4CITE Master Plan Four Corners Intermodal Transloading Equinox Policy Advisory Committee/ Technical Working Group Kick-Off Meeting March 15, 2016
The 4CITE Master Plan will be a comprehensive approach to coordinate the planning and delivery of projects that would improve multi-modal access to the Gallup Industrial Park, the Navajo Inland Port, as well as regional connections to the existing and future transportation infrastructure.
4CITE Master Plan Objectives:
▲ Evaluate Transportation Planning Issues ▲ Gather existing data on land use, economics, environmental ▲ Consider future transportation conditions ▲ Evaluate impacts of growth ▲ Develop prioritized recommendations for transportation needs ▲ Build consensus and support for 4CITE
Project Team Contacts: Denise Weston - Bohannan Huston (505) 923-3321 [email protected] Mario Juarez-Infante - Wilson & Co. (505) 348-4070 [email protected]
COMMENTS: ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
POLICY ADVISORY COMMITTEE (PAC) SIGN IN SHEET 4CITE Master Plan Four Corners Intermodal Transloading Equinox
Page 1 of 3
Date: 3-15-2016 Location: NWNM Council of Governments Time: 1:00-4:00 PM Subject: PAC and TWG Kickoff Meeting Attendance
NAME EMAIL ORGANIZATION PRESENT?
Begay, Lance [email protected]
Navajo DOT
Henderson, Stan [email protected]
City of Gallup
Ikeda, Steven [email protected]
State Land Office Rep
Irving, Jeff [email protected]
McKinley County
Jesus, Brenda [email protected]
Rock Springs Navajo Chapter
Joe, Larry [email protected]
Navajo DOT
Johnson, Ean [email protected]
BNSF
Largo, John [email protected]
Lee, Albert [email protected]
Eastern Navajo Agency RBDO
Seaton, Jeremy [email protected]
District 6 Council Delegate Assistant
Sheperd, Fred [email protected]
New Mexico Economic Development
POLICY ADVISORY COMMITTEE (PAC) SIGN IN SHEET 4CITE Master Plan Four Corners Intermodal Transloading Equinox
Page 2 of 3
Date: 3-15-2016 Location: NWNM Council of Governments Time: 1:00-4:00 PM Subject: PAC and TWG Kickoff Meeting Attendance
NAME EMAIL ORGANIZATION PRESENT?
Shirley, Zander [email protected]
Manuelito Navajo Chapter
Silago, Rita [email protected] Tsay yah toh Navajo Chapter
Williams, Evan [email protected]
Northwest Regional Transportation Planning Organization
TECHNICAL WORKING GROUP (TWG) SIGN IN SHEET 4CITE Master Plan Four Corners Intermodal Transloading Equinox
Page 1 of 3
Date: 3-15-2016 Location: NWNM Council of Governments Time: 1:00-4:00 PM Subject: PAC and TWG Kickoff Meeting Attendance
NAME EMAIL ORGANIZATION PRESENT?
Begaye, Lance [email protected] NDOT
Bond, Jeff [email protected] Gallup McKinley County Schools
Bracken, Jake [email protected] Gallup Land Partners
Bradley, Darryl [email protected] NDOT
Edelson, Steven [email protected]
Garcia, JoAnn [email protected] NMDOT, District 6
Gibson, Jackson [email protected] NMDOT
Henderson, Stan [email protected] City of Gallup
Henley, Elijah [email protected] FHWA
Holiday, Marticia [email protected] NMDOT, District 6
Irving, Jeff [email protected] McKinley County
TECHNICAL WORKING GROUP (TWG) SIGN IN SHEET 4CITE Master Plan Four Corners Intermodal Transloading Equinox
Page 2 of 3
Date: 3-15-2016 Location: NWNM Council of Governments Time: 1:00-4:00 PM Subject: PAC and TWG Kickoff Meeting Attendance
NAME EMAIL ORGANIZATION PRESENT?
Jesus, Brenda [email protected] Rock Springs Chapter
Johnson, Ean [email protected] BNSF
Largo, John [email protected] Navajo Economic Development
McCabe, Shirley [email protected] Navajo Land Department
Pinto, Sharon [email protected] BIA
Rogers, Larry [email protected] Eastern Navajo Land Commission
Sage, Michael [email protected] Greater Gallup EDC
Seaton, Jeremy [email protected] Navajo Nation District 6 Council Delegate
Shirley, Zander [email protected] Manuelito Chapter
Silago, Rita [email protected] Tsayatoh Chapter
Silversmith, Garret [email protected] NDOT
TECHNICAL WORKING GROUP (TWG) SIGN IN SHEET 4CITE Master Plan Four Corners Intermodal Transloading Equinox
Page 3 of 3
Date: 3-15-2016 Location: NWNM Council of Governments Time: 1:00-4:00 PM Subject: PAC and TWG Kickoff Meeting Attendance
NAME EMAIL ORGANIZATION PRESENT?
