Thomas Jefferson National Accelerator Facility Page 1 Benjamin Raydo Electronics Group (Physics Division) Future of Trigger (at Jlab) March 17, 2016

Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 1

Benjamin Raydo

Electronics Group (Physics Division)

Future of Trigger (at Jlab)

March 17, 2016

Page 2: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 2

Overview

1. CLAS (Jlab Hall B) Trigger System

2. 12GeV DAQ/Trigger Hardware

3. HPS (Jlab Hall B) Trigger System

4. CLAS12 (Jlab Hall B) Trigger System

5. Trigger/DAQ Future Possibilities

Page 3: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 3

CLAS DAQ H/W FastBus 96 ch TDC FastBus 96 ch ADC CLAS Detector

CLAS DAQ readout hardware was heavily based on “Fast”Bus modules

• time-to-digital (TDC) for timing measurements

• analog-to-digital (ADC) to energy measurements

• Relatively slow data rates (<40MB/s per crate) and large conversion times (>1µs)

• Miles of delay cable needed (to compensate for trigger latency ~300ns)

• Modules do not provide information to trigger system

Great modules for time/energy measurements during CLAS lifetime

Page 4: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 4

CLAS Trigger H/W

CLAS Trigger:

• Hit based: typically all channels in a sub-detector were OR’d together

o Trigger system sees hit, but doesn’t know what part was hit

• Energy based: calorimeters were analog sums with 1 or 2 thresholds

o Trigger know energy threshold is exceeding overall, but doesn’t

know where or whether a single or multiple particles are

responsible for total energy

• Global trigger logic was based on a medium sized FPGA that

performed timing coincidences between hits in subdetectors

• Trigger had to be pretty fast <200ns to make decisions before analog

information gets to the end of the delay cables!

CAEN V1495

Based Global

Trigger Module:

Page 5: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 5

CLAS12 DAQ H/W • FastBus in CLAS12 has been eliminated

• Most of the DAQ/trigger electronics are custom built based on VXS (a VME

extension) that allow use of commercial crate/power supplies

• Readout hardware also has a trigger path (no splitting/delaying analog signals)

• Readout is over VME (200MB/s per crate)

• Trigger is over VXS (10Gb/s to 20Gb/s per module, sent to concentrator card)

• Trigger latency can be up to 8µs

FADC250 DCRB VSCM SSP (for RICH and MM)

Page 6: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 6

CLAS12 DAQ Readout Rates

DAQ Module (QTY) Channel

Count

Detector(s)2 Raw Data

Rate

Triggered Data Rate (@20kHz)

FADC250 (~250) 16 channel, 12bit ADC

250Msps

~4,000 ECAL,

PCAL, FTOF,

CTOF,

HTCC,

LTCC, FT,

CND

~1.5TB/s ~3Gb/s (no zero suppression, 100ns raw)

~30MB/s* (100ns raw)

~3MB/s* (“fit” pulses)

DCRB (252) 96 channel, amplify/discriminate

1ns TDC

24,192 Drift

Chamber

~1GB/s1 ~20MB/s1

VSCM (33) 1024 SVT FSSR ASIC channels

33,792 SVT ~10GB/s1 ~40MB/s1

RICH FPGA (140) 192 channel MAPMT readout

1ns TDC

25,024 RICH ~10GB/s1 ~20MB/s1

1 data rate for each 1% occupancy of detector 2 not all CLAS12 detectors or DAQ modules listed

Standard CLAS12 experiments achieve

massive data rate reduction in a triggered

system (for relatively low trigger rates)

Page 7: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 7

Hall B HPS Trigger

HPS was the first experiment at JLab to take advantage of the newly

developed DAQ/trigger 12GeV upgrade electronics

• ECAL is the main trigger source, which searches for e+e- pairs that satisfy

specific criteria to maximize A’ search efficiency.

• Track finder detector (SVT based on APV25 ASIC) requires triggering with

latency <3µs ECAL Cluster Pair Trigger Illustration:

ECAL Cluster Pair Requirements for Trigger:

Page 8: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 8

Hall B HPS Trigger (cont)

GTP

GTP

Pulses ~50MHz

Clusters ~9MHz

Triggers ~40kHz

ECAL Data Rate ~40MB/s

(Trigger cut large background)

Pulse Rates

Cluster Rates

ECAL Pulses ECAL

Clusters Triggers

140Gbps 20Gbps

Page 9: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 9

CLAS12 Trigger

Detector Can be in

trigger?

Will be in

trigger?

Trigger Algorithm

ECAL/PCAL Yes Yes U/V/W Clustering

DC Yes Yes Segment Position/Angle Finding

CTOF/FTOF Yes Yes Hit based

HTCC/LTCC Yes Yes Hit based

FT Yes Yes 3x3 Clustering

CND Yes No N/A

SVT Yes No N/A

RICH Yes No N/A

MicroMegas No No N/A

CLAS12 triggering will support geometric matching (e.g. drift chamber segment

points to clusters, etc…)

Page 10: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 10

Drift Chamber Segment Finder Example

sweeps angle and wire offset: valid segments are binned into common angle, VHDL

file w/equations auto-generated:

Page 11: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 11

Drift Chamber Segment Finding Trigger

Scope like interface on GTP allows real-time display of found segments by trigger logic

• Cosmic event shown where only 1 segment was the trigger condition

x14 DCRB 70Gbps

(DC Hits)

GTP: • prototype VXS

concentrator card

• Receives all DC hits

from DCRB

• Searches for track

segments and reports

position/angle to next

trigger stage

• VTP (mentioned later

in talk) with be used in

CLAS12

Page 12: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 12

CLAS12 Trigger Timing

Page 13: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 13

CLAS12 VTP – for Triggering

VXS-Trigger-Processor (VTP) is the CLAS12 VXS concentrator for triggering

• Interfaces up to 16x VXS front-end cards (up to 34Gbps per card)

• 4 Optical interfaces (34Gbps each) allow it to share front-end information

and report to global trigger stage

• Very large FPGA for complex/flexible triggering algorithms

Page 14: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 14

CLAS12 VTP – for Control/Readout

Additional features of the VTP allow VME readout to be bypassed for event

readout and instead use the VTP Ethernet:

• 40GbE optical port can be saturated by H/W accelerated UPD/TCP stack

• Front-end modules can also stream event data over the remaining

bandwidth on very fast trigger link rather than use the VME interface

• Two DDR3 memories available (100Gbps bandwidth each) allow for very

large, high bandwidth buffers

This provides a nice platform to develop and test on the existing CLAS12

DAQ infrastructure a way beyond VME – several options exist

• Front-end modules can become part of a normal computer network use the

VTP like a high speed switch

• VTP could consolidate events from all modules in the crate

• A data-driven architecture is also possible for most of the systems

Page 15: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 15

Conclusion

• New hardware for CLAS12 has a massive readout

bandwidth improvement compared to the previous

generation

• Several options can be considered in the future:

• “Complex” H/W trigger (planned path for CLAS12 commissioning)

• Simple H/W trigger, Complex S/W farm trigger

• Data driven architecture (for almost all detectors)

• Ideally we move to a platform more programmer friendly

• FPGA based triggers are very fast and powerful, but much

hardware to implement and at the same time there are many less

people available to work on them

Page 16: Future of Trigger (at Jlab) March 17, 2016 · 2016-03-17 · Future of Trigger (at Jlab) March 17, 2016 . Thomas Jefferson National Accelerator Facility Page 2 ... (Jlab Hall B) Trigger

Thomas Jefferson National Accelerator Facility Page 16

VTP Block Diagram