146

From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 2: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 3: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

From Director General’s Desk

It givesme immensepleasure topresent thisAnnual Report ofNationalWaterDevelopmentAgency(NWDA)fortheyear2015-16.TheReportgivesacomprehensiveoverviewofroleofNWDAinthefieldofwaterresourcesdevelopment,particularlyinter-basintransferofwatercommonlyknownasInterlinkingofRivers(ILR).

TheNationalWaterDevelopmentAgencywassetupin1982bytheGovernmentofIndiaasaSocietyunderSocietiesRegistrationAct1860under thethenMinistryof Irrigation,nowtheMinistryof Water Resources, River Development and Ganga Rejuvenation (MoWR, RD & GR). NWDA is anautonomousorganisationoftheMoWR,RD&GRandisfullyfundedbytheGovernmentofIndia.AsapartofitsmandateNWDApreparesPre-feasibilityReport,FeasibilityReportandDetailedProjectReportofInter-StatelinksundertheNationalPerspectivePlan(NPP)andIntra-StatelinksasproposedbytheStateGovernments.TheconsensusandcooperationoftheconcernedStateGovernmentshasplayedanimportantroleinthepreparationofthereportsonInterlinkingofRivers.

NWDAhascarriedoutitsassignedfunctionsasdescribedintheReportinanefficientandeffectivemannerduringtheyear2015-16inspiteofmanyconstraintsspeciallyshortageoftechnicalofficersascomparedtotherequirement.Theimportantachievementsduringtheperiodareasbelow:

• DetailedProjectReportofPar-Tapi-NarmadaLinkProjectwascompleted.• Themattersrelatedtotheenvironment,forestandwildlifeclearanceinrespectofKen-BetwaLink

Project Phase-I the first interlinking project of ILR Programmewere pursued vigorously and theprocessreachedanadvancedstageofclearance.

• NWDAhasprovidedtherequiredtechnicalassistancetotheMinistryonvariousissuesrelatedtoInterlinkingofRiversProgramme.

• The62ndMeetingoftheGoverningBodyofNWDAwasconvenedduringtheyear.• FivemeetingsoftheSpecialCommitteefor InterlinkingofRivers,threeunderchairpersonshipof

Hon’bleMinister(WR,RD&GR)andtwounderthechairmanshipofHon’bleMinisterofState(WR,RD&GR)wereconvenedduringtheyear.

• Hon’blePresidentofIndiaShriPranabMukherjeeawardedfirstPrize“RajbhashaSiromani”toNWDAinimplementationforofficiallanguage.

Iamsurethisreportwillbefoundusefulinunderstandingtherole,functionsandachievementsofNWDAduringtheyear.

(S. Masood Husain)DirectorGeneral

Page 4: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 5: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

Highlights of ActivitiesDuring the year 2015-16

z 62ndmeetingoftheGoverningBodyofNWDAwasheldon27.01.2016underChairmanshipofSecretary,MinistryofWaterResources,RiverDevelopmentandGangaRejuvenation&ChairmanofGoverningBody.

z DetailedProjectReport(DPR)ofPar-Tapi-NarmadaLinkProjectcompletedduringtheyear2015-16.

z NWDA completed Pre-Feasibility Reports of one Intra-State link during 2015-16.

z The work of preparation of DPRs of four Intra-State links; one each ofTamilNadu,Maharashtra,OdishaandJharkhandnamelyPonnaiyar-Palar,Wainganga (Gosikhurd)-Nalganaga (Purna Tapi), Vamsadhara-RushikulyaandBarakar-Damodar-Subarnarekharemainedunderprogressduringtheyear2015-16.

z Fivemeetings of the Special Committee for Interlinking of Rivers, threeunder the chairpersonship of Hon’ble Minister (WR, RD&GR) and twounder thechairmanshipofHon’bleMinisterofState (WR,RD&GR)wereheld during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015and08.02.2016.

z AllthepreparatoryworksofIndiaWaterWeek-2016wasmadeduringtheyear2015-16fortheeventscheduleduring4th –8thApril2016.

z NWDA participated in India International Trade Fair-2015 held duringNovember,2015atNewDelhi.

z StatutoryclearancesofKen-Betwalinkprojectwereunderprogressduringtheyear-2015-16.

Page 6: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 7: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

AnnualReport2015-16|i

CONTENTSSl.No. Item PageNo

Chapter – 1 National Water Development Agency 1.0 Introduction 11.1 EstablishmentofNWDAanditsFunctions 1

Chapter – 2 Head Quarters and Organisational Set Up2.1 HeadQuartersandOrganisationalSetUp 32.2 StaffStrength 52.3 NWDASociety 52.4 GoverningBody 72.5 TechnicalAdvisoryCommittee 10

Chapter – 3 Special Committee for “Interlinking of Rivers” (SC-ILR) and Task Force for Interlinking of Rivers

3.1 SpecialCommitteeforInterlinkingofRivers 133.2 TaskForceforInterlinkingofRivers 19

Chapter – 4 Technical Activities4.1 NationalPerspectivePlan 204.2 InterBasinWaterTransferLinks 204.3 PreliminaryStudiesCompletedbyNWDA 214.4 WaterTransferLinksunderStudybyNWDA 224.4.1 PresentStatusofInterBasinWaterTransferLinksunderPeninsular 24 Component4.4.2 PresentStatusofPreparationofFeasibilityReportofInterBasinWater TransferLinksunderHimalayanComponent 254.4.3 Manas-Sankosh-Teesta-GangaLink 264.4.4 ConsensusBuildingProcessforManas-Sankosh-Teesta-GangaLink 26

Chapter – 5 Priority Links Identified Under National Perspective Plan (NPP)5.1 EffortsMadeForArrivingAtConsensus 285.2 Examinationofthesubject“InterlinkingofRivers”bytheParliamentaryConsultative

CommitteeonWaterResources 34 Chapter – 6 Intra-State Links Proposed by States6.1 Intra-StateLinks 356.1.1 Jharkhand 35

Page 8: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

ii|AnnualReport2015-16

6.1.2 Gujarat 356.1.3 Maharashtra 356.1.4 Odisha 366.1.5 Bihar 366.1.6 Rajasthan 366.1.7 TamilNadu 376.1.8 Karnataka 376.1.9 Chhattisgarh 376.1.10 OverallStatusofPreparationofPFRs ofIntra-StateLinks 376.1.11 PresentstatusofpreparationofDPRsofintra-Statelinks 406.1.12 SettingupofGrouponIntra-Statelinks 426.1.13ProvidingfundingtotheproposalsoftheStateGovernmentforthepreparation ofDetailedProjectReportofIntra-StateriverlinkProjects 42

Chapter –7 Website of NWDA 43

Chapter – 8 Other Activities of NWDA8.1 MeetingoftheParliamentaryConsultativeCommitteeonWaterResources 448.2 TrainingandHumanResourceDevelopmentActivities 448.3 ImplementationofActforPersonswithDisabilities 448.4 Citizen’sCharterofNWDA 448.5 CommitteeforComplaintsonSexualHarassmentofWomenEmployees 458.6 CommunalHarmonyWeekandQuamiEktaWeek 458.7 Publicationofin-HouseBulletin‘JalVikas’ 468.8 ParticipationinIndiaInternationalTradeFair(IITF)-2015 468.9 JalManthan-2 46

Chapter – 9 Vigilance Activities in NWDA9.1 VigilanceandDisciplinaryCases 479.2 VigilanceAwarenessWeek 47

Chapter – 10 Promotion of Use of Rajbhasha (Hindi) 48

Chapter – 11 Finance and Accounts 51

Chapter – 12 Acknowledgements 52

Page 9: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|iii

LiST OF AppENDiCES

AppendixNo. Item PageNo.

Appendix-I DetailsofTrainingCoursesAttendedbyOfficialsofNWDA 53

Appendix-II Details of Conferences / Seminars /Workshop Attended byOfficialsofNWDA

55

Appendix–III AuditCertificate,AuditReport,RepliesofNWDAandAccountsofNationalWater DevelopmentAgencyforyear2015-16

58

Page 10: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 11: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|1

Chapter – 1

National Water Development Agency

1.0 IntroductionWaterisessentialforlivelihood.Itplaysapivotalroleinthesocio-economicdevelopmentofthecountryandmanagementofecosystem.Wateris a renewable resource but not infinite, andits availability is limited due to the needs ofgrowing population, rapid urbanisation, largeindustrialisation, economic growth etc. Theincreasingchallengesinwatersectorwarrantustofocusoncorrectingthenaturalimbalancesintimeandspaceduetovariations inavailabilityofwatersothatreasonablewaterneedscanbemet.Optimaldevelopmentandmanagementofwaterresourcecallsforanintegratedapproachat the river basin level and also across riverbasinsthroughInter-BasinWaterTransfer.

The concept of large scale Inter Basin WaterTransfer(IBWT)isnotnew.ItwasearliermootedbyDr.K.L.Rao in1972as ‘NationalWaterGrid’andCaptainDastur in1977as ‘GarlandCanal’.Boththeseschemeswereexaminedbyagroupof experts and found techno-economicallynot viable. Thereafter, the Ministry of WaterResources in August, 1980 formulatedthe “National Perspective Plan for WaterResources Development”, which envisagedtransferofwater fromsurplusbasins todeficitbasins. The National Perspective Plan (NPP)

comprises two components, viz; i) PeninsularRivers Development and ii) Himalayan RiversDevelopment.

1.1 Establishment of NWDA and its Functions

The National Water Development Agency wassetupinJuly,1982bytheGovernmentofIndiaas a Society under Societies Registration Act1860 under the thenMinistry of Irrigationto study the feasibility of the links underPeninsular Component of National PerspectivePlan.NWDAisfullyfundedbytheGovernmentof India. Subsequently in 1990,NWDA SocietyresolvedtotakeupthestudiesoftheHimalayanRivers Development Component also. Further,intheyear2006preparationofDetailedProjectReport(DPR)oflinkprojectsandpre-feasibility/feasibilityreportsofintra-Statelinksasproposedby States were also included in the functionsof NWDA. Accordingly, MoWR vide resolutiondated 30.11.2006 has modified the functionsofNWDASociety.ThefunctionsofNWDAwerefurthermodified videMoWR resolution dated19.05.2011toundertaketheworkofpreparationofDPRsofintra-StatelinksalsobyNWDA.

Functions of NWDAFunctions of NWDA as amended fromtime totimeupto31.03.2016are:

Page 12: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

2|AnnualReport2015-16

(a) To carry out detailed surveys andinvestigationsofpossiblereservoirsitesandinter-connecting links in order to establishfeasibility of the proposal of PeninsularRiversDevelopment[1981]*andHimalayanRivers Development Components [1994]*formingpartoftheNationalPerspectiveforWaterResourcesDevelopmentpreparedbythethenMinistryofIrrigation(nowMinistryof Water Resources, River Developmentand Rejuvenation) and Central WaterCommission.

(b) To carry out detailed surveys about thequantum of water in various PeninsularRiverSystems[1981]*andHimalayanRiverSystems [1994]*which can be transferredto other basins/States after meeting thereasonableneedsofthebasin/Statesintheforeseeablefuture.

(c) Toprepare feasibility reportof thevariouscomponents of the scheme relating to

PeninsularRiversdevelopment[1981]*andHimalayanRiversdevelopment[1994]*.

(d) Topreparedetailedprojectreports[2006]*of river link proposals under NationalPerspective Plan for Water ResourcesDevelopment after concurrence of theconcernedStates.

(e) Topreparepre-feasibility/feasibility[2006]*/ detailed project reports [2011]* of theintra-StatelinksasmaybeproposedbytheStates. The concurrence of the concernedco-basin States for such proposalsmay beobtainedbeforetakinguptheirFRs/DPRs”.

(f) To do all such other things the Societymay consider necessary, incidental,supplementary or conducive to theattainmentofaboveobjectives[1981]*.

* Year of Gazette Notification.

Page 13: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|3

Chapter – 2

Head Quarters and Organisational Set Up

2.1 Head Quarters & Organisational Set Up

Director General of the rank of AdditionalSecretarytoGovernmentofIndiaisthePrincipalExecutiveOfficer of the Society, responsible forall day to day affairs including technical, legal,administrative and financial matters of theSociety. The Headquarters of the Agency is atNewDelhi. TheDirectorGeneral,NWDAat the

headquartersisassistedbyChiefEngineer(HQ),Director (Technical),Director (Finance),Director(Administration), Director (Multi DisciplinaryUnit)andtwoSuperintendingEngineers.NWDAhas 2 field organisations (North & South) eachheadedbyaChiefEngineer. Ason31.03.2016,there are2Circles, 7Divisionsunder theNorthorganisation,1Circle,2DivisionsundertheChiefEngineer (HQ) and 2 Circles, 7 Divisions and 2Sub-divisionsundertheSouthorganisation.

OrganisationchartofNWDAason31.3.2016uptoSuperintendingEngineerlevelisshownbelow:

ORGANISATION CHART OF NATIONAL WATER DEVELOPMENT AGENCYAS ON 31.03.2016

DIRECTOR GENERALS. M HASOOD USAIN

CHIEF ENGR. (HQ.) NEW DELHIR.K. JAIN

SE-IIO.P.S. KUSHWAH

DIRECTOR (F)M.P. GUPTA

DIRECTOR (ADMN)NARENDRA KUMAR

DIRECTOR ( MDU ) JANCY VIJ YANA

CHIEF ENGR. (S), HYDERABADM.K. SRINIVAS

SE, GWALIORS.C. AWASTHI

SE, BHUBANSESWARB.L. SHARMA

SE, HYDERABADFAHIM ASHRAF

DIRECTOR (T)

SE-IK.P. GUPTA

CHIEF ENGR. (N), LUCKNOW

N.C. JAIN

H.N. DIXIT

SE, VALSADD.K. SHARMA

SE, PATNAM. AHMAD

Page 14: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

4|AnnualReport2015-16

AmapshowingthelocationsofNWDAofficesisgivenbelow:

Page 15: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|5

2.2 Staff StrengthTheexistingsanctionedstaffstrengthofNWDAason31stMarch,2016is493(asperSIU).Actually506posts arefilled.NWDA is following all theinstructions issued from time to time by theGovt.ofIndiaregardingprovidingreservationinserviceandotherbenefitstoScheduledCastes/Scheduled Tribes, Other Backward Classes,

Ex-Servicemen and Physically Handicappedpersons.NoneofthecandidateswereappointedfordirectrecruitmentinthevariousgradesandcategoriesinNWDAduringtheyear2015-16.

Thestaffstrength(Group-wise)ofNWDAason31stMarch,2016 indicatingSC/ST/OBC/PH/EX-Servicemen/Generalisasunder:

The Staff strength (Group-wise) of NWDA as on 31st March, 2016

Group *Sanctioned(AsperSIU)

Filled*Vacant

(AsperSIU)SC ST OBC PH Ex.S.man General Total

Group-A 59 6 - - - - 51 57 2

Group-B 142 23 6 14 1 - 98 142 0

Group-C 292 71 21 11 7 3 194 307 +15

Total 493 100 27 25 8 3 343 506 +13

* AspertheStaffInspectionUnit(SIU)recommendation.

Note:- Posts declared surplus by the StaffInspectionUnit(SIU)beingabolishedoutinfutureadjustments/retirementsasrecommendedbyit.

2.3 NWDA SocietyThe NWDA Society is the apex body of theNWDAorganisationandmeetsatleastonceinayeartoreviewtheprogressandperformanceofthe Agency towards the attainment of itsobjectives and to give such policy directionsas it deems fit. The Hon’ble Union MinisterofWater Resources, RD&GR is the Presidentof the Society. The President exercises suchpowers for the conduct of thebusiness of theSocietyasmaybevestedinhimbytheSociety.Inaddition,thePresidenthaspowerstoreview

periodicallytheworkandprogressoftheSocietyandappointCommitteesorCommissionsfortheefficientoperationoftheSocietyortoenquireintoandreportontheaffairsoftheSocietyandpasssuchorders,asheconsidersproper.

Since inceptionofNWDA, fourSpecialGeneralMeetings(SGM)andtwentynineAnnualGeneralMeetings of the Society have been held upto31.03.2016.GazetteNotificationoffunctionsofNWDAamendedduringthe4thSpecialGeneralMeeting held on 23.12.2009 was published intheGazetteofIndiaon11thJune,2011.

The list of members of the NWDA Society isgivenbelow:

Page 16: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

6|AnnualReport2015-16

Members of NWDA Society(MoWR Letter No. 2/9/2002 – BM/85 dated 17.02.2003 &

MoWR Resolution No. 2/9/2002-BM/140 dated 12.03.2004)

1 Union MinisterforWaterResources,Govt.ofIndia President2 UnionMinisterofStateforWaterResources,Govt.ofIndia Vice-President

3 Member(Agri.&WR),PlanningCommission Member

4

ChiefMinisters/MinistersandSecretariesortheirnomineesnotbelowtherankofChiefEngineersonominatedin-chargeofWaterResources/IrrigationoftheStatesofAndhraPradesh,Assam,Bihar,Chhattisgarh,Gujarat,Haryana,Jharkhand,Karnataka,Kerala,MadhyaPradesh,Maharashtra,Orissa, Punjab,Rajasthan,TamilNadu,UttarPradesh,Uttarakhand,WestBengalandUnionTerritoryofPuducherry

Member

5 Secretary,MinistryofWaterResources,Govt.ofIndia Member

6SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,MinistryofAgriculture(DepartmentofAgriculture&Cooperation)

Member

7SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,MinistryofFinance(Deptt.ofExpenditure)

Member

8SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,MinistryofPower

Member

9SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,MinistryofScience&Technology

Member

10SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,MinistryofEnvironment&Forest

Member

11SecretaryorhisnomineenotbelowtherankofJointSecretaryorequivalent,PlanningCommission

Member

12 Chairman,CentralWaterCommission Member13 Chairman,CentralGroundWaterBoard Member14 Chairman,CentralElectricityAuthority Member15 AdditionalSecretary,MinistryofWaterResources,Govt.ofIndia Member16 Member(WP&P),CentralWaterCommission Member17 Member(D&R),CentralWaterCommission Member

18DirectorGeneralorhisnomineenotbelowtherankofJointSecretaryorequivalent,IndiaMeteorologicalDepartment

Member

19DirectorGeneralorhisnomineenotbelowtherankofJointSecretaryorequivalent,GeologicalSurveyofIndia

Member

Page 17: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|7

20 SurveyorGeneralofIndiaorhisrepresentative,SurveyofIndia Member21 Directororhisrepresentative,NationalRemoteSensingAgency Member22 Commissioner(PR),MinistryofWaterResources Member

23 DirectorGeneral,NationalWaterDevelopmentAgencyMember-Secretary

(TotalMembersason31.03.2016...........60)

2.4 Governing BodyThe Governing Body (GB) of the NWDASociety under the Chairmanship of theSecretary (Water Resources), Govt. of India,manages,administers,directsandcontrolstheaffairsandfundsoftheSocietysubjecttotherules,bye-lawsandordersof the Society and

generally pursues and carries out theactivities of the Society as set forth in itsMemorandumofAssociationand in doing so,follows and implements the policy directionsand guidelines laid downby the Society. ThecompositionofmembersoftheGoverningBodyofNWDAisgivenbelow:

Composition of the Governing Body of NWDAMoWR Letter No. 2/9/2002 – BM/85 dated 17.02.2003 &

MoWR Resolution No. 2/9/2002-BM/140 dated 12.03.2004)

1. Secretary,MinistryofWaterResources,Govt.ofIndia Chairman

2.SecretaryorhisnomineenotbelowtherankofJointSecretary,MinistryofFinance(Deptt.ofExpenditure)

Member

3. SecretaryorhisnomineenotbelowtherankofJointSecretary,MinistryofPower Member

4.SecretaryorhisnomineenotbelowtherankofJointSecretary,MinistryofAgriculture(Deptt.ofAgriculture&Co-operation)

Member

5.SecretaryorhisnomineenotbelowtherankofJointSecretary,MinistryofScience&Technology

Member

6.SecretaryorhisnomineenotbelowtherankofJointSecretary,MinistryofEnvironment&Forests

Member

7. SecretaryorhisnomineenotbelowtherankofJointSecretary,PlanningCommission Member

8. Chairman,CentralWaterCommission Member

9. Chairman,CentralGroundWaterBoard Member

10. Chairman,CentralElectricityAuthority Member

Page 18: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

8|AnnualReport2015-16

11. AdditionalSecretary,MinistryofWaterResources,Govt.ofIndia Member

12. Member(WP&P),CentralWaterCommission Member

13. Member(D&R),CentralWaterCommission Member

14.Director General or his nominee not below the rank of Joint Secretary, IndiaMeteorologicalDepartment

Member

15. Commissioner(SP),MinistryofWaterResources,Govt.ofIndia Member

16.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,AndhraPradesh

Member

17.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Assam

Member

18.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Bihar

Member

19.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Chhattisgarh

Member

20.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Gujarat

Member

21.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Haryana

Member

22.WaterResourcesSecretaryorhisnomineenotbelowtheRankofChiefEngineer,Jharkhand

Member

23.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Karnataka

Member

24. Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Kerala

Member

25.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,MadhyaPradesh

Member

26.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Maharashtra

Member

27.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Orissa

Member

28.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Punjab

Member

29.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Rajasthan

Member

Page 19: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|9

30.WaterResourcesSecretaryorhisnomineenotbelowtheRankofChiefEngineer,TamilNadu

Member

31.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Uttarakhand

Member

32.WaterResourcesSecretaryorhisnomineenotbelowtheRankofChiefEngineer,UttarPradesh

Member

33.WaterResourcesSecretaryorhisnomineenotbelowtheRankofChiefEngineer,WestBengal

Member

34.Water Resources Secretary or his nominee not below the Rank of Chief Engineer,Puducherry

Member

35. DirectorGeneral,NationalWaterDevelopmentAgencyMember-Secretary

(TotalMembersason31.03.2016...........35)

Since inception of NWDA, Sixty two meetingsof the Governing Body have been held up to31.03.2016.The62nd meetingoftheGoverningBody (GB) ofNWDAwasheld on 27th January,2016atNewDelhi.ShriShashiShekhar,Secretary(WR,RD&GR)chairedthemeeting.Themeetingwas attendedby the senior officers ofMoWR,RD& GR, CWC, NWDA and other Central andStateGovernmentDepartments.Secretary(WR,RD & GR) and Chairman, Governing Body ofNWDAinhisopeningremarksextendedawarmwelcome to all the members and participantsof 62ndGoverningBodymeetingofNWDA.HementionedthatInterlinkingofRiversProgrammeisonhighpriorityoftheGovernmentofIndia.HementionedthatInterlinkingofRiver(ILR)Projectson implementation will provide enormous

benefits for irrigation, power generation andflood control etc. He further mentioned thatNWDA had already completed the DetailedProjectReportsofKen-BetwaLinkProjectPhase-Iand Phase-II, Damanganga-Pinjal and Par-Tapi-NarmadaLinkProjects.Theenvironment,forestandwildlifeclearancesincaseofKen-BetwaLinkProjectPhase-Iareinadvancestage.Theactualworkongroundwouldbeginsoonafterobtainingall the statutory clearances and approvals. HeobservedthattheTaskForceforInterlinkingofRiversisexaminingallrelevantissuesindetailsandwill help in bringing speedy consensus onthelinkprojects.GBalsoapprovedtheAnnualReport for the year 2014-15 along with theAuditedAnnualAccountsofNWDA.

Page 20: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

10|AnnualReport2015-16

{Shri Shashi Shekhar, Secretary (MoWR, RD & GR) chairing the 62nd meeting of Governing Body of NWDA held on 27.01.2016. On his left is Dr. Amarjit Singh, Special Secretary (MoWR, RD & GR) and Shri Ghanshyam Jha,

Chairman of CWC and on his right are Shri S. Masood Husain, DG, NWDA and Dr. B. Rajender, Joint Secretary (PP), MoWR RD & GR}

2.5 Technical Advisory CommitteeTheGoverningBodyof theNWDASociety hasconstituted a Technical Advisory Committee(TAC) of NWDA under the Chairmanship ofthe Chairman, Central Water Commission,for examination and scrutiny of the varioustechnical proposals framed by the Agency. So

far41meetingsofTAChavebeenheld.Thelast meeting of the Technical Advisory Committee(TAC)ofNWDAwasheldon5thOctober,2012atNewDelhi.

The composition of members and specialinviteesoftheTACofNWDAalongwithTermsofReference(TOR)isgivenbelow:

Composition of the Technical Advisory Committee of NWDA(NWDA Letter No.NWDA/112/5/Tech-I/2005/Vol. XXXVII/4639-85 dated 4.5.2006)

1. Chairman,CentralWaterCommission,NewDelhi Chairman

2. Member(WP&P),CentralWaterCommission,NewDelhi Member

3. Member(D&R),CentralWaterCommission,NewDelhi Member

4. Member(HE),CentralElectricityAuthority Member

5. JointSecretary,Deptt.ofAgriculture&Co-operation,NewDelhi Member

6. Advisor(IA),MinistryofEnvironment,Forestsandclimatechange,NewDelhi Member

7. DirectorGeneral,GeologicalSurveyofIndia,Kolkata Member

8. Chairman,CentralGroundWaterBoard,Faridabad Member

Page 21: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|11

9. DirectorGeneral,IndiaMeteorologicalDepartment,NewDelhi Member

10. Director/Scientist(F),NationalInstituteofHydrology,Roorkee Member

11. Chairman,InlandWaterwaysAuthorityofIndia,Noida Member

12. DirectorGeneral,NationalWaterDevelopmentAgency,NewDelhi Member- Secretary

13.Chief Engineer (Water Resources), Irrigation Department, Govt. of UttarPradesh

Special Invitee

14.Chief Engineer& Joint Secretary,Narmada andWater ResourcesDepartment,Govt.ofGujarat

Special Invitee

15.Engineer-in-Chief(Interstate&WaterResources),IrrigationDepartment,Govt.ofAndhraPradesh

Special Invitee

16. ChiefEngineer(Bodhi),WaterResourcesDepartment,Govt.ofMadhyaPradesh Special Invitee

17.ChiefEngineer(WaterResources)&JointSecretary,IrrigationDepartment,Govt.ofMaharashtra

Special Invitee

18. ChiefEngineer,InterstateWater,GovernmentofKerala Special Invitee

19. ChiefEngineer(Irrigation,Design&Research),IrrigationUnit,Govt.ofRajasthan Special Invitee

20. Engineer-in-Chief,WaterResourcesOrganisation,Govt.ofTamilNadu Special Invitee

21. ChiefEngineer,CentralPlanningUnit,DepartmentofIrrigation,Govt.ofOrissa Special Invitee

22.Engineer-in-Chief, Irrigation Department, Water Resources DevelopmentOrganisation,Govt.ofKarnataka

Special Invitee

23. ChiefEngineer,(WaterResources),IrrigationWorks,Govt.ofPunjab Special Invitee

24. ChiefEngineer(LiftCanals),IrrigationDepartment,Govt.ofHaryana Special Invitee

25. ChiefEngineer,P.P.Cell,WaterResourcesDeptt.,Govt.ofBihar Special Invitee

26.ChiefEngineer(Design&Research),Irrigation&WaterwaysDirectorate,Govt.ofWestBengal

Special Invitee

27. ChiefEngineer(P&D),BrahmaputraBoard,Guwahati,Assam Special Invitee

28. ChiefEngineer,IrrigationDepartment,Govt.ofAssam Special Invitee

29. ChiefEngineer(I&F),Govt.ofNCTofDelhi Special Invitee

30. Engineer-in-Chief,WaterResourcesDepartment,Govt.ofChhattisgarh Special Invitee

31. ChiefEngineer,IrrigationDepartment,Govt.ofUttarakhand Special Invitee

32. Engineer-in-Chief,WaterResourcesDepartment,Govt.ofJharkhand Special Invitee

(TotalMembersason31.3.2016……12)(TotalSpecialInviteesason31.3.2016……20)

Page 22: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

12|AnnualReport2015-16

Terms of Reference:1. ToprovidetechnicalguidanceforthestudiesandinvestigationundertakenbyNWDA.

2. ConsiderationandacceptanceofmethodologiesadoptedbyNWDAforcarryingouthydrologicalstudies.

3. ConsiderationandacceptanceofwaterbalanceandprefeasibilityreportspreparedbyNWDAinthelightofcomments/observationsreceivedfromtheconcernedStates.

4. Considerationsandconcurrencetotakeupfieldsurveysanddetailedinvestigationsforwatertransferlinkproposals.

5. Guidanceindetailedinvestigationsandpreparationoffeasibilityreports.

Page 23: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|13

3.1 Special Committee for Interlinking of Rivers.

The Hon’ble Supreme Court vide its judgmentdated27 February, 2012 in thematterofWritPetition(Civil)No.512of2002“InRe:NetworkingofRivers”alongwithWritPetition(Civil)No.668of 2002 has directed the Union of India andparticularlytheMinistryofWaterResourcestoconstituteaCommitteeunderthechairmanshipof Hon’ble Minister of Water Resources forthe implementation of Interlinking of RiversProgramme.

UnionCabinetinitsmeetingheldon24.07.2014has approved the constitution of the “SpecialCommitteeontheInter-linkingofRivers”inlightofthejudgmentdated27.02.2012oftheHon’bleSupremeCourt.TheSpecialCommitteehasbeenconstituted by theMinistry ofWR, RD andGRvideGazetteNotificationdated23.09.2014.Thestatus on progress report and constitution of“Special Committee for Interlinking of Rivers”in compliance of Hon’ble Supreme CourtJudgementdated27.02.2012inthematterwritpetition(Civil)-512of2002:NetworkingofRivers

alongwith writ petition No. 668 of 2002 werereviewedbytheCabinetinthemeetingheldon18.11.2015.

During the year 2015-16 five meetings of theSpecial Committee for Interlinking of Riverswere held. The Fourth meeting of the SpecialCommittee for Interlinking of Rivers chairedby Sushri Uma Bharti, Hon’ble UnionMinisterfor Water Resources, River Development andGangaRejuvenationwasheldon14.05.2015atNewDelhi.Hon’bleUnionMinisterofStateforWaterResources,RiverDevelopmentandGangaRejuvenation; Hon’ble Minister of State forWaterResources,GovernmentofBihar;Hon’bleMinisterof State for Irrigation,GovernmentofUttar Pradesh; Hon’ble Minister of State forWaterResources,GovernmentofMaharashtra.Special Representative of the rank of CabinetMinister, Government of Telangana; Hon’bleMinister of Water Resources, Governmentof Rajasthan and members/representativefrom various Central Government and StateGovernment organizations attended themeeting.

