PR – NW – 1412 - 333 أس ش ق١٤١٢ - ٣٣٣ ISSUE Number: 1.0 – August, 2007G اﻹﺻﺪار رﻗﻢ: ١ اﻹﺻﺪار ﺗﺎرﻳﺦ: ﺷﻌﺒﺎن١٤٢٨ هـ1 of 32 ﺇﻨﺸﺎﺀﺍﺕ ﺇﺭﺸﺎﺩﺍﺕ ﺍﻟﺨﺎﺭﺠﻴﺔ ﺍﻟﺸﺒﻜﺔ ﺇﻟﻰ ﺍﻟﺒﺼﺭﻴﺔ ﺍﻷﻟﻴﺎﻑ ﺘﻘﻨﻴﺔ ﺍﻟﻌﻤﻼﺀ ﻤﻨﺎﺯلFTTH OSP IMPEMENTATION / CONSTRUCTION GUIDELINES ﺃﻋ ـــ ﺩﻩ: ﺍﻟﺘﻭﻗﻴﻊ/ ﺍﻟﺘﺎﺭﻴﺦ ﺍﻟﻭﺤﺩﺓ ﺍﻟﻭﻅﻴﻔﻴﺔ/ ﺍﻹﺩﺍﺭﺓ ﺍﻻﺴﻡ ﺍﻟﺤﺩﻴﺜﺔ ﺍﻟﺘﻘﻨﻴﺎﺕ ﺸﻌﺒﺔ ﺍﻟﺨﺎﺭﺠﻴﺔ ﺍﻟﺸﺒﻜﺔ ﺃﺴﺎﻟﻴﺏ ﺸﻌﺒﺔ ﺸﻌﺒﺔ ﺍﻟﺘﺨﻁﻴﻁ ﺍﻟﺘﻘﻨﻴ ﺍﻟﺤﺩﻴﺜﺔ ﺎﺕ ﺍﻟﺨﺎﺭﺠﻴﺔ ﺍﻟﺸﺒﻜﺔ ﺃﺴﺎﻟﻴﺏ ﺸﻌﺒﺔ/ ﻤﻜﺎﻟﺩﻭ ﺩﻭﻤﻴﻨﺎﺩﻭﺭ/ ﻜﻭﻜﻭ ﺤﺴﻥ ﺴﻠﻴﻤﺎﻥ/ ﺍﻟﺭﺴﻴﻨﻲ ﻋﺒﺩﺍﷲ ﺒﻥ ﺃﺤﻤﺩ/ ﻤﺤﻤﺩ ﺍﻟﺸﺎﻴﻌﻲ ﺼﺎﻟﺢ ﺒﻥ ﺭﺍﺠﻌ ـــ: ﺍﻟﺘﻭﻗﻴﻊ/ ﺍﻟﺘﺎﺭﻴﺦ ﺍﻟﻭﺤﺩﺓ ﺍﻟﻭﻅﻴﻔﻴﺔ/ ﺍﻹﺩﺍﺭﺓ ﺍﻻﺴﻡ ﻤﺩﻴﺭ ﺸﻌﺒﺔ ﺍﻟﺘﺨﻁﻴﻁ ﺍﻟﻤﻜﻠﻑ ﻤﺩﻴﺭ ﺸﻌﺒﺔ ﺃﺴﺎﻟﻴﺏ ﺍﻟﺸﺒﻜﺔ ﺍﻟﺨﺎﺭﺠﻴﺔ/ ﺃﺤﻤﺩ ﺒﻥ ﻋﺒﺩﺍﷲ ﺍﻟﺭﺴﻴﻨﻲ/ ﻤﺤﻤﺩ ﺒﻥ ﺼﺎﻟﺢ ﺍﻟﺸﺎﻴﻌﻲ ﺍﻋﺘﻤ ــ ﺩﻩ: ﺍﻟﺘﻭﻗﻴﻊ/ ﺍﻟﺘﺎﺭﻴﺦ ﺍﻟﻭﺤﺩﺓ ﺍﻟﻭﻅﻴﻔﻴﺔ/ ﺍﻹﺩﺍﺭﺓ ﺍﻻﺴﻡ ﻤﺩﻴﺭ ﺇﺩﺍﺭﺓ ﺘﻁﻭﻴﺭ ﺍﻟﺸﺒﻜﺔ ﺍﻟﺨﺎﺭﺠﻴﺔ ﻭﺍﻟﺠﻭﺩﺓ/ ﺇﺒﺭﺍﻫﻴﻡ ﺒﻥ ﺭﺍﺸـﺩ ﺍﻟﻤﻔـﺩﻯ ﺍﻟﻨﺴﺦ ﻤﻊ ﺍﻟﺘﻌﺎﻤل ﻭﺴﻴﺘﻡ ﺇﻟﻜﺘﺭﻭﻨﻴﺎ ﻤﺭﺍﻗﺒﺔ ﺍﻟﻭﺜﻴﻘﺔ ﻫﺫﻩ ﻤﺭﺍﻗﺒﺔ ﻏﻴﺭ ﺃﻨﻬﺎ ﻋﻠﻰ ﺍﻟﻭﺭﻗﻴﺔ

FTTH }Construction Guidelines - 333

Embed Size (px)

DESCRIPTION

FTTH

Citation preview

Page 1: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

1 of 32

تقنية األلياف البصرية إلى الشبكة الخارجية لإرشادات إنشاءات منازل العمالء

FTTH OSP IMPEMENTATION / CONSTRUCTION GUIDELINES

: دهـــأع

التاريخ/التوقيع اإلدارة/ الوظيفيةالوحدة االسم

شعبة التقنيات الحديثة

شعبة أساليب الشبكة الخارجية

ات الحديثةالتقنيالتخطيط وشعبة

شعبة أساليب الشبكة الخارجية

دومينادور مكالدو/ م

سليمان حسن كوكو/ م

أحمد بن عبداهللا الرسيني/ م

بن صالح الشايعي محمد/ م

:هـــراجع

التاريخ/التوقيع اإلدارة/ الوظيفيةالوحدة االسم

المكلفمدير شعبة التخطيط

الشبكة الخارجيةأساليبشعبة مدير

أحمد بن عبداهللا الرسيني/ م

بن صالح الشايعي محمد/ م

:دهــاعتم

التاريخ/التوقيع اإلدارة/ الوظيفيةالوحدة االسم

الشبكة الخارجية تطوير إدارة مدير

والجودةراشـد المفـدىإبراهيم بن / م

هذه الوثيقة مراقبة إلكترونياً وسيتم التعامل مع النسخ

الورقية على أنها غير مراقبة

Page 2: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

2 of 32

صفحة مراقبة التغيرات

وثيقة تعديلسجل DOCUMENT UPDATE RECORD

اإلصدار رقم

iٍssue اإلصدار تاريخ

DATE OF ISSUE مختصرشرح

DESCRIPTION

1.0 هـ١٤٢٨ شعبان م٢٠٠٧ - أغسطس

August, 2007G

شـبكة األليـاف الشبكة الخارجية لتمديـد إنشاءات هذا األسلوب يوضح

حاليـاً باللغـة وقد تم إصـدار األسـلوب العمالء،البصرية إلى مباني

.الحقاًاإلنجليزية على أن يتم إصدار النص العربي Attached is the first issue of STTP#: PR–NS–1412-333

about Construction guidelines of outside plant for FTTH

installation. The practice is issued in English and the

Arabic version will be issued at a later date.

