EuCARD WP 7 – High Field MagnetsEuCARD WP 7 – High Field Magnets Task 2 – Support studies
Task 7.2.1 – Radiation Task 7.2.1 – Radiation certification certification Status reportStatus report
Status Update Meeting – 07.10.2011
Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan
Faculty of Mechanical and Power Engineering
2
Outline
• Task 7.2.1 plan • Irradiation cryostat status• Sample irradiation time scale• Task 7.2.1 summary
3
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q163 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
EuC Rep EuC Rep EuC Rep EuC Rep
Sub-task 2.1: Radiation resistance certification
Methodology for coil radiation resistance certification M(24) D(42)Determination of radiation types and doses IMDetermination of irradiated sample tests scope IMSelection of the Institute capable of the irradiation IMTest samples productionIrradiated sample test set-ups preparation IMSample irradiation IMIrradiated sample tests (mech+elec+therm) IM
4th yearEuCARD WP 7: HFM Task 2 Start = 01/04/09
1st year 2ed year 3td year
Task 7.2.1 plan
Studies Manuf Tests WP - Work Package Report
M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report
Achieved Oct 2010„Sample test map” report
Achieved
SOLTAN Institute Warsaw has been selected
Achieved Oct 2010
„Sample test map” report
7
Irradiation cryostat status
• Most of cryostat elements are fabricated and assembled
• Sample holder is under the production
• The design of inlet of electron gun need to be changed for new NCBJ gun design – new inlet is expected in week 42
• The level regulation system test is foreseen for week 41
9
Task 7.2.1 Summary
• Irradiation cryostat – expected to be ready in week 42
• Samples irradiation: Mid of Nov 2011 – August 2012
• A formal agreement between PWR and TECHTRA for supply of irradiated materials (including irradiation) - signed in Oct 2011
• Milestone 7.2.1 (M24) „ Methodology for the certification of radiation resistance of coil insulation material” is expected in Oct 2011
• Conceptual design of dewar and insert for the electrical tests – December 2011
10
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q163 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
EuC Rep EuC Rep EuC Rep EuC Rep
Sub-task 2.1: Radiation resistance certification
Methodology for coil radiation resistance certification M(24) D(42)Determination of radiation types and doses IMDetermination of irradiated sample tests scope IMSelection of the Institute capable of the irradiation IMTest samples productionIrradiated sample test set-ups preparation IMSample irradiation IMIrradiated sample tests (mech+elec+therm) IM
4th yearEuCARD WP 7: HFM Task 2 Start = 01/04/09
1st year 2ed year 3td year
Task 7.2.1 plan
Studies Manuf Tests WP - Work Package Report
M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report
Achieved Oct 2010„Sample test map” report
Achieved
SOLTAN Institute Warsaw has been selected
To be achieved within next 2 weeks
Achieved Oct 2010
„Sample test map” report
Start is delayed by 6 months, but finish is expected to be on time
EuCARD WP 7 – High Field MagnetsEuCARD WP 7 – High Field MagnetsTask 2 – Support studies
Task 7.2.2 – Thermal modelsTask 7.2.2 – Thermal modelsStatus RaportStatus Raport
EuCard-WP7-HFM Collaboration Meeting – – CEA Grenoble 22.03.2011
Jaroslaw Polinski, Maciej Chorowski
Faculty of Mechanical and Power Engineering
12
Outline
• Task 7.2.2 plan• CEA Saclay thermal tests status• CEA Saclay thermal modeling status• Insulation test sample production at
RAL• PWR HeII cryostat status• Task 7.2.2 summary
13
Task 7.2.2 plan
Studies Manuf Tests WP - Work Package Report
M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q123 6 9 12 15 18 21 24 27 30 33 36
Sub-task 2.2: Thermal model and design
Selection of the insulation materials IMPreparation of the insulation materials sample IMThermal characterisation of the insulation materials (unirradiated)
IM
Coil samples preparationCoil samples testsThermal model of the coil M(12) IMThermal model of the Nb3Sn dipole magnet M(24) D(36)
EuCARD WP 7: HFM Task 2 Start = 01/04/091st year 2ed year 3td year
Achieved Oct 2010„Sample test map” report
Achieved on time
14
CEA Saclay thermal tests status
• Unirradiated TGPAP - DETD and Cyanate Ester insulation thermal conductivity and Kapitza resistance measurement in HeII condition have been finished. To continue the work the irradiated samples have to be provided by PWR
• Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase where a known aluminum alloy is tested
15
CEA Saclay thermal modeling status
• Steady-state calculations and Quench simulations with the "conduction" model are finished
• Development of a simplified He II two-fluid model for the thermal calculation of the magnet. The results will be presented at The CHATS workshop in CERN next week
• Additional Deliverable 7.2.3 (M30): “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen
16
Insulation test sample production at RAL
• RAL mix 71, RAL Mix 237 and Cyanate ester thermal and electrical laminates are produced and distributed to PWR and CEA Saclay
• Mechanical samples will be cut out from 0.5mm laminate to the 6 mm width Tensile Test specimens. Availability of up to 1kN Tensile Test facility at PWR Mech. Dep. is investigated
• LARP insulation laminates are not produced yet – all components are bought, the production can start on request
18
PWR HeII cryostat status
Top view of the cryostat with wiring
Insert
Measurement vessel
Instrumentation and DAQ electronic
20
PWR HeII cryostat status
Sample holder center flanges
Sample holder sample flanges
Center flanges instrumentation
Heaters T-sensor
22
PWR HeII cryostat status
• Shock tests with LN2 have been done• Leak tests at 4bar GHe have been done• Instrumentation is installed• Connection of instrumentation to DAQ system is
done• LabView program for cryostat operation is done• 6 sample holders are instrumented • 4 thickness of unirradiated 71 Mix samples are ready for
thermal test • The first cool-down with LHe is scheduled for week 43
23
Task 7.2.2 Summary
• Thermal test of unirradiated Mix 71 in HeII conditions will be performed at PWR in week 43
• A new Deliverable 7.2.3 (M30) “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen and nearly completed
• Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase
• LARP insulation laminates production can start on request
24
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q123 6 9 12 15 18 21 24 27 30 33 36
Sub-task 2.2: Thermal model and design
Selection of the insulation materials IMPreparation of the insulation materials sample IMThermal characterisation of the insulation materials (unirradiated)
IM
Coil samples preparationCoil samples testsThermal model of the coil M(12) IMThermal model of the Nb3Sn dipole magnet M(24) D(36)Superfluid helium transport model for HFM M(30)
EuCARD WP 7: HFM Task 2 Start = 01/04/091st year 2ed year 3td year
Task 7.2.2 plan
Studies Manuf Tests WP - Work Package Report
M - Mileston IM - Inter. Milestons D - Deliverables EuC - EuCARD Report
Achieved Oct 2010„Sample test map” report
In progress
2 from 4 are done3th will be done soon
Achieved on time
In progress,expected on time
New Milestoneachieved