Chapter – 3Special Committee for “Interlinking of Rivers” (SC-ILR) and Task

Force for Interlinking of Rivers

Page 24: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

14|AnnualReport2015-16

{Sushri Uma Bharti , Hon’ble Minister (WR, RD&GR), chairing the 4th meeting of Special Committee for Interlinking of Rivers held on 14.05.2015, on her left are Shri B. N. Navalawala, Chief Adviser(WR, RD&GR); Shri Vijay

Shivtare, Hon’ble Minister of State for Water Resources, Govt. of Maharashtra; Shri Ramchandru Tejavath, Special Representative of the rank of Cabinet Minister, Govt. of Telangana; Shri Surendra Singh Patel, Hon’ble

Minister of State for Irrigation, Govt. of Uttar Pradesh and Shri Ram Pratap, Hon’ble Minister of Water Resources, Govt. of Rajasthan. On her right are Shri Vijay Kumar Chaudhary, Hon’ble Minister of WR, Govt. of Bihar and Shri

S. Masood Husain, DG, NWDA}

ThefifthmeetingoftheSpecialCommitteeforInterlinkingofRiverschairedbyProf.SanwarLalJat,Hon’bleUnionMinister of State forWaterResources, River Development and GangaRejuvenation was held on 13.07.2015 at NewDelhi.ShriO.Panneerselvam,Hon’bleMinister,Finance& PublicWorks, Government of TamilNadu;ShriBabubhaiBukhiriya,Hon’bleMinisterof Water Resources, Government of Gujarat;Shri Ram Pratap, Hon’ble Minister of WaterResources, Government of Rajasthan; Shri

Chandra Prakash Chaudhary, Hon’ble MinisterofWaterResources,GovernmentofJharkhand;Shri Surendra Singh Patel, Hon’ble Ministerof State for Irrigation, Government of UttarPradesh; Shri Vijay Shivtare, Hon’ble Ministerof State for Water Resources, Government ofMaharashtra; Shri R. Vidyasagar Rao, Advisor,Government of Telangana; and members/representativefromvariousCentralGovernmentand State Government organizations attendedthemeeting.

Page 25: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|15

The sixth meeting of the Special Committeefor Interlinking of Rivers chaired by SushriUmaBharti,Hon’bleUnionMinister forWaterResources, River Development and GangaRejuvenation was held on 15.09.2015 at NewDelhi.ShriChandraPrakashChaudhary,Hon’bleMinister of Water Resources, Government of

Jharkhand; Shri M.B.Patil, Hon’ble Minister ofWater Resources, Government of Karnataka;ShriVijayShivtare,Hon’bleMinisterofStateforWater Resources,Government ofMaharashtraand members/representative from variousCentral Government and State Governmentorganizationsattendedthemeeting.

{Prof. Sanwar Lal Jat, Hon’ble Minister of State (WR, RD&GR), chairing the 5th meeting of Special Committee for Interlinking of Rivers held on 13.07.2015. On his left is Shri B. N. Navalawala, Chief Adviser(WR, RD&GR); Shri Ram Pratap, Hon’ble Minister of Water Resources, Govt. of Rajasthan and Shri Babubhai Bukhiriya, Hon’ble

Minister of Water Resources, Govt. of Gujarat and his right are Shri Shashi Shekhar, Secretary (WR, RD&GR) and Shri S. Masood Husain, DG, NWDA}

Page 26: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

16|AnnualReport2015-16

{Sushri Uma Bharti, Hon’ble Minister (WR, RD&GR), chairing the 6th meeting of Special Committee for Interlinking of Rivers held on 15.09.2015. On her left are Shri M.B. Patil, Hon’ble Minister for Water Resources, Govt. of Karnataka and

Shri B. N. Navalawala, Chief Adviser(WR, RD&GR). On her right are Shri Vijay Shivtare, Hon’ble Minister of State for WR, Govt. of Maharashtra, Dr. Amarjit Singh, Special Secretary (WR, RD&GR), Shri S. Masood Husain, DG, NWDA and

Shri A.B. Pandya, Chairman, CWC}

TheseventhmeetingoftheSpecialCommitteefor Interlinking of Rivers chaired by Prof.Sanwar Lal Jat, Hon’ble Minister of State forWater Resources, River Development andGanga Rejuvenation was held on 18.11.2015at New Delhi. Shri Girish Mahajan, Hon’bleMinister of Water Resources, Government ofMaharashtra;ShriSurendraSinghPatel,Hon’ble

Ministerof State for Irrigation,GovernmentofUttarPradesh; ShriR.VidyasagarRao,Advisor,Government of Telangana; Prof. RameshChand, Member (Agriculture), NITI Aayogand members/ representatives from variousCentral Government and State Governmentorganizationsattendedthemeeting.

Page 27: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|17

{Prof. Sanwar Lal Jat, Hon’ble Minister of State (WR, RD&GR), chairing the 7th meeting of Special Committee for Interlinking of Rivers held on 18.11.2015. On his left are Shri S. Masood Husain, DG, NWDA and Shri Ramesh

Chand, Member (Agriculture), NITI Aayog and on his right is Dr. Amarjit Singh, Special Secretary (WR, RD&GR)}

EighthmeetingofInterlinkingofRiverschairedby Sushri Uma Bharti, Hon’ble UnionMinisterof Water Resources, River Development andGanga Rejuvenationwas held on 8th February,2016 at Vigyan Bhawan, New Delhi. Prof.Sanwar Lal Jat, Hon’ble Union Minister ofState forWater Resources, RiverDevelopmentand Ganga Rejuvenation; Shri ChandraPrakash Chaudhary,Hon’bleMinister ofWaterResources,GovernmentofJharkhand;ShriGirishMahajan,Hon’bleMinisterofWaterResources,GovernmentofMaharashtra;ShriR.VidyasagarRao, Advisor toGovernment of Telangana andMembers/representative of State Governmentorganizationsattendedthemeeting.

During the Eighth meeting, Hon’ble UnionMinister (WR,RD&GR) informed that bothHon’ble Chief Ministers of Maharashtra andGujarat have expressed their desire to resolveall issues relating to water sharing under theproposed Damanganga-Pinjal and Par-Tapi-Narmada linkprojects for takingup these twolink projects for the implementation. Hon’bleUnion Minister of Water Resources, RD & GRhoped that an agreement can be reached onwatersharinginthesetwoprojectswiththeco-operationofboththeStates.

Page 28: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

18|AnnualReport2015-16

{Sushri Uma Bharti, Hon’ble Minister (WR, RD&GR), chairing the 8th meeting of Special Committee for Interlinking of Rivers held on 08.02.2016. On her left are Prof. Sanwar Lal Jat, Hon’ble Minister of State (WR,

RD&GR) and Shri B. N. Navalawala, Chief Adviser (WR, RD&GR) and on her right is Shri S. Masood Husain, DG, NWDA}

SpecialCommitteeforInterlinkingof Rivers has constituted four specific sub-committees; (i)Sub-committee for comprehensive evaluationof various studies/reports (ii) Sub- Committeefor system studies for identification of mostappropriatealternateplan,(iii)Sub–CommitteeforrestructuringofNationalWaterDevelopmentAgency and (iv) Sub-Committee for consensusbuilding through negotiations and arriving atagreement between concerned States. Thethree Sub-Committees at Sl. No. (i) to Sl. No.(iii)havebeenconstitutedvideMoWR,RD&GRO.M.dated13.02.2015.TheSub-Committeeat

Sl. No. (iv) the group to speed up the processof arriving at consensus amongst the States on the proposal of Inter BasinWater Transferof NWDA, constituted vide MoWR, RD & GRletter dated 20.01.2016 has been renamedas Sub-Committee for the consensus buildingthroughnegotiationsandarrivingatagreementsbetweentheconcernedStates.

ThefirstcombinedmeetingofSub-Committeesfor (i) Comprehensive evaluation of variousstudies/reports on ILR (Sub-Committee-I) and(ii) system studies for identification of mostappropriate alternative plan (Sub-Committee-

Page 29: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|19

II)washeldon26.02.2015.Thesecondmeetingof the Sub-Committees (I) and (II) was heldon 11.03.2015 and 12.03.20115 respectively.The third meeting of Sub- Committee I and IIwas held on 07.042015. The fourth, fifth andsixthmeetingsofSub-Committee-Iwereheldon 30.06.2015, 21.08.2015 and 29.09.2015respectively.

The Sub-Committee for System Studies foridentification of most appropriate alternativeplan(Sub-Committee-II)heldits4thmeetingon11thMay,2015,5thmeetingon28thJuly,2015and6thmeeting(combinedwith5thmeetingofSub-Committee-I)washeldon21stAugust,2015,7th meeting was held on 29.09.2015 (combinedwith 6th meeting of Sub-Committee-I). DuringthesemeetingsofSub-Committee-I,Mahanadi-Godavarilink,Godavari-KrishnalinksandManas-Sankosh-Tista-Ganga link were discussed. Theguidelines of TAC of NWDA and procedure ofworkingatthewaterbalanceinariverbasinwasalsodiscussed.

TheSub-CommitteeforRestructuringofNationalWaterDevelopmentAgencyheld7meetingsandsubmitted its Report toHon’bleMinister (WR,RD&GR) andChairperson, Special Committeeon21.09.2015.

Sub-Committee for Consensus Building underChairman,CWCheldtwomeetingson17.04.2015and30.10.2015.TheissuesregardingNetravati-HemavatiandBedti-VaradalinkunderNPPandSankh-South Koel, South Koel-Subarnarekhaand Barakar-Damodar-Subarnarekha Intra-

Statelinkprojectswerediscussedduringthesemeetings.AGroupunderDG,NWDAasdecidedinthemeetingwasconstitutedtolookintotherelevantaspectsofSankh-SouthKoelandSouthKoel-Subarnarekhalink.ThefirstmeetingofthisGroupwasheldon29.09.2015.

3.2 Task Force for Interlinking of Rivers

The Union Cabinet while approving theconstitutionofSpecialCommittee for ILR in itsmeetingheldon24th July,2014directedthatacommitteecomprisingofexpertsbeconstitutedto look into the issues relating to inter linkingof rivers. In compliance to the direction ofUnion Cabinet, MoWR, RD & GR vide O.M.dated 13th April, 2015 has constituted a TaskForce for Interlinking of Rivers (TF-ILR) undertheChairmanshipofShriB.N.Navalawala,ChiefAdvisor, MoWR, RD&GR. The tenure of TaskForce is2 yearsortill furtherorderwhicheveris earlier. TheTaskForcewill assist theSpecialCommitteeforILRandMoWR,RD&GRregardingthe implementation of ILR Programme. TwomeetingsoftheTaskForcehavebeenheldon23rd April,2015and5thNovember,2015respectivelyduringtheyear2015-16.

DuringthefirstmeetingofTaskForceforILR,thetermsofreferenceoftheTaskForcehavebeendiscussed and some modifications have beensuggested. During secondmeeting of the TaskForce for ILR, various link proposal of NWDAwerediscussedduringthemeeting.

Page 30: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

20|AnnualReport2015-16

4.1 National Perspective PlanSuggestions for a national water grid fortransferring water from water rich regions towater-deficit areas have been made from timetotime. Twoproposals, put forth earlier in theseventieswhichattractedconsiderableattention,are National Water Grid by Dr. K. L. Rao andGarlandCanalbyCaptainDastur.Theseproposalswere not pursued further by the Governmentas they were not found techno-economicallyfeasible.

The continued interest shown by manyindividuals/organisationsgaveimpetustostudyinter-basin water transfer proposals. The thenMinistry of Irrigation (now Water Resources,River Development and Ganga Rejuvenation)formulated a National Perspective Plan (NPP)for Water Resources Development in August1980. The National Perspective Plan comprisesof two components, namely i) PeninsularRivers Development and ii) Himalayan RiversDevelopment.

The implementation of National PerspectivePlan would give benefits of 25 million ha ofirrigation from surface waters, 10 million haby increased use of ground waters, raising theultimateirrigationpotentialfrom140millionhato175millionhaandgenerationof34millionKWof power, apart from the incidental benefits of

floodcontrol,navigation,watersupply,fisheries,salinityandpollutioncontroletc.

4.2 Inter Basin Water Transfer LinksNational Water DevelopmentAgencywasinitiallyentrustedwiththestudiesrelated to the Peninsular Rivers DevelopmentComponentoftheNationalPerspectivePlanforWater Resources Development. Subsequently,the studies related to the Himalayan RiversDevelopment Component of NationalPerspective Plan were also assigned during1990-91. WorkforthepreparationofDetailedProject Reports of the links after concurrenceof the concerned States was also assigned toNWDA during the year 2006-07. Accordingly,NWDAstartedpreparationofDPRofKen-Betwalink in 2006-07 and the same was completedon31.12.2008.TheDPRofKen-Betwalinkwasfurther splitted in Phase-I and Phase-II. Ken-BetwaPhase-IcomprisingofDaudhanDamandits appurtenant works, tunnel, power housesand link canal was completed in 2010. TheDPRs of Ken-Betwa Phase-II and Damanganga- Pinjal link projects have been completed byNWDA during the year 2013-14. The work ofpreparationofDPRofPar–Tapi–NarmadalinkprojecthasbeencompletedinAugust,2015.

Preparation of PFR/FR of intra-State links asproposed by States was assigned to NWDA

Chapter – 4Technical Activities

Page 31: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|21

during 2006-07. Subsequently the work ofpreparationofDPRofintra-Statelinkswasalsoassigned to NWDA during 2011. The work ofpreparation of 2 DPRs namely Burhi Gandak-Noon-Baya-Ganga link and Kosi-Mechi link ofBiharStatehavebeencompleted.TheworkofpreparationofDPRofWainganga (Gosikhurd)-Nalganga (Purna Tapi) link of Maharashtra,Barakar-Damodar-Subarnarekha of Jharkhand,Vamsadhara-Rushikulya of Odisha and that of

Ponnaiyar-Palar link of Tamil Nadu remainedunder progress during the year. NWDA hascompletedPFRsof36intra-Statelinksupto31st March,2016asproposedbyStateGovernments.

4.3 Preliminary Studies Completed by NWDA

PreliminarystudiescompletedbyNWDAunderPeninsular and Himalayan Components ofNationalPerspectivePlanareshowninTable-1.

Table-1Preliminary studies completed by NWDA under National Perspective Plan (NPP)

Sl. No. Name of Study Peninsular

ComponentHimalayan

Component

Total Preliminary

Studies Completed

1 2 3 4 5

i)WaterBalanceStudiesof- Basins/Sub-basins- DiversionPoints

13752

-19

13771

Total: 189 19 208

ii)ToposheetStudiesfor-ReservoirStorageSites-LinkAlignments

5818

1619

7437

Total: 76 35 111

iii)Pre-FeasibilityReportsofLinksincludingoneadditionalandonealternatestudy

18 14 32

Page 32: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

22|AnnualReport2015-16

4.4 Water Transfer Links under Study by NWDA

WatertransferlinksidentifiedforpreparationofFeasibilityReportsbyNWDA:

Peninsular Rivers Development Component:1. Mahanadi (Manibhadra) - Godavari

(Dowlaiswaram)2. Godavari(Polavaram)-Krishna(Vijayawada)3. Godavari (Inchampalli) - Krishna

(Pulichintala)4. Godavari (Inchampalli) - Krishna

(Nagarjunasagar)5. Krishna (Nagarjunasagar) - Pennar

(Somasila)6. Krishna(Srisailam)-Pennar7. Krishna(Almatti)-Pennar8. Pennar(Somasila)-Cauvery(GrandAnicut)9. Cauvery(Kattalai)–Vaigai-Gundar10. Parbati–Kalisindh-Chambal11. Damanganga–Pinjal

12. Par-Tapi-Narmada13. Ken-Betwa14. Pamba-Achankovil-Vaippar15. Netravati-Hemavati16. Bedti–Varada

Himalayan Rivers Development Component:1. Manas-Sankosh-Teesta-Ganga(M-S-T-G)2. Kosi-Ghaghara3. Gandak-Ganga4. Ghaghara-Yamuna5. Sarda-Yamuna6. Yamuna-Rajasthan7. Rajasthan-Sabarmati8. Chunar-SoneBarrage9. SoneDam-SouthernTributariesofGanga10. Ganga(Farakka)-Damodar-Subernarekha11. Subernarekha-Mahanadi12. Kosi-Mechi13. Farakka-Sunderban14. Jogighopa-Teesta-Farakka (Alternative to

M-S-T-G)

Page 33: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|23

AmapshowingvariousproposedInterBasinWaterTransferlinksunderstudyisgivenbelow:

16

15

10

19

11

8

26

27

25

6

24

17 18

2120

1929

22

28

2330

13

23

12

14

7

P I B W T L U Sroposed nter asin ater ransfer inks nder tudyHIMALAYAN COMPONENT

NAME OF THE LINKS

CHUNAR-SONE BARRAGE SONE DAM-SOUTHERN TRIBUTARIES OF GANGAGANGA-DAMODAR-SUBERNAREKHA SUBERNAREKHA-MAHANADI KOSI-MECHIFARAKKA-SUNDERBANS JOGIGHOPA-TISTA-FARAKKA(ALTERNATIVE TO SL. NO. 1)

8

9

10

11

12

13

14

MANAS-SANKOSH-TISTA-GANGAKOSI-GHAGRAGANDAK-GANGA GHAGRA-YAMUNASARDA-YAMUNAYAMUNA-RAJASTHAN RAJASTHAN-SABARMATI

1

2

3

4

5

6

7

PENINSULAR COMPONENTNAME OF THE LINKS

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MAHANADI (MANIBHADRA) -GODAVARI (DOWLAISWARAM)GODAVARI (INCHAMPALLI )-KRISHNA (PULICHINTALA )GODAVARI (INCHAMPALLI)-KRISHNA (NAGARJUNASAGAR)GODAVARI (POLAVARAM)-KRISHNA (VIJAYAWADA) KRISHNA (ALMATTI)-PENNARKRISHNA (SRISAILAM)-PENNARKRISHNA (NAGARJUNASAGAR)-PENNAR (SOMASILA)PENNAR (SOMASILA)- CAUVERY (GRAND ANICUT)CAUVERY (KATTALAI) - VAIGAI-GUNDARKEN-BETWA PARBATI-KALISINDH-CHAMBAL PAR-TAPI-NARMADA DAMANGANGA-PINJAL BEDTI-VARADANETRAVATI-HEMAVATIPAMBA-ACHANKOVIL-VAIPPAR

LEGEND

INTERNATIONAL BOUNDARYRIVERLINKS

Proposed Inter Basin Water Transfer Links Under Study

Page 34: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

24|AnnualReport2015-16

4.4.1 Present Status of Inter Basin Water Transfer Links under Peninsular Component

Out of 16 links identified under PeninsularComponent,FRsofalllinksexcept2minorlinksviz.Bedti-VaradaandNetravati–HemavatilinkpertainingtoKarnatakahavebeencompleted.

(i) Bedti-Varada Link:Govt. of Karnataka has conveyed theirconcurrenceforpreparationoffeasibilityreportbutworkwasstalledduetooppositionoflocalNGOwhodemandedthatEnvironmentalImpactAssessment (EIA) studies for the concernedareashouldbedonefirstbytheGovernmentofKarnatakawithtermsofreferencepreparedbythem.During62ndGoverningBody(GB)meetingofNWDAheldon27.01.2016,therepresentativeofGovernmentofKarnataka informedthatEIAstudiesofBedti-VaradalinkhavebeenentrustedasperToRpreparedbyNWDAtotheconsultantbytheGovernmentofKarnataka.

(ii) Netravati-Hemavati Link:Govt. of Karnataka has not conveyed theirconcurrenceforpreparationofFeasibilityReportso far. NWDA has been pursuing the matterregularlywithGovt.ofKarnatakaforconcurrencefor taking up survey and investigation forpreparation of Feasibility Report for the link.During62ndGoverningBodymeetingofNWDAheld on 27.01.2016, the representative ofGovernment of Karnataka informed that the

DPRofYettinholeprojectenvisagingtransferofNetravatiwater has been submitted to NWDAvidetheirletterdated19.12.2015.

(iii) Status of Revised Proposal of Mahanadi-Godavari link project

TheFeasibilityReportofMahanadi-GodavarilinkprojectwaspreparedbyNWDAin2004.Thelinkcanaloff-takesfromproposedManibhadradamandout-fallintoGodavaririveratapointabout15kmupstreamoftheexistingDowlaishwarambarrage.ThesubmergenceareaoftheproposedManibhadra reservoir, based on the surveyscarried out by Odisha Government is about59,400ha,whichwasamatterofconcernfortheOdisha Government. The Mahanadi- GodavarilinkprojecthasbeendiscussedwiththeWaterResourcesDepartment,GovernmentofOdishafromtimetotime.Basedonthediscussionsandonthebasisofpreliminarystudies,NWDAhasprepared alternative proposals of Mahanadi-Godavari link with minimum submergencearea and comparable benefits. The alternativeproposalwill envisageadamatBarmul acrossMahanadi, six reservoirs in Tel sub-basin,Mahanadi-Godavari link off – taking fromproposedBarmuldam,andMahanadi(Barmul)– Rushikulya and Vamsadhara – Rushikulya(NandiniNalaProject)intrastatelinksofOdishaState.

The status of various studies under PeninsularComponent as on 31st March, 2016 is shownbelow:

Page 35: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|25

4.4.2 Present Status of Preparation of Feasibility Reports of Inter Basin Water Transfer Links under Himalayan Component

Outof14identifiedlinksNWDAhascompletedfeasibility studies of 2 links i.e. Sarda-Yamunaand Ghaghara-Yamuna (Indian portion) butnot circulated as the work in Nepal area isnot complete. Besides the above, Survey &Investigation (S & I) and preparation of draftfeasibility report works in Indian portionpertaining to the 7 links namely (i) Yamuna -Rajasthan link (ii) Chunar -Sone barrage link(iii) Subernarekha - Mahanadi link (iv) Ganga- Damodar - Subernarekha link (v) Farakka- Sunderbans link (vi) Rajasthan - Sabarmatilink and (vii) Gandak - Ganga link have beencompleted. Survey and Investigationworks forpreparationofFeasibilityReportofKosi–Ghaghrain Indian portion has also been completed.Jogighopa-Teesta-Farakka is an alternate of

MSTGandwhichinvolvesSankosh-Teestareachhaving18Kmalignment inBuxaTigerReserveand huge power requirement. The Kosi-MechilinkentirelyliesinNepalterritory,therefore,noworkcouldbetakenupforthesetwolinkssofar.

Survey and Investigation work of Sone Dam-SouthernTributariesofGanga(STG),andManas- Sankosh – Teesta - Ganga (MSTG) is underprogress.

AlltheHimalayanlinksaredependentonstoragesenvisagedinupperlinksinNepalandBhutanandthus involved international ramifications. TheprogressofpreparationofFeasibilityReportsofthese links, thus, depends on the agreementswithNepalandBhutanregardingtheconcernedlinksfortakingupthesurveyandinvestigationsaccordingly.

The status of various studies underHimalayanComponent as on 31st March, 2016 is shownbelow:

Page 36: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

26|AnnualReport2015-16

4.4.3 Manas - Sankosh – Teesta - Ganga (MSTG) Link:

The Pre-Feasibility Report (PFR) of Manas-Sankosh-Teesta-Ganga link was completed in1996.The Manas-Sankosh-Teesta-Ganga linkenvisages diversion of 43000 MCM surpluswater available in Manas and Sankosh riverswith supplementation from intermediatestreams viz. Aie, Raidak, Torsa, Jaldhaka foraugmenting the flow of Ganga at Farakka andmake available about 13965 MCM of water(after enroute utilization) in Mahanadi basinfor further diversion to south for utilization inwatershortKrishna,Pennar,Cauvery,VaigaiandGundar river basins. Feasibility Report (FR) asperoriginalalignmentcouldnotbecompletedas alignment of Manas-Sankosh-Teesta-Gangalinkwaspassing throughManasTigerReserve,BuxaTigerReserveandotherforests.

Consideringpracticaldifficulties for surveyandinvestigation works in these reaches, NWDAhas carried out alternate alignment studiesavoiding various reserved forests with about80mlift.FeasibilityReportoftheMSTGlinkwithrevisedalignmentisunderpreparationandaftercompletion,willbesubmittedtoGovt.ofWestBengal,AssamandBihar for theirsuggestions/viewsonthereport.

4.4.4 Consensus building process for Manas-Sankosh-Teesta-Ganga link project

The Manas-Sankosh-Teesta-Ganga link projectwasdiscussedbytheSub-Committeeforsystemstudies for evaluation of most appropriatealternativeplan in its5thmeetingheldon28thJuly, 2015. Hon’ble Minster (WR,RD&GR) hasrequestedHon’bleChiefMinister,WestBengalvide letter dated 31-12-2015 seeking her

Page 37: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|27

supporttotheProjectProposal.Representativeof West Bengal desired that their suggestionsmaybeconsideredinthereport.

AteamofseniorofficersofMinistryofWR,RD&GR led by the Special Secretary,Ministry ofWR,RD&GRwhichincludedDirectorGeneral,NWDAandotherofficershadameetingwiththeChiefSecretary,GovernmentofWestBengalatKolkataon17thAugust,2015regardingSankosh-Mahanadi Link System, which comprises fourlinks namely; Sankosh-Teesta (first phase ofManas - Sankosh - Teesta -Ganga link);Ganga- Damodar - Subernarekha; Subernarekha- Mahanadi and Farakka - Sunderbans link

projects. The team requested Governmentof West Bengal for agreeing to the proposalof preparation of DPR by NWDA. The StateGovernmentwasalsorequestedtofurnishtheirsuggestions/observationsfortheimprovementoftheproposal.

During62ndGoverningBodymeetingofNWDAheld on 27.01.2016, representative of WestBengal desired that their suggestions may beconsidered in the Report. Director General,NWDA mentioned that FR after completionwill be sent to Govt. ofWest Bengal for theircomments/observation, which would beconsideredappropriately.

Page 38: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

28|AnnualReport2015-16

5.1 Efforts Made For Arriving At Consensus

MinistryofWaterResourcesandNationalWaterDevelopment Agency identified following fivelinks as priority links for initiating the steps toarrive at a consensus amongst the concernedStates through ‘Consensus Group’ headed bytheChairman,CentralWaterCommission:

1. Ken-BetwaLink,

2. Par-Tapi-NarmadaLink,

3. Damanganga-PinjalLink,

4. Parbati-Kalisindh-ChambalLink,and

5. Godavari (Polavaram)-Krishna (Vijayawada)Link.

AftergettingthemandateinJune2006andtheconsensus building efforts by the ConsensusGroupheadedbyChairman,CWC,NWDAwiththeconcurrenceoftheconcernedStatestookupthepreparationofDetailedProjectReport(DPR)oftheagreedlinks.TheDPRsofKen-BetwalinkprojectPhase-IandPhase-II,Damanganga-Pinjallink (March, 2014) and Par-Tapi-Narmada link(August,2015)havebeencompletedbyNWDA.TheDPRofParbati-Kalisindh-Chamballinkcouldnotbetakenasconsensushasnotbeenreachedon NWDA proposal, however Government of

Madhya Pradesh has taken up its own Intra-Stateproject.

Godavari (Polavaram)-Krishna (Vijayawada) linkProjectisapartofPolavaramprojectofAndhraPradeshandtheGovernmentofAndhraPradeshhad taken up the above project including thelink component as per their own planning.Government of India has now constitutedPolavaramProjectAuthorityfortheexecutionofthe Polavaram irrigation project in accordancewithAndhraPradeshReorganisationAct-2014.

On the basis of discussions heldwithGovt. ofOdishafromtimetotime,NWDAhadpreparedalternativeproposalofMahanadi-Godavari linkwith minimum submergence and comparablebenefits.

In view of above, presently four priority linkshavebeen identified viz. 1. Ken-Betwa Link, 2.Par-Tapi-Narmada link, 3. Damanganga-Pinjallinkand4.Mahanadi-Godavarilink.

Status of Preparation of Detailed Project Reports under National Perspective Plan (NPP)(1) Ken-Betwa link project (Phase-I)TheDetailedProjectReport(DPR)ofKen-BetwaPhase-I remained under appraisal in CWC on31.03.2016.Theprojecthasbeenclearedfrom

Chapter – 5Priority Links Identified

Under National Perspective Plan (NPP)

Page 39: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|29

technical angle. The cost estimate is beingrevised. The status related to Environment,ForestsandWildlifeclearancesason31.03.2016isgivenbelow.

Environment clearanceKen-BetwaLinkProjectPhase-Iwasconsideredby Expert Appraisal Committee (EAC) of

MOEF&CCforenvironmentalclearanceinits86th meetingheldon24.8.2015,88thmeetingheldon26thOctober,2015and91stmeetingheldon9th February,2016atNewDelhi.

StatusofEnvironmentClearanceisasunder:

Status of Environment Clearance of Ken-Betwa link project phase-I

Meeting & Date of EAC Decision

86thmeeting24.08.2015 NWDAtoprovideadditionalinformationonEIA/EMPandrepliestorepresentationsreceivedfromNGO.

88thmeeting26.10.2015 EACdesiredtohavedetailedinformationonLandscapeManagementPlan(LMP)

91stmeeting8-9th.02.2016 EACconsideredcompliance reportandasked forwildlife clearancefromNBWL

Wild life clearanceThewildlifeclearanceofKen-BetwaLinkProject,Phase-IhasbeenconsideredbytheStateWildlifeBoardofMadhyaPradeshinitsmeetingheldon22nd September, 2015under theChairmanshipofHon’bleChiefMinister,MadhyaPradesh.TheBoard has decided to forward the proposal toNationalBoardofWildLife(NBWL)ofMoEF&CCwith recommendations for according theWildLifeClearanceofKen-BetwaLinkProjectPhase-I.Accordingly, the proposal was submitted toMoEF&CConNovember3,2015.

The proposal for wild life clearance wasduly considered in 37th meeting of StandingCommittee of the National Board of Wildlife(NBWL)chairedbyHon’bleMinisterofState(I/C)

Environment, Forest and Climate Change heldon 26th February,2016. The Special Secretary(WR, RD&GR) made a presentation of theprojectproposalbeforetheStandingCommitteeof NBWL. The Standing Committee afterdetaileddiscussiondecidedthatacommitteebeconstitutedcomprisingrepresentativesofNTCA,WildlifeInstituteofNBWL,Dr.H.S.Singh,RetiredPCCFandMemberofNBWL, representativeofChief Wildlife Warden, Madhya Pradesh andrepresentativeofuseragency.

ThetermsofreferenceofthisCommitteearetoevaluatetheKen-BetwalinkProjectinaholisticmannervis-a-visitsimpactontigerlandtenuredynamics and vulture nesting and examineavailabledocumentstosuggestfeasibilityoftheprojectinthelongtermtoexaminetheproposal.

Page 40: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

30|AnnualReport2015-16

Forest Land Diversion ClearanceTheFRAcertificatefordiversionofforestlandinrespectofChhatarpurdistricthasbeenreceivedandthesameforPannaDistrictisunderprocess.The technical approval of Catchment AreaTreatment(CAT)PlanfromCCFChhatarpurhasbeen received. NWDA is pursuing the matterwith concerned Collector/Chief Conservatorof Forests (CCF) to obtain the pending FRAcertificate and technical approval of CAT PlanfromSagarattheearliest.