Page 3: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

3 of 32

CONTENTS

1.0 PURPOSE 4

2.0 SCOPE OF APPLICATION 4

3.0 RESPONSIBILITIES 4

4.0 TERMS AND DEFINITIONS 4

4.1 Definitions 4

4.2 Symbols 6

4.3 Abreviations 7

5.0 CONSTRUCTION PROCEDURES 8

5.1 Introduction 8

5.2 Trenching 10

5.3 Installation of Ducts & MHs / HHs 11 5.4 Installation of FTTH Components 15

5.5 Installation of FOC 20 5.6 Blown Fiber Installation Methods 20 5.7 Marking & Identification of FTTH Components 26

5.8 Testing & Acceptance 31

5.9 As Built Drawings 32 6.0 ASSOCIATED PRACTICES 32

Page 4: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

4 of 32

1.0 PURPOSE

This practice has been issued to provide guidelines for the Construction & Implementation of FTTH in Access Network. The document will help Access Network construction staff on how to install FTTH component elements in OSP from Exchange up to subscriber's home or premises. 2.0 SCOPE OF APPLICATION

The practice is to be applied in outside plant network taking in consideration planning & design FTTH by applying Local Convergence Point (LCP) architecture; and using Giga Passive Optical Network (GPON) technology. 3.0 RESPONSIBILITIES

- Network Construction in the Districts. - Contractors.

4.0 TERMS AND DEFINITIONS

4.1 DEFINITIONS Fiber To The Home (FTTH): Access technology architecture that brings fiber optic cable from the exchange direct to customer's location at high bandwidth delivering triple play services (voice, video and data) from a single fiber.

Passive Optical Network (PON): An architecture using optical transmission system designed to carry signals via fiber optic cable from the central office directly to end users such as businesses and multi dwelling units without need for power. Passive means that there is no active or powered element in between the exchange and the customer's location.

Gigabit Passive Optical Network (GPON): ITU G.984 Recommendation that describes a flexible optical fiber access network cable of supporting bandwidth requirements of subscriber and covers system with nominal line rates of 1.2 Gbps and 2.4 Gbps in downstream direction; and 155 Mbps up to 2.4 Gbps in the upstream direction.

Optical Line terminal (OLT): Located inside the exchange and serve as the final termination point of OSP Feeder fiber cables. This is an FTTH access platform designed for ITU-T GPON standard to easily deliver RF video and TDM voice services while providing a smooth migration path to IP Triple Play services.

Fiber Distribution Frame (FDF): Exchange termination equipment where fibers from OLT are split and jointed to Feeder cable when there is mass FTTH deployment.

Optical Distribution Frame (ODF): Location where fibers from OLT ports are terminated then interfaced to Feeder cable of FTTH.

Page 5: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

5 of 32

Main Distribution Frame (MDF): Location where copper OSP cables are terminated inside the exchange make access to Network switch.

Fiber Distribution Terminal (FDT): A hub where all the fiber from the telecom provider's central office is split and distributed to the end users.

Fiber Access Terminal (FAT): A distribution point in the distribution end that distribute the all drop fibers to each customer. It can also house splitters to distribute drops to homes and offices.

Optical Network Terminal (ONT): A media converter that is usually installed outside/inside the home or buildings designed for delivering multi line POTS, Data and Video.

Optical Network Unit (ONU): A unit located outside customer's area to serve more customers, similar to RAN.

Fibre Termination Box (FTB): Customer Lead-In Unit, installed at the customer outer wall for termination of incoming & indoor fibres.

Passive Optical Splitter (POS): Split the signal bi-directionally from a single fiber to multi fiber without any power application.

Centralized Topology FTTH: Type of FTTH architecture where fiber optic cable from OLT is splitted only once before reaching customers. There are two types of Centralized FTTH topology namely: Central Office Homerun and Local Convergence Point.

Central Office Homerun: Type of Centralized FTTH architecture where splitters are located inside the central office & no splitting beyond. See Figure # (1).

Local Convergence Point (LCP): Type of Centralized FTTH architecture where splitters are concentrated in an FDT or a manhole outside the exchange. See Figure # (2).

Distributed / Cascaded: Type of FTTH architecture where fiber from OLT is splitted twice (outside the Exchange/ or one in the Exchange & one outside the Exchange) before reaching customers location. Splitting may be located in Exchange, FDT, manholes, handholes or in FAT. See Figure # (3).

Feeder: Equivalent to the primary cables in the copper network. The fiber cables that connect the exchange to the FDT or a splice point in manhole that serve as a cross connect to Distribution network.

Distribution: Equivalent to the secondary cables in copper network. In FTTH, these are the fiber cables that connect FDT or Cross Connect Cabinet to the last distribution point (an FAT or a splice in a handhole) before Drops. In short, it is the cable in between the Feeder and the Drops.

Drops: The fiber from the last distribution point up to customer's location.

Communication Equipment Room (CER): Buildings drop point to house indoor FDT cabinets, FAT and ONT's.

Page 6: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

6 of 32

Figure # (1): Centralized FTTH Architecture (Splitter located inside the central office).

Central OfficeOptical

Line Terminal

1 x 32 Splitter

Fiber Distribution Terminal

Fiber Access Terminal

Fiber Access Terminal

Central OfficeOptical

Line Terminal

1 x 32 Splitter

Fiber Distribution Terminal

Fiber Access Terminal

Fiber Access Terminal

Figure # (2): Local Convergence Point (LCP), (Splitter Placed in an FDT ) .

1 x 8 Splitter

Central OfficeOptical

Line Terminal 1 x 4

Splitter

Fiber Distribution Terminal

Fiber Access Terminal

1 x 8 Splitter

..

..1 x 8 Splitter

Central OfficeOptical

Line Terminal 1 x 4

Splitter

Fiber Distribution Terminal

Fiber Access Terminal

1 x 8 Splitter

..

..

Figure # (3): Cascaded Distribution Architecture, splitting ratios shown here are as examples only.

4.2 SYMBOLS: Symbols Used are as follows:

Central Office / Exchange

or ODF ODF / FDF

Fiber Distribution Terminal

FDF

Central OfficeOptical Line

Terminal Splitter 1 x 32

.

1: X Splitter

Page 7: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

7 of 32

Fiber Access Terminal

Fiber Optic Cable

PON Splitter 1:X, where x = 2, 4, 8, 16, 32, or 64.

