP columns). However, if desired, other materials can be offered for the column. Please advise MOC.

The fire pump, driver, controller… shall be protected against…explosion, fie, earthquake..

Supplier to provide commercial impact to comply with NFPA 20

An Option was provided to include an enclosure in our Scope of Supply.

According to the Data Sheet, the minimum pumping temperature is 60 oF and the maximum is 84 oF. Please clarify this question.

Line shaft shall be supported at no greater than 10 foot (3 meter) intervals.

Pressure relief valves shall be…listed spring loaded or pilot operatred… Normally, for CABGOC projects, a ClaVal 50-49 main pressure relief valve is used for its surge-protecting properties. This valve is not listed, but if desired, a Model 50-20 FM Approved valve will be supplied.

Unless the requirements of 4.11.1.7 are met, each pump shall have an automatic relief valve listed…

Section 4.11.1.7 says that 4.11.1.1 does not apply to engine driven units.

A listed indicating gate valve or butterfly valve shall be installed on the fire protection system side of the pump discharge check valve.

Noted, we can offer an Option for this valve, however, the MOC of listed valves and the Approved Vendor List are to be discussed. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

Where provided, the suction valve, discharge valve… shall be supervised…

Noted, this will be with the Options for Valves.

A listed check valve or backflow preventer shall be installed in he pump discharge assembly

Noted, we can offer an Option for this valve, however, the MOC of listed valves and the Approved Vendor List are to be discussed. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

Noted, we include an FM Approved flowmeter. If desired, we can offer a complete system including discharge piping, relief valve piping, MPRV piping and flowmeter piping installed on a common skid as we are currently doing for CABGOC SNX.

A position indicator will be provided for the control valve.

Page 28: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

1311/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.3.2.7 Supplier verify

1410/27/2011 NFPA 20 Installation of Stationary Fire Pumps

Table 4.26 (a) Capacity of pump does not comply with Table.

15

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.7.2.4

1611/27/2011 NFPA 20 Installation of Stationary Fire Pumps

A.3.3.23 Head Supplier provide

1711/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.1.2.2 Supplier provide

1811/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.1.2.1 Supplier provide

19

11/27/2011 Motion Analysis

Accelerations

2011/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.3.1.2 Supplier provide Noted; we comply.

21

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.3.2.1 Supplier provide

22 11/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.12.8 …coupling guard in accordance with Section 8 of ANSI B15.1… Supplier provide Noted.

2311/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.5.1.7.4 All gear drives shall be listed and rated… Supplier provide

2411/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.5.1.6.1 …torsional analysis to ensure no damaging stresses or critical speeds… Supplier provide

25

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.3.1.2 Supplier verify

26

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.5.1.8.1 The flexible connecting shaft shall be listed… Supplier verify

27

28

18/19/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Gear

Max sound level pressure level 85 dba Supplier provide

2911/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.2.5 Supplier verify

The pump line shafting shall be sized so ctitical speed shall be 25 percent above the operating speed of the pump.

Confirmed. Also please note that the shaft is sized as per FPM-SU-15.04, 3.2.11, 20% greater than required.

Supplier to provide commercial impact to comply with NFPA 20

Noted, FPE to offer an Option for a 2500 GPM selection.

Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-0000-00121-00 under operating conditions. The controller for each unit of multiply pump units shall incorporate a sequential timing device…

Supplier to provide commercial impact to comply with NFPA 20

There is only one (1) of this pump. Please advise with which pump this pump is to be sequentially operated.

Noted. Please refer to our Bid Calculation Worksheet.

The total shutoff head shall not exceed 140 percent of the total rated head…

Confirmed. Please refer to our Bid Calculation Worksheet.

Pumps shall furnish not less than 150 percent of the rated capacity at a total head of not less than 65 percent of the total rated head.

Confirmed. Please refer to our Bid Calculation Worksheet.

