Furukawa Frd

Embed Size (px)

Citation preview

  • 8/18/2019 Furukawa Frd

    1/28

    FRD-FURUKAWA F-Series

    Hydraulic Breakers 

  • 8/18/2019 Furukawa Frd

    2/28

    Development Target

    1. Durability reliability.

    2. Increase blow power.

    3. Reduce maintenance cost.

    4. Multi-function valve to meet market demand.

    5. Newly designed box frame.

    6. Introduce series of product to fit series of

    excavator sizes.

  • 8/18/2019 Furukawa Frd

    3/28

    Sales features 

    1. Clean air-intake system extends piston and

    bushing life.

    2. Lubrication for upper and lower bushings.

    3. Relief valve to maintain system pressure.

    4. Anti-idle blow valve.

    5. Front and side mounted hose fitting ports.

    6. Tunnel conversion ease.

  • 8/18/2019 Furukawa Frd

    4/28

    Series Construction

    1. Mini  – Series・・・・・・・・・・・・・ F1.2.3.4.5

    2. Mid - Size Series・・・・・・・・・ F6. 9

    3. Conventional Series

    ・・・・・・

     F11.20.30.70

    4. Multi - Function Series

    ・・・

     F12.19.22.27.35.45

  • 8/18/2019 Furukawa Frd

    5/28

    Mini Series (F1-F5)

    Accumulator

    Front-head

    Rod

    Through bolt

    Nitrogen Gas

    Back-head

    Cylinder

    Piston

    Rod pin

    Oil port

    Control valve

    Front bushing

  • 8/18/2019 Furukawa Frd

    6/28

    Mid-Size Series(F6 & F9)

    Nitrogen gas

    Back-head

    Cylinder

    Piston

    Through-bolt

    Thrust ring

    Thrust bushing

    Rod-pin

    Accumulator

    Front-head

    Rod

    Control valve

    Front bushing

    Charge valve

    Nitrogen gas

    Oil port

  • 8/18/2019 Furukawa Frd

    7/28

    Conventional Series (F11 F20 F30 F70) 

    Accumulator

    Front-head

    Rod

    Oil ports

    Nitrogen gas

    Charge valve

    Grease fitting

    Nitrogen gas

    Back-head

    Cylinder

    Piston

    Through bolt

    Front-cover

    Rod pin

    Thrust ring

    Thrust bushing

    Control valve

  • 8/18/2019 Furukawa Frd

    8/28

     Multi-Function Series (F12 - F45) 

    Nitrogen gas

    Back-head

    Cylinder

    Piston

    Front head

    Through bolt

    Front cover

    Rod pin

    Accumulator

    Rod

    Control valve

    Charge valve

    Nitrogen gas

    Oil ports

    Air intake

    Thrust ring

    Thrust bushing

  • 8/18/2019 Furukawa Frd

    9/28

    Functions 

    1. Through bolt

    2. Cylinder

    3. Accumulator

    4. Piston

    5. Front-head

    6. Front cover/bushing

    7. Rod

    8. Control valve

    9. Stroke adjuster

    10. Valve adjuster

    11. Safety valve

    12. Back-head

  • 8/18/2019 Furukawa Frd

    10/28

    Retains back-head, cylinder and front-head together.

    All the threads are die-rolled to maintain material flow.

    When one through bolt is failed, replace diagonally opposed through-

    bolt also.

    To re-torque through-bolts, loosen four of them to ½ turn, and re-torque

    them to the specification.

    Back-head

    F6

     –  F70

    F1  –  F5

    Cylinder

    Front-head

    Through-bolt

    Through-bolt

    ack-head

    Cylinder

    Front-head

    Through-bolt

  • 8/18/2019 Furukawa Frd

    11/28

    The largest single part of the breaker. It is machined, then

    heat-treated and polished to the specification.

    F1

     –  F5

    F6 F9 F11 - F70

    Cylinder

  • 8/18/2019 Furukawa Frd

    12/28

    Reserves pressure oil and absolves pressure spike when piston is at top dead

    center and bottom dead center. It is Nitrogen filled.

    F11and up,diaphragms can be replace with hand tools. 

    When diaphragm is damaged, inlet hose will vibrates and brake power will

    be decreased

    .

    Accumulator

    F1

     –  F5

     

    Accumulator

    Back-head

    Cylinder

    Diaphragm

    Screw-on

    Needs die

    Bolt-on

  • 8/18/2019 Furukawa Frd

    13/28

    Transmits dynamic power toward the rod and rod will break object rock. 

    Surface of the piston is super finished. Not chrome plated.

    Surface of the piston is only protected by the oil film from rusting.

    Pistonod

    F1

     –  F5

    F6  –  F70

    Pistonod

    F6

     –  F701

     –  F5

    Piston

  • 8/18/2019 Furukawa Frd

    14/28

    Front-Head-1 

    Front-head is installed with thrust bushing and front-bushing.

    They hold rod in-line to the piston.

    Front-Head

    Grease fitting

    Front bushing

    Grease fitting

    F1  –  F5F6, F9

    Thrust bushing

  • 8/18/2019 Furukawa Frd

    15/28

    Front-Head-2

    Front-head is installed 3 wear bushings named thrust ring, thrust bushing and

    front-cover. They hold the rod in-line to the piston.