- 4 E / 100 m

- 4 C / 100 m

- 4 MPE / 100 m

4 PVC ducts / length 100 meters

4 Polyethylene ducts / length 100 meters

4 Corrugated ducts / length 100 meters

4 Mini polyethylene ducts / length 100 meters

4.3 ABBREVIATIONS:

PON Passive Optical Network APON ATM Passive Optical Network BPON Broadband Passive Optical Network ePON Ethernet Passive Optical Network GPON Gigabit Passive Optical Network OLT Optical Line Terminal ONT Optical Network Terminal ONU Optical Network Unit ODN Optical Distribution Network ODF Optical Distribution Frame FTTH Fiber To The Home FTTB Fiber to the building FDH Fiber distribution hub FDT Fiber distribution Terminal FAT Fiber Access terminal WDM Wavelength division multiplexer Gbps Gigabits per second Mbps Megabits per second RF Radio Frequency SFU Single Family Unit MDU Multi Dwelling Unit NAP Network Access Point TDM Time Division Multiplexing in downstream TDMA Time Division Multiplexing in upstream SO/HO Small Office/Home Office POS (Sp) Passive Optical Splitter LCP Local Convergence Point CER Communication Equipment Room

- 4 V / 100m

Page 8: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

8 of 32

5.0 CONSTRUCTION PROCEDURES

5.1 Introduction 5.1.1 FTTH Architecture:

FTTH referred to in this practice is based on Gigabit Passive Optical Networks (GPON), which have a network very similar in design and layout to the copper network configurations and elements. In comparison, it consist of Feeder (primary) and Distribution (secondary) network, Fiber Distribution Terminal (Cross connect cabinet), Fiber Access Terminal (Distribution Point) and Drop fibres (buried service wires). The Optical Line Terminal (OLT) interfaces with data switches. The architecture adopted by STC is the Local Convergence Point topology wherein each fibers connected to OLT ports leave the central office then splitted once before being distributed to customers. Splitting is done in FDT, manhole or handhole.

The main components of FTTH are "as shown in Figure # (4)": 1- Optical Line Terminal OLT 2- Passive Optical Splitter POS (Sp) 3- Fiber Distribution Terminal/ Hub FDT/ FDH 4- Fiber Access Terminal FAT 5- Optical Network Terminal ONT

Figure # (4): FTTH Topology & Main Components.

For detailed planning & design information and sizing of different FTTH components refer to STTP # PR – NW – 1412 – 201, "FTTH Planning & Design Guidelines".

5.1.2 FTTH Construction in Existing & Greenfield Areas: 1- Existing Civil Work in Secondary:

FTTH cables shall be pulled in existing or installed Subducts in existing ducts. The FAT shall be installed in manholes & shall be placed in every second handhole, and shall feed drop the area of the handhole where it is placed (12 customers) and area of the following handhole (Forward drop, up to 6 customers). If the area of the previous handhole is not completely served, then it may be possible to serve it from this handhole by backward drop (up to 6 customers). See drawings in Figure # (5), below.

FAT

OLT Splitter

1x32

FAT

ExchangeOptical Line Terminal (OLT )

Fiber Drop Cables to the Customers

Fiber Distribution TerminalFDT

Fiber Access TerminalFAT

Fiber Feeder Cable

Fiber Distribution CablesONT

ONT

ONT

ONT

ONT

Optical Network Terminal (ONT )@ Customer Premsis

FAT O

NT

ONT

ONT

ONT

Page 9: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

9 of 32

FAT1 HH 2

FAT 2 HH 4HH 3HH 1

Main Distribution FOC

Backward Drops from FAT 1 Forward Drops from FAT 1

Drops

Backward Drops from FAT 2

Main Distribution FOC

Figure # (5): FTTH Distribution in Existing secondary civil 2- New Greenfield Areas

In new areas complete construction will be executed from trenching, duct & manhole/ handhole installation, pulling of fibre cable, and installation of all FTTH components. Following are general guidelines for construction & installation of FTTH, however detailed construction method for each part is specified in relevant practices / instructions associated with this practice. FAT shall be housed and installed in manholes/ handholes; and the drops & distribution to the customers shall be as shown in the drawings figure # (6).

Figure # (6): FTTH Distribution & Drops in Greenfield Areas 5.1.3 FTTH Construction Steps

FTTH construction involves the following: 1- Trenching. 2- Installation of Ducts & Manholes. 3- Installation of FTTH Components (FDT, FAT & ONT). 4- Installation of Fibre cable. 5- Blown Fibre Installation Methods. 6- Marking & Identification of FTTH Components. 7- As Built Drawings (Plans). 8- Testing & Acceptance.

Page 10: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

10 of 32

5.2 Trenching. Before starting excavation of the trench, survey of the routes in the plans is conducted to be

sure of: o Safe locations for infrastructure. o Safe distance from other utilities. o Location is permanent. o Safe working, no obstructions. o Location not to be disturbed by other utilities.

Small trenching method, as detailed in the practice # "PR – NS – 1412 – 711, Small Trenches

Design & Implementation", shall be applied for construction & installation of FTTH cables. The size of the trench shall be 20 cm wide x (45 – 90) cm depth, back-filled with sand &

special grout filling compound as shown in drawings below. Main & distribution ducts shall be installed as required; and the ducts shall be arranged in the

trench as shown in Figure # (7) for maximum number of ducts that can be accommodated by the trench.

Ducts for drop fibre cables shall be 20/ 32/ 42/ 50 mm (mini / small ducts) and may be installed in smaller trenches (9 – 15 cm wide), see above referred practice.

900 mm

Asphalt

Grout filling

200 mm

585 mm

215mm

قناة PE

ملم50قنوات توزيع قطر

مم77قنوات رئيسية قطر

PECقنوات فرعية3 تحتوي

ملم 110قناة رئيسية قطر

PECقنوات فرعية5، تحتوي

ملم 110قناة رئيسية قطر

لسحب الكوابل النحاسية

ملم 50رملة

قناة PE

ملم 77قنوات رئيسية PEC

Figure # (7): Maximum Ducts in the Trench

The ducts can be arranged in the trench in a way to give it more stability as shown in Figure # (8).

900 mm

Asphalt

Grout filling

200 mm

585 mm

215mm

قناة PE

ملم50قنوات توزيع قطر

مم 77قنوات رئيسية قطر

PECقنوات فرعية3 تحتوي

ملم 110قناة رئيسية قطر

PEC قنوات فرعية5، تحتوي

قناة رئيسية

ملم 110قطر

ملم 50رملة

Figure # (8): Different Arrangement Of Ducts in the Trench

Page 11: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

11 of 32

5.3 Installation of Ducts& Manholes.

5.3.1 Ducts - Main Feeder & Distribution ducts:

The main feeder & distribution ducts shall be of PE or PEC ducts sizes 110 & 77 mm fitted with Subducts, the number of ducts shall be set as required for the particular route.

- Duct Section Length: The objective should be to make the section lengths as long as possible and thereby reduce the number of

manholes and joints required. The length of duct sections will be influenced by location of large buildings, underground obstructions, intersection points with other duct routes, pulling tensions, safe locations for manholes, etc..

It is suggested that 500 m be the norm and maximum at 1500 m, with option to increase length but consider the maximum pulling tension for both fiber and pulling machine.