(2) Ken-Betwa Link Project (Phase-II)TheDPRofKen-BetwaLinkProjectPhase-IIhasbeencompletedandsubmittedtoGovernmentof Madhya Pradesh and Uttar Pradesh videNWDAletterdatedJanuary17,2014.Ken-Betwalinkprojectphase-IIentirelypertainstoMadhyaPradeshandthebenefitsoftheprojectarealsoentirelytotheMadhyaPradesh.

The WRD, Govt. of M.P. has subsequentlysuggestedsomemodificationsinDPR.TheDPRisbeing revisedbyNWDA in consultationwithGovt.ofMadhyaPradesh.

Thestatusofenvironmentandforestclearanceoftheprojectisgivenbelow.

Environmental Clearance of Lower Orr DamDraft Environmental Impact Assessment (EIA)StudyoftheLowerOrrDamhasbeencompletedby WAPCOS as per the ToRs approved byMoEF&CC. The public hearings for the LowerOrr damhavebeen conducted at threeplaces

i.e. (i) Village Dadauni, District Shivpuri on17.9.2015, (ii) Village Piproud, District AshokNagar on 18.9.2015 and (iii) Village Nauner,District Datia on 19.9.2015. The issues raisedby the participants alongwith the compliancethereof will be included in the final EIA andEnvironmentalManagementPlan(EMP)Report.TheEIAReportwillbesubmittedtoEAC(RiverValley and Hydroelectric Projects), MoEF&CCfor according environmental clearance of Ken-BetwaLinkProject-Phase-II.

The proposal for environmental clearance ofLowerOrrDamwasdulyconsideredduring91st meeting of Expert Appraisal Committee (EAC)ofMoEF&CCheldon8thFebruary,2016.NWDAproject proponent has made a presentation.The EAC has considered the proposal ofEnvironmentalClearanceofLowerOrrDambutraised certain issues on soil mapping, e-flows,additionalcommandareaandlinkagewithKen-BetwaLinkProject,Phase-I.Thecompliancetothe issues/observations has been submittedto MoEF & CC for consideration of EAC andaccordingEnvironmentalclearanceofLowerOrrDaminitsnextmeeting.

Forest Clearance of Lower Orr DamForm-IfordiversionofforestlandunderLowerOrr Dam has been submitted to Collectorand District Forest Officer (DFO),Ashok Nagarand Shivpuri for processing the case of forestclearance. Further processing of the case forforest clearance of Lower Orr Dam is to bedone by Forest Department,Madhya Pradesh.

Page 41: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|31

After completing other parts of the form byForest Department, Madhya Pradesh, thesamewillbesubmittedtoMoEF&CCwiththeirrecommendationsforissuingforestclearance.

(3) Damanganga-Pinjal Link ProjectThe Detailed Project Report (DPR) ofDamanganga-Pinjal link project has beencompleted by NWDA duringMarch, 2014 andthesameisunderappraisalinCWC.

The issue of sharing of water, hydropowerand cost is under discussion amongst NWDA,Government of Maharashtra and Governmentof Gujarat at the official level. So far threemeetings have been held at the level of ChiefEngineer of the concerned departments. Thewater availability study has been acceptedby both the States. It has also agreed thatthe sharing of water between Gujarat andMaharashtra will be on the proportionatecatchment area basis duly accounting for thevariationincatchmentrainfall.GujaratStatewillenjoythesolebenefitofhydropowergenerationfromBhugaddampowerhouseandthecostofthispowerhousewillbebornebyGujaratState.Similarly,MaharashtrawillenjoythesolebenefitofhydropowergenerationfromKhargihillpowerhouseandthecostofthispowerhousewillbebornebyMaharashtraState.

Hon’ble Union Minister for WR, RD & GRheld a meeting with Hon’ble Chief Ministerof Maharashtra on 7th January, 2015 atMumbai to expedite the further course ofaction for implementation of Damanganga-

Pinjal link project. The Secretary, Narmada,Water Resources, WS & Kalpsar Department,GovernmentofGujaratwasalsopresentduringthismeeting.

Hon’ble Chief Minister of Maharashtra in hisD.O. letter dated 16th January, 2015 addressedto Hon’ble Union Minister for WR, RD & GRhas requested to facilitate for finalization ofMoU in consultation with the party States.The Hon’ble Chief Minister of Gujarat in herDO letter dated 22nd January, 2015 addressedto the Chief Minister of Maharashtra and inanother DO letter dated 10th September, 2015addressed to Hon’ble Union Minister for WR,RD& GR has expressed to sign an agreementfor implementation of Damanganga-Pinjal andPar-Tapi-Narmada link projects together afterresolving all issues relating to water sharingundertheproposedlinkproject.

(4) Par-Tapi-Narmada Link ProjectThe DPR of Par-Tapi-Narmada link project hasbeen completed by NWDA and submitted toWater Resources Departments of GovernmentofGujaratandMaharashtrainAugust,2015.

The issue of sharing of water and power inrespect of Par-Tapi-Narmada link project hasbeen under discussion amongstNWDA,WaterResourcesDepartments,GovernmentofGujaratandMaharashtraattheofficiallevel.Thewateravailability study of Par-Tapi-Narmada link hasbeenagreedbyboththeStates.

The Hon’ble Chief Minister of Maharashtravide his D.O. letter dated 16th January, 2015

Page 42: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

32|AnnualReport2015-16

addressed to Hon’ble Union Minister (WR,RD&GR) has conveyed his agreement forthe proposed Par-Tapi-Narmada link projectprovided that the Maharashtra is allowed totransferatleast300MCMofwatertoGirnaSub-basinandremainingwatershareofMaharashtrawouldbecompensatedelsewhereinTapibasin.He further observed that the Governmentof Gujarat will honour the report of IyengarCommittee (1958)whichwas set up to assessthe alternative requirement and allocation ofwatersfordifferentareasinTapibasin.

TheHon’bleUnionMinister(WR,RD&GR)videherDO letterdated22nd June,2015addressedtotheHon’bleChiefMinisterofGujaratsolicitedthe views of Government of Gujarat in thematter of honouring the provisions of IyengarCommitteeReport.TheHon’bleChiefMinister,GujaratvideherD.O.letterdated10thSeptember,2015addressedtoHon’bleUnionMinister(WR,RD&GR)indicatedthat“theIyengarCommitteeReportwasa technical study reportand ithasnever been an agreement, duly signed by allthebasinStates.ThisReportwas submitted in1958i.e.beforeconstructionofUkaiDam.ThepresenttotaluseofTapiwaterbyGujaratStateat Ukai dam is 5200 MCM per annum. Anyreduction in Gujarat’s existing requirement of5200MCMofTapiwaterwillaffecttheexistingestablishedcommandareaofUkaiproject.Afterstudyingtheissuesrelatedtowatersharingandother relatedmatter,Gujaratwill take suitabledecisionaccordingly.GujaratwouldliketosignanMoUof both the linkprojects i.e. Par-Tapi-

NarmadaandDamanganga-Pinjaltogetherafterresolvingallissuesrelatingtowatersharing”.

The further course of action forwater sharingagreement and implementation of Par-Tapi-Narmada link project will be decided inconsultationwithbothStates.

(5) Revised Proposal of Mahanadi-Godavari link project

TheFeasibilityReportofMahanadi-GodavarilinkprojectwaspreparedbyNWDAin2004.Thelinkcanaloff-takes fromproposedManibhadradamandout-fall intoGodavaririveratapointabout15kmupstreamof theexistingDowlaishwarambarrage.ThesubmergenceareaoftheproposedManibhadra reservoir, based on the surveyscarried out by Odisha Government is about59,400ha,whichwasamatterofconcernfortheOdisha Government. The Mahanadi- Godavarilink project has been discussedwith theWaterResources Department, Government of Odishafromtimetotime.Basedonthediscussionsandon the basis of preliminary studies, NWDA hasprepared alternative proposals of Mahanadi-Godavari linkwithminimum submergence areaandcomparablebenefits.ThealternativeproposalwillenvisageadamatBarmulacrossMahanadi,six reservoirs in Tel sub-basin, Mahanadi-Godavarilinkoff–takingfromproposedBarmuldam, andMahanadi (Barmul) – Rushikulya andVamsadhara–Rushikulya(NandiniNalaProject)intrastatelinksofOdishaState.

TheAdditionalSecretary,MinistryofWR,RD&GR;Chairman,CentralWaterCommission;and

Page 43: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|33

Director General, NWDAmade a presentationontheabovealternativeproposalofMahanadi-Godavari link project before the Hon’bleChiefMinister of Odisha on 29thMay, 2015 atBhubaneswar.

During5thmeetingoftheSpecialCommitteeforILRheldon13th July,2015atNewDelhi,whilediscussing the revised proposal of Mahanadi-Godavari link project the Principal Secretary,Water Resources Department, Government ofOdisha has raised the issue of water balancein Mahanadi basin. He observed that therewas no surplus water in Mahanadi basin by2050ADasper theirassessment.The issueofwaterbalanceofMahanadibasinwasdiscussedby Sub-Committee for System Studies foridentificationofmostappropriateplan(SC-II)inits4thmeetingheldon11thMay,2015;andthecombined meetings with Sub-Committee forcomprehensive evaluation of various studies/reports available on the issue of ILR held on21stAugust,2015and29th September,2015. Itwas decided by the Sub-Committee-II to carryout system simulation studies including thewater balance studies of Mahanadi-Godavarilink through National Institute of Hydrology.Accordingly the Hydrological study and multireservoir simulation for proposed Mahanadi–Godavari linkwas assigned toNIH, Roorkee.Thescopeofworkcoversassessmentofwateravailability at the seven proposed sites andintegratedmultireservoirsimulationstudiesofthesystem.

(6) Godavari-Krishna link projectsThesurpluswaterofMahanadi-GodavaririversisproposedtobedivertedtoKrishnabasinforutilization in thewater deficit Krishna, Pennar,Cauvery, Vaigai and Gundar river basins.Following three link projects are proposed fordiversionofsurplusMahanadi-GodavariwaterstoKrishnabasin:

(i) Godavari(Inchampalli)-Krishna(Nagarjunasagar)link

(ii) Godavari(Inchampalli)-Krishna(Pulichintala)link

(iii) Godavari(Polavaram)-Krishna(Vijayawada)link

The above link proposals were discussed bythe Sub-Committee for system studies foridentification of most appropriate alternativeplan in its 5th meeting held on 28th July, 2015.TheSub-CommitteeobservedthattheFeasibilityReports of Godavari (Inchampalli)-Krishna(Nagarjunasagar) and Godavari (Inchampalli)-Krishna (Pulichintala) link proposals have beenpreparedbyNWDAintheyear2005i.e.beforebifurcation of Andhra Pradesh State. Thus,issuesandconcernsoftheTelanganaStateabouttheselinkprojectshavenotbeendulytakencareoff. ThewaterbalancestudyofGodavaribasinuptoproposedInchampallidamsiteneedstobeupdatedconsideringthelatestavailabledata.

NWDA has revised thewater balance study ofGodavari basin up to Inchampalli dam site byconsideringtheviewsofTelanganaStateandalsothelatestavailabledataduringtheyear2015-16.

Page 44: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

34|AnnualReport2015-16

5.2 Examination of the subject “Interlinking of Rivers” by the Parliamentary Consultative Committee on Water Resources

AmeetingofConsultativeCommitteeofMoWR,RD&GRwas held under the Chairmanship ofHon’ble Minister (WR,RD&GR) on 31.08.2015at Khajuraho. Themeetingwas attended by 9Hon’bleMember of Parliament besides seniorofficersoftheMinistryanddiscussedmainlyonagriculture, irrigation projects, command areadevelopment, sprinkle and drip irrigation etc.includingKen-Betwalinkproject.

Aftermeeting, theChairperson alongwith themembers of Consultative Committee visitedtheproposedDaudhandamsiteofKen–Betwa

link project Phase-I on 31.08.2015. All wereapprisedof thedetailsof theproject includingthe benefits envisaged to bothMP & UP. Theproject will be very beneficial for the overalldevelopmentofBundelkhandregioncomprisingTikamgarh, Chhattarpur, Panna districts ofMPandMahoba,JhansiandBandadistrictsofUttarPradesh.TheConsultativeCommitteemembersalsointeractedwiththelocalpeoplecominginthe submergence. The local people expressedtheirfullsupporttotheProjectasitwillimprovetheir socio- economic condition. The Hon’bleMembers of the Parliament appreciatedthe efforts made by the Ministry under theleadershipofHon’bleMinister(WR,RD&GR)inpursuingtheprojectforitsimplementation.

Page 45: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|35

6.1 Intra-State LinksMinistry of Water Resources in June 2005conveyed the approval to identify intra-StatelinksintheStateslikeBiharandtopreparepre–feasibility/feasibilityreportsoftheselinksbyNWDA.ThisworkwasaddedinthefunctionsofNWDAaftertheapprovalintheSpecialGeneralMeetingofNWDASocietyheldon28.06.2006.Later on during the year 2011, preparation ofDetailedProjectReportsofintra-StatelinkshasalsobeenaddedinthefunctionsofNWDA.

NWDArequestedalltheStates/UTstoinformthedetailsofintra-Statelinksforcarryingoutfurtherstudies by NWDA. Response from the States ofBihar,Maharashtra, Gujarat, Odisha, Jharkhand,Meghalaya, Nagaland, Karnataka, Chhattisgarh,Kerala, Punjab, Delhi, Rajasthan and UnionTerritories of Puducherry, Andaman & NicobarIslands andDaman&Diuwas received. Govts.of Nagaland, Meghalaya, Kerala, Punjab, DelhiandUnionTerritoriesofPuducherry,Andaman&NicobarIslandsandDaman&DiuindicatedthattherewasnoIntra-StatelinkproposalconcerningtotheirStates/UTs.

6.1.1 JharkhandGovt. of Jharkhand suggested three intra-State linkproposals viz. (i) Barakar –Damodar–Subarnarekha, (ii)Sankh -SouthKoeland (iii)SouthKoel-Subarnarekhalinks.PFRsofallthe

three linkshavebeencompleted.TheBarakar-Damodar-Subarnarekha linkhasbeentakenupforpreparationofDPRbyNWDA.

6.1.2 GujaratGovt.ofGujaratsuggestedfortakingupthePFRof Damanganga – Sabarmati – Chorwad intra-Statelink.ThePFRofthelinkhasbeencompletedduring2011-12.

6.1.3 MaharashtraOut of 20 links proposed by Maharashtra,the PFR of 17 links namely (i) Wainganga(Goshikhurd) – Nalganga (Purna Tapi), (ii)Wainganga–ManjraValley(Notfoundfeasible),(iii)UpperGhat–GodavariValley(Damanganga(Ekdare)- Godavari Valley), (iv) Upper Vaitarna–GodavariValley,(v)NorthKonkan–GodavariValley,(vi)UpperKrishna–Bhima(systemofsixlinks),(vii)Mulsi–Bhima,(viii)Nar–Par–Girnavalley, (ix) Koyna-Mumbai City, (x) Kolhapur-Sangli-Sangola,(xi)Koyna-Nira(xii)SriramSagarProject (Godavari) – Purna – Manjira, (xiii)Middle Konkan – Bhima Valley, (xiv) Savithri –Bhima, (xv) Riverlinking projects of Tapi basinand Jalgaon District, (xvi) Narmada – Tapi and(xvii)Jigaon–Tapi–GodavariValleyhavebeencompleteduptoMarch2014.TheworkofDPRofintra–StatelinkofWainganga(Gosikhurd)–Nalganga(PurnaTapi)linkremainedinprogressduring the year. The Wainganga (Gosikhurd)-

Chapter – 6

Intra-State Links Proposed by States

Page 46: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

36|AnnualReport2015-16

Godavari (SRSP) link withdrawn by Govt. ofMaharashtraandtwolinksnamelyKhariagutta-Navatha Satpura foothills andKharighutiGhat-TapilinkaregroundwaterrechargeschemestobestudiedbyCGWB.ConsequentlynotacceptedbyTACofNWDAforPFRstudies.

6.1.4 OdishaGovt. of Odisha submitted proposal for takingupthreeintra-Statelinks.ThePFRofMahanadi-Brahmani intra-State link was completed byNWDA and not found techno-economicallyviable. The PFRs of two more links viz; (i)Mahanadi-Rushikulya Link Project (BarmulProject) and (ii) Vamsadhara-Rushikulya(Nandininalla) Project have been completed.TheVamsadhara-RushikulyahasbeentakenupforpreparationofDPRbyNWDA.

6.1.5 BiharInMay2008,Govt.ofBiharrequestedNWDAtoprepare DPRs of six intra-State link proposals,namelytransferofKosibasinwatertoMahanandabasinthroughKosi–Mechilinkcanal,transferofSonebasinwaterthroughSone–Kiullinkcanal&transferofGangawaterthroughBarh–NawadaPumpcanalschemetoPunpun–Harohar–Kiulbasin withmultipurpose development of thesebasins,Kohra–Chandravatlink,BurhiGandak–Noon–Baya–Gangalink,BurhiGandak-BagmatithroughBelwadharandKosi–Gangalink.PFRofKosi-Mechi linkwas completedduring 2008-09.The PFRs of Burhi Gandak-Noon-Baya-Gangaand Kohra-Chandravat linkswere completed byNWDAduringtheyear2009-10.Duringtheyear

2010-11,NWDAcompletedthePFRsofremaining3 links viz; Bagmati-Burhi Gandak (throughBelwadhar), Barh-Nawada pump canal schemeandKosi(Bagmati)-GangaLinkofBiharState.

NWDAhascompletedDetailedProjectReportsof Burhi Gandak-Noon-Baya-Ganga and Kosi-Mechi intra-State links inDecember, 2013 andMarch, 2014 respectively and submitted toGovernmentofBihar.TheseareunderappraisalinCentralWaterCommission.

The Govt. of Bihar vide their letter dated27.05.2011 has proposed to entrust the workofpreparationofDPRsofthreemoreintra-statelink schemes to NWDA viz. (i) Development ofBagmati Irrigation & Drainage Project Phase-II(BarragenearKataunjhainMuzaffarpurDistrict)and Adhwara Multipurpose Project with Kosi-Adhwara-Bagmati links (ii) Transfer of GangawatertosouthBiharthroughpumpcanalschemeatBuxerand(iii)DevelopmentofBadua-Chandanbasin. Initially,NWDAconsented to takeup theworkoftwolinks(a)TransferofGangawatertosouthBiharthroughpumpcanalschemeatBuxer(b) Development of Badua –Chandan Basin butafter receiving the details from Govt. of Bihar,itwas found that thesearenot intra-state linksthereforenottakenup.Inthemeantime,NWDAhastakenupPFRofKosi-Adhawara-BagmatilinksonbasisofavailabledatainApril,2014andthesamewascompletedinMarch,2015.

6.1.6 RajasthanIn February 2009, the Govt. of Rajasthansubmittedtwoproposalsofintra-Statelinksviz.

Page 47: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|37

(i)Mahi-Luni link and (ii)Wakal-Sabarmati-Sei-West Banas-Kameri link. During 2011-12, PFRofWakal-Sabarmati-Sei-WestBanas-Kamerilinkwas completed and the PFR ofMahi-Luni linkhasbeencompletedduring2012-13.

6.1.7 Tamil NaduGovt. of Tamil Nadu submitted a proposal fordiversionoffloodflowsofPonnaiyarRiverbelowKrishnagiri reservoir to the water short Palarbasin through Ponnaiyar-Palar link for whichPFRwascompletedduring2011-12.TheworkofpreparationofDPRof Ponnaiyar-Palar link takenupbyNWDAremainedinprogressduringtheyear.

6.1.8 KarnatakaTotalsixproposalswerereceivedfromKarnataka.These have been technically examined. Outof these, four proposals are found feasiblefor preparation of PFR. The PFR of one link

namelyBedti-DharmaandVaradalinkhasbeencompletedduringtheyear2015-16.

6.1.9 ChhattisgarhGovernment of Chhattisgarh proposed onelink viz. Pairy-Mahanadi link forpreparationofPrefeasibility Report, PFRof this link has beencompletedinMarch,2015.

6.1.10 Overall Status of Preparation of PFRs of Intra-State Links

Upto March, 2016 out of total 46 intra-Statelinks, NWDA has completed PFRs of 36 links(4 during 2008-09, 5 during 2009-10, 6 during2010-11, 6 during 2011-12, 6 during 2012-13and6during2013-14,2during2014-15andoneduring2015-16)asproposedbytheconcernedStates.Thedetailsofintra-StatelinkssuggestedbyvariousStateGovernmentsandtheirpresentstatusaregivenbelow:

Details of Intra-State Link Proposals and their Present Status

S. No.

Name of Intra-state link Rivers Status

Maharashtra

1. Wainganga(Goshikurd)–Nalganga(PurnaTapi)[Wainganga–WesternVidarbha&Pranhita–WardhalinksmergedandextendedthroughKanhan–Wardhalink]

Wainganga&Nalganga PFRCompleted&DPRunderpreparation

2. Wainganga–ManjraValley Wainganga&Manjra PFRCompleted(Notfoundfeasible)

3. UpperKrishna–Bhima(systemofSixlinks) Krishna&Bhima PFRCompleted

4. UpperGhat–GodavariValley(Damanganga(Ekdare)-GodavariValley)

Damanganga&Godavari

PFRCompleted

Page 48: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

38|AnnualReport2015-16

S. No.

Name of Intra-state link Rivers Status

5. UpperVaitarna–GodavariValley Vaitarna&Godavari PFRCompleted

6. NorthKonkan–GodavariValley Patalganga&Godavari PFRCompleted

7. Koyna–Mumbaicity Koyna PFRCompleted

8. SriramSagarProject(Godavari)–Purna–Manjira

Godavari, Purna &Manjira

PFRCompleted

9. Wainganga(Goshikurd)–Godavari(SRSP) Wainganga&Godavari WithdrawnbyGovt.ofMaharashtra

10. MiddleKonkan–BhimaValley Savitri,Kundalika,Amba&Bhima

PFRCompleted

11. Koyna–Nira Koyna&Nira PFRCompleted

12. Mulsi–Bhima Mulsi&Bhima PFRCompleted

13. Savithri–Bhima Savithri&Bhima PFRCompleted

14. Kolhapur–Sangli–Sangola Krishan&Bhima PFRCompleted

15. RiverlinkingprojectsofTapibasinandJalgaonDistrict

Tapi PFRCompleted

16. Nar–Par-Girnavalley Nar,Par&Girna PFRCompleted

17. Narmada–Tapi Narmada&Tapi PFRCompleted

18. Khariagutta–NavathaSatpurafoothills Dropped Ground waterrecharge scheme to be studiedby CGWBconsequently notaccepted by TACof NWDA for PFRstudies.

19. KhariaGhutiGhat–Tapi Dropped

20. Jigaon–Tapi–GodavariValley Tapi&Godavari PFRCompleted

Gujarat

21. Damanganga–Sabarmati–Chorwad Damanganga,Sabarmati&Chorwad

PFRCompleted

Odisha

22. Mahanadi–Brahmani Mahanadi&Brahmani PFRCompleted

Page 49: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|39

S. No.

Name of Intra-state link Rivers Status

23. Mahanadi–Rushikulya(BarmulProject) Mahanadi&Rushikulya PFRCompleted

24. Vamsadhara–Rushikulya(NandiniNallaproject)

Vamsadhara&Rushikulya

PFRCompleted&DPRtakenup

Jharkhand

25. SouthKoel–Subernarekha SouthKoel&Subernarekha

PFRCompleted

26. Sankh–SouthKoel Sankh&SouthKoel PFRCompleted

27. Barkar–Damodar–Subernarekha Barkar,Damodar&Subernarekha

PFRCompleted&DPRtakenup

Bihar

28. Kosi–Mechi[entirelylieinIndia] Kosi&Mechi DPR Completedin March -2014 &under appraisal inCWC

29. Barh–Nawada Ganga&Kiul PFRCompleted

30. Kohra–Chandravat(nowKohra-Lalbegi) Kohra&–Chandravat PFRCompleted

31. BurhiGandak–Noon–Baya-Ganga BurhiGandak,Noon,Baya&Ganga

DPRCompletedinMarch-2013&underappraisalinCWC

32. BurhiGandak–Bagmati[Belwadhar] BurhiGandak&Bagmati

PFRCompleted

33. Kosi–Ganga Kosi&Ganga PFRCompleted

34. DevelopmentofBagmatiIrrigation&DrainageProject-Phase-II(BarragenearKataunjhainMuzaffarpurDistrict)andAdhwaraMultipurposeProjectwithKosi-Adhwara-BagmatiLink

Kosi,Adhwara&Bagmati

PFRCompleted

Page 50: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

40|AnnualReport2015-16

S. No.

Name of Intra-state link Rivers Status

35. TransferofGangawatertoSouthBiharthroughpumpCanalSchemeatBuxer

Ganga Initially, NWDAconsented to takeup the work butafter receiving thedetails from Govt.of Bihar, it wasfound that theseare not intra-statelinks thereforenottakenup.

36. DevelopmentofBadua-ChandanBasin Badua&Chandan

Rajasthan

37. Mahi–Lunilink Mahi&Luni Notfoundfeasible

38. Wakal–Sabarmati–Sei–WestBanas–Kamerilink

Wakal,Sabarmati,Sei,WestBanas&Kameri

Notfoundfeasible

Tamil Nadu

39. Ponnaiyar–Palarlink Ponnaiyar&Palar PFRCompleted&DPRunderprogress

Karnataka

40. Almatti(Bagalkot)-MalaprabhaSub-basin Almatti&Malaprabha Notfoundfeasible

41. Malaprabha-TungabhadraSub-basin Malaprabha&Tungabhadra

Notfoundfeasible

42. Bedti-DharmaandVaradalink Bedti,Dharma&Varada PFRCompleted

43. Bhadra-Vedavathi(V.V.Sagarlink) Bhadra&Vedavathi Proposalstakenup

44. Diversionofwestflowingriversschemes Proposalstakenup

45. DiversionofAghanashinitoVarada Aghanashini&Varada Proposalstakenup

Chhattisgarh

46. Pairy-Mahanadilink Pairy&Mahanadi PFRCompleted

6.1.11 Present status of preparation of DPRs for Intra-State links:PresentstatusofpreparationofDPRsforintra-StatelinksidentifiedbyStatesisgivenbelow:

Page 51: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|41

Sl. No.

Name of link Rivers State concerned

Status of DPR

1 BurhiGandak-Noon-Baya–Gangalink

BurhiGandak&Ganga

Bihar DPR has been completed and submittedto Government of Bihar vide letter datedDecember30,2013.Replies / compliance of CWC commentson various technical aspects on DPR havebeen sent to CWC. Cost estimate of thelink project is under revision in the lightof the observations of CWC. The replies /compliance to the comments of GFCC havebeensubmittedtoGFCCon29.07.2015.

2 Kosi-MechiLink

Kosi&Mechi

Bihar DPR has been completed and sent toGovernmentofBiharvideNWDAletterdatedApril02,2014.Replies to the comments of HydrologyDirectorate, CWC on DPR received, whichwere replied on 13.02.2015. The collectionoftheremainingdataforcomplianceofthecommentsofCWConDPRisunderprogress.

3 Ponnnaiyar-Palarlink

Ponnniyar&Palar

TamilNaduDPRremainedunderprogress.

4 Wainganga(Gosikhurd)-Nalganga(PurnaTapi)

Wainganga&PurnaTapi

WMaharashtra DPRisunderprogress.ThetimescheduleforcompletionofDPRhasbeenmodified fromMarch2016 toMarch2017due to increaseof the length of canal from about 190 kmto 470 km in order to divert a quantumof 1912 MCM of water instead of 300MCM as communicated by Government ofMaharashtra.

5 Barakar-Damodar-Subarnarekhalink

Barakar&Damodar

Jharkhand DPR has been taken up in April, 2014. ThematterwasdiscussedintheSub-CommitteeofConsensusBuildingon30.10.2015.ThewaterbalancestudyatproposedBalpaharidamsiteonBarakarriverwillbecarriedoutafreshandPFRofthislinkwhichwaspreparedearlierbyNWDAwill be revised in light of commentsmadebythemembersduringthemeeting.

Page 52: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

42|AnnualReport2015-16

6 Vamsadhara-Rushikulya(NandaniNalla)

VamsadharaandRushikulya

OdishaThe work of preparation of DPR has beeninitiated.

6.1.12 Setting up of Group on Intra-State links

MinistryofWaterResources,RiverDevelopmentand Ganga Rejuvenation (MoWR, RD & GR)constituted a Group on Intra State River LinksvideOMdated12.03.2015underChairmanshipofShriA.DMohile,FormerChairman,CWC,NewDelhi and having Shri A.D. Bhardwaj, FormerDG,NWDA&FormerMemberCWC,NewDelhiand Chief Engineer (IMO), CWC, New Delhias Members and Director (Technical), NWDA,NewDelhi as Convenor. TheGrouphas held 8meetingsandsubmitteditsreporton28.05.2015toMoWR,RD&GR.

6.1.13 Providing funding to the proposals of the State Government for the preparation of Detailed Project Report of Intra-State river link Projects

The work for preparation of Detailed ProjectReport(DPR)ofIntra-Stateriverlinkprojectswasaddedinthefunctions/mandateofNWDAvide

MoWR,RD&GRresolutiondated19thMay,2011andGazettenotificationdated11th June,2011.Presently DPRs of Intra-State link as proposedbyStatesarebeingpreparedbyNWDAwiththefundsprovided toNWDAthroughGrants - in -AidbytheMinistryofWR,RD&GR.

Ministry of WR, RD&GR vide their letter No.2/12/2015-BM/2217 dated 1.12.2015 hasconveyed the following decision regarding thefundingofDPRofintra-statelinksthat:

“NWDA should generally confine itself to inter-state river linkage project DPR. They can take up intra-state river linkage projects only as consultancy works, if awarded by any State Government. The Government of India fund should not be utilized for DPR preparation of intra-state river linking projects”.

In view of the above decision/direction of theMinistryofWR,RD,&GR,thecostofpreparationofDPRofIntra-statelinksforfutureprojectsbyNWDA will be borne by the concerned StateGovernments.

Page 53: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|43

NWDAlauncheditswebsitehttp://www.nwda.gov.inon30thSeptember,2005.Thewebsiteisbeing maintained in a bilingual manner whilemaking it more interactive and stakeholderfriendly.

The website furnishes information through itsmain links projected namely on Organization,National Perspective Plan, NWDA Studies,Photogallery, Implementation of RTI Act,Notices, Tenders and Vacancy Circulars. Inaddition to IndiaWaterWeek, other links viz;Contact Us, Office forms, Inter Basin WaterTransfer,SpecialStudies,CommitteeofExperts,TermsofReferenceforpreparationofDetailedProjectReport,Publication,Vigilance,GrievanceRedressal, other ILR matters and Citizen’scharterarealsoavailable.Thewebsitehasbeenmade more interactive by providing instantaccesstoawiderangeofinformationespeciallyconcentrating and incorporating details onone of the main objectives of NWDA of InterLinking of Rivers (ILR) namely, on the need,earlier proposals, existing experiences on ILRand proposed ILR projects coming under bothPeninsular andHimalayan Rivers DevelopmentComponents of National Perspective Planof Ministry of Water Resources, GR & RD,GovernmentofIndia.

