Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 DEC 0 8 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: In the Matter of ) Docket Nos. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) - UNIT 1 COMPLETION OF CONSTRUCTION ACTIVITIES AND SUBMITTAL OF THE ASME N-3 CODE DATA REPORTS References: 1. U.S. Nuclear Regulatory Commission Letter to TVA, dated July 2, 1987, Meeting summary for the June 26, 1987, meeting between NRC and TVA regarding commitment to ASME Section III requirements for welding activities (A02 870714 005) 2. Tennessee Valley Authority letter to U.S. Nuclear Regulatory Commission, dated December 14, 1987, ASME Section III Requirements for Welding Activities (L44 871224 802) 3. Tennessee Valley Authority letter to U.S. Nuclear Regulatory Commission, dated October 13, 1988, ASME Section III Requirements for Welding Activities (L44 881013 808) 4. U.S. Nuclear Regulatory Commission Letter to TVA, dated November 20, 1990, Approval of Transition from ASME Code Section III to Section XI Welding Requirements (A02 901126 002) Enclosed for your use are the WBN Unit 1 ASME Section III N-3 Code Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined in the above references. Also enclosed is a list of WBN Unit 1 ASME Section III N-5 Code Data Report Supplements provided in accordance with the guidelines in ASME interpretation 111-1-83-175 and the commitments referenced above. These documents indicate that all ASME Section III activities on Unit 1 have been completed and the jurisdiction of the governing ASME Code for Unit 1 has transferred from ASME Section III to ASME Section XI. The listed documents 9512190132 951208 PDR ADOCK 0500039o •. P .... i............... ..... P D R"

Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

  • Upload
    others

  • View
    17

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381

DEC 0 8 1995

U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555

Gentlemen:

In the Matter of ) Docket Nos. 50-390Tennessee Valley Authority

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 1 COMPLETION OF CONSTRUCTIONACTIVITIES AND SUBMITTAL OF THE ASME N-3 CODE DATA REPORTS

References:

1. U.S. Nuclear Regulatory Commission Letter to TVA, datedJuly 2, 1987, Meeting summary for the June 26, 1987, meetingbetween NRC and TVA regarding commitment to ASME Section IIIrequirements for welding activities (A02 870714 005)

2. Tennessee Valley Authority letter to U.S. Nuclear RegulatoryCommission, dated December 14, 1987, ASME Section IIIRequirements for Welding Activities (L44 871224 802)

3. Tennessee Valley Authority letter to U.S. Nuclear RegulatoryCommission, dated October 13, 1988, ASME Section IIIRequirements for Welding Activities (L44 881013 808)

4. U.S. Nuclear Regulatory Commission Letter to TVA, datedNovember 20, 1990, Approval of Transition from ASME CodeSection III to Section XI Welding Requirements(A02 901126 002)

Enclosed for your use are the WBN Unit 1 ASME Section III N-3 CodeData Reports. These reports are provided in accordance with ASMESection III requirements and TVA's commitments outlined in theabove references. Also enclosed is a list of WBN Unit 1 ASMESection III N-5 Code Data Report Supplements provided in accordancewith the guidelines in ASME interpretation 111-1-83-175 and thecommitments referenced above. These documents indicate that allASME Section III activities on Unit 1 have been completed and thejurisdiction of the governing ASME Code for Unit 1 has transferredfrom ASME Section III to ASME Section XI. The listed documents

9512190132 951208PDR ADOCK 0500039o•. P .... i............... ..... P D R"

Page 2: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

U.S. Nuclear Regulatory CommissionPage 2

DEC 0 8 1995.

are available for your review, on site at WBN, in the plantdocument and records files.

If you should have any questions, please contact P. L. Pace at(423) 365-1824.

Sincerely,

D. V. KehoeNuclear Assurance

and Licensing Manager

Enclosurecc (Enclosure):

NRC Resident InspectorWatts Bar Nuclear Plant1260 Nuclear Plant RoadSpring City, Tennessee 37381

Mr. P. S. Tam, iSenior Project ManagerU.S. Nucle~ar Regulatory CommissionOne White Flint North11555 Rockville PikeRockville,' Maryland 20852

U.S. Nuclear Regulatory CommissionRegion II101 Marietta Street, NW, Suite 2900Atlanta, Georgia 30323

Page 3: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

0ENCLOSURE

WP51\N3NRCMEM. REV

Page 4: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

0FORM N-3 OWNERS' DATA REPORT FOR NUCLEAR POWER PLANT COMPONENTS*

As Required by the Provisionis 6f the ASME Code, Section III Pg. 1 of 3

1. Name of Owner Tennessee Valley Authority

2. Addressof Owner 400 W. Summit Hill Drive, Knoxville, TN 37902

3. Name of power plant Watts Bar Nuclear Plant Unit 1 N/A(unit no.) (Nat'l. Bd, no.)

4. Location of power plant Spring City, TN

5. NUCLEAR VESSELS'IList all nuclear concrete and metallic vessels or core supports and attach copies of all N arnd NPT Certificate Holders' Data

Reports, Forms N-i, N-1A, N-2, NCS-1, and C-1.)