- Ducts for Drop Cables to the customers: Ducts to carry drop fibres to the customer shall be small pipes (20/ 32/ 42/ 50 mm outside

dia.). Using the smallest size allows up to three (3) pipes to enter the MH through the 50 mm diameter drop holes, i.e. total of 72 pipes, 36 on each side of the HH, for more flexibility in distributing drops.

Drop ducts shall be terminated on customers' outer walls as specified in the practice # "PR – NS – 1412 – 253: Telephone Installations in Residential & Commercial Buildings & Compounds". In empty lots, the ducts shall be placed in the furthest end protruding 30 cm above ground & a marking post is placed over the duct; see the practice # "PR – NS – 1412 – 332: Guidelines for Installation of secondary Network Using Ducts", for more details.

5.3.2 Manholes & Handholes

Manholes and handholes will function as housing of FAT, fibre pulling, fibre jointing points; and pass through distribution and drop fibers from the FAT. A)- Manhole/ Handhole Location

There are two basic requirements for manhole location:

1- Safe working area as well as a suitable location for the placing, jointing, and maintenance of cables and equipment.

2- The manhole should be located such that subsequent work operations will not interfere with pedestrian or traffic flow.

Manholes should not be located in the unpaved strip between traffic lanes. The manhole should be placed not less than 30 m from the intersecting roadway. A manhole that is

located in or near an intersection is hazardous to both workmen and traffic. The manhole is not to be used to turn corners; conduit bends are to be used instead to turn corners. Avoid placing manholes in a curve of the road or over the edge of a hill; areas subject to flooding;

locations that will obstruct access to buildings, lane ways and entrance ways.

Page 12: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

12 of 32

B)- Manhole Type & Size The manhole to be used with the FTTH installation is the Small Manhole type, size:

1200 (length) x 1200 (width) x 1500 (height) mm Manhole specifications & openings shall be as shown in drawings Figure # (8) & (9).

Figure # (8): Small Size Manhole

Figure # (9): Duct Openings in Manhole Walls

المسار الرئيسي المسار الرئيسي

Page 13: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

13 of 32

C)- Handholes Type & Size Two-Cover Handholes may be used for drops, and have the following configurations &

specifications:

1530 mm

860mm

100 mm

ءاطغلا سايق650 ×650 mm

ءاطغلا سايق650 ×650 mm

1330 mm

660 mm

610 mm

100 mm

50 mm ةلازإلل لباق نيءاطغلا نيب ماسق لصافRemovable Cover Separator

ءاطغلا سايق650 ×650 mm

: نيءاطغ تاذ شيتفت ةحتفل يولع رظنم

1530 : ةيجراخلا تاسايقلا mm (W) x 860 mm (D) x 1000 mm (H)

1230 :ةيلخادلا تاسايقلا mm (W) x 560 mm (D) x 800 mm (H)

أ

1530 mm1330 mm1230 mm

150 mm

150 mm

Dim . 115 mm

Dim . 115 mm

Dim . 115 mm

Dim . 115 mm

ب

50 mm

.ملم 115 رطق تاحتف 4 يوتحي : ةنيبكلا ةهج )أ( يبناج رظنملباوآ لماح 2 ددع يوتحت ةسآاعملا ةهجلا

: يوتحت ،ةنيبكلا مامأ شيتفت ةحتفل نيتهجلاب )ب( يبناج رظنم.)Distribution( عيزوتلا لباوآ تاونقل ملم 115 رطق تاحتف 4-)1 .)Drops( ءالمعلا ىلإ طاقسإلا لباوآ تاونقل ملم 55 رطق ةحتف 12-)2

150 mm

150 mm

860 mm660 mm560 mm

50 mm

800 mm1000 mm

Dim . 55 mm

20 mm

50mm

Dim . 115 mm

Dim . 115 mm

Dim . 115 mm

Dim . 115 mm

50 mm

420 mm

130 mm

100 mm

100 mm

The specification for the concrete & reinforcing steel bars of handholes shall be as follows:-- All dimensions in mm.- Reinforcement bars are 14 mm diameter deformed steel bars of 500 MPa minimum. conforming to ASTM A615 Grade 60.- All concrete to be of cement giving 27.5 MPa compressive strength at 28 days, minimum size aggregate 15 mm.-Reinforcement bars to be placed in the centre , spacing between bars 100 –150 mm center to center.

- Moisture and soil salt resistant additives shall be included in the concrete mix. be sulfate resistance type V conforming to ASTM C150.- The outer concrete surfaces of the Handholes & Pulling Boxes shall be painted with protective layers of butamine. with approved bituminous material.

Manhole cover shall be 45 Kg heavy duty cast iron.

- :يلاتلاوحنلاىلعشيتفتلاةحتفلحيلستلاديدحوةناسرخلاتافصاومنوكترتميلملاب تاسايقلا عيمج- ,ASTM A615( تافصاوملل ًاقفو.لاكساب اغيم 500 ةوقو ،ملم14 رطقب موربملا عونلا نم حيلستلا ديدح نابضق-

Grade 60(.زآرملا ىلإ زآرملا نم ملم 150–100 حيلستلا نابضق نيب تافاسملا ، طئاحلا فصتنم يف حيلستلا ديدح نابضق عضوت-طسوتمبىصحىوتحيو،موي28دعبلاكساباغيم5,27طغضةوقبيطعييذلاتنمسألانمتاناسرخلاعيمجنوكت-.لقألاىلعملم15مجحASTM C( تاسايقل ًاقفو ،V عون ،حالمألل مواقم .تنمسألاةطلخيفةبرتلاحالمأوةبوطرللةمواقمداومفاضت-

150(ةدمتعم ةيتلفسأ داومب .لزاعلاراقلاةدامبشيتفتلاتاحتفلةيجراخلاةيتنمسألاماسجألايلطمتي-

مارجوليآ 45 ةنز ةيلقثلا ةمدخلل رهزلا ديدح نم شيتفتلا ةفرغ ءاطغ نوكي-

Figure # (10): Handhole Dimensions & Duct Openings

Page 14: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

14 of 32

The specification for the concrete & reinforcing steel bars of handholes shall be as follows: - Reinforcement bars are 14 mm diameter deformed steel bars of 500 MPa minimum. conforming to ASTM A615 Grade 60. - All concrete to be of cement giving 27.5 MPa compressive strength at 28 days, minimum size aggregate 15 mm. - Reinforcement bars to be placed in the centre, spacing between bars 100 – 150 mm center to center. - Moisture and soil salt resistant additives shall be included in the concrete mix. "sulfate resistance type V conforming to ASTM C150". - The outer concrete surfaces of the Handholes & Pulling Boxes shall be painted with protective layers of butamine. with approved bituminous material.