    Thrust bushing

    Thrust ring

    Air check valve

    F11, F20, F30F12, F19, F22, F27, 35, F45, F70

    next page

  • 8/18/2019 Furukawa Frd

    16/28

    Front-Cover/Bushing 

    Front-Cover/Bushing holds rod and it is exposed to the dusty condition.

    Grease lubrication is a key for maintenance.

    Front-Bushing

    Front-Cover

    For F11 and larger breakers, front-cover is provided with

    wear indicating recess

    .

    Advise operator to replace front cover before recess is wear out.

    Use of worn front cover can damage rod head or piston striking face

    .

    F1 - F5

     4mm

    F6 F9

     6mm

    F11 - F27 : 3.5 mm

    F30 - F70 : 4.5 mm

    Clearance

    Thrust ringThrust bushing

    Front-head

    .

    Front cover

  • 8/18/2019 Furukawa Frd

    17/28

    Rod

    Four different kind of rods are available for different rock conditions.

  • 8/18/2019 Furukawa Frd

    18/28

    Flat(blunt)rod

    Flat tip design rod, common for shot rock breaking. Used for hard but

    cracked rock. Rod breaks rock with shock wave.

    Because of flat face, rod will not slip during breaking. 

    Moil point / corn rod 

    Conical tip is named corn rod and square dipyramid is named moil point

    rod. Commonly used for breaking of concrete, rock layers, hard foundation

    and road construction. Sharp point can penetrate well against the rock

    with wedge effect.

    Rod

  • 8/18/2019 Furukawa Frd

    19/28

    Wedge point 

    Chisel design tip is named wedge point.. Wedge effect of the tip will

    penetrate into the object rock. Good for trenching, breaking of layered

    rock. It is not recommended to use for hard rock.

    Core rod

    Fitted hard alloy steel bar in the moil point rod. This rod is only

    recommended for abrasive rock.

    Rod

  • 8/18/2019 Furukawa Frd

    20/28

    Control Valve 

    F1  – F5 : Control valve is directly mounted on the piston.

    F6 & F9 : Control valve is built in the cylinder.

    Control valve

    F1 - F5 F6 , F9

    Piston

    Cylinder

  • 8/18/2019 Furukawa Frd

    21/28

    Multi-Function Control Valve

    Stroke adjuster

    Valve adjuster

    Remote grease port

    Safety valve

    F12, F19, F22, F27, F35, F45

  • 8/18/2019 Furukawa Frd

    22/28

    Stroke Adjuster 

    Stroke Adjuster

    Stroke Valve

    Constant Blow

    Stroke valve

    Automatic Stop

    Available for F11 and larger

    Adjusts piston stroke. LONG stroke or SHORT stroke.LONG stroke: less number of blows. 100 blows.

    SHORT stroke: more number of blows. 150 blows but 70 force of LONG stroke

    For hard rock use LONG stroke.

    For soft or cracked rock, use SHORT stroke.

     

    Choice of AUTOMATIC STOP valve. Named

    “ nti

     idle

    low”

     

    Quit blows when rock is broke.

    To restart simply press the rod

    against the rock.

    *Only active at LONG stroke position.

  • 8/18/2019 Furukawa Frd

    23/28

    Stroke Adjuster

    Screw Position 

    Number of rotations from the fully screwed in position.

       N  u  m   b  e  r  o   f   b   l  o

      w  s

    V l Adj & S f l

  • 8/18/2019 Furukawa Frd

    24/28

    Open : To increase number of blows and decrease operating pressure.

    Close : To reduce number of blows and raise operating pressure.

    Valve Adjuster & Safety valve

    Open Close

    Adjuster

    Valve Adjuster

     (Factory preset, no adjustment required)

     

    V l Adj & S f l

  • 8/18/2019 Furukawa Frd

    25/28

    Safety Valve

    Valve Adjuster & Safety valve

    Control maximum operating pressure at 21MPa.

    Valve is not re-adjustable. Replace spring, needle and sheet if operating pressure becomes low.

    needle

    spring

    sheet

  • 8/18/2019 Furukawa Frd

    26/28

     

    F1  – F5: Nitrogen gas is not charged.

    F6  – F9: Nitrogen gas is charged.

    Compressed nitrogen gas increases piston down speed.

    Back-head

    Accumulator

    F1 - F5

    F6, F9 Back-head

    Charge valve

    Back-Head

  • 8/18/2019 Furukawa Frd

    27/28

    Back-Head

    F12, F19, F22, F27, F35, F45, F70

    Increase gas press. : Increase impact power and decrease number of blows.

    Decrease gas press. : Decrease impact power and increase number of blows. 

    Nitrogen gas can leak. When impact power is decreased, measure nitrogen gas pressure. 

    Back-Head

    Charge valve

    Swivel adopter

    Back-head2 x 2 Oil port 

    Charge valve

    F11 

    F20 

    F30 

    Hi pressure IN

    Back-head

    Air cap

    Hi pressure IN

  • 8/18/2019 Furukawa Frd

    28/28

    Rock rofessional