Torres, Juan [email protected] NMEDD
Wilkey, Adam [email protected] Gallup Land Partners
3/21/2016
1
4CITE Master PlanFour Corners Intermodal Transloading
Equinox
Policy Advisory Committee (PAC)
Technical Working Group (TWG)
March 15, 2016
Introductions
• Project Team
• Policy Advisory Committee (PAC)
• Technical Working Group (TWG)
3/21/2016
2
4CITE Master Plan
The 4CITE Master Plan will be a comprehensive approach to coordinate the planning and delivery of projects that would improve multi-modal access to the Gallup Industrial Park, the Navajo Inland Port, as well as regional connections to the existing and future transportation infrastructure.
4CITE Master Plan – Study Area
3/21/2016
3
4CITE Master Plan – Expanded Study Area
4CITE Master Plan – Regional Area
3/21/2016
4
4CITE Master Plan - Objectives
• Evaluate Transportation Planning Issues
• Gather existing data on land use, economics, environmental
• Consider future transportation conditions
• Evaluate impacts of growth
• Develop prioritized recommendations for transportation needs
• Build consensus and support for 4CITE
Role of the PAC / TWG
• Share info on plans/projects in the region
• Support data collection
• Help build alternatives
• Evaluate alternatives
• Refine recommendations
• PROJECT CHAMPIONS
Participate in 4-5 workshop events.
3/21/2016
5
The PLAN is
•Collection of existing conditions / planned projects
•General evaluations of future growth scenarios
•Quantitative and Qualitative view of regional transportation as it relates to 4CITE
•Collection of recommendations for further evaluations
The PLAN is NOT
•A regional transportation plan for Gallup or the NWCOG area
•A traffic demand model
•Quantitative analysis of all roadways
•An engineering document with costs/design
3/21/2016
6
Coordination - Plans and ProjectsInput Welcome!!
• Inland Port Feasibility Study - Navajo Nation
• Gallup Land Partners Energy Logistic Park Comp Plan
• NWNMCOG Comprehensive Economic Development Strategy 5-Year Regional Plan 2009-2014
• NWNMCOG Northwest NM Factbook 2012
• BNSF Transcon Development
• NGL Transload Facility in Milan
• McKinley County Carbon Coal Road
• Farmington - Thoreau Railroad Study 2015
• Navajo Thoreau Industrial Park
• NMDOT STIP
• McKinley County CIP – roads and utilities
• City of Gallup CIP – roads and utilities
• Statewide Multi-Modal Transportation Plan
• Any and all TRAFFIC COUNT DATA available
• Other?
Coordination - Plans and ProjectsInput Welcome!!
3/21/2016
7
Technical Approach-Transportation Scenarios
Full Build-out of GLP Energy
Logistics Park
Partial Build-out of GLP
Energy Logistics Park
Full Build-out of GLP Energy
Logistics Park
Partial Build-out of Navajo In-land Port
Full Build-out of GLP Energy
Logistics Park
Full Build-out of Navajo In-land
Port
Full Build-out of GLP Energy
Logistics Park
Full Build-out of Navajo In-land
Port
GLP Workforce Housing
created in Study Area
Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5
Technical Approach-Transportation Analysis
Land Use
• Study team will identify and confirm appropriate land use assumptions for each scenario.
TripGeneration
• Daily and peak period trip generation will be estimated using ITE trip generation rates.
Trip Distribution
• Anticipated origins and destinations of generated trips will be derived based on review of community demographics and travel patterns from the 2040 NMDOT statewide travel demand model.
Trip Assignment
• Origins and destinations from generated trips will logically be assigned to the roadway network.
Background Traffic
• “Background” traffic anticipated on the study area roadways will be defined based on the traffic forecasts from the existing 2040 NMDOT statewide model and combined with generated traffic volumes.
Analysis
• Performance of the network will be computed through a comparison of daily traffic volumes and roadway capacities (v/c ratio) and through a peak hour assessment in Synchro
3/21/2016
8
Issue and Concerns
• Open Discussion
• Comments
• Questions
• Ideas
• Maps at Tables• Mark up
• Sticky Notes
• Comment Sheets• Share today
• Email / Call
Schedule
3/21/2016
9
Team Contacts
• Mario Juarez-Infante - Wilson & Company • (505) 348-4070 / [email protected]
• Denise Weston – Bohannan Huston• (505) 923-3321 / [email protected]