The Frame for the HH cover shall be of galvanized iron, right angled corners, and dimensions of: 660 x 1330 mm (outside) & 560 x 1230 mm (inside). There shall be an inverted -T- shape separator in the middle of the cover frame to separate the two covers. The dimensions of the separator shall be 610 mm long, 50 mm wide and 50 mm high. The cover for the HH shall be 65 cm x 65 cm in size, with a thickness of 5 cm. The cover shall be of two types:

1- Medium Duty: to be placed in main roads & streets, and shall be made of Ductile Iron. 2- Light Duty: To be pla1ced in walkways, and shall be made of Cast Iron.

The Cover shall weigh 50 – 55 Kg. The covers shall have Prizing Holes for lifting the cover and open the handhole. The cover shall have STC logo and name in both Arabic & English.

D)- Distribution Network & Drops from Manhole/ Handhole

The maximum Drops per FAT shall be twenty four (24) i.e. 12 Drops on each side of the manhole. The layout of distribution & drops cables from the manhole/ handhole shall be as shown in the drawings figure # (10) below

.

Figure # (11): Typical Fiber Distribution and Drop duct layout for Residential areas using Small

Trenches.

Page 15: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

15 of 32

5.3.3 Cable Vault Entrance The duct banks shall be located in a manner, which allows cables to be easily routed to the ODF without

encountering cable congestion in the long term.

The cable entrance shall be located in the front of the building at the end of the vault. The ducts entering the vault shall be positioned such that the cables can be placed in their respective positions with little or no bending. Ducts shall preferably enter the vault via pre-fabricated socket banks or plastic terminators. The duct ends shall be leveled so as to remove any sharp edges.

The opposite wall to the duct entrance shall have two cast-in pulling irons centered vertically and horizontally with each duct entrance formation for the pulling of network cables. Pulling eyes shall be anchored to resist a pulling force of 50 kN.

Access to the cable vault or exchange via a tunnel shall be prevented by suitable locking facilities.

Each cable shall be provided with adequate supports at approximately 100 cm centers. In manholes and Vaults, joints shall be placed horizontally. A suitable rack shall support the joint.

Supports shall be installed so as not to hinder the installation of additional cables, and to allow adequate access for jointing purposes and reasonable working space for maintenance. A working space of 100 cm shall be achieved where possible.

The cabling running from termination to equipment (ODF, DDF etc.) shall be provided with adequate ladders or trays to allow a neat workmanlike installation to be achieved.

Cable brackets, trays and supports, shall ensure that the cables are supported so as to induce the minimum strain into the materials. Manufacturer installation recommendations shall be followed regarding handling, bending and setting radii. No sharp edges and protruding bolts etc, which may damage cable sheaths, shall be permitted.

5.4 Installation of FTTH Components (FDT, Splitter, FAT, FTB & ONT). 5.4.1 Fibre Distribution Terminal (FDT)

* Outdoor Cabinets units are located nearest to the customers, preferably in the middle of cabinet (FDT) area. * The following should be considered when choosing a site for the cabinet:

- Easy reach to the cabinet and installations in all times of the day, especially after work hours for cabinets at subscriber’s premises. - Suitable locations for outdoors cabinet are near the mosques, schools & public parks. It should be away from pedestrians, traffic, traffic signals, and road crossings; and should not be subjected to direct sun rays during the mid day. - To be placed away from Customers’ walls. - Should not cause any inconveniences to the public. - To be placed on solid grounds, not water and flood runways; or in wadis. - Abide by Municipality rules and regulations.

* Indoor cabinets units are located inside customers building, in telecom equipment room (CER).The room shall be of specifications as sated in practice # PR – NW – 1412 – 253 "Telephone Installations in Residential & Commercial Buildings & Compounds". Indoor FDT have various sizes: 32, 64, 96 , 128, 160, 192, etc..

Page 16: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

16 of 32

* Outdoor FDT cabinets shall be made of Glass Fibre Reinforced Polyester or Glass Fibre Reinforced Polycarbonate, and shall be sturdy construction and impact-resistant against damage during handling, placing and installation. The cabinet shall be thermally insulated, dust and weather proof, and watertight. The FDT capacity & size shall be:

1- 512 (576 splice ports) fibres; with approximate outer dimensions of: 1500 mm (Height) x 800 mm (Width) x 600 mm (Depth).

2- 256 (288 splice ports) fibres; with approximate outer dimensions of: 1500 mm (Height) x 800 mm (Width) x 300 mm (Depth).

The cabinet shall be full open from the front, fitted with high quality locking system. See pictures in Figure # (12).

Figure # (12): General View of Various Sizes of Fiber Distribution Terminal Cabinet.

5.4.2 Splitters (POS- Sp) Each FDT cabinet shall be fitted with an integrated splitter of size 16 x 1:32 or 8 x 1:32. The splitters shall be high quality with maximum split ratio loss, including connectors 16.7 dB. The splitters shall be pre-terminated & shall bear clear identification on the connection & distribution points.(See picture in figure # (13).

Figure # (13): A pre -terminated type Splitter housed in FDT..

5.4.3 Fiber Access Terminal (FAT)

Fibre Access Terminal is used to link the Distribution network with the Drop fibre network, and is located near the centre or in the shortest point for all drops.

FAT closure is placed underground inside manholes/ handholes, and shall provide a hermetically sealed interior environment (watertight, weather proof) and secure storage for the spliced & excess fibres. FAT closure shall accommodate (1-2) incoming fibre cables and up to 24 outgoing drop cables. The physical size of the FAT shall be about 450 mm long, and (150 – 200) mm in diameter or square.

Page 17: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

17 of 32

5.4.4 Fibre Termination Box (FTB) Fibre Termination Box (FTB) is the customer Lead-In Unit, installed at the customer outer wall for termination of incoming & indoor fibres. The (FTB) shall be made of Glass Fiber Reinforced Polyester or Glass Fiber Reinforced polycarbonate and suitable for flush-mounted or surface-mounted on outer concrete walls. It shall be dust proof, splash watertight, weatherproof, and locked by a high quality and safe locking system. The FTB shall accommodate 1-2 incoming drop cable with (4) patch cord fitted with adaptor/connector (FC/APC) for residential areas (SDU); and 12-24 patch cord adaptor/connector (FC/APC) for commercial areas (MDU).

. 5.4.5 Optical Network Terminal (ONT)

Optical Network Terminal (ONT) or Optical Network Unit (ONU) is the final end point in FTTH network; and is located inside/ outside customer's premises and provides the appropriate services towards the customer. The minimum services which can be provided by ONT are 2 POTS + 1 Ethernet Port + 1 CATV ports in SFU and in MDU up to 20 POTS lines, 4 10/100 Base-T Ethernet, 8 T1s and 4 CATV ports.

ONT requires electrical power source. The outdoor type is installed on the outer wall of customer's building; and serves as fiber termination box.

ONT is to be installed upon service request. See samples of ONT / FTB in Figures # (14), (15), (16), (16) & (17).

Figure # (14): Sample of an Outdoor ONT.

5.4.6 Termination Of Optical Network Terminal (ONT) At The Home

Sample of FTTH terminations at the subscribers' premises are shown in the drawings in Figures # (15), (16) , (17) and (18).

Page 18: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

18 of 32

Figure # (15): ONT Outside/ Outdoor installation in Mixed Multi Dwelling Units with Small Business Customers.