MSP-GN00-MAR-SPC-CHV-0000-00007-00MSP-GN00-MAR-SPC-CHV-0000-00008-00

25.27.10

Supplier to provide commercial impact to comply with Purchaser's specification

We do not see these specifications listed in MSP-CP00-MEC-SPC-PAR-0000-00006-00 (Firewater Pumps) as applying to this equipment. However, these specifications have now been received and we are reviewing.

The pump head shall be designed to support the driver, pump, column assembly…

…engines shall be connected to vertical shaft pumps by means of a right angle gear drive with a listed flexible connecting shaft…

The engine is connected to the gearbox by a universal driveshaft but those listed for this size engine are for use with Clarke or Cummins engines. Please refer to the UL website for confirmation.

There are no UL Listed right angle gear drives for this application. This gearbox is FM Approved.

FPE will provide a torsional vibration analysis during engineering submittal.

The flexible coupling shall be directly attached to the engine flywheel adapter…

The engine is connected to the gearbox by a universal driveshaft with hubs provided for engine stub shaft and gear shaft.

The engine is connected to the gearbox by a universal driveshaft but those listed for this size engine are for use with Clarke or Cummins engines. Please refer to the UL website for confirmation.

Operating Conditions

A noise level of 85 dBA cannot be achieved without using an acoustic enclosure, which can be offered, if desired. Please note that the engine and gear mechanical noise level exceeds 85 dBA.

A deduction of 1 percent from engine horsepower rating as corrected to standard SAE conditions shall be made for diesel engines for every 10° F above 77°F ambient temperature.

Noted. Please refer to our Bid Calculation Worksheet.

Page 29: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

30

11/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.1 Engines shall be listed for fire pump service. Supplier provide

31 11/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.2 Engine ratings Supplier verify Confirmed.

3211/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.7.1 Supplier verify Confirmed.

33

11/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Air tank designed by vendor per ASME VIII Div1 and stamped

34 11/27/2011 NFPA 20 Installation of Stationary Fire Pumps 12.5.1 Two means for recharging storage batteries shall be provided. Supplier provide Confirmed.

3511/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.6 (1) Chargers shall be specifically listed for fire pump…

36

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.4.5.2

37

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.11.1.7 Supplier verify

38

10/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Cooling System Plate and Frame Heat Exchanger

39 10/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver Cooling System Plate and Frame Heat Exchanger Supplier provide See response to SL 38.

40

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.8.2 A means shall be provided to maintain 120°F Supplier verify

4110/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.4.3.3 Supplier verify

The engine offered is a UL Listed Model, but it will be modified to meet the specifications, thus voiding the label. If a standard UL Listed engine is desired, the engine starter, alternator, switches and other electrical items would be Caterpillar standard, not rated for use in a Class 1, Div. 2 area.

Engines shall be equipped with a reliable starting device and shall accelerate to rated output speed within 20 sec.

Starting System-Remarks

Supplier to provide commercial impact to comply with Purchaser's data sheet

The air receivers included are as per Chevron Pressure Vessel Specification FPM-SU-8.00, ASME VIII, Div. 1, Stamped. If a standard ASME VIII, Div. 1 Stamped less expensive vessel (as Manchester, Hanson, etc.) is acceptable, a price reduction is available. To this date, the manufacturers of standard ASME vessels have decline to quote us to CVX specifications, including for our current CVX SNX project

Supplier to provide commercial impact to comply with NFPA 20

Chargers are integral within the UL Listed engine controller, and, by extension, are UL Listed.

…an engine listed for use with DF#2 shall be permitted to be used but shall have the nameplate and rated horsepower derated 10 percent…

Supplier to provide commercial impact to comply with NFPA 20

Please confirm that local air quality management regulations allow only the use of DF#1 fuel in order for this section to apply.

The requirements of 4.11.1 shall not apply to engine-driven pumps for which engine cooling water is taken from the discharge.

Confirmed. Cooling water for the engine and gearbox are taken from the pump discharge. Please refer to Calculation Worksheet.