OtherrelatedlinkshavealsobeendevelopedandprojectedonthewebsiteeversinceNWDAhasbeenmandatedwiththetasksofDPRpreparationofKen-BetwaLinkProject,preparationofPFRs/FRs/DPRsof intra-StateLinksandconveningofIndiaWaterWeek so as to provideup todateinformation on these activities undertaken byMinistryofWaterResources,GR&RD.

Themain linksmaintainedandupdatedduringthereportingperiodof2015-16are:

Provision of Information on NWDA and itsfunction, NWDA Society, Governing Body,Technical Advisory Committee, status of intra-State links in NWDA Studies, Photo gallery,ImplementationofRTIAct,NoticesandTenders,Vacancy Circular, Contact us, Publication,TelephoneDirectory,CentralPublicInformationOfficer, Vigilance, Grievance Redressal, CitizenCharters,Photogalleryetc.FurthertheDPRsofthe links completed so far, LocationMap, thebriefdetails onPFRof Intra State linkprojectshavebeenplacedonwebsiteduring2015-16.

Further,NWDAis intheprocessofredesigningandredevelopmentofitspresentwebsite.

Chapter –7Website of NWDA

Page 54: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

44|AnnualReport2015-16

8.1 Meetings of the Parliamentary Consultative Committee on Water Resources

Three meetings of the ParliamentaryConsultative Committee on Water Resourceswere held on “Interlinking of Rivers” on05.05.2015, 31.08.2015 and 05.11.2015 underthe Chairpersonship of Hon’ble Minister ofWater Resources, RD & GR at New Delhi toreview the program of Interlinking of Rivers.DG,NWDAandother seniorofficersofNWDAattendedthemeeting.

DG, NWDA made a detailed presentation onvariousissuesrelatingtoILRprogrammeduringtheabovemeetings.

8.2 Training and Human Resource Development Activities

ThetrainingandexchangeofknowledgeisgivenspecialimportanceinNWDA.During2015-16aspartofhumanresourcesdevelopment,officersof NWDA were deputed for various TrainingCourses/Conferences/Seminars/Workshopsorganised by various agencies/organizations toenhance their knowledge in latest technologyin the field of Water Resources Engineering,Computeroperations,AccountingManagementetc. Details of Training courses attended byNWDAofficialsaregiveninAppendix-I. Details

of Conference/Seminars/workshops etc. inwhichNWDAofficialsparticipatedaregivenatAppendix-II.

8.3 Implementation of Act for Persons with Disabilities

Thedetails of implementationof personswithdisabilities (Equal opportunities Protection ofRightandParticipation)Act1995 inNWDAareasunder:

1. TheordersissuedbytheGovt.ofIndiaareimplemented.

2. Group ‘C’ & MTS employees have beenbenefited.

3. There is reservation for such persons inrecruitment of Junior Engineer, Steno Gr-III, Draftsman Gr-III, Hindi Translator, LDC,DriverGrade-IIIandMTSpostsfilledbydirectrecruitment. Benefits of reservation arebeing provided to physically handicappedpersons in promotionwherever applicablefrom MTS to higher scales in Group CwithinGroupC,aspertheinstructionsandguidelineslaiddownbytheGovernment.

8.4 Citizen’s Charter of NWDAAspertheguidelinesissuedbytheDepartmentofAdministrativeReforms&PublicGrievances(AR&PG),MOWR,RD&GR,NWDAhasprepared

Chapter – 8

Other Activities of NWDA

Page 55: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|45

its draft Citizen’s charter as formulated by theTaskForcesetupforthispurpose.TheCitizen’scharter for NWDA includes NWDA’s preamble,set up, organizational structure, activities,grievances redressal mechanism, stakeholdersetc.ChiefEngineer(HQ)hasbeennominatedasPublicGrievanceOfficerandDirector (Tech)as

nodalofficerforCitizen’scharter.Thefinalcharterhas been sent to Performance ManagementDivision, Cabinet Secretariat and ParliamentLibraryandalsouploadedonNWDA’swebsite.The constitution of its Task Force is furnishedbelow:

8.5 Committee for Complaints on Sexual Harassment of Women Employees

Inaccordancewiththeguidelineslaiddownby

theHon’bleSupremeCourtof Indiatopreventsexual harassment of women employees, aCommittee is functioning to look in to thecomplaintsofthewomenworkinginNWDA.Thecomposition of the Committee is as follows:-

1. ChiefEngineer(HQ),NWDA Chairman2. Director(MDU),NWDA Member3. Director(Admn.),NWDA Member4. ChiefResearchOfficer,CSMRS Member5. Director(TechnicalCoordination),CWC Member6. Director(Tech.),NWDA Member-SecretaryandNodalOfficer

1. Director(MDU) Chairperson

2. ExecutiveEngineer(HQ),NWDA Member

3. Dr.(Smt.)R.Malitha,RepresentativeofNariRakshaSamiti,NGO,2,RajNivasMarg,CivilLines,Delhi-56

Member

4. Smt.JasvinderKaur,AssistantEngineer

Member

TheCommitteesubmitsitsfindingtotheDirectorGeneral,NWDAfornecessaryaction.

8.6 Communal Harmony Week and Quami Ekta Week

NationalWaterDevelopmentAgencyobservedthe Communal Harmony Week which

coincided with Quami Ekta Week from 19th to 25th November, 2015 to boost the spirit ofcommunalharmony.DuringthisweekallstaffofNWDAwereadministered“NationalIntegrationPledge”. Bilingual posters were displayed intheofficepremises. DG,NWDAaddressedtheofficers and staff during Communal Harmony

Page 56: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

46|AnnualReport2015-16

Week and Quami Ekta Week to generate thedesiredawareness.

8.7 Publication of in-House Bulletin ‘Jal Vikas’

NWDAispublishingaquarterlyin-housebulletin‘Jal Vikas’ since October, 1991. The Journalis being distributed amongst water resourcesengineers and scientists of various Central/StateGovt.Departments andother concernedOrganisations in the country. The primaryobjective of this bulletin is to disseminateinformation on activities and achievements ofNWDA. Thetechnicalarticlespublished in thebulletin mainly pertain to the proposed InterBasinWaterTransferlinksstudiedbyNWDAandmattersrelevanttotheNWDAobjectives.Everyyear, the October issue is exclusively broughtoutinHindias‘Rajbhasha Visheshank’.

8.8 Participation in India International Trade Fair (IITF)-2015

National Water Development Agencyparticipated in India International Trade Fair-2015heldduring14-27November,2015atNewDelhiwithmajor emphasis on display of issuerelated to Interlinking of Rivers. The details of

various Inter Basin Water Transfer proposalswere exhibited in the stall of NWDA, in thepavilionofMinistryofWaterResourcesduringthe Fair. The visitors to the NWDA stall wereapprised about the Inter BasinWater TransferlinksbeingstudiedbyNWDA.

8.9 Jal Manthan – 2A two days conference “Jal Manthan -2” wasorganised at Vigyan Bhawan, New Delhi from22-23 February, 2016 and itsmain themewas“Integrated Approach for Sustainable Water Management”. During the Jal Manthan -2,discussionswereheldwithvariousstakeholderson optimal and sustainable use of waterresources.

OnthefirstdayofJalManthanon22ndFebruary,2016, consultation & discussions were heldon River Basin Approach for sustainableDevelopment, Ground Water Management,Water Security and Principles of Allocation ofWater.Whereas,discussionsontheseconddayon 23rd February, 2016, were held on WaterManagement, Coordination between centreand states,WaterConservation, Innovation inWaterGovernanceandonInterlinkingofRivers.Various Recommendations/ Resolution weremadeduringJalManthan-2.

Page 57: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|47

9.1 VIGILANCE AND DISCIPLINARY CASES.

NationalWaterDevelopmentAgencyisfollowingalltheinstructionsissuedfromtimetotimebytheDOP&T and the Central Vigilance Commission.Shri R. K. Jain, Chief Engineer (HQ) is workingas part time Chief Vigilance Officer of NWDA.He looksaftervariousaspectsof vigilanceanddisciplinarymattersoftheemployeesofNWDA.

No disciplinary case is pending in theorganization.Fivecomplaintsconcerningtotheofficers/staffofNWDAhavebeenreceivedandthesameareunderprocess.

Allmonthly,quarterly,yearlyreturnsaswellasevaluationsofvigilanceperformancearebeingsent toMinistry ofWater Resources / CentralVigilanceCommissionbyChiefVigilanceOfficer,NWDAfromtimetotime.

ThreevigilanceinspectioninrespectofOfficeofthe(i)ExecutiveEngineer,InvestigationDivision,Bangalore, (ii)ExecutiveEngineer, Investigation

Division, Ranchi & (iii) Executive Engineer,Investigation Division, Bhopal were conductedbytheVigilanceUnitduring2015-16.

9.2 VIGILANCE AWARENESS WEEKTheVigilanceAwarenessWeekwascelebratedfrom26.10.2015to31.10.2015byalltheofficesof NWDA. A “Pledge” in this connection wasadministered on 26.10.2015 by the DirectorGeneral, NWDA to all the officers and staffmembersworkingatNWDA(HQ).BannersandPostershighlightingtheevilsofcorruptionweredisplayedatprimelocationsintheHeadquarterofficeaswellasfieldofficesofNWDAaspertheinstructionsof theCVC.ChiefVigilanceOfficer,NWDA shared his viewswith the staff/officerson the topic “Vigilance is the weapon against corruption”. The compliance report has beensent toMinistryofWaterResources,RD&GRvideletterdated04.12.2015.

Chapter – 9Vigilance Activities in NWDA

Page 58: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

48|AnnualReport2015-16

National Water Development Agency (NWDA)hasbeenactively involved inthepromotionofuse of Rajbhasha (Hindi) and is continuouslytakingstepstowardstheactualimplementationoftheprovisionsofofficiallanguageAct,1963&theirrules.ThequarterlymeetingsoftheOfficialLanguage Implementation Committee wereorganised regularly in theNWDAHeadquarter,NewDelhiandinallitsfieldoffices.Duringthediscussions and reviews done in themeetingsorganised under the Chairmanship of theDirector General and Head of Offices, it wasclearly reflected that official use of Hindi andHindicorrespondence is increasingdaybyday.RajbhashaAdhikari andAssistantDirector (OL)regularly attended the meetings of OfficialLanguage Implementation Committee ofMinistryofWaterResourcesandeffectivestepswere taken for implementation & observanceof the decisions taken in these meetings. Alldocuments were issued bilingually during theyear2014-15asmentioned in theSection3(3)ofOfficialLanguageAct.

In accordance with the instruction issued bythe Department of Official Language ‘Hindi Pakhawara’wasorganisedfrom14thSeptemberto28thSeptember,2015attheHQs,NewDelhi.DG, NWDA issued appeal for progressive useof Hindi during the Pakhawara. DG, NWDA

requested all the officials to bemore inclinedtowards use of official language and workmore originally in Hindi and said that the useof official language should not be made onlyduring the Pakhawara but should be adoptedon a continuing basis. Various activities wereorganised during the Pakhawara in whichofficersandstaffmembersactivelyparticipated.

Duringtheyear,fourworkshopswereorganisedon technical, administrative and officiallanguagematters inwhichofficersand staffofNWDA actively participated. During the yearmain achievements are as under (1) secondSub-Committee of Parliament on officialLanguageinspectedNWDA(HQ)officeondated22.06.2015regardingProgressiveuseofofficiallanguageinNWDA(HQ)(2)Committeehasalsoinspected Investigation Circle of Bhubaneswarondated01.10.2015regardingProgressiveuseofofficiallanguageinNWDAfieldoffices.NWDAheadquarter and Investigation Circle officeshavefull-filledPromisesgiventoParliamentaryCommittee. (3) One day Technical Seminar inHindiwasalsoorganizedbyInvestigationCircle,NWDA, Bhubaneswar to introduce & exploreoriginalideasrelatedwithinterlinkingofRiversProgrammeissuesbyengineersandexpertsfromrespectivefields.Thetopicwas“Inter linking of Rives is necessary for Water Development in

Chapter – 10

Promotion of Use of Rajbhasha (Hindi)

Page 59: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|49

future”. (4)DirectorGeneral,NWDAawardedRajbhashaVaijantiShieldPrizetoBhubaneswarCircle and Laghu Rajbhasha Vaijanti Shield tootherfourDivisionworkingunderitscircleduringHindi Pakhwara 2015. (5)Hon’ble President of

IndiaShriPranabMukherjeeawardedfirstprize“RajbhashaSiromani” toNWDAon14.09.2015forbestperformanceinimplementationofficialsLanguage.

{Shri R.K. Jain, Chief Engineer,(HQ), NWDA; Shri N.C. Jain, Director (Tech.), NWDA and Smt. Jancy Vijayan, Director (MDU), NWDA during the inauguration of Hindi Pakhwara 2015}

Page 60: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

50|AnnualReport2015-16

{Shri Pranab Mukherjee, President of India Presenting Award of first prize “Rajbhasha Siromani” to Shri S. Masood Husain, Director General, NWDA for best performance in implementation of official Language on

14.09.2015}

Page 61: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|51

TheMinistryofWaterResources,Govt.ofIndiaallocated Grants-in-Aid of Rs. 69.00 CroresunderPlanschemeforNWDAfortheyear2015-16.TheactualexpenditureoftheAgencyduring2015-16wasRs.69.01Crores.

The Comptroller andAuditorGeneral of India,NewDelhi has been entrusted the auditing ofaccountsof theAgency foraperiodof5yearsw.e.f. the year 2014-15. The Principal Director

ofAudit,ScientificDepartments,NewDelhihasconducted theauditof theaccountsofNWDAfortheyear2015-16.

Audit Certificate, Audit Report alongwithparawise replies of NWDA and the auditedstatement of accounts of the Agency for the year2015-16aregivenatAppendix-III.

Chapter – 11

Finance and Accounts

Page 62: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

52|AnnualReport2015-16

The various activities of the NWDAhaveprogressedwell during the year 2015-16under the able guidance and valuable adviceof SushriUmaBharati,Hon’bleUnionMinisterofWaterResources,RD&GRandPresidentoftheNWDASociety,Prof.SanwarLalJat,Hon’bleMinisterforState,MinistryofWaterResources,RiverDevelopment andGangaRejuvenation&VicePresidentoftheNWDASociety,ShriShashiShekhar,Secretary(WR,RD&GR)&Chairman,GoverningBodyofNWDA,Dr.Amarjeet Singh,Special Sercretary,MOWR, RD&GR, Shri A.B.PandyaandShriGhanshyamJha,Chairman,CWC&ChairmanofTechnicalAdvisoryCommitteeofNWDAandChairmanofConsensusGroup,andall themembersof theNWDASociety,SpecialCommitteeforInterlinkingofRiversanditsSub-

Committees,TaskForceforInterlinkingofRivers,GoverningBody,TAC,etc.NWDAacknowledgesthe excellent co-operation received fromthe Secretaries, Engineers-in-Chief and ChiefEngineers and other officials of the States ofAndhra Pradesh, Assam, Bihar, Chhattisgarh,Gujarat,Haryana,Jharkhand,Karnataka,Kerala,MadhyaPradesh,Maharashtra,Odisha,Punjab,Puducherry, Rajasthan, TamilNadu, Telangana,Uttar Pradesh, Uttrakhand and West Bengal.The Agency thanks all the members of theNWDA Society, Governing Body and TechnicalAdvisoryCommitteeofNWDA.TheAgencyalsoacknowledges the overwhelming cooperationreceivedfromtheofficersofMoWR,RD&GR,CWC,GSI,CSMRS,NRSC,BISAGetc.inachievingtheobjectivesandtargetsasplannedbyNWDA.

Chapter – 12

Acknowledgements

Page 63: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|53

Appendix-I

Trainings attended by NWDA Officials

S.N0.

Trainings Period Venue Organised by

Officer/(s) who Participated

1. Trainingprogrammeon“PublicProcurement”.

06.04.15to11.04.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.R.K.Gupta,EE2.Sh.N.P.Sahu,AD

2. Trainingprogrammeon“PublicProcurement”.

20.04.15to25.04.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.R.P.Rawat,EE2.Sh.K.K.Rao,AE.

3. Trainingprogrammeon“PublicProcurement”.

25.05.15to30.05.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.P.V.Ramaraju,EE2.Sh.S.C.Mangal,AE3.Sh.S.S.Mohapatra,AO

4. Trainingprogrammeon“PublicProcurement”.

08.06.15to13.06.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.R.K.Gupta,AEE2.Sh.P.K.Srivastava,AE3.Sh.S.R.Mahor,DD

5. Trainingprogrammeon“PublicProcurement”.

01.06.15to06.06.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.S.A.Naidu,EE2.Sh.P.S.Murthy,AE.

6. Trainingprogrammeon“PublicProcurement”.

15.06.15to20.06.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.R.P.Ahirwar,EE2.Sh.S.P.Tomar,JE.

7. Thetrainingprogrammeon“Onlinesystemforuploadingandmonitoringofvigilancecomplaints”.in the

28.05.15 MinistryofWR,RD&GR,ShramShaktiBhawan,NewDelhi.

MoWR,RD&GR

Sh.S.K.Rana,LDC

8. Trainingprogrammeon“PublicProcurement”.

06.07.15to11.07.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.N.G.Rao,EE2.Sh.R.Ramaraj,EE

9. Trainingprogrammeon“PublicProcurement”.

20.07.15to25.07.15

NIFM,Faridabad

NIFM,Faridabad

Sh.N.S.R.K.Reddy,EE

Page 64: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

54|AnnualReport2015-16

10. Thetrainingprogramme on “CurrentrequirementsinEnvironmentalImpact Assessment (EIA)ProcessandProcedures(asperMoEFGuidelines).

20.07.15to22.07.15

NationalInstituteformicro,smallandmediumenterprises(ni-msme)campus,Yousufguda,Hyd.

NationalInstituteformicro,smallandmediumenterprises (ni-msme)campus,Yousufguda,Hyderabad

1.Smt.JancyVijayan,Dir(MDU)2.Sh.P.S.Murthy,AssistantEngineer

11. Trainingprogrammeon“PublicProcurement”.

03.08.15to08.08.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.P.C.Gupta,EE2.Sh.P.K.Mishra,EE

12. Trainingprogrammeon“PublicProcurement”

17.08.15to22.08.15

NIFM,Faridabad

NIFM,Faridabad

Sh.AfrozAlam

13. TRAININGON“RecordsManagementforRecordOfficers”

22.09.15to24.09.15

NationalArchives of India,Janpath,NewDelhi

MOWR Sh.S.S.Ingaleshwar,SuperintendentGrade–I.

14. Trainingprogrammeon“PublicProcurement”

07.09.15to12.09.15

NIFM,Faridabad

NIFM,Faridabad

Sh.R.K.Kharbanda,DDSh.B.S.Ucharia,DD

15. Trainingprogrammeon“PublicProcurement”

14.09.15to19.09.15

NIFM,Faridabad

NIFM,Faridabad

Sh.AyubAnsari,EE

16. TrainingonRecruitment/Reservationroster

24.09.15 ISTM,NewDelhi

MoWR Smt.N.Jayanthi,Assistant

17. Trainingprogrammeon“PublicProcurement”.

05.10.15to10.10.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.JaiRamVerma,A.E.E.2.ShM.N.Rao,A.E.E.

18. Trainingon“Servicerules/Pensionrules/Payfixation”

19.10.15 ISTM,NewDelhi

MoWR 1.Sh.AjayPratapSingh,LDC2.Sh.Irfan,LDC

19. TRNGCOURSEONRockfillMaterialSurvey,Testing,DesignAndQualityAssuranceForRockfillDams

14.10.15to16.10.15

CSMRS,NewDelhi

CSMRS,NewDelhi

Sh.K.C.BAGHEL,JE

20. Trainingprogrammeon“PublicProcurement”.

12.10.15to17.10.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.S.K.Gawande,AE2.Sh.R.Chandrasekharan,AE

Page 65: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|55

21. Trainingprogrammeon“PublicProcurement”.

02.11.15to07.11.15

NIFM,Faridabad

NIFM,Faridabad

1.Sh.NageshMahajan,DD2.Sh.JagmeetSingh,A.O.

22. Trainingprogrammeon“PublicProcurement”.

02.11.15to07.11.15

NIFM,Faridabad

NIFM,Faridabad

Sh.S.MohanKumar,AEE.

23. Trainingcourseon“EnvironmentalAspectsofWaterResourcesProjects”

16.11.15to20.11.15

NWA,PUNE NWA,PUNE 1.Sh.N.S.R.K.Reddy,E.E.2.Sh.K.K.Rao,A.E.

24. Trainingprogrammeon“PublicProcurement”.

07.12.15to12.12.15

NIFM,Faridabad

NIFM,Faridabad

Sh.A.S.Nayak,EE

25. Trainingprogrammeon“PublicProcurement”.

14.12.15to19.12.15

NIFM,Faridabad

NIFM,Faridabad

Sh.D.K.Goyal,AEE

26. TrainingonAdvancedtechnologiesinWaterandWastewatermanagementandtheiroperation

18.12.15to19.12.15

HotelTivoliGarden,NewDelhi

AdvanceWaterDigestPvt.Ltd.

Smt.AnitaLalchandani,AD

27.

Trainingcourseon“OfficialLanguagePolicyandUnicode&Hindi”

03.03.16to 04.03.16

NTPI(NorthernRegion),Badarpur,NewDelhi.

NTPI(Northern Region),Badarpur,NewDelhi

Smt.ArchanaGupta,AssistantDirector(OL)

Appendix-II

Details of Conferences, Seminars & workshop attended by NWDA Officials

S.N0.

Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

A. Conference1. Nationalmeeton

“promotingspacetechnologybasedtoolsandapplicationsingovernanceanddevelopment”,

07.09.15 AtVigyanBhawan,NewDelhi,

ISRO,DEPTT.OFSPACE.

Sh.R.K.Jain,CE(HQ)

2. Annualconventionofcentralinformationcommission.

16.10.15to

17.10.15

VigyanBhawan,NewDelhi

Sh.R.K.Jain,CE(HQ)

Page 66: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

56|AnnualReport2015-16

3. CloudforDigitalIndiaSummit,2015

16.10.15 Oberoihotel,NewDelhi

BharatExhibitions,BEExpositionsPvt.Ltd.,

Smt.JancyVijayan,Dir(MDU)

4. IXWorldAquaCongress–InternationalConference2015onRevivingtraditionalwaterandenvironmentconservationtechniques.

26.11.15to

27.11.15

IndiaHabitatCentre,NewDelhi

AquaFoundation Sh.N.C.Jain,Dir(T)Sh.O.P.S.Kushwah,SE

5. Indo-European WaterForum

23.11.15to

24.11.15

Shangri-Lahotel,NewDelhi

NationalWaterMission

Sh.S.MasoodHusain,DGSh.R.K.Jain,CE(HQ)Smt.JancyVijayan,DirMDU

6. InternationalWaterConference–TheneedtocreateaBlueRevolution

02.12.15 PHDHouse,NewDelhi

PHDChamberofCommerceandIndustry,NewDelhi

Sh.R.K.Jain,CE(HQ)Sh.R.K.Kharbanda,DD(T)DG,NWDAchairedonetechnical session

7. SymposiumOnHydrology

22.12.15to

23.12.15

CWC,NewDelhi

IAH,ROORKEE Sh.R.K.Jain,CE(HQ),Sh.N.C.Jain,Dir(T)Sh.O.P.S.Kushwah,SESh.JabbarAli,DD

8. 103rd Indian ScienceCongress(ISC)-PrideofIndiaExpo-2016

03.01.16to

07.01.16

UniversityofMysore,Karnataka

TheIndianScienceCongressAssociation.

ParticipationinExpobySh.S.A.Naidu,EE,Bangalore

9. Second National DamSafetyConference

12.01.16to

13.01.16

JNTataAuditorium,IISc,Bengaluru

CWC,NewDelhi Sh.M.K.Srinivas,CE(S)andSh.K.P.Gupta,SuperintendingEngr.Sh.S.MasoodHusain,DGgavepresentationonILRinTech.Session,on13.1.2016

10. Convention on “GangaGram”

30.01.16 TalkatoraStadium,NewDelhi

NationalMissionforCleanGanga(NMCG),MoWR,RD&GR

1.Smt. Jancy Vijayan,Director(MDU)2. Sh. Narendra Kumar,Director(Admn.)3.Sh.M.P.Gupta,Director(Fin.)4.Sh.K.P.Gupta,SE-I5.Sh.O.P.S.Kushwah,SE-II.

11. WaterExWorldExpo2016

10.02.16to

12.02.16

GujaratUniversityExhibitionhall,Ahmedabad

M/sJasubhaiMediaPvt.Ltd.

Sh.JabbarAli,DDSh.B.K.Tandel,AESh.D.K.Sharma,SE

Page 67: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|57

B. Seminars12. Seminaron“Cleanandsafe

drinkingwaterinIndia”.28.04.15 PHDHouse,New

DelhiSmt.JancyVijayan,Director(MDU)

13. AustraliaIndiaSeminaronWaterResourcesManagement

12.08.15 Australian High Commission,NewDelhi

Smt.JancyVijayan,Dir(MDU)

14. Institutional seminaron “Water production,reclamation andpreservation”.

13.08.15 TERI Sh.N.C.Jain,Dir(T)

15. Interactive seminar onIndia–IsraelCooperationopportunities inSustainable WaterManagement

21.01.16 FICCIandEmbassyofIsrael

Sh.R.K.Jain,CE(HQ)

16. National Seminar on“Conjunctive Use ofSurface Water andGroundwater in Majorand Medium IrrigationProjects”

11.02.16to

12.02.16

GroundWaterDepartment,A.P.andDepartmentofCivilEngineering,VelagapudiRamakrishnaSiddharthaEngineeringCollege.

Sh.M.K.Srinivas, CE(S)deliveredkeynoteaddressonbehalfofDG,NWDASh.N.G.Rao,DDasdelegate.

C. Workshop17. Workshop on ISO

(9001:2008)24.08.15to25.08.15

FICCIQualityForum

1.Sh.P.Anjaneyulu,A.E.2.Sh.K.C.Bhagel,J.E.

18. One day workshop onRighttoInformationforAppellateAuthorities

30.11.15 ISTM,NewDelhi

1.Sh.R.K.Jain,CE(HQ)2.Sh.M.K.Srinivas,CE(S)

19. Workshop on ISO(9001:2008) to beconducted by FICCIQualityForum

11.01.16to

12.01.16

CWC,NewDelhi

1.Sh.K.RPatel,A.E.2.Sh.M.Govindappa,A.E.E.

20. Workshop on “Lessonslearnt from the ongoing Dam Rehabilitation andImprovement Project(DRIP)”

18.02.16 DRIP,CWC,DELHI

Sh.S.MasoodHusain,DG,NWDA

Page 68: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

58|AnnualReport2015-16

47

Appendix-III

Page 69: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|59

48

Agency

Page 70: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

60|AnnualReport2015-16

49

Page 71: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|61

50

Page 72: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

62|AnnualReport2015-16

51

Page 73: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|63 52

Page 74: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

64|AnnualReport2015-16

53

Page 75: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|65

54

Page 76: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

66|AnnualReport2015-16

55

Page 77: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|67

Separate Audit Report on the consolidated accounts of National Water Development Agency (NWDA), New Delhi for the period 2015-16.

Comments RepliesA) Balance Sheet.1. NWDApurchased itemsunder theheadFixed

Assets amounting to Rs.14.42 lakh. But, duetomisclassification these itemswerewronglydepicted resulting in overstatement of AssetsandunderstatementofExpenditure in incomeandexpenditureaccount.Thisissueispersistingdespitepointedoutinpreviousreport.

As per the uniform format of Accounts, the Assetspurchased during the year are booked under thepayment side of receipts and payments A/C, Schedule– I and column – 3 of the schedule – 8. The Asset ofRs.81,88,760.00 purchased during the financial year2015-16wereshownaccordinglyintheAnnualAccountand there was no overstatement of Assets. Purchaseof Assets during the financial year are not booked asexpenditure in the Income and expenditure Accountso there is no understatement of expenditure. Onlydepreciation charged during the current year is to bebookedasexpenditure in the Incomeandexpenditureaccount,whichhasbeenbookedcorrectly.

The detail of the purchase of Assets amounting to Rs.14.42lakhisnotgivenintheauditparaandsuchamountisnotdepictedanywhereintheAnnualAccounts.Evenif, there isanymisclassificationofAssets (Assets tobebookedunderoneheadhasbeenbookedunderotherhead)totalassetspurchasedduringtheyearwillremainsameandnooverstatementofAssetswillcome.

Hence,theParamaypleasebedropped2. The categorization of assets issued by NWDA

wasnotinconsonancewiththeUniformFormatof Accounts. The UPS systems were to becategorizedasFurnitureandFixtures.However,as per NWDA instruction UPS system was tocategorized as Office Equipments. Similarly,as per NWDA instruction, “Computers andperipherals” were not categorized separatelyas instructed byMoF but included in the listof “Office Equipments”. Electrical Machinery/lights/fansweretobebookedunderaseparatesub- head “Electrical Installations”. However,there is no sub-head “Electrical Installations”.Thisresultedinmisclassificationofassets.

A separate head as “Computer and Peripherals” hasalready been in existence, (kindly refer schedule 8availablewithAnnualAccounts).

Otherobservationsarenotedforfuture.

Page 78: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

68|AnnualReport2015-16

B) Income & Expenditure Account 1. NWDA Headquarters purchased the

consumableitemsamountingtoRs.9.58lakhduring2015-16.Theclosingbalanceof consumable items was Rs.2.58 lakh.However, the values of closing stock ofconsumable itemswerenotdepicted inthe Annual Accounts which resulted inunderstatement of Current Assets andoverstatementofExpenditureofRs.2.58lakh.

Consumable items are purchased on Quarterly basis. Somebalanceofconsumableitemslikestationery,cleaning&sanitaryitemsetc.remainseveryyearwhichisbeingutilizedduringthenextfinancialyearandpreviousyearbalanceisusedincurrentyear. If previous yearbalance is deducted, fromcurrent yearbalance,itwillbenominalamountandtheremaynotbeanysubstantialimpactonthecurrentyearexpenditure.ThustheremaynotbeoverstatementofexpenditureandunderstatementofcurrentAssets.

InviewoftheaboveParamaypleasebedropped.2. As per latest actuarial certificate of

Gratuity and Leave Encashment issuedbytheconsultant,totalliabilityofNWDAis Rs.47.54 crore (as on 31.03.2016).However, NWDA provided provisionof Rs.22.72 crore only for Gratuity andLeaveEncashment.Thus,thereisashortprovisioning of liability amounting toRs.23.02crore(Rs.45.74Crore–Rs.22.72crore)whichresultedinunderstatementof Current Liabilities and Provision byRs.23.02 crore and understatement ofExpenditurebythesameamount.