Figure # (16): Details of ONT Outside/ Outdoor installation in Mixed Multi Dwelling Units with Small Business Customers.

Page 19: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

19 of 32

Figure # (17): ONT Installation In Residential area.

Figure # (18): Details of ONT Installation In Residential area.

Page 20: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

20 of 32

5.5 Installation of Fibre cable. Fibre laying for FTTH can be accomplished by traditional method as specified in practice # "(PR – NW

– 1412 – 300): Fibre Optical Cable Underground Placing Guidelines"; or by blown fibre method using special construction FOC in normal Subducts or micro-ducts, as will be explained in section (5.6) below.

Using traditional methods of pulling FOC, where short sections are encountered (i.e. distances between manholes), it may be possible to arrange cable lengths so that some cables may be pulled through intermediate manholes eliminating some jointing costs. Pulling tension must not exceed 2.0 kN.

Bends &curves should be checked before commencing pulling operations. The minimum dynamic bending radius for moving fiber cable is 20 times the outside diameter of the cable. It will be good to increase curvature for extra protection of the cable. The minimum static bend for fixed cable is 10 times the outside diameter of the cable.

If the cable is laid out on the ground, no traffic of any form can be allowed to run over it.

Cables shall be arranged in the Manhole/ Handhole as shown in the drawings in Figure # (19).

Cables shall be pulled and terminated on Fiber Termination Box (FTB) in every existing building.

Figure # (19): FOC Installation in FAT HH/MH

5.6 Blown Fibre Installation Method.

Blowing Fibre is a method where the fibre is guided through micro ducts/ miniducts using a flow of air

that evenly distributes the installation force along the entire length of the fibre. This fibre can be blown several kilometres along zig-zagging routes and even up and down buildings.

Page 21: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

21 of 32

5.6.1 Components & Accessories of Blown Fiber

Figure # (20): FTTH, Blown Fibre Layout. As shown in FTTH Blown fibre layout Figure (19), the main components of the blown fibre are as

follows:

1- Optical Fibre: The fibre used for blown fiber method shall be a Single-mode (SM), with special construction single fibre

construction; or constructed in special construction cable or bundle ready for blowing by air into the ducts. A fibre bundle may consist of 4 or 8 or more fibres bonded together to form a flexible yet single ‘strand’. The fiber is installed in feeder, distribution & drop parts of FTTH topology.

2- Blown Tube: Small diameter low friction HDPE tubes provide the dedicated pathway for the optical fibre units. The tubes are available in a variety of sizes, combinations, and protective systems supplied on drums. The tubes have all been rigorously tested and enable the blown fibre units to be blown the optimum distance within the tube.

Figure # (21): FTTH, Blown Tubes.

Page 22: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

22 of 32

The tubing products (for both internal and external applications) come in 1, 2, 4, 7, 12, 19 and 24 way. a) Blown Tube – Internal The Indoor Range of products is available in Reduced Fire Hazard/Low Smoke Zero Halogen options, see drawing below. b) Blown Tube – External The Outdoor Range of products is available in standard sub-duct, heavy duty, anti-rodent, or armoured versions to withstand the different environmental conditions.

Figure # (22): Indoor/ Internal (left) & Outdoor (right) FTTH, Blown Tubes. .

3) Tube Accessories An integral part of Blown Fibre method is the tube connection and tube sealing products. A wide range of products are available which enable tubes to be connected together, sealed from water or gas ingress, or reduced from one tube size to another, sealing & end caps (Reducers, Adaptors, Manifolds & Plug Kits).

See shape of different accessories of FTTH blown fiber in Figure # (23).

Optical connector

Electronics

Gas Block Connector 6091

Bulkhead Connector

End Cap

Blown Fibre

Pigtail

Blown Fibre Micro Duct to Pigtail

OPTICAL SPLICE CASSETTE

Plowing Fiber Accessories are different than Existing

Optical connector

Electronics

Gas Block Connector 6091

Bulkhead Connector

End Cap

Blown Fibre

Pigtail

Blown Fibre Micro Duct to Pigtail

OPTICAL SPLICE CASSETTE

Plowing Fiber Accessories are different than Existing

Figure # (23): FTTH, Blown Tubes Accessories.

Page 23: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

23 of 32

4) Compact Node Closure A closure used in manholes where feeder blown fibre cables are spliced It is supplied with 12 single circuit splice trays and sufficient components for installing one cable, enabling the breakout of up to 24 fibres (dual fibre circuits) to customer drop cables. Distribution cables are installed through fibre cable entry kit.

5) Branching Unit (Tube Distribution Centre) Used for management and distribution of fibres to the customers. The unit provides in-line and diversion connections with the use of "Y" and "T" tube joints; installed underground near then customers. Each Branching unit / Distribution centre can serve up to 5 dwelling units (subscribers).

6) Entry Kit (External Customer Splice Box) This is the Customer Lead-In Unit, installed at the customer outer wall for termination of incoming fibres. It may be of two parts mounted on either side of the wall connected by a length of tube (conduit). Comprises: blow fibre unit, customer lead in unit, connecting conduit & terminating box.

5.6.2 Equipment & Tools Consist mainly of air Compressor, Blowing Head and fibre guiding fittings & accessories (regulators, coilers, pan guides or supports, etc..). The compressor provides clean dry air to the blowing head and the tubes, usually at a rate of 10 / 13 bars. The blowing head accommodates a FOC or a bundle of number of fibres (2, 4, 8, 12 etc.) to be blown into mini-ducts or micro-tubes at the same time. Figure # (23) shows FTTH blown fiber equipment & tools setup details.

Figure # (24): FTTH, Blown Fibre Equipment Setup.

Page 24: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

24 of 32

5.6.3 Blowing Procedures

1) Trenching & Installation of Empty Tubes: - Trenching for FTTH blown fiber shall be by using small trenches as specified in section (5.2) above; and duct laying is as per normal ducting methods. Mini ducts & tubes are connected at tube distribution units using tube connectors.

- Main & distribution ducts shall be installed in 20 cm wide trenches; and the drop ducts branching to the customer premises may be installed in smaller trenches (9 – 15 cm wide).

- Mini-ducts (2x50 mm dia. with 7 x 12 mm dia. sub-ducts, which can carry up 96 fibres per sub-duct) are laid from the manholes in front of the cabinet through intermediate manholes to manholes where Node Closures are to be installed.

- Micro-ducts (35 mm dia. with 19/24 x 5 mm dia. micro-tubes) are laid from the Node Closures to the Branching Units / Tube Distribution Centres placed buried in the trenchs. The Node will serve up to 6 Tube Distribution Centre.

- Micro-ducts (20 mm dia. with 2x5 mm dia. Micro-tubes) are laid from the Branching units to customer locations where the Entry kits will be installed.

The FTTH blown fibre ducts shall be installed in every lot as stated in section (5.3.1) above, and the distribution layout shall be as shown in Figure # (25) below.

Figure # (25): FTTH, Blown Fibre Distribution & Drop Ducts Layout.