Supplier to provide commercial impact to comply with Data Sheet

Noted, we will offer an Option for a plate and frame engine heat exchanger, but from our experiences with CABGOC, including our current SNX Project and past Tombua Landana, South Nemba, North Nemba, N'Dola, etc., the engine manufacturers' standard heat exchangers have been preferred. Also please note that if a standard UL Listed engine is to be supplied, Caterpillar's standard shell and tube heat exchanger will be included.

We intrepret this as applying where an enclosure is provided in our Scope. If desired, an Optional Enclosure can be offered.

In event of a failure of the varible speeds control system, the engine shall be fully functional with the governor

These are mechanical engines without ECM's.

Page 30: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

42

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.4.2.1 Supplier verify

4310/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.7.3.1.4 There shall be a manually operated switch or valve on the control panel Supplier provide

4410/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Vibration Torsional Critical Speeds Supplier provide

4510/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.2.7.3.4 Supplier verify Confirmed.

46

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.4.1.2.3 Supplier provide

4710/27/2011 NFPA 20 Installation of Stationary Fire Pumps

11.4.2.1 Fuel supply tank

4810/27/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps

3.7 (1) Fuel supply tank

49 10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.4.4.1 Flame resistant reinforced flexible hose listed for this service… Supplier provide Confirmed.

50

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.7.1 Fire pumps shall be dedicated to and listed for fire protection. Supplier provide

51

18/19/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Material Super Duplex 2507

52

18/19/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Engine Electrical Area Classification

5310/27/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps

3.10.3.10 Instrumentation

5410/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.29.2

5510/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.1.3.1 All controllers shall be specifically listed for diesel engine-driven service. Supplier provide

56

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.4.4.1 Supplier provide

5710/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.7.2.7.1 Supplier provide Confirmed.

Engines that incorporate an electronic control module (ECM) to accomplish and control the fuel injection process shall have an alternate ECM permanently mounted and wired so that in the event of a failure of the primary ECM

These are mechanical engines without ECM's.

Confirmed. The engine can also be manually started from the start contactors.

Confirmed, FPE will supply during normal submittal a torsional vibration analysis.

The diesel engine as installed shall be capable of carrying its full rated load within 20 seconds…

Tanks used in accordance with the rules of this standard shall be limited in size to 1320 gal. For situations where fuel tanks in excess of 1320 gal are used , the rules of NFPA 37…shall apply.

This size engine does not require a 1320 gallon tank. It is our experience that CABGOC tank specification is to be followed.

Supplier to provide commercial impact to comply with NFPA 20

Noted, we will offer an Option for a diesel fuel tank sized per NFPA 20.

Supplier to provide commercial impact to comply with specification

3.7.1 of FPM-SU-15.04 states that the engine is to operate with DF#2. Please clarify your request.

We can provide a UL Listed pump, but the MOC of a UL Listed pump does not comply with CVX specification. If you wish a UL Listed Pump, please advise materials of construction desired.

Supplier to provide commercial impact to comply with Data Sheet

The casting material offered is Super Duplex SS ASTM A890, Grade 6A (SDSS 2507) from American vendors. The equivalent UNS number for castings is UNS J93380.

Supplier to provide commercial impact to comply with Data Sheet

In our Bid, all electrical equipment will be designed for a Class 1, Division 2, Groups C & D hazardous area. If desired, an Option can be provided for equipment to meet T3 area temperature classification, EEMUA #107¸ including such items as engine exhaust gas coolers, flame traps, etc. Please note that with a UL Listed engine, Caterpillar's standard electrical items are supplied.

Supplier to provide commercial impact to comply with specification

We comply with 3.10.3.10 of FPM-SU-15.04, except overspeed will be as per NFPA 20 Standards 11.2.4.4.2.

All electrical components, clearances, and wiring shall meet the minimum requirements of the applicable NFPA 70,…

Supplier to provide commercial impact to comply with NFPA 20

Confirmed, we comply with NFPA 20 Standards in this regards.

Confirmed, the engine controller offered is UL Listed.

A listed pressure recording device shall be installed to sense and record the pressure in each fire pump controller pressure-sensing line at the input to the controller

The pressure recorder is part of the UL Listed engine controller, and by extension, meets NFPA 20 requirements.