AspertheActuarialCertificateofGratuityandLeaveEncashmentfortheyear2015-16,issuedbytheActuarialconsultant,totalliabilityofNWDAcomestoRs.45.74croreason31stMarch,2016,including

Rs.5.79 crore for the financial year 2015-16. Against whichRs21.92crore(Rs12.40croreinFDRandRs.9.52croreBankBalance) was available in this fund as on 31.3.2016 whichincludes an amount of Rs. 13.00 crore transferred to NWDASuperannuation&Gratuity fund during the year 2015-16, tofill the gap as on 31.3.2016 between total Liability and totalavailable amount in this fund. Thus current liabilities arenotunderstatedduringthefinancialyear2015-16.

Hence,theParamaypleasebedropped.3. NWDA (Valsad), paid an advance of

Rs.6.29 lakh (March2016) forpurchaseofmotorvehicleand themotorvehiclewas received by Vadodara Division on23.04.2016. However, provision fordepreciation amounting to Rs.0.47 lakhwasmadeinAnnualAccounts(Schedule8-FixedAssets)fromthedateofreleaseofadvance.Thus,theIncome&ExpenditureAccount of NDWA (Investigation Circle,Valsad) was overstated by Rs.0.47 lakhandcorpus/Capital Fund in theBalanceSheet (Schedule 1) was understated tothesameextent.

NecessaryrectificationwillbemadeduringtheFinalAccountof2016-17

Hence,theParamaypleasebedropped

Page 79: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|69

4. NWDA (Valsad) paid insurance charges ofRs.0.26 lakh to National Insurance CompanyLimited, Vadodara in respect of vehicle forthe period from 25.04.2016 to 24.04.2017.However, prepaid expenseswere not shownunder the head Current Assets, Loans andAdvance(Schedule11).ThustheexpenditureunderAdministrativeExpenses (Schedule21)ofIncomeandExpenditureAccounthasbeenoverstated by Rs.0.26 lakh and the CurrentAssets,LoansandAdvances(Schedule11)hasbeenunderstatedtothesameextent.

Asper theprescribedaccountingpracticeofNWDA,onlyprovision forRentandSalariesare tobemade.Howeverthe expenditure is very nominal so itmay be charged inrevenueexpenditure.

Hence,theParamaypleasebedropped.

C) Receipt & Payment Accounts1. NDWA(Valsad)hadshownanamountofRs.7.84

croreastotalGrantsreceivedfromGovernmentofIndiaasdetailedbelow:

S.No. Particulars Amount in

Rs.

1. Grantsreceivedfrom

HQ,NWDA,New

Delhi(Net) 70431000.00

2. Add:CPFrecoveries 7736002.00

3. Add:GSLISrecoveries 168040.00

4. Add:NewPension

scheme recoveries

100323.00

78435365.00

5. Less:Purchaseof

Fixedassets

725727.00

Total 77709638.00

AlthoughNWDA(Valsad)receivedRs.7.04croreonly as Grants – in – Aid from theMinistry ofWater Resources, but incorporated the figurespertaining to CPF Recoveries, GSLIS Recoveriesand New Pension Scheme totaling to Rs.80.04lakh in Receipts & Payments account, withouttheactualcashflowfromitsHeadOffice.NWDA(Valsad)didnotactuallyreceive

CPFandGSLISAccountarebeingmaintainedatHQNewDelhiinrespectofalltheNWDAemployeesirrespectiveofposting.AmountdeductedfromthesalariesofemployeesofNWDAtowardsCPF,NPSandGSLISistoberemittedbyeachDivision/DDOtoNWDAHQNewDelhiforcreditingitintorespectiveAccounts.Grants-in-AidisbeingreleasedbyHQNewDelhitoDivisions.ToavoidthephysicaltransferoffundbythedivisiontoHQtowardsrecoveriesofCPF,NPSandGSLISandthentransfertheFundfromHQtodivisionsfor thesame, ithasbeendecided inNWDAthatamountofrecoveries/deductionsmadewillbekeptbydivisionandscheduleforthesamewillbesenttoHQ.NecessaryJournalentry for samebycrediting theamount to theGrants-in-AidwillbepassedbythedivisionofficeandGrantsinAidA/Cwillbeincreasedbythatamount.Similarly,HQwillalsopass the entry by debiting the Grants-in-Aid to DivisionsandcreditingtoCPF/GSLIS/NPSAccounts.AttheendoftheyeartotalGrants-in-Aidreleasedtodivisions isgottalliedtakingtheCPF/GSLIS/NPSdeductions.Thisisbeingdonetoavoidthecashtransactionanditmakenoeffectontheanyaccountingsystem.

HencetheParamaypleasebedropped.

Page 80: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

70|AnnualReport2015-16

the amount of Rs.80.04 lakh. This resultedin overstatement of Income to the tune of Rs.80.04 lakh and understatement ofLiabilitiestothesameextent,whichneedstobereconciled.

2. AnamountofRs.74831whichwasshownasstale cheque in previous year account hasbeentakenbackinthecurrentyearaccounttoexpensesonemployeesretirementLeaveSalary & Pension Contribution (Schedule–20A ‘EstablishmentExpenses’)asthevalidityof the chequewasexpiredbutwasnotdepictedinReceipt&PaymentAccounts.This resulted into understatement ofliabilitiesandexcessofIncometothesameextent.

TwochequesNo330652dated29.3.2012forRs.73552/-andchequeno0402404dated2.1.2012forRs1279/-wereissuedtoP.A.O,C.W.C,NewDelhitowardspensionandleavesalary contribution and to Judge Saket court, New Delhirespectively.ThisamountwastransferredtoStaleChequeAccountandtakenintoCashBookasreceiptduringtheyear2012–13.NowthechequeshasbeencancelledandjournalentrybydebitingStaleChequeAccountandcreditingleavesalaryandpensioncontributionAccounthasbeenpassed.

Thus,thereisnounderstatementofLiabilitiesandexcessofincome.

Hence,theParamaypleasebedropped.

D) General

1. NWDA did not provision for Rs.4.94 croreofunutilizedgrants inCurrent Liability as agrantrefundabletotheMinistry.

Grant received by NWDA was shown under the headCorpus/CapitalFundontheliabilitysideofBalanceSheet.So,theunutilizedGrantwasalreadyappearedintheliabilitysidethereforeseparateprovisionwasnotmade.

Hence,theParamaypleasebedropped.

Page 81: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|71

2. NWDA had accounted for interestsearnedonsavingsinbankandlongtermadvanceswasaccountedoncashbasis,in contravention of the Provision inUniformformatofaccounts.

Normally, Interest is being credited by Bank upto Dec, andcredited in Jan every year. Interest of Jan toMarch is beingcreditedinApril.TheinterestofJan,15toMarch,15creditedinApril,15wastakenintoaccountandInterestfromJan,16toMarch,16wasnottakenintoaccount.Forpreviousyear(i.e.2014-15) threemonth interest takenduring theyear2015-16andthreemonthinterestof2015-16hasbeentakenin2016-17 which not makes much difference. Full year interest hasbeen taken during 2015-16.HoweverAccrued Interest in thecase of Superannuation and Gratuity Fund (schedule-3) andContributoryProvidentFund(schedule-6)hasbeentakenintotheAnnualAccount.

Theinterestonlongtermadvancesisrecoveredasandwhenitbecomesdue.Thereisnotaccruedinterestcomesinthiscase

Hence,theParamaypleasebedropped

E) Grants- in –Aid

OutofthetotalgrantinAidofRs.74.01crore (which include Rs.69.00 crorereceivedduring2015-16,unspentgrantof previous year Rs.4.29 crore and Rs.0.72 crore other receipts) during theyear2015–16NWDAutilizedRs.68.77CroreandtransferRs.0.30croretoIndiaWater Week during the year 2015-16leaving un – utilized grant of Rs. 4.94crore.

Thisisastatementoffact

Page 82: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

72|AnnualReport2015-16

Annexure to SAR

1. Adequacy of Internal Audit SystemInternalAuditWingofNWDAconductedtheInternal Audit of two Circle offices and fivedivisionsduringtheyear2015-16,outof17DivisionsandCircleoffices.

Thisisastatementoffact.

2. Adequacy of the Internal Control System: ThereisscopeofimprovementintheInternalControlSystemofNWDAHeadquartersinthefollowingareas,asdeficiencieswerenoticed.

i) Cash Book was not being maintained inprescribedformi.e.GAR3.

NWDA is an autonomous organization followingcommercial Accounting procedure i.e. double entrysystem. Cash Book in form GAR-3 is for GovernmentdepartmentwhichisnotsuitableforNWDA.ThereforeitisnotpossibletomaintaintheCashBookinGAR-3form.

Hence,theParamaypleasebedroppedii) Therewasadelayofseventofifteendaysin

remittanceofcashreceiptstobank.Now,thereceiptisdepositedinregularbasis.

iii) Surpriseverificationofcashwasnotdoneonregularbasis.

Now,thesurpriseverificationisbeingdoneregularlyanditwillbeshowntothenextAudit.

Hence,theParamaypleasebedropped.iv) Denomination- wise details of closing

balancewerenotmentionedduringphysicalverificationofcashattheendofeachmonth.

Denominationwisedetailsarenowshownattheendofeachmonth.ItwillbeshowntothenextAudit

Hence,theParamaypleasebedropped.v) Thecopiesofbillswerenotcertifiedas“Paid

&Cancelled”.NowitisbeingdoneandwillbeshowntothenextAudit

vi) Accounting Manual and Internal AuditManualhadnotbeenpreparedbyNWDA.

SignificantAccountingpoliciesarementionedinschedule24and25ofconsolidatedAccountsofNWDA.NWDAalsohasInternalAuditManualwhichwillbeshowntothenextaudit.

vii) Broadsheetoflongtermadvanceswerenotmaintained.Intheabsenceofbroadsheets,auditcouldnotverifythecorrectnessoftheamountoflongtermadvancesasreflectedintheannualaccounts.

Broadsheetregisterfor longtermadvanceshasalreadybeenopenedfromtheyear2016-17andwillbeshowntothenextaudit.

Hence,theParamaypleasebedropped.

Page 83: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|73

viii) The Expenditure Control Register (GAR9/TR28-A) to ensure that the expenditureunder various heads remainedwithin budgetallocationswasnotmaintained.

Expenditure statements are prepared by NWDA onmonthlybasisanditisreviewedonthebasisofbudgetallocations. No excess Expenditure has been incurredoverandabovetheallottedbudget.

Hence,theParamaypleasebedropped.ix) TA/LTC,WorksControlRegisterandRegisterof

Contractswerenotmaintained.LTC&TARegisterarebeingmaintainedandwereshowntotheauditorsduringAudit.WorksControlRegisterandRegisterofcontractsarebeingmaintainedandwillbeshownduringnextaudit.

Inviewoftheabove,theParamaypleasebedropped.

x) Register of Valuables (GAR 5), AccessionRegister (GFR 35), Grants in Aid Register(GFR39), Stock Register of Consumables(GFR 41) and Investment Register were notmaintainedinprescribedformat.

Stock Register of consumables in GFR-41 will bemaintainedinfuture.

Otherregisterwillalsobemaintainedaspertheformatinfuture.

xi) Consumable and non- consumable itemswere being purchased and issued withoutrequisition/demandapplication.

Consumableitemsi.e.Stationery,PrinterCartage,Cup-Saucer,andWatertumblersetc.arebeingissuedagainstproper requisition / demand slip. One or two smallstationery item such as pen, pencil, and photocopypaper issuedon verbal demandand issued through apettyregisterwhichwilltakenintostockregister.

xii) Provision for recoveryofLoansandAdvancestostaffandothersneedstobemadeincasespendingsincelong-time.

Effortsarebeingmade for recoveryof theamountbyissuingreminderfromtimetotime.

xiii) 41nos.ofchequesamountingtoRs.8.15lakh(ason31stMarch2016)wereissuedbutthesewerenotpresentedtobank.Thepossibilityofthese cheques becoming time barred cannotberuledout,whichmayaffectthepositionofcurrentassetsandliabilitiesintheaccounts.

Actually there were 33 Cheques amounting to Rs84.53Lakhwere issuedbefore31stMarch,2016.Outof which 31 cheques were presented for payment.BalancetwochequesamountingtoRs33900/-(Ch.No794890dated19.6.2015forRs.32700+Ch.No.980556dated 29.10.2015 for Rs. 1200/-) were not presentedforpayment.Thesamehasbeenreversed inthisyeari.e.2016-17.

Hence,theParamaypleasebedropped.xiv) TheRegisteroffixedassetwasnotmaintained

properlyinprescribedformat.Noted, necessary instruction has been issued toconcerned offices to maintain Fixed Assets registerproperly.

3. System of Physical Verification of InventoryPhysicalverificationofstationeryandconsumableitemshasbeenconductedupto31.03.2016.

NoComments.

Page 84: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

74|AnnualReport2015-16

4. System of Physical Verification of assets.i) Although physical verification of fixed assets

and inventories has been conducted upto2015-16, unserviceable items had not beendisposedbyNWDA,Further,thebookvalueofun–serviceableitemsidentifiedduringphysicalverificationofassetswasnotindicated.

UnserviceableitemasshownduringphysicalVerificationof assets as on 31.03.2016 are under process fordisposal.

Hence,theParamaypleasebedropped.

ii) AsperRuleofGFR190,allGovt.organizationsare required to maintain a separate registerknownasAssetsRegisterfortheirfixedassetsviz.Tools&plant,officeequipment, furniturefixtures&fittings,computer&peripheralsetc.in Form GFR-40 and this register should beclosedatthecloseoffinancialyear.Thevalueof fixed assets shown in the Assets RegistershouldtallywiththevalueofassetsshownintheAnnualAccounts.Registersoffixedassetswere not maintained properly in prescribedformGFR40,duetowhich thevalueoffixedassets of Rs.2.90 crore shown in the annualaccounts(Schedule8)couldnotbeverified.

FixedassetsregisterinFormGFR-40w.e.f.FinancialYear2016-17willbemaintainedandshowntonextaudit.

Hence,theParamaypleasebedropped.

5. Regularity in payment of statutory dues:TheNWDAwasregularindepositingstatutorydues.

NoComments.

Page 85: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|75

Replies to the Points of Management Letter on the Annual Accouts of NWDA, New Delhi for the year 2015-16

1. During 2015-16 NWDA divertedRs.30.00 lakh to India Water Week2016 from the grant received by it,which was irregular. As such, thegrantwasnotutilizedforthepurposeit was sanctioned and the Expendi-ture was overstated and \Incomewasunderstatedtothatextent.

Thisisastatementoffact.TheMinistryofWaterResources,RiverDevelopmentandGangaRejuvenationdecidedtoorganize4thIndiaWaterWeek-2016from10th-14thApril,2016andentrustedtheworkoforganizationofIndiaWaterWeek-2016 to NWDA. NWDA submitted the proposal along with estimateamountingtoRs.4.51croretoMinistryforapprovalofCompetentAuthorityrequestingMinistryofWaterResources,RD&GRforFinancialAssistanceofRs.2.51crore.Theremainingexpenditurewasproposedtobemetfromthereceipts such as sponsorship, delegate fee and sale of space in exhibition.Ministryhadapprovedtheestimatefor3.56croreandsanctionedtheamountofRs.1.00croreasFinancialAssistancefororganizingtheevent.Theamountwasutilizedforvariousworksdonefortheevent.Thepartofexpenditurewasalsometfromtheamountreceivedassponsorship,delegatefeeandsaleofspaceinexhibition.

Duringtheevent,certainadditionaldevelopmentstookplaceleadingtothedeviations/increase in expenditure like number of technical sessions wereincreasedrequiringmorespaceforwhichadditionalpaymenthavetobemade.Thus,thepaymentamountingtoRs.1.75crorewasmadetoITPO(venueforconference and exhibition of IndiaWaterWeek) against originally plannedasRs.1.25Crore.AlsothevaledictoryfunctionwasoriginallyplannedtobeorganizedinthePragatiMaidanforwhichthevenuewasbookedandpaymentsweremade to IndiaTradePromotionOrganization (ITPO).The functionwasfinallyorganized inVigyanBhawanasdesiredbyofficeofHon’blePresidentof India leadingtoanadditionalexpenditureofRs.14 lakh.ThustherewasashortageoffundsintheIndiaWaterWeekaccountformakingpaymentofbills.Tomeettheexpenditure/releaseofpaymenttoVigyanBhawanandotherbills,Rs.30lakhweretransferredfromgrant-in-aidtoNWDAtoIndiaWaterWeekaccountwithdueapprovalofDirectorGeneral,NWDAandOrganizingSecretaryofIndiaWaterWeek-2016subjecttorefundinNWDAaccount.

Certain amount such as sponsorship committed by State Govt. and sale ofspaceinexhibitionislikelytobereceivedinIndiaWaterWeekaccount.Thematterisbeingpursuedwithconcernedauthorities/DepartmentofStateGovt.TheamountofRs.30lakhwillberefundedtoNWDAaccountonrealizationofpendingreceiptsinIWWaccount.Incase,thereisashortageofthereceiptsinIWWaccount,amountofRs.30lakhwillberefundedtoNWDAaccountfromthefundsofforthcomingIndiaWaterWeekevents.

Page 86: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

76|AnnualReport2015-16

2. NWDA(Headquarters)atNewDelhiagainst the sanctioned strength of493posts,506officers/officialswereinposition.NWDAwasoperating13posts in excess of manpower sanc-tionedinvariouscadres.

InthisregarditistomentionthatMinistryofFinance(DepartmentofExpenditure) (Staff InspectionUnit)Vide theirOfficeorderNo.52/1/2007-SIUdated19.12.2011sanctioned493postsforNWDAasawholeincludingitsHQagainstthesanctionedstrengthof637.SIUfurther,statedthattheexactnumberofofficials,whoaresurplusandinexcessofsanctionedstrength,tobeadjustedagainstthefu-turevacanciesandnormalwasteout.

ThestaffstrengthreferredaboveisofentireorganizationandnotoftheheadquartersaloneatNewDelhi.Duringtheyear2011whenSIU inspectionwas conducted,NWDAwas having the sanctionedstrengthof637posts.SubsequenttocomplianceoftheSIUreportandbythetimethepresentauditfortheyear2015-16wascarriedout, therewere506officials only after adjustmentof excessoffi-cialsagainstretirementofemployees.Thus,NWDAiscomplyingtheinstructionsofSIU. Itmaynotbeoutof context tomentionherethatattheendof2016(i.e.31.12.2016)afteradjustmentofexcessofficialsthereareonly484officialsinoperation.Further,theabovefactwasalreadyfurnishedtotheauditteamduringtheaudit.Asthepresentstrength isbelowthesanctionedstrength, thisauditParamaybedropped.

3. Schedule11(B):Loans,Advancesandother assets

a) IntheconsolidatedaccountsofNWDA– Loans and advances to staff wereRs.65.92 lakh. Of this, Rs.0.55 lakhwas outstanding against two officersatNWDAHeadquarterssince1985-86to2005-06

Rs.55160/-includestheRecoveryofTAAdvanceandpayadvanceamountingtoRs.40500/-andRs.13650/-respectivelyisinrespectofShriM.S.Khan,andRs.1010/-payAdvanceisinrespectofShriP.L.Shrivastava,whowereondeputationtothisoffice.Lettersarebeingregularlysenttotheparentofficesofthedeputationistforrecoveryofthesame.

b) Loan and Advance to others wereRs.267.36 lakh. Of this, Rs.8.33 lakhwasoutstandingagainstsevenpartiesatNWDAHeadquartersformorethantwoyears.

RegardingtheLoansandAdvancestoothersvigorouseffortsarebeingmadeforrecoveryandadjustmentofLoansandAdvancetoothers.

Hence,theParamaypleasebedropped

Page 87: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|77

4. Schedule11(C):Claimreceivable

In the consolidated accounts ofNWDA – Leave salary recoverablewere Rs.34.19 lakh. The amount isaccumulated since 1987-88. Simi-larly,NPSamountingtoRs.2.87lakhwasalso recoverable formore thantwo years. Vigorous efforts need tobemade at higher level to recoverthe old outstanding balances. Thesamemaybebrought to thenoticeofMinistryconcerned.

Vigorousefforts forreimbursementof leavesalaryamountingtoRs.34.19lakhhavebeentakenbysendingD.O.lettersfromtimetotimetothehighestlevel.

Hence,theParamaypleasebedropped.

Page 88: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

78|AnnualReport2015-16

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT & GANGA REJUVENA-

TION ,GOVT. OF INDIA)SIGNIFICANT ACCOUNTING POLICIES (Schedule No. 24 ) 2015-16

1 NationalWaterDevelopmentAgencyiscoveredunderthePLANEXPENDITURE.

2 TheDepreciationiscalculatedontheassetspurchased/addedduringtheyearonhalfyearlybasis.(fullyeardepreciationchargedforassetsaquiredupto30thSeptember,2015andhalfyearforassetsaquiredafter30thSeptember,2015.)

3 DepreciationontheAssetshasbeenchargedatthefollowingratesonthebasisofwrittendownvaluemethod. a) Building 10%b) Furniture,Fixture&Fitting 10%c) OfficeEquipments 15%d) Compuer/peripherials 60%e) Tools&Plant 15%f) Vehicles 15%g) TechnicalBooks 60%h)CampEquipment 15%

4 Salaries & Rent for the month of March,2016 have been provided in Accounts and shownoutstandingexpensesunderthecurrentliabilities.(Schedule-7).

5 ProvisionofAuditFeefortheyear2015-16hasbeenmade(Schedule-7) 6 NWDAisfullyfundedbyGovt.OfIndiathroughGrants-in-aid. 7 FinancialimplicationonadoptionofMACPschemewouldbemetwithintheexistingbudgetof

NWDA8SaprarateAccountsofIWWhasbeenpreparedandattachedwithNWDA,sAccounts.

9 AmounthasbeenroundedofftothenearestRupee. 10 AnnualAccountsarepreparedonthebasisproformaprovidedbyC.G.A. 11 Inventoryvaluation-Notapplicable. 12 ForeignCurrencyTransactions Nil

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Page 89: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|79

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT & GANGA REJUVENATION,

GOVT. OF INDIA)CONTINGENT LIABILITIES AND NOTE ON ACCOUNT

(Schedule No. 25)2015-16

1 ContingentLiabilitiy NosuchLiability

2 CapitalCommitments Notapplicable

3 LeaseObligations Nil

4 CurrentAssets,LoanandAdvances Schedule-11

5 IncomeTax-Beinggranteeinstitution Notapplicable

6 ForeignCurrencyTransactions Nil

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S. Masood Husain)

Director General

Page 90: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

80|AnnualReport2015-16

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Particulars Schedule Current Year Previous Year

CAPITAL FUND AND LIABILITIES

CORPUS/CAPITALFUND 1 83967779.00 81038563.00

RESERVEANDSURPLUS 2 0.00 0.00

EARMARKED/ENDOWMENTFUNDS 3 227177524.00 110400293.00

SECUREDLOANSANDBORROWINGS 4 0.00 0.00

UNSECUREDLOANSANDBORROWINGS 5 0.00 0.00

DEFERREDCREDITLIABILITIES 6 0.00 0.00

CURRENTLIABILITIESANDPROVISIONS 7 31502103.00 28510750.00

TOTAL 342647406.00 219949606.00

ASSETS

FIXEDASSETS 8 29009950.00 29027403.00

INVESTMENTS-FROMEARMARKED/ 9 227177524.00 110400293.00ENDOWMENTINVESTMENTS-OTHERS 10 0.00 0.00

CURRENTASSETS,LOANS,ADVANCEETC. 11 86459932.00 80521910.00

MISCELLANEOUSEXPENDITURE 0.00 0.00(Totheextentnotwrittenofforadjusted)

TOTAL 342647406.00 219949606.00

SIGNIFICANTACCOUNTINGPOLICIES 24

CONTINGENTLIABILITIESANDNOTESONACCOUNTS 25

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

CONSOLIDATED BALANCE SHEET AS AT 31st MARCH, 2016(AmountinRupees)

Page 91: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|81

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDINCO

ME&EXP

ENDITU

REACC

OUNTFO

RTH

EYEAR

201

5-1

6(Amou

ntin

Rup

ees)

EXPE

NDI

TURE

Sche

dule

Curr

ent Y

ear

Prev

ious

Yea

rIn

com

eSc

hedu

leCu

rren

t Yea

rPr

evio

us Y

ear

Establish

men

tExpen

ses

2050

4438

152.00

4019

4607

3.00

Incomefrom

Sales/Service

120.00

0.00

OtherAdm

inistrativ

eExpe

nsesetc.

2159

8389

34.00

6647

2486

.00

GRAN

TS/SU

BSIDIES

1368

1785

316.00

6111

0185

9.00

Works

2110

6214

947.00

9212

1654

.00

(IrrevocableGran

ts&su

bsidiesreceived)

TaskForce/Spe

cialCell-ILR

2112

8300

38.00

7613

149.00

Fees/Sub

scrip

tions

140.00

0.00

Expe

nditu

reonGran

ts,Sub

sidies

etc.

220.00

0.00

Inco

me

from

Inve

stm

ent (

Inco

me

on

Inte

rest

23

0.00

0.00

Invest.FromEarmarked/en

dow.Fun

dsDe

preciatio

n8

8114

576.00

5815

795.00

tran

sferredtoFun

ds)

150.00

0.00

Income from

Royalty,P

ublicati

onetc.

160.00

0.00

InterestEarne

d17

4223

295.00

3139

888.00

OtherIn

come

1814

5467

.00

2756

02.00

Increa

se(D

ecrease)in

StockofF

inish

edGo

odsa

ndW

orks-in

-progress.

190.00

0.00

TOTA

L:(B

)69

1436

647.

0057

3969

157.

00TO

TAL:

(A)

6861

5407

8.00

6145

1734

9.00

BalanceBe

ingExcessofIncom

eov

erExpe

nditu

re(A

-B)

-528

2569

.00

4054

8192

.00

Tran

sferto

Spe

cialReserve(S

pecifyeach)

Tran

sferto

/from

Gen

eralReserve

0.00

0.00

BALA

NCE

BEINGSU

RPLU

S(DEFICIT)

CARR

IEDTO

CORP

US/CA

PITA

LFU

ND

-528

2569

.00

4054

8192

.00

SIGN

IFICAN

TAC

COUNTINGPO

L-ICIES

CONTIGE

NTLIAB

ILITIESAN

DNOTES

ONACC

OUNTS

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

Page 92: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

82|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDRE

CEIPT&PAY

MEN

TAC

COUNTFO

RTH

EYEAR

201

5-1

6(Amou

ntin

Rup

ees)

RECE

IPT

Curr

ent Y

ear

Prev

ious

Yea

rCu

rren

t Yea

rPr

evio

us Y

ear

I.Ope

ning

Balan

ceExpe

nses

a).C

ashinHan

d30

173.00

4957

7.00

a).Estab

lishm

entE

xpen

ses

5023

3735

3.00

4387

9733

3.00

b).B

ankBa

lance

(Co

rrespo

ndingtoSched

ule20

A)i.In

SavingAc

coun

ts42

8741

56.00

3539

4961

.00

b).A

dministrativ

eExpe

nses

5994

4316

.00

6817

7505

.00

iiChe

que/D

raftinTransit

0.00

0.00

(Co

rrespo

ndingtoSched

ule21

A)c).Postagein

Han

d18

706.00

2057

6.00

Supe

rann

uatio

n&Gratuity

Fun

d34

7717

95.00

3573

7684

.00

Paym

entm

adeagainstF

undsfo

rII.

Gran

tReceived

Vario

usProjects.

a)From

Governm

ento

fInd

ia69

0000

000.00

6200

0000

0.00

LinkCa

nalProject

1170

7508

7.00

9374

7120

.00

b)Vibran

t.GujratG

loba

lTrade

Sho

w0.00

2000

0.00

b).From

StateGovernm

ent

Investmen

tand

Dep

ositMad

eIII.

Incomeon

Investmen

tFrom

a).O

utofE

armarked/En

dowmen

tfun

ds0.00

0.00

a)Earmarked/End

owFun

ds0.00

0.00

b).O

utofO

wnFu

nds(Investmen

t-othe

rs)

0.00

0.00

b)OwnFu

nd(O

nInvestmen

t)0.00

0.00

Sup

eran

nuati

on&GratuityFun

d-FDR

4850

0000

.00

5806

4149

.00

IV.

InterestReceived

Expe

nditu

reonFixed&Cap

italW

ork-in

-a)OnBa

nkDep

osits:NWDA

3710

413.00

2613

434.00

Prog

ress

Supe

rann

uatio

n&Gratuity

Fun

d65

121.00

6443

084.00

a)PurchaseofFixed

Assets

8188

760.00

8918

141.00

b).Loa

ns&Advan

cese

tc.

5071

58.00

4338

02.00

b).Expen

ditureonCa

pitalW

ork-in-Progress

0.00

0.00

V.OtherIn

come(Spe

cify)

Refund

ofInteresta

ndLon

gTerm

Advan

ce0.00

0.00

Realisa

tionofNoti

cePeriodAm

ount

0.00

0.00

(b)Vibrant.GujratG

loba

lTrade

Sho

w28

99.00

Rece

ipt o

n Sa

le o

f Ass

ets

1705

26.00

4180

62.00

Fina

nce Ch

arges(Interest)

0.00

0.00

Misc

.Receipts

6909

6.00

6261

6.00

OtherPaymen

ts(S

pecify)

Supe

rann

uatio

n&GratuityFun

d21

1300

32.00

1446

8900

.00

VI.

Amou

ntBorrowed

0.00

0.00

SecurityDe

posit/Refun

d52

000.00

0.00

VII.

AnyOtherReceipts(givedetails)

AdvancetoStaff

3585

126.00

6223

206.00

IndiaWaterW

eek(IW

W)-20

1630

0000

0.00

AdvancetoOthers/Refun

dofAdv.