2) Blowing Fiber Into Ducts: Methods of blowing fibre differ for the different vendors; however, they essentially involve feeding compressed air (from air compressor) & fibre cable simultaneously into a blowing head coupled to blown duct; and control fibre movement to the other end of the tube. Fibre flow can be blown in stages for very long unspliced distances. Before starting blowing operation, cable size and fibre count is defined and suitable duct is selected. The route is divided into blowing sections/

Page 25: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

25 of 32

distances and blowing points are decided. Then way & method of blowing is chosen: Single blow (point to point), Coiling, Centre Blowing or Cascade Blowing.

- Coiling Method:

When fibre reaches the far end of a 'single blow', it is possible to continue blowing, accumulating the arriving fibre in a standard pan. The coiler simply feeds any excess fibre into an empty pan in the same way that it is supplied during blowing. By turning this pan over, the free end then becomes available for further blowing, with the original blown length still attached. The coiler is ‘automatic’, coiling at whatever speed the fibre is presented to it, stopping if necessary.

Figure # (26): The Coiler in Action

- Centre Blowing: A simpler and quicker way to blow fibre through two sections without using the coiler is to start the blow at the centre point (manhole # 2). Blow ‘back’ to previous manhole (#1), then stop. Turn the pan over, and then blow the other section in the other way to next manhole (#3). The big advantage of this is that, at any time the blow can be stopped, the fibre unit removed from the blowing head, and the fibre pan turned over. This exposes the other end of the fibre unit, which can then be fed to blow into another tube. This means no splice at the central point.

- Cascade Blowing: A way to blow 'multiple' distances by the use of an accumulator and a second blowing head, so that fibre can be blown simultaneously along both sections of routes, with the accumulator in the middle or with the aid of a second person, controlling the middle-position blowing head. The fibre cable/ bundle and air hose are both fed into a small chamber inside the "Blowing Head" and the head is connected to the blown tube. The air compressor regulator is opened and from then on, the fibre cable / bundle is inside the tube route and carried forward by airflow. Fibre is fed in under control by the tiny feed rollers on the left. The speed is set from a portable control box. The same rollers measure the installed fibre length. The blowing head can be opened to permit the fibre to be removed, see figure # (27). This does not have to be at the free end of the fibre; the blowing head can be removed at any point along a fibre. The blowing device is automatic. If a restriction is encountered, the drive slows accordingly, applying no stress to the fibre. With a suitable porous end cap in place, the fibre will stop automatically when it reaches the far end.

Page 26: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

26 of 32

Figure # (27): Blowing Head In Open Position

Bundles of 2-fibre, 4-fibre, 8-fibre or 12-fibre are all easy-to-use, straight from the pan, with no de-reeling equipment, see figure # (28). The tiny guide rollers in the blowing head are strong enough to lift fibre unit from the pan, via the smooth fibre guide, and feed it into the blowing head and tube. Fibre cables shall be fed from reels into the blowing head & blown tubes.

Figure # (28): Fibre Pan

5.7 Identification & Marking of FTTH Components.

All FTTH components are marked, numbered & identified by symbols as stated in section 4.2.

Each FTTH fibre cable terminated at the Optical Line Terminal, Optical Distribution Terminal or Fibre Distribution Frame inside the exchange shall be numbered in consecutive order and shall continue to any branch of cables outside the exchange

Page 27: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

27 of 32

5.7.1 Fiber Optic Cable All fibers are single mode type FEFS with core and cladding diameter of 10 µm and 125 µm

respectively, where the type of cable is defined as follows:

First Letter = Conductor Insulation Type E = Polyethylene – solid C = Polyethylene – cellular V = Polyvinyl chloride F = Fibre Optic Cable Second Letter = First Sheath Material Type E = Polyethylene – solid V = Polyvinyl chloride R = Halogen free flame retardant Subsequent Letters = Other Key Characteristics H = High density polyethylene outer sheath F = Filled cable with metal moisture barrier B = Indoor (building) cable E = Polyethylene second sheath D = Double Tape armoring and polyethylene second sheath • FEEDER - Cable Identification Example Feeder Cable for Local Convergence Architecture Assumptions:

FTTH GPON v.2, OLT cards with 4-port, each port have 2.48 Gbps max. Bandwidth transmission capability or 4 PON per card, OLT can accommodate up to 9 cards. Each OLT can serve up to 1152 ONT. Each ONT can deliver up to 77.5 Mbps of bit-rate theoretically. . This will be terminated in the FDF/ ODF rack # 1 to be distributed through ports (1-48) in the ODF patch panel.

Cable # 1 of 72 fibers with 24 dark fibers coming out of the exchange, from FDF rack # 1, shelf # 1, Port # (1 - 48) from the patch panel.

01 72 (24)F(4) R1: S1: 001 - 048 (8)

Duct assignment

FTTH fiber cable number leaving the exchangeFeeder fiber cable size with dark fibres

ODF/FDF Rack Number Shelf #

Port #

Page 28: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

28 of 32

• DISTRIBUTION - Cable Identification Example:

Distribution Cable for Local Convergence Point Architecture Assumption:

A fiber strand from Feeder cable in the Feeder example was splitted inside an FDT. Taking the first strand of the Feeder cable, the following will be the identification of the cables that will come out of the splitter:

01:36F (4):FDT1: Sp1: 001 - 032 : (8)

• CABLE DROPS:

Fiber Drops are fibres that terminate in the customers location. Its fibre end is connected or spliced direct to the pig tail of Optical Network Terminal. Drop cables are identified by specifying:

- Drop #, - Drop size (2, 12, 24), and dark fibres (2, 10, etc..) - FAT #, and ports #s where drop is connected. 03 12(10) FAT4: 01 - 02

5.7.2 Cable Labeling

Cables will be labeled with appropriate designations & symbols written clearly on aluminum strips and fixed on cables in every cable vault, manhole & handhole as per applied practices; (see practice # PR – NS – 1412 – 356 " Cable Installation & Removal"). Examples of Cable Labeling: 1- Feeder Cable:

Cable # Cable Type Cable Size (Used fibres) Termination In FDF (Rack # , Shelf #) Function 01 FEFS 144 (96) R1S1 FTTH

2- Distribution Cable: Distribution Cable Type Cable Size Feeder Cable # Termination In FDF Function Cable # (Used fibres) (Rack # , Shelf #) 01 FEFS 144 (96) 01 R1S1 FTTH

Duct AllocationSplitter Output Ports #

Splitter Number

Cable NumberFibre size with dark fibre

FDT Number

FAT # & O/P Ports #Drop size & dark fibres

Drop #

Page 29: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

29 of 32

5.7.3 Marking Fiber Distribution Terminal (FDT) Numbering & identification of Fiber Distribution Terminal in the plans shall contain the following

information: Feeder Route Number, FDT Number in sequence with the other FDTs in same Feeder Route; and FDT size with spare/ unconnected fibres. The OSP Engineer and Designer will commence numbering of FDT, with the first FDT nearest to OLT receiving the first number. All FDTs shall be numbered, and numbering should be reflected in all design drawings including Distribution and Fiber Drops.