To ensure dependable operation of the engine and its controller, the controller equipment shall be arranged to automatically start and run engine for at least 30 minutes once a week.

Page 31: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

58

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

12.3.3.1.1

59

10/27/2011 MSP-GN00-CRR-SPC-CHV-0000-00001-00 Paint Specification

All

60

10/27/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater pumps

3.1 (10) (g), (h) Drains and lifting lugs Supplier provide

61

10/27/2011

MSP-GN00-TEC-SPC-CHV-0000-00002-01 Design Sheet for Noise All 85 dba @ 3' Supplier provide

62

10/27/2011 A9066-00-052006-0020 Firewater package

All Supplier verify

6310/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.22.2.1 Supplier verify

64

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

14.2.1

6518/19/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Spare Parts Start-up & Comm

6618/19/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Driver

Spare Parts Normal 2 Yr Maintenance

6710/27/2011 A9066-00-052006-0020 Firewater package

Scope of Supply Item 8, 9, 10

6810/27/2011 NFPA 20 Installation of Stationary Fire Pumps

14.3 Manuals, Special Tools, and Spare Parts Included.

69

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.14.8.2 Double intake screens shall be provided at the suction intake. Supplier provide

70

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps

4.14.8.3 Screens shall be removeable, or an in suti cleaning shall be provided Supplier provide

The structure or panel shall be securely mounted in , as a minimum, a NEMA Type 2 dripproof enclosure(s) or enclosure(s) with an ingress protection (IP) rating of IP 31.

Supplier to provide commercial impact to comply with NFPA 20

NEMA 2 enclosures are not normally used on an offshore platform. As per 3.3.10.1.b of FPM-SU-15.04, the enclosures are NEMA 4X (316SS).

Supplier to provide commercial impact to comply with specification

To the best of my knowledge, Caterpillar does not offer to sandblast the engines as required by 3.7. The coating systems offered are as FPE supplied for CABGOC S. Nemba, N. Nemba, Tombua Landana, etc., as well as being supplied for SNX.

If desired, we will supply a threaded drain, but the P&ID shows a flanged connection. The skid will be provided with four (4) lifting lugs.

A noise level of 85 dBA cannot be achieved without using an acoustic enclosure, which can be offered, if desired. Please note that the engine mechanical noise level exceeds 85 dBA.

Inspection and Test Plan

As per 2.7 of MSP-CP00-MEC-SPC-PAR-0000-00006-00, we are were to provide an ITP with our Bid, which we provided.

Before shipment from the factory, each pump shall be hydrostatically tested by the manufacturer for a period of not less than 5 minutes.

Confirmed. However, please note that CABGOC specification FPM-SU-15.04 at 7.3.2 requires a 2-hour hydro.

The pump manufacturer, the engine manufacturer (when supplied), the controller manufacturer, and the transfer switch manufacturer (when supplied) or their factory-authorized representative shall be present for field acceptance tests.

Supplier to provide commercial impact to comply with NFPA 20

Our rates for site service were included with the commercial bid.

Supplier to provide commercial impact to comply with Data Sheet

Start-up and Commissioning Spare Parts are included in our price.

Supplier to provide commercial impact to comply with Data Sheet

An Option will be provided for 2 Years of Maintenance spares.

Supplier to provide commercial impact to comply with MR

We do not understand the question. Our bid includes the submission of Items 8, 9, and 10, as applicable.

Supplier to provide commercial impact to comply with NFPA 20

This does not apply to pumps. The pump is provided with a strainer as per 7.3.4 of NFPA 20.

A means to clean screens from marine growth need to be supplied. Screens are -50 feet below MWL

This does not apply to pumps. The pump is provided with a strainer as per 7.3.4 of NFPA 20.