7523

310.00

1129

7699

.00

R ecoveryofLoa

ns&Advan

ces

Remittan

ce/Earne

stM

oneyDep

osit

1593

05.00

3599

94.00

-FromStaff

4425

442.00

6194

011.00

staleCh

eque

7483

1.00

7355

.00

-FromOthers

8211

587.00

4212

416.00

Perfo

man

ceGua

rantee

3379

.00

0.00

Remittan

ce91

19.00

855.00

GSLIS

5048

49.00

2231

93.00

Closing Ba

lances

CPF

1710

00.00

0.00

LeaveSalaryReceived

9317

2.00

1489

28.00

Supe

rann

uatio

n&G

ratuity

Fun

d:S.B.A/c

9520

6708

.00

3477

1795

.00

Earnest M

oneyDep

osit

5255

79.00

4666

50.00

T elpho

neReceivable

0.00

3493

.00

a).Ca

shin

han

d

6770

5.00

3017

3.00

Perfo

rman

ceGau

rantee

Dep

osit

0.00

1471

65.00

b)B

ankba

lance

Supe

rann

uatio

n&Gratuity

Fun

dA/C

1300

0000

0.00

6512

4975

.00

i)InSavingAc

coun

ts49

3024

75.00

4287

4156

.00

Saleofscrap

/Ten

derP

aper

2050

0.00

4075

0.00

c).Postagein

Han

d39

292.00

1870

6.00

TDS

1470

0.00

Tota

l:91

6193

092

7777

5623

2To

tal:

9161

9257

8.00

7777

5623

2

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

Page 93: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|83

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

C

IRCLEWISEBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6(Amou

ntin

Rup

ees)

Parti

cula

rsSc

hedu

leHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

CAPITA

LFU

NDAN

DLIAB

ILITIES

CORP

US/CA

PITA

LFU

ND

139

7172

31.00

8824

732.00

9570

445.00

4348

323.00

1612

0662

.00

5386

386.00

8396

7779

.00

RESERV

EAN

DSU

RPLU

S2

0.00

0.00

0.00

0.00

0.00

0.00

0.00

EARM

ARKE

D/EN

DOWMEN

TFU

NDS

322

7177

524.00

0.00

0.00

0.00

0.00

0.00

2271

7752

4.00

SECU

REDLO

ANSAN

DBO

RROWINGS

40.00

0.00

0.00

0.00

0.00

0.00

0.00

UNSECU

REDLO

ANSAN

DBO

RROWINGS

50.00

0.00

0.00

0.00

0.00

0.00

0.00

DEFERR

EDCRE

DITLIAB

ILITIES

60.00

0.00

0.00

0.00

0.00

0.00

0.00

CURR

ENTLIAB

ILITIESAN

DPR

OVISIONS

795

2096

1.00

3918

659.00

5175

529.00

3218

849.00

7782

648.00

1885

457.00

3150

2103

.00

RECE

IPT OFAS

SETSFRO

MOTH

ERCIRCLES

2851

857.00

4236

952.00

3620

971.00

1864

813.00

1212

939.00

6845

03.00

1447

2035

.00

TOTA

L27

9267

573.

0016

9803

43.0

018

3669

45.0

094

3198

5.00

2511

6249

.00

7956

346.

0035

7119

441.

00

ASSETS

FIXE

D AS

SETS

891

2239

7.00

4482

775

5289

394.00

3054

548

5038

143.00

2022

693.00

2900

9950

.00

INVE

STMEN

TS-FR

OMEAR

MAR

KED/

922

7177

524.00

0.00

0.00

0.00

0.00

0.00

2271

7752

4.00

ENDO

WMEN

TINVE

STMEN

TS-OTH

ERS

100.00

0.00

0.00

0.00

0.00

0.00

0.00

CURR

ENTAS

SETS,LOAN

S,ADV

ANCE

ETC

.11

3956

6721

.00

7809

520.00

1078

3149

.00

5700

420.00

1674

1924

.00

5858

198.00

8645

9932

.00

MISCE

LLAN

EOUSEX

PENDITU

RE(Totheextentnotwritt

enofforadjusted)

TRAN

SFER

OFAS

SETSTOOTH

ERCIRCLES

3400

931.00

4688

048.00

2294

402.00

6770

17.00

3336

182.00

7545

5.00

1447

2035

.00

TOTA

L 27

9267

573.

0016

9803

43.0

018

3669

45.0

094

3198

5.00

2511

6249

.00

7956

346.

0035

7119

441.

00

SIGN

IFICAN

T AC

COUNTINGPO

LICIES

24CO

NTINEN

TLIAB

ILITIESAN

DNOTESON

ACCO

UNTS

25

Page 94: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

84|AnnualReport2015-16

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISEINCO

ME&EXP

ENDITU

REACC

OUNTFO

RTH

EYEAR

201

5-16

[EXP

ENDITU

RE] (Amou

ntin

Rup

ees)

Parti

cula

rsSc

hedu

leHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Establish

men

tExpen

ses

2024

3724

068.00

4558

5263

.00

5639

7087

.00

3652

2584

.00

9779

4654

.00

2441

4496

.00

5044

3815

2.00

OtherAdm

inistrativ

eExpe

nsesetc.

2117

3706

43.00

8258

725.00

6994

098.00

5024

038.00

1729

5152

.00

4896

278.00

5983

8934

.00

Works

2185

1997

1.00

3690

8982

.00

1028

8310

.00

3639

1006

.00

8959

929.00

5146

749.00

1062

1494

7.00

TaskForce/Spe

cialCell-ILR

2112

8300

38.00

0.00

0.00

0.00

0.00

0.00

1283

0038

.00

Expe

nditu

reonGran

ts,Sub

sidiese

tc.

220.00

0.00

0.00

0.00

0.00

0.00

0.00

Inte

rest

23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Depreciatio

n8

2788

362.00

9095

23.00

1256

558.00

1021

215.00

1670

429.00

4684

89.00

8114

576.

00

TOTA

L:(B

)28

5233

082.

0091

6624

93.0

074

9360

53.0

078

9588

43.0

012

5720

164.

0034

9260

12.0

069

1436

647.

00

BalanceBe

ingExcessofIncom

eover

Expe

nditu

re(A

- B)

5154

840.

00-7

5784

69.0

032

4168

.00

-109

9642

.00

-281

277.

00-1

8021

89.0

0-5

2825

69.0

0Tran

sferto

Spe

cialReserve(S

pecifyeach)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tran

sferto

/from

Gen

eralReserve

0.00

0.00

0.00

0.00

0.00

0.00

0.00

BALA

NCE

BEINGSU

RPLU

S(DEFICIT)

CARR

IED

TO C

ORP

US/

CAPI

TAL

FUN

D51

5484

0.00

-757

8469

.00

3241

68.0

0-1

0996

42.0

0-2

8127

7.00

-180

2189

.00

-528

2569

.00

SIGN

IFICAN

T AC

COUNTINGPO

LICIES

CONTIGE

NTLIAB

ILITIESAN

DNOTES

ONACC

OUNTS

Page 95: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|85

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISEINCO

ME&EXP

ENDITU

REACC

OUNTFO

RTH

EYEAR

201

5-1

6[INCO

ME]

(Amou

ntin

Rup

ees)

Parti

cula

rsSc

hedu

leHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Incomefrom

Sales/Service

120

0.00

0.00

0.00

0.00

0.00

0.00

Gran

ts/Su

bsidies

1328

7716

004.00

8362

1695

.00

7492

5715

.00

7770

9638

.00

1248

4582

3.00

3296

6441

.00

6817

8531

6.00

Fees/Su

bscriptio

ns14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Inco

me

from

Inve

stm

ent (

Inco

me

on

Invest.FromEarmarked/e

ndow

.Fun

ds

tran

sferredtoFun

ds)

150.00

0.00

0.00

0.00

0.00

0.00

0.00

Incomefrom

Royalty,P

ublicati

onetc.

160.00

0.00

0.00

0.00

0.00

0.00

0.00

InterestEarne

d17

2654

601.00

3770

68.00

3347

18.00

1422

29.00

5783

49.00

1363

30.00

4223

295.

00

OtherIn

come

1817

317.00

8526

1.00

-212

.00

7334

.00

1471

5.00

2105

2.00

1454

67.0

0

Increa

se(D

ecrease)in

StockofF

inish

ed

Good

sand

Works-in

-progress.

190.00

0.00

0.00

0.00

0.00

0.00

0.00

Tota

l:(A)

29

0387

922.

0084

0840

24.0

075

2602

21.0

077

8592

01.0

012

5438

887.

0033

1238

23.0

068

6154

078.

00

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

Page 96: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

86|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,R

IVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISERE

CEIPTS&PAY

MEN

TSA

CCOUNTFORTH

EYEAR

201

5-16[REC

EIPT

S] (Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

I.O

peni

ng B

alan

ce(a).CashinHan

d69

09.00

5219

.00

2855

.00

2801

.00

1238

9.00

0.00

3017

3.00

(b).Ba

nkBalan

ceI.In

CurrentAccou

nts

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ii.InSaving

Accou

nts

1722

6163

.00

5041

971.00

4791

345.00

3656

493.00

7713

116.00

4445

068.00

4287

4156

.00

iii.C

hequ

e/D

raftinTransit

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(c).Postagein

Han

d41

65.00

3677

.00

1048

.00

1653

.00

6985

.00

1178

.00

1870

6.00

(d)Sup

eran

nuati

on&GratuityFun

d34

7717

95.00

0.00

0.00

0.00

0.00

0.00

3477

1795

.00

II.G

rant

Rec

eive

d(a)FromGovernm

ento

fInd

ia28

9961

659.00

8645

4021

.00

7565

3686

.00

7843

5365

.00

1262

1539

1.00

3327

9878

.00

6900

0000

0.00

(b). V.GujratG

loba

lTrade

Sho

w0.00

0.00

0.00

0.00

0.00

0.00

0.00

(c).FromStateGovernm

ent

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(d). FromOtherSou

rces(Details)

III.

Inco

me

on In

vest

men

ts fr

om(a).Earm

arked/En

dowFun

ds0.00

0.00

0.00

0.00

0.00

0.00

0.00

(b). OwnFu

nd(O

th.In

vestmen

t)0.00

0.00

0.00

0.00

0.00

0.00

0.00

IV.

Inte

rest

Rec

eive

d0.

00(a)OnBa

nkDep

osits

2456

205.00

3494

41.00

2112

34.00

1354

81.00

4217

32.00

1363

20.00

3710

413.

00(b)Sup

eran

nuati

on&GratuityFun

d65

121.00

0.00

0.00

0.00

0.00

0.00

6512

1.00

(c) Loa

ns&Advan

cese

tc.

1983

96.00

2762

7.00

1234

84.00

6755

.00

1508

86.00

10.00

5071

58.0

0

V.O

ther

Inco

me

(Spe

cify

)

Realisa

tionofNoti

cePeriodAm

ount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Rece

ipt o

n Sa

le o

f Ass

ets

0.00

7941

6.00

1035

5.00

5427

6.00

1308

4.00

1339

5.00

1705

26.0

0Misc

. Receipts

1731

7.00

3347

5.00

2129

.00

665.00

1486

0.00

650.00

6909

6.00

VI.

Amou

nt B

orro

wed

0.00

0.00

0.00

0.00

0.00

0.00

0.00

VI

I.An

y O

ther

Rec

eipt

s (gi

ve d

etai

ls)

RecoveryofLoa

ns&Advan

ces

-FromStaff

4908

11.00

6174

1.00

1095

0.00

1675

998.00

1877

758.00

3081

84.00

4425

442.

00-FromOthers

4850

3.00

6237

134.00

5912

71.00

0.00

8488

00.00

4858

79.00

8211

587.

00Re

mittan

ce91

19.00

0.00

0.00

0.00

0.00

0.00

9119

.00

GSLIS

5048

49.00

0.00

0.00

0.00

0.00

0.00

5048

49.0

0CP

F0.00

1710

00.00

0.00

0.00

0.00

0.00

1710

00.0

0Leave SalaryReceived

0.00

7874

.00

2312

.00

0.00

8298

6.00

0.00

9317

2.00

EarnestM

oney/S

ecurity

Dep

osit

4300

.00

2077

69.00

0.00

1050

00.00

1110

00.00

9751

0.00

5255

79.0

0Teleph

onereceivab

le0.00

0.00

0.00

0.00

0.00

0.00

0.00

Perfo

rman

ceGua

rantee

Dep

osit

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TDS

1470

0.00

0.00

0.00

0.00

0.00

0.00

1470

0.00

Supe

rann

uatio

n &Gratuity

Fun

dA/C

1300

0000

0.00

0.00

0.00

0.00

0.00

0.00

1300

0000

0.00

Saleofscrap

/Ten

derP

apers

0.00

0.00

400.00

0.00

0.00

2010

0.00

2050

0.00

Tota

l:47

5780

012.

0098

6803

65.0

081

4010

69.0

084

0744

87.0

013

7468

987.

0038

7881

72.0

091

6193

092.

00

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

Page 97: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|87

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,R

IVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISERE

CEIPTS&PAY

MEN

TSA

CCOUNTFORTH

EYEAR

201

5-16[PAY

MEN

TS]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

I.Ex

pens

esa).Estab

lishm

entE

xpen

ses

2426

2377

9.00

4528

5415

.00

5565

3230

.00

3662

3299

.00

9774

6054

.00

2440

6090

.00

5023

3786

7.00

(Co

rrespo

ndingtoSched

ule20

A)b).A

dministrativ

eExpe

nses

1737

1162

.00

8281

268.00

7031

550.00

5020

688.00

1734

6767

.00

4892

881.00

5994

4316

.00

(Co

rrespo

ndingtoSched

ule21

A)

II.Pa

ymen

t mad

e ag

ains

t Fun

ds fo

rVa

riousProjects.

LinkCa

nalProject(W

orks)

2135

0009

.00

3622

9034

.00

1023

8310

.00

3639

1006

.00

7719

979.00

5146

749.00

1170

7508

7.00

III.

Inve

stm

ent a

nd D

epos

it M

ade

a).O

utofE

armarked/En

dowmen

tfun

ds0.00

0.00

0.00

0.00

0.00

0.00

0.00

b).O

utofO

wnFu

nds(Investmen

t-othe

rs)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sup

eran

nuati

on&GratuityFun

d-F

DR48

5000

00.00

0.00

0.00

0.00

0.00

0.00

4850

0000

.00

IV.

Expe

nditu

re o

n Fi

xed

& C

apita

l Wor

k- in

- Prog

ress

a)PurchaseofFixed

Assets

2242

756.00

2832

326.00

7279

71.00

7257

27.00

1346

543.00

3134

37.00

8188

760.

00b).Expen

ditureonCa

pitalW

ork-in-Progress

0.00

0.00

0.00

0.00

0.00

0.00

0.00

V.Re

fund

of I

nter

est a

nd L

ong

Term

Adv

ance

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7thVibran

tGujratT

rade

Sho

w20

15-M

OWR

2899

.00

0.00

0.00

0.00

0.00

0.00

2899

.00

VI.

Fina

nce

Char

ges (

Inte

rest

)0.00

0.00

0.00

0.00

0.00

0.00

0.00

VII.

Oth

er P

aym

ents

(Spe

cify

)Su

perann

uatio

n&GratuityFun

d21

1300

32.00

0.00

0.00

0.00

0.00

0.00

2113

0032

.00

SecurityDe

posit/Re

fund

0.00

5200

0.00

0.00

0.00

0.00

0.00

5200

0.00

AdvancetoStaff

4931

20.00

2401

1.00

1087

42.00

1731

573.00

1227

680.00

0.00

3585

126.

00StaleCh

eque

7483

1.00

0.00

0.00

0.00

0.00

0.00

7483

1.00

OthersA

dvan

ces/ExcessR

efun

ds

2058

929.00

0.00

1503

351.00

0.00

3961

030.00

0.00

7523

310.

00India WaterW

eek-201

630

0000

0.00

0.00

0.00

0.00

0.00

0.00

3000

000.

00Re

mittan

ce/EarnestM

oneyDep

osit

1097

00.00

4875

0.00

0.00

855.00

0.00

0.00

1593

05.0

0TD

S0.00

0.00

0.00

0.00

0.00

0.00

0.00

Perfo

rman

ceGua

rantee

0.00

0.00

0.00

0.00

3379

.00

0.00

3379

.00

VIII.

Clos

ing

Bala

nces

Supe

rann

uatio

n&GratuityFun

d-SavingAc

coun

t95

2067

08.00

0.00

0.00

0.00

0.00

0.00

9520

6708

.00

FDR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

a).C

ashinHan

d24

090.00

2075

1.00

1040

2.00

4835

.00

7627

.00

0.00

6770

5.00

b).B

ankBa

lance

0.00

0.00

0.00

0.00

0.00

0.00

0.00

i)InSavingAc

coun

ts21

5754

10.00

5903

050.00

6124

701.00

3574

493.00

8096

969.00

4027

852.00

4930

2475

.00

c).Postagein

Han

d16

587.00

3760

.00

2812

.00

2011

.00

1295

9.00

1163

.00

3929

2.00

d).D

raftinTransit

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tota

l47

5780

012.

0098

6803

65.0

081

4010

69.0

084

0744

87.0

013

7468

987.

0038

7881

72.0

091

6193

092.

00

Sd/-

(S

.S. M

ohap

atra

)Ac

coun

ts O

ffice

r

Sd/-

(R

.K. S

inha

)Di

rect

or (F

inan

ce)

Sd/-

(S

. Mas

ood

Husa

in)

Dire

ctor

Gen

eral

Page 98: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

88|AnnualReport2015-16

SCHE

DULE

1- C

APITA

L FUN

D(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

e-sw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us

Year

Balanceasat

theBe

ginning

ofthe

Year

3231

9635

.00

1357

0875

.00

8518

306.00

4722

238.00

1503

2371

.00

6875

138.00

8103

8563

.00

3157

2230

.00

Add

;-’Assetspurchased

duringt

heye

ar

2242

756.00

2832

326.00

7279

71.00

7257

27.00

1369

568.00

3134

37.00

8211

785.00

8918

141.00

Sub

Tota

l (A)

:34

5623

91.0

016

4032

01.0

092

4627

7.00

5447

965.

0016

4019

39.0

071

8857

5.00

8925

0348

.00

4049

0371

.00

-A

ssetstransferre

dtoM

OWR(Veh

icles)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-C

apita

lInvestm

entW

ritten

Off

0.00

0.00

0.00

00.00

0.00

0.00

Add/De

duct:B

alan

ceofn

etin

come/(expen

diture)

0.00

transferre

dfro

mth

eIncomean

dExpen

ditureA/c.

5154

840.00

-757

8469

.00

3241

68.00

-109

9642

.00

-281

277.00

-180

2189

.00

-528

2569

.00

4054

8192

.00

Sub

Tota

l (B)

:51

5484

0.00

-757

8469

.00

3241

68.0

0-1

0996

42.0

0-2

8127

7.00

-180

2189

.00

-528

2569

.00

4054

8192

.00

Bala

nce

at th

e Ye

ar e

nd

3971

7231

.00

8824

732.

0095

7044

5.00

4348

323.

0016

1206

62.0

053

8638

6.00

8396

7779

.00

8103

8563

.00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 99: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|89

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

3- E

ARM

ARKE

D/EN

DOW

MEN

T FU

NDS

(Sup

eran

nuati

on &

Gra

tuity

Fun

d)

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Prev

ious

Yea

r

a) O

peni

ng B

alan

ce o

f the

fund

s

(Sup

eran

nuati

on&Gratuity

Fun

ds)

Saving

Ban

kA/c

3477

1795

.00

0.00

0.00

0.00

0.00

0.00

3477

1795

.00

3573

7684

.00

FDR’s

7550

0000

.00

0.00

0.00

0.00

0.00

0.00

7550

0000

.00

1743

5851

.00

b)Ad

ditio

n to

the

Fund

s

Bank

Interest:-Re

ceived

6512

1.00

0.00

0.00

0.00

0.00

0.00

6512

1.00

6443

084.00

Accrued

7970

816.00

0.00

0.00

0.00

0.00

0.00

7970

816.

0012

8498

.00

Received

duringtheyear

1300

0000

0.00

0.00

0.00

0.00

0.00

0.00

1300

0000

0.00

6512

4975

.00

C) L

ess U

tilis

ation

/Exp

endi

ture

Paym

entsRelea

sed

-211

3003

2.00

0.00

0.00

0.00

0.00

0.00

-211

3003

2.00

-144

6890

0.00

Bank

cha

rges

-176

.00

0.00

0.00

0.00

0.00

0.00

-176

.00

-899

.00

Tota

l22

7177

524.

000.

000.

000.

000.

000.

0022

7177

524.

0011

0400

293.

00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 100: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

90|AnnualReport2015-16

SCHE

DULE

- 7

CURR

ENT

LIAB

ILIT

IES

AND

PRO

VISI

ON

S (Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

esw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us Ye

arA.

CURR

ENT

LIABI

LITIE

SOt

her C

urre

nt Li

abili

ties

Outstand

ingE

xpen

ses:

Salary&Allo

wan

ces

7362

328.00

3422

440.00

4804

803.00

2707

356.00

7447

357.00

1659

604.00

2740

3888

.00

2616

9878

.00

Rent,Rate&Taxes

0.00

1174

50.00

9884

3.00

1123

28.00

1997

66.00

1283

43.00

6567

30.0

068

1593

.00

Remittan

ce91

19.00

0.00

0.00

0.00

0.00

0.00

9119

.00

855.00

StaleCh

eque

s0.00

0.00

0.00

0.00

0.00

0.00

0.00

7483

1.00

CPF

9678

62.00

1710

00.00

0.00

0.00

0.00

0.00

1138

862.

0062

913.00

GSLIS

6828

37.00

0.00

0.00

0.00

0.00

0.00

6828

37.0

017

7988

.00

Othe

rs62

615.00

0.00

0.00

0.00

1200

0.00

0.00

7461

5.00

1426

15.00

EarnestM

oney/S

ecurity

Dep

osit

1215

00.00

2077

69.00

2718

83.00

2870

00.00

1125

00.00

9751

0.00

1098

162.

0074

9533

.00

Perfo

rman

ceGua

rantee

Dep

osit

0.00

0.00

0.00

1121

65.00

1102

5.00

0.00

1231

90.0

015

0544

.00

Supe

rann

uatio

n&GratuityFu

nd0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TDS

1470

0.00

0.00

0.00

0.00

0.00

0.00

1470

0.00

0.00

Sub

Tota

l (A)

:92

2096

1.00

3918

659.

0051

7552

9.00

3218

849.

0077

8264

8.00

1885

457.

0031

2021

03.0

028

2107

50.0

0

B.PR

OVIS

IONS

AuditF

ee30

0000

.00

0.00

0.00

0.00

0.00

0.00

3000

00.0

030

0000

.00

Supe

rann

uatio

n&GratuityFu

nd0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l (B)

:30

0000

.00

0.00

0.00

0.00

0.00

0.00

3000

00.0

030

0000

.00

Gran

dTotal:

9520

961.00

3918

659.00

5175

529.00

3218

849.00

7782

648.00

1885

457.00

3150

2103

.00

2851

0750

.00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 101: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|91

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N

(Amou

ntin

Rup

ees)

Parti

cula

rsG

ROSS

BLO

CKDE

PREC

IATI

ON

NET

BLO

CKCo

st/Valuti

onas

at

beginn

ingof

the

year

Additio

nsdu

ringthe

year

Dedu

ction

durin

gth

e ye

ar

Cost/

Valutio

nat

the

year

en

d

As a

t the

beginn

ing

of th

e ye

ar

On

Additio

nsdu

ringthe

year

On

Dedu

ction

durin

gthe

year

Upto

the

year

As a

t the

curr

ent

yearend

As a

t the

prev

ious

yearend

12

34

56

78

910

11A.

FIXE

D AS

SETS

Build

ing

5825

436

00

5825

436

5589

218

2362

20

5612

840

2362

1823

6218

Tool

s & P

lant

s19

3025

8520

7081

2574

8719

2521

7917

0428

6743

6304

1042

5217

3749

1918

7726

020

8836

5M

otor

Ve

hicl

es23

5718

3748

1780

639

1346

224

4761

8115

8084

2212

8282

284

1630

1624

9614

8226

567

7763

415

Furn

iture

&

Fixt

ure

1738

7336

2647

911

4116

8819

6235

5989

6591

011

3578

198

463

1000

3228

9620

331

8821

545

Offi

ce

Equi

pmen

t17

2310

15-348

8916

2400

215

5721

2410

9021

1073

3499

8255

2010

8100

8947

6203

536

4390

8

Com

pute

r/Pe

riphe

rial

2410

6427

5241

955

1833

4829

1650

3420

1642

1548

6355

713

8778

2488

8994

4276

040

6398

443

Tech

nica

l Bo

ok36

4857

1520

036

6377

2898

9445

432

033

5326

3105

174

963

Cam

p Eq

uipm

ent

2071

939

0047

0919

910

2017

337

547

0815

840

4070

546

Sub

Tota

l :10

7810

212

1288

5284

6394

696

1143

0080

078

7828

0985

2139

220

1335

185

2908

5029

0099

5029

0274

03B.

CA

PITA

L W

ORK

-IN-

PRO

GRE

SS

00

00

00

00

00

Sub Total:

00

00

00

00

00

Gra

nd T

otal

:10

7810

212.

0012

8852

84.0

063

9469

6.00

1143

0080

0.00

7878

2809

.00

8521

392.

0020

1335

1.00

8529

0850

.00

2900

9950

.00

2902

7403

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 102: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

92|AnnualReport2015-16

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol 2

- Co

st /

Val

uatio

n as

at

Begi

nnin

g of

the

Year

](Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

5825

436.00

0.00

0.00

0.00

0.00

0.00

5825

436.

00Tools&

Plants

4708

778.00

6600

257.00

1507

988.00

3655

628.00

2329

234.00

5007

00.00

1930

2585

.00

MotorVeh

icles

5085

785.00

3347

731.00

5408

975.00

2919

815.00

5226

325.00

1583

206.00

2357

1837

.00

Furnitu

re&Fixture

5155

730.00

2121

752.00

3540

168.00

2112

538.00

2546

822.00

1910

326.00

1738

7336

.00

OfficeEqu

ipmen

t41

2723

0.00

2316

919.00

2238

596.00

1623

667.00

6244

407.00

6801

96.00

1723

1015

.00

Compu

ter/Pe

riphe

rial

1076

4512

.00

2229

819.00

3220

664.00

3825

163.00

2912

643.00

1153

626.00

2410

6427

.00

TechnicalB

ook

3041

30.00

1492

3.00

2708

3.00

3619

.00

1473

2.00

370.00

3648

57.0

0Ca

mpEq

uipm

ent

0.00

1471

9.00

6000

.00

0.00

0.00

0.00

2071

9.00

Sub

Tota

l :35

9716

01.0

016

6461

20.0

015

9494

74.0

014

1404

30.0

019

2741

63.0

058

2842

4.00

1078

1021

2.00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:35

9716

01.0

016

6461

20.0

015

9494

74.0

014

1404

30.0

019

2741

63.0

058

2842

4.00

1078

1021

2.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 103: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|93

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

3: A

dditi

on d

urin

g th

e Ye

ar]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tools&

Plants

0.00

0.00

1489

43.00

0.00

-171

753.00

2298

91.00

2070

81.0

0MotorVeh

icles

7283

24.00

2003

957.00

1053

041.00

6296

06.00

4028

78.00

0.00

4817

806.

00Fu

rnitu

re&Fixture

2093

56.00

4873

04.00

5677

68.00

7199

.00

9814

26.00

3948

58.00

2647

911.

00OfficeEqu

ipmen

t16

5586

3.00

1762

15.00

2998

19.00

3952

2.00

-247

5296

.00

2689

88.00

-348

89.0

0Co

mpu

ter/Pe

riphe

rial

3760

18.00

9883

04.00

6710

19.00

4940

0.00

3035

191.00

1220

23.00

5241

955.

00TechnicalB

ook

1520

.00

0.00

0.00

0.00

0.00

0.00

1520

.00

CampEq

uipm

ent

0.00

0.00

3900

.00

0.00

0.00

0.00

3900

.00

Sub

Tota

l :29

7108

1.00

3655

780.

0027

4449

0.00

7257

27.0

017

7244

6.00

1015

760.

0012

8852

84.0

0

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:29

7108

1.00

3655

780.

0027

4449

0.00

7257

27.0

017

7244

6.00

1015

760.

0012

8852

84.0

0

Note;-A

ssestspurchased

duringtheyear201

5-16

forRs.821

1785

/-(R

s.12

8852

84-R

s.46

9652

4/-add

edbyvario

usofficeso

fNWDA

cha

ngeinHea

ds

ofAssets/Tran

sferofA

ssets.The

sameha

salso

bee

ntakeninth

ecolumnNo.4whichhasnulify

theim

pactontotalA

ssetsu

ptotheyear201

5-16

Col.-

5)

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 104: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

94|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

4: D

educ

tion

durin

g th

e Ye

ar]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tools&

Plants

0.00

4829

3.00

6003

.00

1713

9.00

1651

33.00

2091

9.00

2574

87.0

0MotorVeh

icles

6589

47.00

8151

67.00

1140

148.00

5022

28.00

7969

72.00

0.00

3913

462.

00Fu

rnitu

re&Fixture

0.00

8732

.00

3096

4.00

4190

.00

2682

94.00

9950

8.00

4116

88.0

0OfficeEqu

ipmen

t0.00

4326

1.00

2405

80.00

1032

0.00

7400

40.00

5898

01.00

1624

002.

00Co

mpu

ter/Pe

riphe

rial

0.00

4524

0.00

0.00

0.00

0.00

1381

08.00

1833

48.0

0TechnicalB

ook

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CampEq

uipm

ent

0.00

4709

.00

0.00

0.00

0.00

0.00

4709

.00

Sub

Tota

l :65

8947

.00

9654

02.0

014

1769

5.00

5338

77.0

019

7043

9.00

8483

36.0

063

9469

6.00

B.

CAPI

TAL

WO

RK -

PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:65

8947

.00

9654

02.0

014

1769

5.00

5338

77.0

019

7043

9.00

8483

36.0

063

9469

6.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 105: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|95

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

5: C

ost /

Val

uatio

n as

at

Year

end

](Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

5825

436.00

0.00

0.00

0.00

0.00

0.00

5825

436.

00Tools&

Plants

4708

778.00

6551

964.00

1650

928.00

3638

489.00

1992

348.00

7096

72.00

1925

2179

.00

MotorVeh

icles

5155

162.00

4536

521.00

5321

868.00

3047

193.00

4832

231.00

1583

206.00

2447

6181

.00

Furnitu

re&Fixture

5365

086.00

2600

324.00

4076

972.00

2115

547.00

3259

954.00

2205

676.00

1962

3559

.00

OfficeEqu

ipmen

t57

8309

3.00

2449

873.00

2297

835.00

1652

869.00

3029

071.00

3593

83.00

1557

2124

.00

Compu

ter/Pe

riphe

rial

1114

0530

.00

3172

883.00

3891

683.00

3874

563.00

5947

834.00

1137

541.00

2916

5034

.00

TechnicalB

ook

3056

50.00

1492

3.00

2708

3.00

3619

.00

1473

2.00

370.00

3663

77.0

0Ca

mpEq

uipm

ent

0.00

1001

0.00

9900

.00

0.00

0.00

0.00

1991

0.00

0.00

Sub

Tota

l :38

2837

35.0

019

3364

98.0

017

2762

69.0

014

3322

80.0

019

0761

70.0

059

9584

8.00

1143

0080

0.00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:38

2837

35.0

019

3364

98.0

017

2762

69.0

014

3322

80.0

019

0761

70.0

059

9584

8.00

1143

0080

0.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 106: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

96|AnnualReport2015-16

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

6: A

s at t

he B

egin

ning

of t

he Y

ear]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

5589

218.00

0.00

0.00

0.00

0.00

0.00

5589

218.

00Tools&

Plants

4485

139.00

6021

006.00

1272

444.00

3117

001.00

1691

638.00

4556

39.00

1704

2867

.00

MotorVeh

icles

2321

420.00

3349

449.00

2814

363.00

2578

087.00

3288

814.00

1456

289.00

1580

8422

.00

Furnitu

re&Fixture

2636

153.00

1141

067.00

2093

206.00

9177

42.00

1613

952.00

5637

90.00

8965

910.

