Page 1: FP7: EuCARD after a year of preparation…

FP7: EuCARDafter a year of preparation…

A.Jeremie

Page 2: FP7: EuCARD after a year of preparation…

A bit of history

• 2006: Letters of intent• October 2006: working groups getting better

organised (LHC, SC, Novel tech.)• Spring/Summer 2007: sub-groups defining

proposals=> lots of meetings• September 2007: ESGARD meeting at

CERN=>proposals selected• Autumn 2007: Writing of proposal and lots of

cost reduction!! Painful!• And…

Page 3: FP7: EuCARD after a year of preparation…
Page 4: FP7: EuCARD after a year of preparation…
Page 5: FP7: EuCARD after a year of preparation…

Budget

EU request = 30% of total budget

Page 6: FP7: EuCARD after a year of preparation…

Budget

IA Management, 0.764 M€, 2%DCO, 0.230 M€, 0%MEGLIO, 0.300 M€, 1%AccNet, 0.586 M€, 1%

TA-CERN, 1.352 M€, 3%

TA-DESY, 3.190 M€, 6%TA-RAL, 1.517 M€, 3%

HFM, 8.736 M€, 17%

ColMat, 5.701 M€, 11%

NCLinac, 8.786 M€, 17%

SRF, 15.576 M€, 32%

ANAC, 3.576 M€, 7%

Page 7: FP7: EuCARD after a year of preparation…

WP10 : JRA NCLinac

CERN, JAI, CNRS, INFN, CI, CIEMAT, HIP, PSI, UU, ESRF, STFC, RHUL,

Task Coordination

10. NCLinac10.1 Coordination and communication

G. Blair/JAI-RHUL,E. Jensen/CERN

10.2 NC high gradient cavities W. Wuensch/CERN10.3 Linac & FF stabilization A. Jeremie/IN2P3-LAPP10.4 BDS (laser wire) G. Blair/JAI-RHUL10.5 Drive beam phase (monitor)&LHC crab phase F. Marcellini/LNF-INFN10.6 DR vacuum (coatings, NEG, e-cloud) P. Chiggiato/CERN

10 JRA Technology for normalconducting

higher energy linear accelerators

WP #

WP type

JPK 1/02/08

Page 8: FP7: EuCARD after a year of preparation…

WP10 : JRA NCLinacDeliverables:

•Simulation and measurement of the CLIC module (HOM damping, breakdown)

•Fabrication, test & measurement of prototype CLIC module

•Design, fabrication & test for nm stabilization of a CLIC quad module and a CLIC Final Focus stand

•Beam delivery tuning strategies tested at ATF2

•Fabrication & tests of Laserwire and BPM at ATF2

•Design, fabric. & test of phase control to ~10fs by RF & electro-optical monitors

• Simulations, selection and set-up for large scale coating production for lower 2nd e yield & enhanced pumping fo DR’s.

JPK 1/02/08

Page 9: FP7: EuCARD after a year of preparation…

Task 3: Linac & FF stabilisationIt is planned in this project to study the effectiveness of stabilisation equipment (such as seismic sensors, actuators, interferometers etc…) in a real accelerator environment. The equipment will be implemented at a CLIC quadrupole module inside the CTF3 facility, in the first stage with a quadrupole mock-up. In addition it is planned to use a CLIC standard module for comparing the vibration measurements with a laser interferometer (which can also serve as an alignment device) and the seismic sensors. The compatibility of these stabilisation devices with the alignment system that will be used in CLIC will be checked. A dedicated FF test stand will be built with a support and magnet prototype where the stabilisation will be developed. Furthermore, the stabilisation procedures will be simulated to ensure a better understanding of the beam-based feedback, stabilisation and the alignment. This will be tested on different accelerator facilities such as ATF2, CTF3 in preparation of ILC and CLIC.

Page 10: FP7: EuCARD after a year of preparation…

Sub-task 1: CLIC quadrupole module

• CERN together with LAPP aims at demonstrating 1 nm quadrupole stability for the CLIC main linac quadrupole. – stabilisation feedback performance in different locations– 1 nm stability of the main linac quadrupoles in an accelerator

environment – Test and evaluate Inertial sensors for accelerator environment – study vibration isolation for the main beam quadrupole – CERN will study the design and construction of main linac prototype

magnet.

• The interferometric measurement system, developed in UOXF-DL, will be used to cross check results

• CERN aims at testing the compatibility between the repositioning system and the stabilization system in the real environment of the two beam test stand.

Page 11: FP7: EuCARD after a year of preparation…

Sub-task 2: Final Focus Test stand• LAPP together with CERN aims at exploring the potential to achieve

0.1nm stability scale for the final doublet quadrupoles > few Hz – design, simulation, construction and installation of the support – feedback design depending strongly on the final doublet support chosen. – LAPP will adapt feedback software to new configuration and boundary

conditions and continue work to reduce costs.

• Oxford aims at studying the design, construction and deployment of an interferometric system – measure the motion between test magnet/girder and floor. – Installation of interferometric system with maximum resolution– correlate results with measurements done by inertial sensors.

• UOXF-DL will contribute to the Development of optimized low-emittance beam transport and feedback for ILC and CLIC – completing an ILC prototype ATF2 intra-train and pulse-pulse FB and FF – study the simulation of the global luminosity performance of ILC and CLIC.

Page 12: FP7: EuCARD after a year of preparation…

Deliverables

Deliverables of tasks

Description/title Nature1 Delivery month2

10.3.1 CLIC Module final report R M48

10.3.2 Final Focus final report R M48

Page 13: FP7: EuCARD after a year of preparation…

MilestonesMile-stone

Description/title Nature1 Delivery month2

Comment

10.3.1Commissioning of CLIC quadrupole module

D M24Complete module with girder and accelerating structure

10.3.2Characterization of noise/ vibrations sources in an accelerator

O M24

10.3.3Quadruple mock-up manufactured and ready for installation

D M24

10.3.4Installation of interferometers at CTF3 Module

D M24

10.3.5Installation of ATF2 final-focus alignment monitoring system

D M6

10.3.6Installation of ILC prototype FB/FF at ATF2

O M24D = Demonstrator, O = Other

Page 14: FP7: EuCARD after a year of preparation…

Conclusion

• Promised a lot of work within FP7• FP7 bid (EU request) is only 30% of whole

budget needed for the project• If accepted, the first euros will come at

best in January 2009

• This meeting is the perfect place to get organized!