A means to clean screens from marine growth need to be supplied. Screens are -50 feet below MWL

Page 32: FW-PUMP_TBE

Mafumeira Sul Project MSP-CP00-MEC-EVA-PAR-0000-00020-00Rev D01

A9066-00-052006-0024

Fluid-Power - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE:SUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION OPEN/CLOSED

SUBMITTED DATE: 31 OCT 2011SUBMITTED BY: FLUID-POWER

FPE RESPONSE

71

10/27/2011 NFPA 20

Installation of Stationary Fire Pumps Table 4.8.2 Centrifugal Pump Capacities

72

11/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Data Sheet

General NFPA 20

7310/27/2011 NFPA 20 Installation of Stationary Fire Pumps

7.5.1.7.5 Water cooled gear drives shall be equipped with a visual means… Supplier provide Included.

74

Supplier to provide commercial impact to comply with NFPA 20

Noted, FPE to offer an Option for a 2500 GPM selection. Please note that for our current project for CABGOC, SNX, the pump is not UL Listed.

Supplier to provide commercial impact to comply with NFPA 20

Noted, FPE to offer an Option. Please note that for our current project for CABGOC, SNX, the pump is not UL Listed.

Page 33: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 33 of 43

DXP - TECHNICAL CLARIFICATIONS

RFQ NO.: A9066-00-052006-0020 FIREWATER PKGSUBMITTED DATE: 10/25/11SUBMITTED BY: AMEC TO DXP

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION

1 11/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00

Firewater PumpGeneral

2 11/18/2011

NFPA 20 Installation of Stationary Fire Pumps4.12.1

3 11/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Firewater Pump Liquid

411/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Firewater Pump

511/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3

611/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3.1

7 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.18.4.1

811/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.11.1.1

9 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.7

1011/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.1

1111/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.6

1211/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.20.2.1.1

13 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.2

Verical Turbine Pump Caisson Arrangement

Page 34: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 34 of 43

1411/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.5.2.1

1511/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.2.7

16

11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 12.7.2.4

17 11/18/2011 MSP-PP02-MER-DAS-CHV-0000-00121-00 Data Sheet

18 11/18/2011 NFPA 20 Installation of Stationary Fire Pumps A.3.3.23

1911/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.2

2011/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.1

2111/18/2011 Motion Analysis

2211/18/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.1.2

23

11/18/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.2.1

2411/18/2011 NFPA 20 Installation of Stationary Fire Pumps 4.12.8

25 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.4

2618/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.3

2718/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.6.1

2818/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.5

2918/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.3

Operating Conditions

MSP-GN00-MAR-SPC-CHV-0000-00007-00MSP-GN00-MAR-SPC-CHV-0000-00008-00

25.27.10

Page 35: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 35 of 43

3018/19/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.1.2

31 18/19/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.8.1

Page 36: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 36 of 43

DXP - TECHNICAL CLARIFICATIONS

9000gpm unit

TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION RESPONSE

NFPA 20 Pump hydraulics meet NFPA20 as quoted

Pumping temperature Supplier provide Ocean ambient temperature

Caisson BTM Depth Supplier provideby others

Supplier provide. Which is it?Neither is included

…Variable speed pressure limiting control…shall be listed… Not Included

Supplier provide by others

Supplier provideby others

Supplier provide by others

Supplier provideby others

Supplier provideby others

Supplier provideby others

The test outlet control valves shall be supervised closed. Supplier provide by others

Supplier to provide commercial impact to comply with NFPA 20

The fire pump, driver, controller… shall be protected against…explosion, fie, earthquake..

Supplier to provide commercial impact to comply with NFPA 20

Would require a blast proof enclosure which will take approximately 2 weeks to quote if required.