00OfficeEqu

ipmen

t29

8513

8.00

1988

087.00

1911

855.00

1441

265.00

2148

340.00

4274

25.00

1090

2110

.00

Compu

ter/Pe

riphe

rial

8115

660.00

1942

227.00

2832

419.00

2685

472.00

3854

294.00

7341

43.00

2016

4215

.00

TechnicalB

ook

2402

48.00

1385

4.00

1950

9.00

3213

.00

1277

0.00

300.00

2898

94.0

0Ca

mpEq

uipm

ent

0.00

1465

1.00

5522

.00

0.00

0.00

0.00

2017

3.00

Sub

Tota

l :26

3729

76.0

014

4703

41.0

010

9493

18.0

010

7427

80.0

012

6098

08.0

036

3758

6.00

7878

2809

.00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:26

3729

76.0

014

4703

41.0

010

9493

18.0

010

7427

80.0

012

6098

08.0

036

3758

6.00

7878

2809

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 107: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|97

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [

Col -

7: O

n Ad

ditio

n du

ring

the

Year

](Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

2362

2.00

0.00

0.00

0.00

0.00

0.00

2362

2.00

Tools&

Plants

3354

6.00

8652

5.00

5764

6.00

8060

1.00

4690

7.00

1310

79.00

4363

04.0

0MotorVeh

icles

4250

62.00

1390

77.00

3761

26.00

9200

8.00

2315

12.00

1903

7.00

1282

822.

00Fu

rnitu

re&Fixture

2657

11.00

1262

04.00

1850

89.00

1197

60.00

1513

84.00

2876

33.00

1135

781.

00OfficeEqu

ipmen

t30

4995

.00

6546

7.00

7818

2.00

2996

8.00

1187

21.00

1361

66.00

7334

99.0

0Co

mpu

ter/Pe

riphe

rial

1696

641.00

4915

99.00

5546

05.00

6986

34.00

1120

730.00

3013

48.00

4863

557.

00TechnicalB

ook

3878

5.00

641.00

4545

.00

244.00

1175

.00

42.00

4543

2.00

CampEq

uipm

ent

0.00

10.00

365.00

0.00

0.00

0.00

375.

00

Sub

Tota

l :27

8836

2.00

9095

23.0

012

5655

8.00

1021

215.

0016

7042

9.00

8753

05.0

085

2139

2.00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:27

8836

2.00

9095

23.0

012

5655

8.00

1021

215.

0016

7042

9.00

8753

05.0

085

2139

2.00

Note;-N

etinterestcha

rged

duringtheyear201

5-16

isRs.81

1457

6/-(Rs.852

1392

-Rs.40

6816

/-ad

dedbyinv.CirclePatna

towardsinter-chan

gein

Hea

ds

ofAssets.The

sameha

salso

bee

ntakeninth

ecolumnNo.8whichhasnulify

theim

pactontotalD

epreciati

oncha

rged

uptotheyear201

5-16

Col.-9

)

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 108: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

98|AnnualReport2015-16

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [

Col -

8: O

n De

ducti

on d

urin

g th

e Ye

ar]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tools&

Plants

0.00

4587

3.00

5773

.00

1584

8.00

1615

2.00

2060

6.00

1042

52.0

0MotorVeh

icles

0.00

3825

43.00

0.00

4590

87.00

0.00

0.00

8416

30.0

0Fu

rnitu

re&Fixture

0.00

7644

.00

2425

7.00

3386

.00

1967

4.00

4350

2.00

9846

3.00

OfficeEqu

ipmen

t0.00

4152

6.00

1889

71.00

7942

.00

2063

84.00

3806

97.00

8255

20.0

0Co

mpu

ter/Pe

riphe

rial

0.00

4384

7.00

0.00

0.00

0.00

9493

1.00

1387

78.0

0TechnicalB

ook

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CampEq

uipm

ent

0.00

4708

.00

0.00

0.00

0.00

0.00

4708

.00

Sub

Tota

l :0.

0052

6141

.00

2190

01.0

048

6263

.00

2422

10.0

053

9736

.00

2013

351.

00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:0.

0052

6141

.00

2190

01.0

048

6263

.00

2422

10.0

053

9736

.00

2013

351.

00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 109: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|99

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

9: T

otal

upt

o th

e Ye

ar e

nd]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

5612

840.00

0.00

0.00

0.00

0.00

0.00

5612

840.

00Tools&

Plants

4518

685.00

6061

658.00

1324

317.00

3181

754.00

1722

393.00

5661

12.00

1737

4919

.00

MotorVeh

icles

2746

482.00

3105

983.00

3190

489.00

2211

008.00

3520

326.00

1475

326.00

1624

9614

.00

Furnitu

re&Fixture

2901

864.00

1259

627.00

2254

038.00

1034

116.00

1745

662.00

8079

21.00

1000

3228

.00

OfficeEqu

ipmen

t32

9013

3.00

2012

028.00

1801

066.00

1463

291.00

2060

677.00

1828

94.00

1081

0089

.00

Compu

ter/Pe

riphe

rial

9812

301.00

2389

979.00

3387

024.00

3384

106.00

4975

024.00

9405

60.00

2488

8994

.00

TechnicalB

ook

2790

33.00

1449

5.00

2405

4.00

3457

.00

1394

5.00

342.00

3353

26.0

0Ca

mpEq

uipm

ent

0.00

9953

.00

5887

.00

0.00

0.00

0.00

1584

0.00

Sub

Tota

l :29

1613

38.0

014

8537

23.0

011

9868

75.0

011

2777

32.0

014

0380

27.0

039

7315

5.00

8529

0850

.00

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

000.00

Gra

nd T

otal

:29

1613

38.0

014

8537

23.0

011

9868

75.0

011

2777

32.0

014

0380

27.0

039

7315

5.00

8529

0850

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 110: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

100|AnnualReport2015-16

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol -

10: A

s at t

he C

urre

nt Y

ear e

nd]

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

2125

96.00

0.00

0.00

0.00

0.00

0.00

2362

18.0

0Tools&

Plants

1900

93.00

4903

06.00

3266

11.00

4567

35.00

2699

55.00

1435

60.00

1877

260.

00MotorVeh

icles

2408

680.00

1430

538.00

2131

379.00

8361

85.00

1311

905.00

1078

80.00

8226

567.

00Fu

rnitu

re&Fixture

2463

222.00

1340

697.00

1822

934.00

1081

431.00

1514

292.00

1397

755.00

9620

331.

00OfficeEqu

ipmen

t24

9296

0.00

4378

45.00

4967

69.00

1895

78.00

9683

94.00

1764

89.00

4762

035.

00Co

mpu

ter/Pe

riphe

rial

1328

229.00

7829

04.00

5046

59.00

4904

57.00

9728

10.00

1969

81.00

4276

040.

00TechnicalB

ook

2661

7.00

428.00

3029

.00

162.00

787.00

28.00

3105

1.00

CampEq

uipm

ent

0.00

57.00

4013

.00

0.00

0.00

0.00

4070

.00

Sub

Tota

l :91

2239

7.00

4482

775.

0052

8939

4.00

3054

548.

0050

3814

3.00

2022

693.

0029

0099

50.0

0

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

000.00

Gra

nd T

otal

:91

2239

7.00

4482

775.

0052

8939

4.00

3054

548.

0050

3814

3.00

2022

693.

0029

0099

50.0

0

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 111: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|101

SCHE

DULE

- 8:

FIX

ED A

SSET

S DE

SCRI

PTIO

N [C

ol 1

1 - A

s at

the

prev

ious

Yea

r end

](Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

A.FI

XED

ASSE

TSBu

ilding

2362

18.00

0.00

0.00

0.00

0.00

0.00

2362

18.0

0Tools&

Plants

2236

39.00

5792

51.00

3829

42.00

5386

27.00

3188

45.00

4506

1.00

2088

365.

00MotorVeh

icles

3329

308.00

3812

48.00

2013

807.00

3417

28.00

1570

407.00

1269

17.00

7763

415.

00Fu

rnitu

re&Fixture

2519

577.00

9806

85.00

1614

160.00

1194

796.00

1165

791.00

1346

536.00

8821

545.

00OfficeEqu

ipmen

t11

4209

2.00

3288

32.00

4755

07.00

1824

02.00

1262

304.00

2527

71.00

3643

908.

00Co

mpu

ter/Pe

riphe

rial

2648

852.00

2875

92.00

7091

55.00

1139

691.00

1193

670.00

4194

83.00

6398

443.

00TechnicalB

ook

6388

2.00

1069

.00

7574

.00

406.00

1962

.00

70.00

7496

3.00

CampEq

uipm

ent

0.00

68.00

478.00

0.00

0.00

0.00

546.

000.

00Su

b To

tal :

1016

3568

.00

2558

745.

0052

0362

3.00

3397

650.

0055

1297

9.00

2190

838.

0029

0274

03.0

0

B.

CAPI

TAL

WO

RK-IN

-PRO

GRE

SS0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

Gra

nd T

otal

:10

1635

68.0

025

5874

5.00

5203

623.

0033

9765

0.00

5512

979.

0021

9083

8.00

2902

7403

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CONSO

LIDA

TEDSC

HEDU

LEFORM

INGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Page 112: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

102|AnnualReport2015-16

SCHE

DULE

- 9:

INVE

STM

ENT

FRO

M E

ARM

ARKE

D/EN

DOW

MEN

T FU

ND

(Sup

eran

nuati

on&

Gra

tuity

Fun

d)

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Prev

ious

Yea

r

1 IN

VEST

MEN

T FR

OM

EAR

MAR

KED

FUN

D

InGovernm

entS

ecurities

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Otherapp

rovedSecuriti

es

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Nati

onalise

dBa

nk;Saving

Accou

nt95

2067

08.00

0.00

00.00

0.00

0.00

9520

6708

.00

3477

1795

.00

FixedDe

posit

1240

0000

0.00

0.00

0.00

0.00

0.00

0.00

1240

0000

0.00

7550

0000

.00

Accrue

dInterest

7970

816.00

0.00

0.00

0.00

0.00

0.00

7970

816.

0012

8498

.00

Tota

l:22

7177

524.

000.

000.

000.

000.

000.

0022

7177

524.

0011

0400

293.

00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

C

IRCLEWISESC

HEDU

LESFO

RMINGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 113: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|103

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFBA

LANCE

SHE

ETASAT

31stM

ARCH

,201

6

SCHE

DULE

-11:

CU

RREN

T AS

SETS

, LO

ANS,

ADV

ANCE

S et

c.(A

mou

nt in

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

esw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us Ye

arA.

CU

RREN

T AS

SETS

CashBalan

cein

Han

d24

090.00

2075

1.00

1040

2.00

4835

.00

7627

.00

0.00

6770

5.00

3017

3.00

Bank

Balan

cein

Savin

gBan

kAccou

nt21

5754

1059

0305

0.00

6124

701.00

3574

493.00

8096

969.00

4027

852

4930

2475

.00

4287

4156

.00

Bank

Balan

cein

CurrentAccou

nt0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

PostageinHan

d16

587.00

3760

.00

2812

.00

2011

.00

1295

9.00

1163

.00

3929

2.00

1870

6.00

Draft

inTr

ansit

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NWDA

Reti

remen

tBen

efitA

ccou

nt0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l (A)

:21

6160

87.0

059

2756

1.00

6137

915.

0035

8133

9.00

8117

555.

0040

2901

5.00

4940

9472

.00

4292

3035

.00

B.

LOAN

S ADV

ANCE

S AND

OTH

ER

ASSE

TSLoan

s&Advan

ces:

ToSt

aff

1152

522.00

1212

946.00

7766

60.00

7024

47.00

1639

361.00

1107

650.00

6591

586.

0074

3193

0.00

ToOthers

1576

4392

.00

5540

07.00

3280

626.00

6938

12.00

6443

243.00

0.00

2673

6080

.00

2639

5755

.00

Sub

Tota

l (B)

:16

9169

14.0

017

6695

3.00

4057

286.

0013

9625

9.00

8082

604.

0011

0765

0.00

3332

7666

.00

3382

7685

.00

CL

AIM

S REC

EIVA

BLE

LeaveSalalry

Recoverab

le.

7466

87.00

1150

06.00

5879

48.00

7118

22.00

5360

34.00

7215

33.00

3419

030.

0034

7788

9.00

SecurityD

eposit

0.00

0.00

0.00

1100

0.00

0.00

0.00

1100

0.00

1100

0.00

NewPen

sionSche

me(N.P.S

.)28

7033

.00

0.00

0.00

0.00

0.00

0.00

2870

33.0

028

2301

.00

Rem

mita

nce

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CPF

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Accrue

dInterest

0.00

0.00

0.00

0.00

5731

.00

0.00

5731

.00

0.00

Sub

Tota

l (C)

:10

3372

0.00

1150

06.0

058

7948

.00

7228

22.0

054

1765

.00

7215

33.0

037

2279

4.00

3771

190.

00Gr

and

Tota

l39

5667

21.0

078

0952

0.00

1078

3149

.00

5700

420.

0016

7419

24.0

058

5819

8.00

8645

9932

.00

8052

1910

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 114: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

104|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFINCO

ME&EXP

ENDITU

REFORTH

EPE

RIOD/

YEA

REN

DED31

stM

ARCH

,201

6

SCHE

DULE

- 13

: G

RAN

TS /

SU

BSID

IES

( Irr

evoc

able

Gra

nts &

subs

idie

s rec

eive

d)

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Valsa

dHy

dera

bad

Patn

aTo

tal

Prev

ious

Year

1Gran

ts-in

-aid (C

entra

lGov

t.)28

7718

903.00

8362

1695

.00

7492

5715

.00

7770

9638

.00

1248

4582

3.00

3296

6441

.00

6817

8821

5.00

6110

8185

9.00

2Gran

tfor7thVibrantGujrat

Glob

alTr

adeshow

-289

9.00

0.00

0.00

0.00

0.00

0.00

-289

9.00

2000

0.00

Returned

toM

OWR,RD

&GR

Tota

l:28

7716

004.

0083

6216

95.0

074

9257

15.0

077

7096

38.0

012

4845

823.

0032

9664

41.0

068

1785

316.

0061

1101

859.

00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 115: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|105

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFINCO

ME&EXP

ENDITU

REFORTH

EYEAR

ENDE

D31

stM

ARCH

,201

6

SCHE

DULE-17

:INTERE

STEAR

NED

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Prev

ious

Yea

r

(a)

OnSaving

Ban

kAc

coun

t24

5620

5.00

3494

41.00

2112

34.00

1354

81.00

4274

63.00

1363

20.00

3716

144.

0026

1343

4.00

(b)

Loan

sand

Advan

ces

1983

96.00

2762

7.00

1234

84.00

6748

.00

1508

86.00

10.00

5071

51.0

052

6454

.00

(c)

Others

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tota

l:26

5460

1.00

3770

68.0

033

4718

.00

1422

29.0

057

8349

.00

1363

30.0

042

2329

5.00

3139

888.

00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 116: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

106|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFINCO

ME&EXP

ENDITU

REFORTH

EYEAR

ENDE

D31

stM

ARCH

,201

6

SCHE

DULE-18

:OT

HERINCO

ME

(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

esw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us Ye

ar

DisposalofAssets

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Profi

t /Losson D

isposalofAsse ts

0.00

5178

6.00

-274

1.00

6662

.00

-145

.00

302.00

5586

4.00

1738

67.00

Misc

ellan

eousIn

come

1731

7.00

3347

5.00

2129

.00

672.00

1486

0.00

650.00

6910

3.00

6098

5.00

Realisatio

nofNoti

cePeriodAm

ount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SaleofTen

derF

ormse

tc.

0.00

0.00

400.00

0.00

0.00

2010

0.00

2050

0.00

4075

0.00

Tota

l:17

317.

0085

261.

00-2

12.0

073

34.0

014

715.

0021

052.

0014

5467

.00

2756

02.0

0

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 117: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|107

SCHE

DULE-20

:ESTA

BLISHM

ENTEX

PENS

ES(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

esw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us Ye

ar

(a)

Salarie

sand

Wages(P

ay)

3137

0021

.00

1352

4841

.00

1917

0658

.00

1462

1546

.00

3415

1753

.00

8994

166.00

1218

3298

5.00

1246

2752

7.00

(b)

Allowan

ces &

Bon

us58

7615

04.00

3206

0422

.00

3722

6429

.00

2190

1038

.00

6338

9444

.00

1537

2326

.00

2287

1116

3.00

2143

2451

1.00

(c)

Contrib

ution

toProvid

ent

Fund

(CPF)a

nd22

1143

73.00

0.00

0.00

0.00

0.00

0.00

2211

4373

.00

1551

6754

.00

(d)

InterestonCP

F0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(e)

CPF/

GSLIS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(f)Expe

nsesonEm

ployee

s’Re

tire-

men

t&Te

rminal

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bene

fit(S

uperan

nuati

on&

GratuityFu

nd)

1300

0000

0.00

0.00

0.00

0.00

0.00

0.00

1300

0000

0.00

4573

8796

.00

(g)

LeaveSalary&Pen

sionCo

ntri-

butio

n35

8910

.00

0.00

0.00

0.00

2534

57.00

4800

4.00

6603

71.0

065

6307

.00

(h)

NPSG

ovt.C

ontribu

tion

1119

260.00

0.00

0.00

0.00

0.00

0.00

1119

260.

0010

8217

8.00

Tota

l:24

3724

068.

0045

5852

63.0

056

3970

87.0

036

5225

84.0

097

7946

54.0

024

4144

96.0

050

4438

152.

0040

1946

073.

00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFINCO

ME&EXP

ENDITU

REFORTH

EYEAR

ENDE

D31

stM

ARCH

,201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 118: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

108|AnnualReport2015-16

CIRC

LE W

ISE

SCHE

DULE

- 21

: O

THER

ADM

INIS

TRAT

IVE

EXPE

NSE

S(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uart

ers

Gwal

ior

Bhub

anes

war

Vals

adHy

dera

bad

Patn

aTo

tal

Prev

ious

Yea

r

(a)

Tra

velli

ng E

xpen

ses

2743

800

3719

594.00

2686

060.00

2192

997.00

4685

980.00

2499

907.00

1852

8338

.00

1777

1331

.00

(b)

Offi

ce E

xpen

ses

Elec

tric

ity C

harg

es16

0995

734

0821

.00

3727

14.00

1896

74.00

1061

155.00

7595

6.00

3650

277.

0033

2062

5.00

Teleph

one &Trunkcall

6791

9119

7643

.00

2842

88.00

8180

4.00

1755

67.00

1063

88.00

1524

881.

0012

9163

5.00

Publicati

on,Periodical&

Boo

k14

2989

5438

3.00

2493

3.00

3752

5.00

9060

2.00

3091

4.00

3813

46.0

035

6100

.00

WaterCha

rges

7594

158

721.00

8252

.00

0.00

8155

7.00

0.00

2244

71.0

025

5844

.00

Stati

onery &Prin

ting

9578

5536

437.00

4833

7.00

2258

0.00

6380

1.00

4349

.00

1133

359.

0010

7699

0.00

Conveyan

ce0

1358

9.00

6446

.00

7506

.00

2076

0.00

1227

2.00

6057

3.00

7887

7.00

Liverie

s37

516

1304

1.00

2436

5.00

1662

4.00

1575

7.00

9410

.00

1167

13.0

015

2994

.00

Telegram

,Telex&Fax

035

.00

545.00

210.00

0.00

5848

.00

6638

.00

1251

1.00

Postages

1615

4670

860.00

5907

5.00

4372

8.00

1211

47.00

1901

7.00

4753

73.0

045

9377

.00

Rubb

erStamp

055

5.00

1230

.00

4607

.00

2405

.00

4285

.00

1308

2.00

1347

0.00

Repa

irsofO

fficeCycle

00.00

0.00

0.00

0.00

0.00

0.00

60.00

Bank

Cha

rges

4033

3122

.00

6323

.00

1086

40.00

2747

.00

8285

.00

1331

50.0

033

320.00

Misc

. Expen

ses

3476

5824

6329

.00

1856

37.00

1329

81.00

1804

80.00

2977

26.00

1390

811.

0012

5689

4.00

Lawyerfee

1671

015

895.00

1350

0.00

0.00

1650

.00

0.00

4775

5.00

1622

729.00

Hosp

italit

y65

635

9067

.00

2526

7.00

4317

.00

9039

.00

750.00

1140

75.0

010

7584

.00

Advertisemen

t10

5084

3908

7.00

2450

7.00

1365

.00

1160

68.00

0.00

2861

11.0

031

0809

.00

Audit F

ees

00.00

0.00

0.00

0.00

0.00

0.00

0.00

InternetCha

rges

00

0.00

0.00

0.00

0.00

0.00

0.00

OtherAdm

inistati

veExpen

ses

1130

720.00

0.00

0.00

0.00

0.00

1130

72.0

010

6035

.00

(c)

Rent

, Rat

e &

Tax

es77

7856

718

9731

6.00

1639

561.00

1378

842.00

9354

824.00

1107

793.00

2315

6903

.00

2815

5542

.00

(d)

Repa

irs &

Mai

nten

ance

2531

089

1542

230.00

1583

058.00

8006

38.00

1311

613.00

7133

78.00

8482

006.

0010

0897

59.00

0Su

b - T

otal

:17

3706

4382

5872

5.00

6994

098.

0050

2403

8.00

1729

5152

.00

4896

278.

0059

8389

34.0

066

4724

86.0

0

(e)

Wor

ks85

1997

1.00

3690

8982

.00

1028

8310

.0036

3910

06.00

8959

929.00

5146

749.00

1062

1494

7.00

9210

4553

.00

(f)

7th

V.G

.Glo

bal T

rade

show

* 0.00

0.00

0.00

0.00

0.00

0.00

0.00

1710

1Su

b - T

otal

:85

1997

1.00

3690

8982

.00

1028

8310

.00

3639

1006

.00

8959

929.

0051

4674

9.00

1062

1494

7.00

9212

1654

.00

(g)

Spec

ial C

omm

ittee

/Ce

ll-IL

R12

8300

38.00

0.00

0.00

0.00

0.00

0.00

1283

0038

.00

7613

149.00

Tota

l:38

7206

52.0

045

1677

07.0

017

2824

08.0

041

4150

44.0

026

2550

81.0

010

0430

27.0

017

8883

919.

0016

6207

289.

00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFINCO

ME&EXP

ENDITU

REFORTH

EYEAR

ENDE

D31

stM

ARCH

,201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 119: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

AnnualReport2015-16|109

SCHE

DULE

- 20

A:

ESTA

BLIS

HMEN

T EX

PEN

SES

(Amou

ntin

Rup

ees) Pa

rticu

lars

Head

Qua

rters

Gwal

ior

Bhub

anes

war

Valsa

dHy

dera

bad

Patn

aTo

tal

Prev

ious

Year

(a)

Salarie

sand

Wages(P

ay)

3554

5754

.00

1348

5130

.00

1893

4963

.00

1473

0021

.00

3427

5125

.00

9054

951.00

1260

2594

4.00

1281

1983

2.00

(b)

Allowan

ces&

Bon

us54

3856

99.00

3180

0285

.00

3671

8267

.00

2189

3278

.00

6321

7472

.00

1530

3135

.00

2233

1813

6.00

2097

3745

7.00

(c)

Govt.C

ontribu

tionto

Providen

tFun

d(CP

F)and

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

InterestonCP

F21

2094

24.00

0.00

0.00

0.00

0.00

0.00

2120

9424

.00

3402

6430

.00

(d)

Paym

entsto

wardsG

SLIS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(e)

Expe

nsesonEm

ployee

s’R e

tirem

ent&

Term

inal

Bene

fit(S

uperan

nuati

on&

GratuityFu

nd)

1300

0000

0.00

0.00

0.00

0.00

0.00

0.00

1300

0000

0.00

6512

4975

.00

(f)NP

SGov

t.Con

tribu

tion

1119

260.00

0.00

0.00

0.00

0.00

0.00

1119

260.

0010

8217

8.00

(g)

LeaveSalary&Pen

sion

Contrib

ution

3589

10.00

0.00

0.00

0.00

2534

57.00

4800

4.00

6603

71.0

065

6307

.00

(h)

NPS

4732

.00

0.00

0.00

0.00

0.00

4732

.00

5015

4.00

Tota

l:24

2623

779.

0045

2854

15.0

055

6532

30.0

036

6232

99.0

097

7460

54.0

024

4060

90.0

050

2337

867.

0043

8797

333.

00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFRE

CEIPTS&PAY

MEN

TSACC

OUNTFO

RTH

EYEAR

ENDE

D31

-3-20

16

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 120: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

NationalWaterDevelopmentAgency

110|AnnualReport2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MINISTR

YOFWAT

ERRESOURC

ES,RIVER

DEV

ELOPM

ENT&GAN

GAREJUVE

NAT

ION,G

OVT.O

FINDIA)

CIRC

LEW

ISESC

HEDU

LESFO

RMINGPA

RTOFRE

CEIPTS&PAY

MEN

TSACC

OUNTFO

RTH

EYEAR

ENDE

D31

-3-20

16

SCHE

DULE

- 21

A:

OTHE

R AD

MIN

ISTR

ATIV

E EX

PENS

ES(Amou

ntin

Rup

ees)

Parti

cula

rsHe

ad Q

uarte

rsGw

alio

rBh

uban

esw

arVa

lsad

Hyde

raba

dPa

tna

Tota

lPr

evio

us Ye

ar

(a)

Trav

ellin

g Exp

ense

s27

4380

0.00

3719

594.00

2686

060.00

2192

997.00

4765

980.00

2499

907.00

1860

8338

.00

1781

4124

.00

(b)

Offi

ce E

xpen

ses

Electricit

yCha

rges

1609

957.00

3408

21.00

3727

14.00

1896

74.00

1061

155.00

7595

6.00

3650

277.

0033

2062

5.00

Teleph

one&Trun

kcall

6791

91.00

1976

43.00

2842

88.00

8180

4.00

1755

67.00

1063

88.00

1524

881.

0012

9163

5.00

Publica

tion,Periodical&

Boo

k14

2989

.00

5438

3.00

2493

3.00

3752

5.00

9060

2.00

3091

4.00

3813

46.0

035

6100

.00

WaterCha

rges

7594

1.00

5872

1.00

8252

.00

0.00

8155

7.00

0.00

2244

71.0

025

5844

.00

Stati

onery&

Prin

ting

9578

55.00

3643

7.00

4833

7.00

2258

0.00

6380

1.00

4349

.00

1133

359.

0010

7699

0.00

Conveyan

ce0.00

1358

9.00

6446

.00

7506

.00

2076

0.00

1227

2.00

6057

3.00

7887

7.00

Liveries

3751

6.00

1304

1.00

2436

5.00

1662

4.00

1575

7.00

9410

.00

1167

13.0

015

2994

.00

Telegram

,Telex&Fa

x0.00

35.00

545.00

210.00

0.00

5848

.00

6638

.00

1251

1.00

Postages

1615

46.00

7086

0.00

5907

5.00

4372

8.00

1211

47.00

1901

7.00

4753

73.0

045

9377

.00

Rubb

erSt

amp

0.00

555.00

1230

.00

4607

.00

2405

.00

4285

.00

1308

2.00

1347

0.00

Repa

irsofO

fficeCycle

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.00

Bank

Cha

rges

4209

.00

3122

.00

6323

.00

1086

40.00

2747

.00

8285

.00

1333

26.0

034

219.00

Misc

.Expen

ses

3476

58.00

2463

29.00

1856

37.00

1329

81.00

1804

80.00

2977

26.00

1390

811.

0012

5845

9.00

Lawyerfee

1671

0.00

1589

5.00

1350

0.00

0.00

1650

.00

0.00

4775

5.00

1622

729.00

Hosp

italit

y65

635.00

9067

.00

2526

7.00

4317

.00

9039

.00

750.00

1140

75.0

010

7584

.00

Advertisemen

t10

5084

.00

3908

7.00

2450

7.00

1365

.00

1160

68.00

0.00

2861

11.0

031

0809

.00

Audit F

ees

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

InternetCha

rges

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Othe

rAdm

inistati

veExpen

ses

1130

72.00

0.00

0.00

0.00

0.00

0.00

1130

72.0

010

6035

.00

writeo

ff34

3.00

0.00

0.00

0.00

0.00

0.00

343.

000.00

(c)

Rent

, Rat

e &

Taxe

s77

7856

7.00

1919

859.00

1677

013.00

1375

492.00

9326

439.00

1104

396.00

2318

1766

.00

2981

5304

.00

(d)

Repa

irs &

Mai

nten

ance

2531

089.00

1542

230.00

1583

058.00

8006

38.00

1311

613.00

7133

78.00

8482

006.

0010

0897

59.00

Sub

- Tot

al:

1737

1162

.00

8281

268.

0070

3155

0.00

5020

688.

0017

3467

67.0

048

9288

1.00

5994

4316

.00

6817

7505

.00

(e)

Spec

ial C

omm

ittee

/Cel

l-ILR

1283

0038

.00

0.00

0.00

0.00

0.00

0.00

1283

0038

.00

7613

149.00

(f)W

orks

8519

971.00

3622

9034

.00

1023

8310

.00

3639

1006

.00

7719

979.00

5146

749.00

1042

4504

9.00

8611

6870

.00

(g)

7th

V.G.

Glob

al Tr

ade

show

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1710

1.00

Sub

- Tot

al:

2135

0009

.00

3622

9034

.00

1023

8310

.00

3639

1006

.00

7719

979.

0051

4674

9.00

1170

7508

7.00

8613

3971

.00

Tota

l:38

7211

71.0

044

5103

02.0

017

2698

60.0

041

4116

94.0

025

0667

46.0

010

0396

30.0

017

7019

403.

0015

4311

476.

00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 121: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 111

P

ARTI

CULA

RSSc

hedu

leCu

rren

t yea

rPr

evio

us Y

ear

CAPI

TAL

FUN

D AN

D LI

ABIL

ITIE

S

Corp

us/C

apita

l Fun

d1

0.

00

Rese

rve

and

Surp

lus

2

0.00

Earm

arke

d /E

ndow

men

t Fun

d3

0.

00

Secu

red

Loan

s and

Bor

row

ings

4

0.00

Uns

ecur

ed L

oans

and

Bor

row

ings

5

0.00

Defe

rred

Cre

dit L

iabi

lities

625

0030

92.0

024

1265

82.0

0

Curr

ent

Liab

ilitie

s and

Pro

visio

ns7

6525

9165

6.00

5850

3885

0.00

Tota

l67

7594

748.

0060

9165

432.

00

ASSE

TS

Fixe

d As

sets

8

0.00

Inve

stm

ents

-Fro

m E

arm

arke

d/En

dow

men

t9

0.

00

Inve

stm

ents

-Oth

ers

1063

6089

701.

0053

0157

977.