FDT Numbering: FDT2 256/512 (100) 01

Marking & stenciling the FDT shall include: Exchange Name, Area code, Feeder route number and FDT serial number, as shown in Figure (17).

Figure # (17): FDT Cabinet (Example: Stencil for FDT Cabinet # 2 in Feeder Route 1 of Huttayn Exchange).

5.7.4 Identifying & Marking Fiber Access Terminal (FAT) All FAT's shall be numbered and numbering should be reflected in all design drawings. Numbering of Fibre Access Terminal shall contain the following information: FAT #, which is a serial number allocated to all FATs connected to one FDT, FAT size and unused outlets, distribution cable number & number of fibres connected to the FAT.

FAT Numbering:

FAT3 24(12) Sp1 : 01-12

111 / KL FR 1 FDT 2

111 /KL FR 1

FDT 2

Feeder Route #FDT size (Spare fibres)

FDT #

Splitter # : Connected fibres to FAT

FAT size (Unused outlets)

FAT #

Page 30: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

30 of 32

Stenciling & marking of FAT shall contain: Exchange Name and Area Code, Feeder Route Number, Fibre Distribution Number where it is connected, FAT number in sequence with other FAT connected to same FDT. Location of stencil may be placed in the upper left corner for big size FAT or in the upper centre for small FAT's. The OSP Engineer and designer will commence numbering with the first Fibre Access Terminal nearest the Fibre Distribution Terminal receiving the first number.

Figure # (18): Example: Stencil for FAT # 8 of FDT Cabinet # 2 in Feeder Route 1 of Huttayn Exchange.

5.7.5 Identifying & Marking Splitters Splitter Number- Assigned is based from the port designation in the Optical Line Terminal. Splitters may be located inside the exchange FDF or outside the exchange housed in FDT or FAT. Number and Stencil for Splitter may contain the following: Exchange Name and Site Code, OLT Number, Port connection in the OLT & Size of Splitter. Sp1(1:32) R1 S1 01

Example: Stencil for a splitter # 1 terminated in FDT connected to ODF Rack # 1, shelf #1, port # 5 with splitter size 1:32. on plastic or aluminum tape.

Figure # (19): Plastic / Metal Plate attached to Splitter

5.7.6 Identifying & Marking Fibre Terminal Box – FTB: FTB is identified by:

- FTB # - Size (4, 12 or 24) - connected drop fiber to FTB connector (01-02 ).

03 12 01- 02

111/ KL

FR 1 FDT 2 FAT 8

Sp1(1:32) R1 S1 05

Connected Drop fibres numbers

FTB size

FTB # / Drop #

Port #Shelf #

Rack # Splitter # & size #

Page 31: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

31 of 32

• Identification Plate At the Fibre Terminal Box: The identification plate shall bear the following information:

- FTB # - Parcel # - Block # - FDT # - Area Code # - Exchange Code/ #.

The plate shall be as shown in the drawing Figure (20).

Figure # (20): Identification Plate @ FTB 5.7.7 Marking Of Optical Network Terminal - ONT:

The ONT shall be stenciled & marked by the following information: - ONT # - ONT Type - Vendor Name - Date of Delivery in premises

5.8 Testing & Acceptance. 5.8.1 Testing the Cables There are four basic phases in testing of fibre optic cable installation:

1. Visual (pre-installation) inspection at the delivery on site for transportation damage; (and possible reel test).

2. Installation testing, which occurs after the cable is pulled through the conduit and at every splice point.

3. Splice testing. 4. Final acceptance testing after installation and prior to activation.

The following is a list of testing guidelines:

• Testing reels of optical fibre cables at delivery is not required, however, testing prior to, and after construction is essential to identify any cable performance degradation caused during installation. Testing prior to installation provides baseline of performance

• Pre-shipment Testing – This typically consists of an OTDR (Optical Time Domain Reflectometer) test performed at 1550 nm. All optical fibre cables must be bi-directionally OTDR – tested prior to shipment and the test report attached to the reel. Bi-directional testing is important to verify results and to make certain that no potential problems were missed.

Page 32: FTTH }Construction Guidelines - 333

PR – NW – 1412 - 333 ٣٣٣ - ١٤١٢ – ق ش –أس ISSUE Number: 1.0 – August, 2007G هـ١٤٢٨ شعبان: تاريخ اإلصدار– ١: رقم اإلصدار

32 of 32

Remember, the data can flow in two directions on the fibre strand. Test to make certain that it will.

• A pre-installation (visual) test will verify the characteristics of the cable and check for any transportation damage. The test must be jointly conducted by the Construction Inspector and the contractor in order to preclude future difficulties should a cable be damaged during construction.

• Installation Testing – Cable should be tested once it has been placed in the conduit and prior to splicing to make sure that there has been no installation damage. Installation testing is usually done with an OTDR.

• Splice testing is done after each splice to ensure that a clean, low-loss connection was made. OTDR, local injection detection and profile alignment can be used alone or in combination for splice testing.

• Post Installation – Final Acceptance Testing – The usual post installation testing method is to perform end-to-end OTDR testing for both directions. The results should be compared to the pre-installation test. It is highly recommended that an ongoing testing program be established after the system is powered up.

• It is important that technicians testing the fibre use same brand and model of test equipment and the same testing profile. Use of different test equipment and profiles will result in confusion and inconsistent test results.

• Make certain to understand the test results to verify that all specifications have been met. • Test measurements shall be recorded which include: attenuation, splices loss, fibre ran

length, etc…as per procedures outlined in practice # (PR – NS – 1412 – 401): Provisional Acceptance Test Procedures.

5.8.2 Testing of Other Components

Testing of all other components (FDT, Splitters, FAT, FTB, and ONT) shall be performed after installation & construction completion as will be specified for each component & according to above mentioned practice.

5.9 As Built Drawings (Plans). As Built drawings shall be marked (In Red) on the design plans to show the exactly constructed &

completed works. Only changed items & portions in the design plan shall be marked and the new constructed shall be shown in red. Unconstructed items shall be crossed out in red; and if the executed lengths are different, the planned lengths shall be crossed and the exact constructed lengths written beside them in red. If no change occurred on the design plans during construction, it is to be clearly written on the plans: "Executed as per Plans".

6.0 ASSOCIATED PRACTICES

• STTP # (PR – NS – 1412 – 201): FTTH Planning & Design Guidelines. • STTP # (PR – NS – 1412 – 232): Manhole Design. • STTP # (PR – NS – 1412 – 711): Small Trenches Design & Implementation. • STTP # (PR – NS – 1412 – 332): Guidelines for Installation of Secondary Network Using Ducts. • STTP # (PR – NS – 1412 – 334): Ducts Construction Guidelines. • STTP # (PR – NS– 1412 – 300): Fibre Optical Cable Underground Placing Guidelines. • STTP # (PR – NS – 1412 – 401): Provisional Acceptance Test Procedures. • STTP # (PR – NW – 1412 – 614 ): Access Network Process.