Variable Speed Pressure Limiting Control or Variable Speed Suction Control

Supplier to provide commercial impact to comply with NFPA 20

Pressure relief valves shall be…listed spring loaded or pilot operatred…Unless the requirements of 4.11.1.7 are met, each pump shall have an automatic relief valve listed…

A listed indicating gate valve or butterfly valve shall be installed on the fire protection system side of the pump discharge check valve.Where provided, the suction valve, discharge valve… shall be supervised…

A listed check valve or backflow preventer shall be installed in he pump discharge assembly

Metering devices or fixed nozzles for pump testing shall be listed

Page 37: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 37 of 43

Supplier provideby others

Supplier verifyOK

OK

Diff Head Supplier provide refer to proposal

Head Supplier provide refer to proposal

Supplier provideOK

Supplier provideOK

AccelerationsTo be confirmed upon final engineering

Supplier provideOK

Supplier provide

drive shaft is not listed

Supplier provideOK

All gear drives shall be listed and rated… Supplier provide Confirmed

Vertical shaft turbine pumps… or vertical hollow shaft…Supplier provide

OK

Supplier provideOK

Supplier provideOK

The gear drive shall be equipped with a nonreverse ratch.Supplier provide

OK

…automatic air release valve shall be provided to vent air from the column

The pump line shafting shall be sized so ctitical speed shall be 25 percent above the operating speed of the pump.

Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-0000-00121-00 under operating conditions. The controller for each unit of multiply pump units shall incorporate a sequential timing device…

Supplier to provide commercial impact to comply with NFPA 20

The total shutoff head shall not exceed 140 percent of the total rated head…

Pumps shall furnish not less than 150 percent of the rated capacity at a total head of not less than 65 percent of the total rated head.

Supplier to provide commercial impact to comply with Purchaser's specification

The pump head shall be designed to support the driver, pump, column assembly…

…engines shall be connected to vertical shaft pumps by means of a right angle gear drive with a listed flexible connecting shaft…

…coupling guard in accordance with Section 8 of ANSI B15.1…

…torsional analysis to ensure no damaging stresses or critical speeds…

Water cooled gear drives shall be equipped with a visual means…

Page 38: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 38 of 43

Supplier verify

The flexible connecting shaft shall be listed… Supplier verify Exception

The flexible coupling shall be directly attached to the engine flywheel adapter…

Connected to a stub shaft mounted directly to the fly wheel

Page 39: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 39 of 43

OPEN/CLOSED

Page 40: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 40 of 43

Page 41: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 41 of 43

Page 42: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 42 of 43

DXP - TECHNICAL CLARIFICATIONS

RFQ NO.:SUBMITTED DATE: 2500 GPM unitSUBMITTED BY:

Mafumeira Sul Project

SN DATE DOCUMENT NUMBER TITLE SECTION TECHNICAL REQUIREMENT DESCRIPTION CLARIFICATION RESPONSE OPEN/CLOSED

110/27/2011 NFPA 20 Installation of Stationary Fire Pumps Table 4.8.2 Centrifugal Pump Capacities

Pump hydraulics meet NFPA as quoted

210/27/2011 NFPA 20

Installation of Stationary Fire Pumps4.12.1

3 10/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Firewater Pump Liquid Pumping temperature Supplier provide Ocean ambient temperature

410/27/2011 MSP-GN00-FGS-SPC-CHV-0000-00003-00 Firewater Pump 3.2 (4) Supplier verify

Confirmed

510/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3 Supplier provide. Which is it?

Neither is included

610/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.4.3.1

…Variable speed pressure limiting control…shall be listed… Not Included

7NFPA 20 Installation of Stationary Fire Pumps 4.18.4.1 Supplier provide

PRV is not in DXP's scope of supply

810/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.11.1.1 Supplier provide

Not in DXP's scope of supply

9

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.7 Supplier provide

1010/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.1 Supplier provide

Not Applicable.

1110/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.15.6 Supplier provide

1210/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.20.2.1.1 Supplier provide

13 10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.16.2 The test outlet control valves shall be supervised closed. Supplier provide

1410/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.5.2.1 Supplier provide

1510/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.2.7 Supplier verify

16

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 12.7.2.4

Standard in Firetrol panel

1710/27/2011 MSP-LQ02-MER-DAS-CHV-0000-00053-00 Data Sheet Diff Head Supplier provide

Refer to proposal

18 10/27/2011 NFPA 20 Installation of Stationary Fire Pumps A.3.3.23 Head Supplier provide Refer to proposal

1910/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.2 Supplier provide

Confirmed

2010/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.1.2.1 Supplier provide

Confirmed

2110/27/2011 Motion Analysis Accelerations

to be confirmed upon final engineering

2210/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.3.1.2 Supplier provide

Confirmed (driver is interpretted as gear)

Supplier to provide commercial impact to comply with NFPA 20

The fire pump, driver, controller… shall be protected against…explosion, fie, earthquake..

