EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1 – Radiation Task 7.2.1 – Radiation certification certification Status report Status report Status Update Meeting – 07.10.2011 Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan Faculty of Mechanical and Power Engineering

EuCARD WP 7 – High Field Magnets Task 7.2.1 – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1

Embed Size (px)

Citation preview

EuCARD WP 7 – High Field MagnetsEuCARD WP 7 – High Field Magnets Task 2 – Support studies

Task 7.2.1 – Radiation Task 7.2.1 – Radiation certification certification Status reportStatus report

Status Update Meeting – 07.10.2011

Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan

Faculty of Mechanical and Power Engineering

2

Outline

• Task 7.2.1 plan • Irradiation cryostat status• Sample irradiation time scale• Task 7.2.1 summary

3

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q163 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48

EuC Rep EuC Rep EuC Rep EuC Rep

Sub-task 2.1: Radiation resistance certification

Methodology for coil radiation resistance certification M(24) D(42)Determination of radiation types and doses IMDetermination of irradiated sample tests scope IMSelection of the Institute capable of the irradiation IMTest samples productionIrradiated sample test set-ups preparation IMSample irradiation IMIrradiated sample tests (mech+elec+therm) IM

4th yearEuCARD WP 7: HFM Task 2 Start = 01/04/09

1st year 2ed year 3td year

Task 7.2.1 plan

Studies Manuf Tests WP - Work Package Report

M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report

Achieved Oct 2010„Sample test map” report

Achieved

SOLTAN Institute Warsaw has been selected

Achieved Oct 2010

„Sample test map” report

4

Conceptual design of the irradiation cryostat

5

Irradiation cryostat

Level regulation system

Level meter 350W heater

6

Irradiation cryostat

Nitrogen transfer lineModified Nitrogen tank

7

Irradiation cryostat status

• Most of cryostat elements are fabricated and assembled

• Sample holder is under the production

• The design of inlet of electron gun need to be changed for new NCBJ gun design – new inlet is expected in week 42

• The level regulation system test is foreseen for week 41

8

Irradiation time scale

9

Task 7.2.1 Summary

• Irradiation cryostat – expected to be ready in week 42

• Samples irradiation: Mid of Nov 2011 – August 2012

• A formal agreement between PWR and TECHTRA for supply of irradiated materials (including irradiation) - signed in Oct 2011

• Milestone 7.2.1 (M24) „ Methodology for the certification of radiation resistance of coil insulation material” is expected in Oct 2011

• Conceptual design of dewar and insert for the electrical tests – December 2011

10

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q163 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48

EuC Rep EuC Rep EuC Rep EuC Rep

Sub-task 2.1: Radiation resistance certification

Methodology for coil radiation resistance certification M(24) D(42)Determination of radiation types and doses IMDetermination of irradiated sample tests scope IMSelection of the Institute capable of the irradiation IMTest samples productionIrradiated sample test set-ups preparation IMSample irradiation IMIrradiated sample tests (mech+elec+therm) IM

4th yearEuCARD WP 7: HFM Task 2 Start = 01/04/09

1st year 2ed year 3td year

Task 7.2.1 plan

Studies Manuf Tests WP - Work Package Report

M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report

Achieved Oct 2010„Sample test map” report

Achieved

SOLTAN Institute Warsaw has been selected

To be achieved within next 2 weeks

Achieved Oct 2010

„Sample test map” report

Start is delayed by 6 months, but finish is expected to be on time

EuCARD WP 7 – High Field MagnetsEuCARD WP 7 – High Field MagnetsTask 2 – Support studies

Task 7.2.2 – Thermal modelsTask 7.2.2 – Thermal modelsStatus RaportStatus Raport

EuCard-WP7-HFM Collaboration Meeting – – CEA Grenoble 22.03.2011

Jaroslaw Polinski, Maciej Chorowski

Faculty of Mechanical and Power Engineering

12

Outline

• Task 7.2.2 plan• CEA Saclay thermal tests status• CEA Saclay thermal modeling status• Insulation test sample production at

RAL• PWR HeII cryostat status• Task 7.2.2 summary

13

Task 7.2.2 plan

Studies Manuf Tests WP - Work Package Report

M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q123 6 9 12 15 18 21 24 27 30 33 36

Sub-task 2.2: Thermal model and design

Selection of the insulation materials IMPreparation of the insulation materials sample IMThermal characterisation of the insulation materials (unirradiated)

IM

Coil samples preparationCoil samples testsThermal model of the coil M(12) IMThermal model of the Nb3Sn dipole magnet M(24) D(36)

EuCARD WP 7: HFM Task 2 Start = 01/04/091st year 2ed year 3td year

Achieved Oct 2010„Sample test map” report

Achieved on time

14

CEA Saclay thermal tests status

• Unirradiated TGPAP - DETD and Cyanate Ester insulation thermal conductivity and Kapitza resistance measurement in HeII condition have been finished. To continue the work the irradiated samples have to be provided by PWR

• Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase where a known aluminum alloy is tested

15

CEA Saclay thermal modeling status

• Steady-state calculations and Quench simulations with the "conduction" model are finished

• Development of a simplified He II two-fluid model for the thermal calculation of the magnet. The results will be presented at The CHATS workshop in CERN next week

• Additional Deliverable 7.2.3 (M30): “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen

16

Insulation test sample production at RAL

• RAL mix 71, RAL Mix 237 and Cyanate ester thermal and electrical laminates are produced and distributed to PWR and CEA Saclay

• Mechanical samples will be cut out from 0.5mm laminate to the 6 mm width Tensile Test specimens. Availability of up to 1kN Tensile Test facility at PWR Mech. Dep. is investigated

• LARP insulation laminates are not produced yet – all components are bought, the production can start on request

17

PWR HeII cryostat status

Cryostat general view

Cryostat parts in vacuum space

18

PWR HeII cryostat status

Top view of the cryostat with wiring

Insert

Measurement vessel

Instrumentation and DAQ electronic

19

PWR HeII cryostat status

Measurement vessel Top cover of measurement vessel

20

PWR HeII cryostat status

Sample holder center flanges

Sample holder sample flanges

Center flanges instrumentation

Heaters T-sensor

21

PWR HeII cryostat status

4 sample holders in the measurement vessel

22

PWR HeII cryostat status

• Shock tests with LN2 have been done• Leak tests at 4bar GHe have been done• Instrumentation is installed• Connection of instrumentation to DAQ system is

done• LabView program for cryostat operation is done• 6 sample holders are instrumented • 4 thickness of unirradiated 71 Mix samples are ready for

thermal test • The first cool-down with LHe is scheduled for week 43

23

Task 7.2.2 Summary

• Thermal test of unirradiated Mix 71 in HeII conditions will be performed at PWR in week 43

• A new Deliverable 7.2.3 (M30) “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen and nearly completed

• Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase

• LARP insulation laminates production can start on request

24

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q123 6 9 12 15 18 21 24 27 30 33 36

Sub-task 2.2: Thermal model and design

Selection of the insulation materials IMPreparation of the insulation materials sample IMThermal characterisation of the insulation materials (unirradiated)

IM

Coil samples preparationCoil samples testsThermal model of the coil M(12) IMThermal model of the Nb3Sn dipole magnet M(24) D(36)Superfluid helium transport model for HFM M(30)

EuCARD WP 7: HFM Task 2 Start = 01/04/091st year 2ed year 3td year

Task 7.2.2 plan

Studies Manuf Tests WP - Work Package Report

M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report

Achieved Oct 2010„Sample test map” report

In progress

2 from 4 are done3th will be done soon

Achieved on time

In progress,expected on time

New Milestoneachieved