00

Curr

ent A

sset

s, L

oans

, Adv

ance

s etc

.11

4150

5047

.00

7900

7455

.00

Misc

ella

neou

s Exp

endi

ture

(To

the

exte

nt n

ot w

rit-

ten

off o

r adj

uste

dTo

tal

6775

9474

8.00

6091

6543

2.00

Sign

ifica

nt A

ccou

nting

Pol

icie

s

Conti

ngen

t Lia

biliti

es a

nd N

otes

on

Acco

unts

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CO

NTR

IBU

TORY

PRO

VIDE

NT

FUN

D BA

LAN

CE S

HEET

AS

ON

31S

T M

ARCH

201

6

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 122: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

112 | Annual Report 2015-16

EXPE

NDI

TURE

Cu

rren

t Yea

rPr

evio

us Y

ear

INCO

ME

Curr

ent Y

ear

Prev

ious

Yea

r

Govt

. Con

trib

ution

12

0658

23.0

011

9531

28In

tere

st o

n FD

R10

8076

72.0

015

8576

76

Int.

on G

ovt.

Cont

ributi

on23

5607

02.0

021

5130

84In

tere

st o

n Go

vt. s

ecur

ities

25

1180

78.0

021

6731

48

Int.

on E

mpl

oyee

s Con

trib

ution

2749

9055

.00

2342

1326

Inte

rest

on

SB A

/c

22

8403

7.00

7752

34

Bank

Cha

rges

Exce

ss A

mt.

paid

on

pu

rcha

se o

f Gov

t. se

curit

y

1639

.00

1243

352.

00

1792

1462

124

Inte

rest

on

SDS

A/c

3507

110.

0035

0711

0

Net

disc

ount

rece

ived

on

purc

hase

of G

ovt.

Secu

rities

41

0233

.00

10

2153

3

Defic

it22

2434

41.0

015

5167

53

Tota

l 64

3705

71.0

058

3514

54.0

0To

tal

6437

0571

.00

5835

1454

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

Inco

me

& E

xpen

ditu

re A

ccou

nt fo

r the

yea

r end

ed 3

1-3-

2016

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 123: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 113

RECE

IPT

Curr

ent Y

ear

Prev

ious

Yea

rPA

YMEN

T

Cu

rren

t Yea

rPr

evio

us Y

ear

Bank

ope

ning

bal

ance

CP

F Ad

vanc

e

313

2671

8.00

33

7711

24.0

0

Stat

e Ba

nk o

f Bik

aner

&

Jaip

ur

67

7689

33.0

071

3139

0.00

Full

& F

inal

Pay

men

t

23

6013

25.0

013

9806

26.0

0

Punj

ab N

ation

al B

ank

1117

5608

.00

4436

345.

00Fi

nal W

ithdr

awal

s

2224

0570

.00

1565

6794

.00

Mat

urity

of G

ovt.

Secu

rity

15

2000

00.0

0---

--In

vest

men

t. in

Gov

t. Se

curiti

es

6993

3119

.00

3874

0591

.00

Mat

urity

of F

DR

5384

4786

.00

7834

1460

.00

Inve

stm

ent i

n FD

R

1050

0000

0.00

5820

0000

.00

Int.

on S

B A/

c

22

8403

7.00

7752

34.0

0Ba

nk C

harg

es

16

39.0

017

92.0

0

Int.

on S

DS A

/c

35

0711

0.00

3507

110.

00N

PS E

mpl

oyee

s Con

t.

Int.

on G

ovt.

Secu

rities

25

1180

78.0

021

6731

48.0

0N

PS G

ovt.

Cont

.

Int.

on F

DR

1080

7672

.00

1585

7676

.00

Bank

Bal

ance

Empl

oyee

’s su

bscr

iptio

n &

Intt

on

Em

ploy

ees &

Em

ploy

er’s

Cont

ributi

on a

nd G

ovt.

Cont

1027

6333

1.00

1075

7310

5.00

SBBJ

2794

1220

.00

6776

8933

.00

PNB

1242

4964

.00

1117

5608

.00

Tota

l

2924

6955

5.00

2392

9546

8.00

Tota

l29

2469

555.

0023

9295

468.

00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

C

ON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

Rece

ipt &

Pay

men

t Acc

ount

for t

he y

ear e

nded

31-

3-20

16

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 124: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

114 | Annual Report 2015-16

SCHE

DUEL

– 6

DEF

FERE

D CR

EDIT

LIA

BILI

TES

Curr

ent Y

ear

Prev

ious

Yea

r

PART

ICU

LARS

Inte

rest

Acc

rued

on

Inve

stm

ent

2500

3092

.00

2412

6582

.00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

(31.

03.2

016)

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 125: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 115

Sche

dule

– 7

Cur

rent

liab

ilitie

s and

Pro

visi

ons

PART

ICU

LARS

Curr

ent y

ear

Prev

ious

Yea

rEM

PLO

YEES

CO

NTR

IBU

TIO

NO

peni

ng B

alan

ces

3045

0194

7.00

2640

3278

4.00

Addi

tion

durin

g th

e ye

arEm

ploy

ees C

ontr

ibuti

on

7136

7600

.00

6353

4232

.00

Refu

nd o

f Adv

ance

10

0572

39.0

010

0124

44.0

0In

tere

st C

redi

ted

to M

embe

rs A

ccou

nts

2749

9055

.00

1089

2389

4.00

---23

4213

26.0

041

3425

841.

0036

1000

786.

00De

ducti

on d

urin

g th

e ye

arTr

ansf

er to

unc

laim

ed su

bscr

iptio

nFi

nal P

aym

ents

97

6634

1.00

7070

921.

00Fi

nal W

ithdr

awal

2224

0570

.00

1565

6794

.00.

Loan

s/Ad

vanc

es to

Mem

bers

3115

5718

.00

3377

1124

.00

Tran

sfer

to N

PS su

bscr

iber

s Fun

d---

------

-----

6316

2629

.00

------

------

----

350

2632

12.0

056

4988

39.0

030

4501

947.

0012

2694

.00

122

694.

0012

2694

.00

Empl

oyee

s Unc

laim

ed su

bscr

iptio

n EM

PLO

YER’

S CO

NTR

IBU

TIO

N28

0414

209.

0025

3857

702.

00O

peni

ng B

alan

ceAd

ditio

n du

ring

the

year

Empl

oyer

’s Co

ntrib

ution

120

6582

3.00

119

5312

8.00

Inte

rest

cre

dite

d to

Mem

bers

Acc

ount

s23

5607

02.0

0 35

6265

25.0

021

5130

84.0

0 33

4662

12.0

0

Dedu

ction

dur

ing

the

year

3160

4073

4.00

287

3239

14.0

0Fi

nal P

aym

ents

1383

4984

.00

Tran

sfer

to N

PS S

ubsc

riber

s fun

d---

-13

8349

84.0

030

2205

750.

0069

0970

5.00

---

------

------

- 28

0414

290.

00

28

0414

209.

00N

WDA

Acc

ount

Tot

al

6525

9165

6.00

5850

3885

0.00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

(31.

03.2

016)

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 126: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

116 | Annual Report 2015-16

Parti

cula

rsCu

rren

t Yea

rPr

evio

us Y

ear

Fixe

d De

posit

2412

0000

0.00

Add

Accr

ued

Inte

rest

2031

4337

.00

2615

1433

7.00

2096

3205

2

Prom

issor

y N

otes

(Gov

t. Se

curiti

es)

3295

7500

0.00

Add

Accr

ued

Inte

rest

3811

978.

0033

3386

978.

0027

9337

539

Spec

ial D

epos

it Sc

hem

e40

3116

09.0

0

Add

Accr

ued

inte

rest

8767

77.0

041

1883

86.0

041

1883

86

T

otal

6360

8970

1.00

5301

5797

7

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

C

ON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

(31.

03.2

016)

SCHE

DULE

-10

INVE

STM

ENTS

-OTH

ERS

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 127: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 117

Sche

dule

-11

Curr

ent A

sset

s, L

oans

, Adv

ance

s etc

.Cu

rren

t Yea

rPr

evio

us Y

ear

PART

ICU

LARS

Rece

ivab

le fr

om E

E,ID

,Jhan

si17

1000

.00

NW

DA96

7863

.00

6291

4.00

Bank

Bal

ance

sSt

ate

Bank

of B

ikan

er &

Jaip

ur, S

aket

, New

Del

hi

2794

1220

.00

67

7689

33.0

0

Punj

ab N

ation

al B

ank,

San

sad

Mar

g, N

ew D

elhi

.12

4249

64.0

011

1756

08.0

0

Tota

l41

5050

47.0

0

790

0745

5.00

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

C

ON

TRIB

UTO

RY P

ROVI

DEN

T FU

ND

(31.

03.2

016)

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 128: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

118 | Annual Report 2015-16

Mon

thSu

bscr

iptio

n (E

mpl

oyee

s Con

trib

ution

)Re

fund

of A

dvan

ceTo

tal

4/20

1457

4724

378

1101

6528

344

5/20

1458

1779

382

3971

6641

764

6/20

1457

4799

679

4956

6542

952

7/20

1458

5034

383

8846

6689

189

8/20

1458

0580

382

6471

6632

274

9/20

1457

9456

984

3988

6638

557

1

0/20

1458

8754

986

7038

6754

887

1

1/20

1458

4160

284

1713

6683

315

1

2/20

1459

3731

788

2972

6820

289

1/20

1560

0874

882

4687

6833

435

2/20

1558

6187

482

6258

6688

132

3/20

1570

6646

390

5238

7971

701

TOTA

L71

3676

0010

0572

3981

4248

39

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CO

NTR

IBU

TORY

PRO

VIDE

NT

FUN

DSt

atem

ent s

how

ing

the

mon

th w

ise d

etai

ls of

CPF

Sub

scrip

tion

(Em

ploy

ees C

ontr

ibuti

on) a

nd R

efun

d of

Adv

ance

for t

he Y

ear 2

015-

16

Anne

xure

-I

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 129: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 119

Sl. N

o.N

ame

& D

esig

natio

n S.

/Sh.

/Sm

t.CP

F A/

c N

o.Em

ploy

ees C

ontr

ibuti

on

(Sub

scrip

tion)

Empl

oyer

’s Co

ntrib

ution

Tota

l

1.Sm

t. B.

Sar

ojin

i Dev

i, LD

C43

774

346

4292

9050

3636

2.Sh

ri V.

Sank

ar N

arya

na, S

updt

.43

418

104

4262

3044

4334

3.Sh

ri R.

Anj

aiah

, D/m

418

2259

1948

1161

7070

804.

Shr.

M. K

umar

a Sw

amy,M

TS44

527

4535

3680

1864

2553

5.Sm

t. C.

V.S.

S Di

khsh

itullu

,EE

450

5680

582

5158

8819

636.

Shri

M.C

. Man

dal,

LDC

791

2952

2935

4201

6494

307.

Shri

B. G

opal

a Kr

ishan

D/m

104

2944

325

0785

2802

288.

Shri

M.K

. San

dle,

Driv

er46

432

4648

6239

1294

8560

9Sh

ri T.

M. S

ampa

th, A

.O27

3817

096

7765

1005

935

10.

Shri

N. B

abu

Rao,

LDC

444

4680

9139

5965

8640

5611

.Sh

ri V.

Sub

ram

ani,

Driv

er10

263

4265

5815

4812

1581

312

.Sh

ri V.

Srin

ivas

, JA

390

3606

8860

0167

9608

5513

.Sh

ri, D

. Ros

ayya

, MTS

504

1814

3138

5668

5670

9914

.Sh

ri. R

. Nar

simha

Rao

, UDC

542

5635

953

2454

5888

1315

.Sh

ri T.

Mun

iyap

pa, M

TS88

5595

3541

6389

9759

2416

Smt.

Leen

a Ra

vind

er S

PS02

1478

889

8918

4523

7073

417

Shri

K.L.

P. R

ao, D

river

422

1127

2052

2244

6349

6418

Shri

M.S

oman

, LDC

156

1169

544

6824

4585

1919

Shri

Ram

Bah

adur

, Tha

nkur

, UDC

1233

504

5019

5753

5461

20Sh

r, T.

M. s

amua

l, LD

C 73

054

4079

4109

2695

5005

21Sh

ri, L

. Koc

hum

an, L

DC73

310

9359

4094

0551

8764

22Sh

ri K.

M. G

hota

nkar

, JAO

309

2125

374

9119

3630

3731

023

Shri,

T.N

arga

raju

, LDC

108

1138

3751

0010

6238

4724

Shri.

E.K

. Moh

an, L

DC80

410

3497

638

1925

1416

901

25Sh

ri. P.

Bar

ik ,M

TS16

012

6801

4116

7553

8476

26Sh

ri, B

. Ana

ndaR

ao, M

TS40

822

842

3907

3041

3572

27Sh

ri, H

em B

ahad

ur, M

TS08

4546

9740

6796

8614

93To

tal

9766

341

1383

4984

2360

1325

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

CO

NTR

IBU

TORY

PRO

VIDE

NT

FUN

DSt

atem

ent s

how

ing

deta

ils o

f Ful

l & F

inal

Pay

men

t / T

rans

fer d

urin

g th

e ye

ar 2

015-

16

Anne

xure

-II

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S. M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 130: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

120 | Annual Report 2015-16

ANNEXURE-III

NATIONAL WATER DEVELOPMENT AGENCY, NEW DELHICONTRIBUTORY PROVIDENT FUND

Statement showing the details of fixed deposits schedule as on 31st March, 2016

Sl. No.

FDR No. Amount Rate of Interest (%)

Date of Maturity

Maturity Value

FDRS Purchased from

State Bank of Bikaner & Jaipur, Saket, New Delhi

1 677427dt. 8—6-12 8000000 9.50 8-6-17 12792879 -do-2 677437 dt. 11-6-12 8000000 9.50 11-6-17 12792879 -do-3 677461 dt. 14-6-12 8000000 9.50 14-6-17 12792879 -do-4 674425 dt. 19-10-12 8000000 9.00 19-10-17 12484074 –do-5 674439 dt. 22-10-12 8000000 9.00 22-10-17 12484074 -do-6 674444 dt. 23-10-12 8000000 9.00 23-10-17 12484074 -do-7 675049 dt. 13-4-13 6000000 8.75 2-04-16 7765783 -do-8 675050 dt. 13-4-13 9000000 8.75 3-04-16 11651412 -do-9 675051 dt. 13-4-13 9000000 8.75 4-04-16 11654150 -do-

10 675047 dt. 13-4-13 9000000 8.75 5-04-16 11656887 -do-11 675048 dt. 13-4-13 9000000 8.75 6-04-16 11658624 -do-12 678290 dt. 14-11-13 6600000 9.00 14-11-16 8619930 -do-13 678614 dt. 22-11-13 6600000 9.00 21-11-16 8619930 -do-14 679975 dt 2.2.15 8250000 8.50 2.2.18 10617904 -do-15 679981 dt 3.2.15 8250000 8.50 3.2.18 10617904 -do-16 679987 dt4.2.15 8250000 8.50 4.2.18 10617904 -do-17 679989 dt 5.2.15 8250000 8.50 5.2.18 10617904 -do-18 681272 dt 20.4.15 9000000 8.50 20.4.2018 11583168 -do-19. 681304 dt 24.4.15 9000000 8.50 24.4.2018 11583168 -do-20 681313 dt 27.4.15 9000000 8.50 27.4.2018 11583168 -do-21 681316 dt 28.4.15 9000000 8.50 28.4.2018 11583168 -do-22 681312 dt 29.4.15 9000000 8.50 29.4.2016 11583168 -do-23 681736 dt27.7.15 9000000 8.15 24.6.2015 11388744 -do-24 681737 dt27.7.15 9000000 8.15 27.6.2018 11388744 -do-25 682381 dt18.01.16 8400000 7.75 18.12.2018 10508529 -do-26 682386 dt19.01.16 8400000 7.75 19.12.2018 10508529 -do-27 682394 dt20.01.16 8400000 7.75 20.12.2018 10508529 -do-28 682398 dt21.01.16 8400000 7.75 21.12.2018 10508529 -do-29 682424 dt25.01.16 8400000 7.75 25.12.2018 10508529 -do-

TOTAL 241200000

Sd/-(S. S. Mohapatra) Accounts Officer

Sd/-(R.K. Sinha)

Director(Fin.)

Sd/-(S. Masood Husain)

Director General

Page 131: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 121

Annexure-IV

NATIONAL WATER DEVELOPMENT AGENCY, NEW DELHICONTRIBUTORY PROVIDENT FUND

Statement showing the details of Promissory Notes/Govt. Securities as on 31.03.2016

Sl. No. Promissory Notes No Date of Purchase Face Value Date of Maturity1. 6.05% GS 2019 20.01.2006 2600000 12.01.20192. 10.45% GS 2018 26.09.2007 2500000 30.04.20183. 10.71% GS 2016 24.01.2008 7100000 19.04.20164. 6.25 % GS 2018 09.05.2008 5700000 02.01.20185. 12.30 % GS 2016 03.09.2008 7600000 02.07.20166. 8.07% GS 2017 20.05.2009 16100000 15.01.20177. 6.35 % GS 2020 24.09.2009 13625000 02.01.20208. 6.90% GS 2019 19.01.2010 15000000 13.07.20199. 6.35 % GS 2020 22.04.2010 11800000 02.01.2020

10. 8.20% GS 2024 12.08.2010 6200000 15.09.202411. 8.20% GS 2024 23.12.2010 13950000 15.09.202412. 8.20% GS 2023 25.05.2011 7200000 10.11.202313. 8.08% GS 2022 02.08.2011 5500000 02.08.202214. 8.79% GS 2021 08.12.2011 6900000 08.11.202115. 8.28% GS 2027 02.03.2012 14800000 21.09.202716. 8.28% GS 2027 19-06-2012 15800000 21-09-202717. 8.33% GS 2026 31-10-2012 15200000 09-07202618. 8.35% GS 2024 7-06-2013 25600000 27-03-202419. 8.20 % GS 2025 25-11-2013 9100000 25-09-202520. 8.28 % GS 2027 13-02-2014 12300000 21-09-202721. 7.16 % GS 2023 27-03-2014 7600000 20-05-202322. 6.90% GS 2026 17.7.2014 11000000 4.2.202623. 8.20% GS 2025 15.9.2014 6700000 24.9.202524. 8.35% GS 2024 3.2.2015 20600000 27.3.202425 8.35% GS 2024 16.4.2015 29000000 27.3.202426 7.16% GS 2023 4.8.2015 12400000 25.5.202327 7.68% GS 2023 21.1.2016 27700000 15.12.2023

Total 329575000

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Page 132: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

122 | Annual Report 2015-16

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 BALANCE SHEET AS AT 17-12-2015(Amount in Rupees)

Particulars Schedule Current Year

CAPITAL FUND AND LIABILITIES

CORPUS/CAPITAL FUND 1 5699710.00

RESERVE AND SURPLUS 2 0.00

EARMARKED/ENDOWMENT FUNDS 3 0.00

SECURED LOANS AND BORROWINGS 4 0.00

UNSECURED LOANS AND BORROWINGS 5 0.00

DEFERRED CREDIT LIABILITIES 6 0.00

CURRENT LIABILITIES AND PROVISIONS 7 0.00

TOTAL 5699710.00

ASSETS

FIXED ASSETS 8 0.00

INVESTMENTS - FROM EARMARKED / ENDOWMENT 9 0.00

INVESTMENTS - OTHERS 10 0.00

CURRENT ASSETS, LOANS, ADVANCE ETC. 11 5699710.00

MISCELLANEOUS EXPENDITURE 0.00

(To the extent not written off or adjusted)

TOTAL 5699710.00

SIGNIFICANT ACCOUNTING POLICIES 24

CONTINGENT LIABILITIES AND NOTES ON ACCOUNTS 25

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Page 133: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 123

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT. O

F IN

DIA)

INDI

A W

ATER

WEE

K 20

15- I

NCO

ME

& E

XPEN

DITU

RE A

CCO

UN

T AS

ON

17-

12-2

015

(Am

ount

in R

upee

s)

EXPE

NDI

TURE

Sche

dule

IWW

-201

5IN

COM

ESc

hedu

leIW

W -2

015

Esta

blish

men

t Exp

ense

s20

0.00

Inco

me

from

Sal

es/S

ervi

ce12

0.00

Oth

er A

dmin

istra

tive

Expe

nses

etc

.21

2731

5131

.00

GRAN

TS /

SUBS

IDIE

S 13

1300

0000

.00

Expe

nditu

re o

n Gr

ants

, Sub

sidie

s etc

.22

0.00

(Irre

voca

ble

Gran

ts &

subs

idie

s rec

eive

d)In

tere

st

230.

00Fe

es/S

ubsc

riptio

ns14

1974

3797

.00

Inco

me

from

Inve

stm

ent (

Inco

me

on

Inve

st. F

rom

Ear

mar

ked/

endo

w. F

unds

tran

sfer

red

to F

unds

)15

0.00

Inco

me

from

Roy

alty

, Pub

licati

on e

tc.

160.

00In

tere

st E

arne

d17

2343

18.0

0O

ther

Inco

me

1836

726.

00In

crea

se (D

ecre

ase)

in S

tock

of F

inish

edGo

ods a

nd W

orks

-in-p

rogr

ess.

190.

00

TOTA

L

(B)

2731

5131

.00

TOTA

L (

A)33

0148

41.0

0

Bala

nce

Bein

g Ex

cess

of I

ncom

e ov

erEx

pend

iture

(A -

B)56

9971

0.00

Tran

sfer

to S

peci

al R

eser

ve (S

peci

fy e

ach)

Tran

sfer

to /

from

Gen

eral

Res

erve

0.00

BALA

NCE

BEI

NG

SURP

LUS

(DEF

ICIT

)CA

RRIE

D TO

CO

RPU

S/CA

PITA

L FU

ND

5699

710.

00

SIGN

IFIC

ANT

ACCO

UN

TIN

G PO

LICI

ES

CON

TIGE

NT

LIAB

ILIT

IES

AND

NO

TES

ON

ACC

OU

NTS

Sd/-

(S.S

.Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S.M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 134: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

124 | Annual Report 2015-16

NAT

ION

AL W

ATER

DEV

ELO

PMEN

T AG

ENCY

(MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT. O

F IN

DIA)

INDI

A W

ATER

WEE

K-20

15- R

ECEI

PT &

PAY

MEN

T AC

COU

NT

AS O

N 1

7-12

-201

5 (Am

ount

in R

upee

s)RE

CEIP

TIW

W -2

015

PAYM

ENT

IWW

-201

5

I.O

peni

ng B

alan

ceEx

pens

esa)

. Cas

h in

Han

d0.

00a)

. Est

ablis

hmen

t Exp

ense

s0.

00b)

. Ban

k Ba

lanc

e

(Co

rres

pond

ing

to S

ched

ule

20A)

i. In

Sav

ing

Acco

unts

0.00

b). A

dmin

istra

tive

Expe

nses

27

3151

31.0

0ii

Cheq

ue /

Draft

in T

rans

it0.

00

(Co

rres

pond

ing

to S

ched

ule

21A)

c). P

osta

ge in

Han

d0.

00

Paym

ent m

ade

agai

nst F

unds

for

II.G

rant

Rec

eive

dVa

rious

Pro

ject

s.a)

F

rom

Gov

ernm

ent o

f Ind

ia13

0000

00.0

0 L

ink

Cana

l Pro

ject

0.00

b).

Fro

m S

tate

Gov

ernm

ent

0.00

Inve

stm

ent a

nd D

epos

it M

ade

III.

Inco

me

on In

vest

men

t Fro

ma)

. Out

of E

arm

arke

d/En

dow

men

t fun

ds0.

00a)

Ear

mar

ked/

End

ow F

unds

0.00

b). O

ut o

f Ow

n Fu

nds (

Inve

stm

ent-

othe

rs)

0.00

b) O

wn

Fund

(On

Inve

stm

ent)

0.00

IV.

Inte

rest

Rec

eive

dEx

pend

iture

on

Fixe

d &

Cap

ital W

ork-

in- P

rogr

ess

a) O

n Ba

nk D

epos

its23

4318

.00

0.00

b).

Loa

ns &

Adv

ance

s etc

.0.

00

V.O

ther

Inco

me

(Spe

cify

)Re

fund

of I

nter

est a

nd L

ong

Term

Adv

ance

0.00

Spo

nsor

ship

Fee

s88

6961

0.00

Subl

etting

of S

talls

9800

630.

00Fi

nanc

e Ch

arge

s (In

tere

st)

0.00

Misc

. Rec

eipt

s

36

726.

00O

ther

Pay

men

ts (S

peci

fy)

0.00

Regi

stra

tion/

Dele

gatio

n89

0737

.00

Clos

ing

Bala

nces

VI.

Amou

nt B

orro

wed

0.00

a).

Cash

in h

and

20

000.

00VI

I.An

y O

ther

Rec

eipt

s (gi

ve d

etai

ls)b)

Ban

k ba

lanc

e

i)

In

Savi

ng A

ccou

nts

- SBB

J56

1100

2.00

Oth

er R

ecei

pts

1828

20.0

0

H

DFC

6870

8.00

c).

Pos

tage

in H

and

Tota

l:33

0148

41.0

0To

tal

3301

4841

.00

Sd/-

(S.S

. Moh

apat

ra)

Acco

unts

Offi

cer

Sd/-

(R.K

. Sin

ha)

Dire

ctor

(Fin

ance

)

Sd/-

(S.M

asoo

d Hu

sain

)Di

rect

or G

ener

al

Page 135: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 125

SCHEDULE 1- CAPITAL FUND(Amount in Rupees)

Particulars IWW-2015

Balance as at the Beginning of the Year 0.00

Sub Total (A): 0.00

- Capital Investment Written Off

Add/Deduct: Balance of net income/(ex-penditure)transferred from the Income and Expendi-ture A/c. 5699710.00

Sub Total (B): 5699710.00

Balance at the Year end 5699710.00

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF BALANCE SHEET AS AT 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Page 136: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

126 | Annual Report 2015-16

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF BALANCE SHEETAS AT 17-12-2015

SCHEDULE - 7 CURRENT LIABILITIES AND PROVISIONS (Amount in Rupees)

Particulars IWW- 2015A. CURRENT LIABILITIES

Other Current LiabilitiesOutstanding Expenses : Salary & Allowances 0.00Rent,Rate & Taxes 0.00Remittance 0.00Stale Cheques 0.00CPF 0.00Others 0.00Earnest Money /Security Deposit 0.00Performance Guarantee Deposit 0.00Superannuation & Gratuity Fund 0.00TDS 0.00

Sub Total (A) : 0.00B. PROVISIONS

Audit Fee 0.00Superannuation & Gratuity Fund 0.00

Sub Total (B): 0.00Grand Total: 0.00

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

Page 137: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 127

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF BALANCE SHEETAS AT 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

SCHEDULE -11: CURRENT ASSETS, LOANS, ADVANCES etc.(Amount in Rupees)

Particulars IWW- 2015A. CURRENT ASSETS

Cash Balance in Hand 20000.00Saving Bank Account - SBBJ 5611002.00 HDFC 68708.00Postage in Hand 0.00Draft in Transit 0.00

Sub Total (A) : 5699710.00

B. LOANS ADVANCES AND OTHER ASSETSLoans & Advances : To Staff 0 To Others (Security Deposit) Vigyan Bhawan 0.00 ITPO 0.00

Sub Total (B) : 0.00C CLAIMS RECEIVABLE 0

Sub Total (C) : 0.00Grand Total 5699710.00

Page 138: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

128 | Annual Report 2015-16

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF INCOME & EXPENDITUREACCOUNT AS ON 17-12-2015

SCHEDULE - 13: GRANTS / SUBSIDIES ( Irrevocable Grants & subsidies received)

(Amount in Rupees)

Particulars IWW - 2015

Fund received from MOWR,RD & GR for India Water Week 13000000.00

Total: 13000000.00

Page 139: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 129

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF INCOME & EXPENDITUREACCOUNT AS ON 17-12-2015

SCHEDULE - 14: FEES / SUBSCRIPTION (Amount in Rupees)

Particulars IWW-2015

India Water Week

1 Registration/ Delegation Fee 890737.00

2 Annual Fees/Subscription 0.00

3 Seminar/Programme Fees 0

4 Sponsorship Fee 8869610.00

5 Subletting of Stalls-I.W.W. 9800630.00

6 Other Receipts (Suspense Ac-count) 182820.00

Total: 19743797.00

Page 140: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

130 | Annual Report 2015-16

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF INCOME & EXPENDITUREACCOUNT AS ON 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

SCHEDULE - 17: INTEREST EARNED(Amount in Rupees)

Particulars IWW- 2015

(a) On Saving Bank Account 234318.00

(b) Loans and Advances 0.00

(c) Others 0.00

Total: 234318.00

Page 141: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 131

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF INCOME & EXPENDITUREACCOUNT AS ON 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

SCHEDULE - 18 : OTHER INCOME

(Amount in Rupees)

Particulars IWW-2015

Disposal of Assets 0.00

Profit /Loss on Disposal of Assets 0.00

Miscellaneous Income 36726.00

Sale of Tender Forms etc. 0.00

Total: 36726.00

Page 142: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

132 | Annual Report 2015-16

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF INCOME & EXPENDITUREACCOUNT AS ON 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

CIRCLE WISE SCHEDULE - 21: OTHER ADMINISTRATIVE EXPENSES(Amount in Rupees)

Particulars IWW -2015

Travelling Expenses 354731.00Printing 1088176.00Telephone & Trunkcall 11396.00Registration Material 978305.00Launching of Separate Website 511004.00Momentous purchases 176675.00Postages 107591.00Supporting Staff 105757.00Event Promotion 3752057.00Bank Charges 4717.00Hospitality Expenses 3002208.00Signage Expenses 503157.00Audio Visual Equipment Expenses 870493.00Transport Hiring 379835.00Exhibition Expenses 3668344.00Rent, Rate & Taxes 11800685.00

Total 27315131.00

Page 143: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All

National Water Development Agency

Annual Report 2015-16 | 133

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES, GOVT. OF INDIA)

INDIA WATER WEEK-2015 SCHEDULES FORMING PART OF RECEIPTS & PAYMENTSACCOUNT AS ON 17-12-2015

Sd/-(S.S. Mohapatra)Accounts Officer

Sd/-(R.K. Sinha)

Director (Fin.)

Sd/-(S.Masood Husain)

Director General

SCHEDULE - 21 A: OTHER ADMINISTRATIVE EXPENSES(Amount in Rupees)

Particulars IWW -2015

Travelling Expenses 354731.00

Printing 1088176.00

Telephone & Trunkcall 11396.00

Registration Material 978305.00

Launching of Separate Website 511004.00

Momentous purchases 176675.00

Postages 107591.00

Supporting Staff 105757.00

Event Promotion 3752057.00

Bank Charges 4717.00

Hospitality Expenses 3002208.00

Signage Expenses 503157.00

Audio Visual Equipment Expenses 870493.00

Transport Hiring 379835.00

Exhibition Expenses 3668344.00

Rent, Rate & Taxes 11800685.00

Sub - Total: 27315131.00

Page 144: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 145: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All
Page 146: From Director General’s Desk - NWDAnwda.gov.in/upload/uploadfiles/files/ar2015-16.pdf · held during 2015-16 on 14.05.2015, 13.07.2015, 15.09.2015,18.11.2015 and 08.02.2016. z All