Supplier to provide commercial impact to comply with NFPA 20

Would require a blast proof enclosure which will take approximately 2 weeks to provide pricing if required.

Line shaft shall be supported at no greater than 10 foot (3 meter) intervals.

Variable Speed Pressure Limiting Control or Variable Speed Suction Control

Supplier to provide commercial impact to comply with NFPA 20

Pressure relief valves shall be…listed spring loaded or pilot operatred…

Unless the requirements of 4.11.1.7 are met, each pump shall have an automatic relief valve listed…

A listed indicating gate valve or butterfly valve shall be installed on the fire protection system side of the pump discharge check valve.

Discharge piping is not in DXP's scope of supply

Where provided, the suction valve, discharge valve… shall be supervised…

A listed check valve or backflow preventer shall be installed in he pump discharge assembly

Discharge piping is not in DXP's scope of supply

Metering devices or fixed nozzles for pump testing shall be listed

Discharge piping is not in DXP's scope of supply

Discharge piping is not in DXP's scope of supply…automatic air release valve shall be provided to vent air from

the columnDischarge piping is not in DXP's scope of supply

The pump line shafting shall be sized so ctitical speed shall be 25 percent above the operating speed of the pump.

Bearing spacing would need to change to 90". Pricing impact to follow

Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-0000-00121-00 under operating conditions. The controller for each unit of multiply pump units shall incorporate a sequential timing device…

Supplier to provide commercial impact to comply with NFPA 20

Operating Conditions

The total shutoff head shall not exceed 140 percent of the total rated head…

Pumps shall furnish not less than 150 percent of the rated capacity at a total head of not less than 65 percent of the total rated head.

MSP-GN00-MAR-SPC-CHV-0000-00007-00MSP-GN00-MAR-SPC-CHV-0000-00008-00

25.27.10

Supplier to provide commercial impact to comply with Purchaser's specification

The pump head shall be designed to support the driver, pump, column assembly…

Page 43: FW-PUMP_TBE

Mafumeira Sul ProjectTechnical Bid Evaluation API XXXXXX

MSP-CP00-MEC-EVA-PAR-0000-000XX-00REV H01

A9066-00-052006-00XX Page 43 of 43

23

10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.2.1 Supplier provide

Drive shaft will not be listed

2410/27/2011 NFPA 20 Installation of Stationary Fire Pumps 4.12.8 Supplier provide

confirmed

25 10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.4 All gear drives shall be listed and rated… Supplier provide confirmed

2611/27/2011 NFPA 20 Installation of Stationary Fire Pumps Table 7.3.2.1 (a) Pump Column Weights Supplier verify

Not Applicable.

2710/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.6.1 Supplier provide

Included

2810/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.5 Supplier provide

Confirmed

2910/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.7.3

The gear drive shall be equipped with a nonreverse ratch.Supplier provide

Confirmed

3010/27/2011 NFPA 20 Installation of Stationary Fire Pumps 11.2.3.1.2 Supplier verify

31 10/27/2011 NFPA 20 Installation of Stationary Fire Pumps 7.5.1.8.1 The flexible connecting shaft shall be listed… Supplier verify Drive shaft will not be listed

…engines shall be connected to vertical shaft pumps by means of a right angle gear drive with a listed flexible connecting shaft…

…coupling guard in accordance with Section 8 of ANSI B15.1…

…torsional analysis to ensure no damaging stresses or critical speeds…

Water cooled gear drives shall be equipped with a visual means…

The flexible coupling shall be directly attached to the engine flywheel adapter…

Drive shaft will be mounted on a stub shaft which is mounted directly to the flywheel