Certificate Holder - and - Serial No. State No. or CRN Nat'l. Bd. No. Year Built

pp_ Att-.whmPnt I

Attach supplemental pages as required.

6. NUCLEAR PIPING (Identify all nuclear piping by listing system identification appearing on Form N-5 and attach copies of all N-5 Data Reports

for nuclear piping.)

Certificate Holder - and - Serial No. Piping System Identification Nat'l. Bd. No. Year Built

See Attachment 1

Attach supplemental pages as recquired.

*Supplemental information in the form of.lists, sketches, or drawings may be used provided (1) size is 81/ x" 1 1,`(2) information in items 1 through 4 on this DataReport is included on each sheet, 131 each sheet is numbered and the number of sheets is recorded at the'top of this form.

(12/881 This form 1E000241 may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

Page 5: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

FORM N-3 (Back - Pg. 2 of _3_)

Unit No. 17. NUCLEAR PUMPS & VALVES (List and identify all nuclear pumps and valves and attach copies of all N Certificate Holders' Data Reports, Forms

NV-1 and NPV-1.)

Certificate Holder Pump Valve Cert. Holder's Serial No. Nat'l. Bd. No. Year Built

See Attachment 1

Attach supplemental pages as required.

8. Remarks: This Supplemental N-3 and the listed N-5 documents in Attachment 1 are ndditionq

to the original N-3 Code Data Report signed on March 4. 1985, A copy of the origina1

N-3 and its associated List of N-5 documents is shown in Attachment 2. The original

N-3 Code Data Report was signed under TVA's Owners' Certificate of Aiithorizgtion

No. OWN-105. This Supplement N-3 Code Data Report is provided in acyordnne with

a special agreement between TVA, the U. S. Nuclear Regulatory Commiss•ion, and TVA'q

Authorized Inspection Agency. (See attached continuation sheet.)

OWNERS' CERTIFICATE OF COMPLETED INSTALLATION

I, the undersigned, certify-that the statements made in this report are correct and have checked all nuclear components coming under the scope ofthe ASME Code, Section III, and state that to the best of my knowledge and belief, each Certificate Holder has met all the rules for construction

of the ASME Code, Section Ill. Attached are copies of Certificate Holders' Data Reports covering all nuclear components.

Owners' Certificate of Authorization No. S Expires

Date ~O 2 5 Signature(authorized representative)

CERTIFICATE OF INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of

Tennessee and employed by Hartford Steam Boiler Inspection & Insurance Company

of Hartford, CT based on audits of the owners' quality assurance program and supporting documentation for componentsand/or appurtenances and installation of same described in this Data Report on October 24 , 1995 , state that to the best of myknowledge and belief, the owner, or his designee, as applicable, has complied with the requirements of the ASME Code, Section Ill.By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the components and/or

appurtenances and installation of same described in this owners' Data Report. Furthermore, neither the inspector nor his employer shall be liable

in any manner for any personal injury or roperty ýamage or a loss of any kind arising from or connected with this audit activity.

Date 10/24/1995 Siqnea' el 1ý,ý ý _ Commissions TN 2480(Authorized Inspector) [Nat'l. Bd. (incl. endorsements) and state or prov. and no.]

Page 6: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Attachment 1FORM N-3 CONTINUATION SHEET Pg. 3 of 3

Tennessee Valley Authority400 W. Summit Hill Drive, Knoxville, TN 37902Watts Bar Nuclear Plant Unit No. 1

8. Remarks: (Continued) The following listed N-5 documents werecompleted under TVA's Certificate of Installation (NA)Authorization, 1480-1, and Certificate of Overall Responsibility(N) Authorization, N-2344. The NA Certificate of Authorization,1480-1, expires August 6, 1997. The N Certificate ofAuthorization, N-2344, expires July 23, 1997.

N-3 LISTING OF N-5 CODE DATA REPORTS

SYSTEM NAME/DESCRIPTION TVA N-5 IDENTIFIER

Addenda to original N-5s:

Control Air TVA-I-32-3-PlR2-Al

Ice Condenser

Chemical and Volume Control

Component Cooling

New System N-5s:

Station Drainage

Standby Diesel Generator

In-Core Flux Detection

TVA-I-32-3-PlR2-A2

TVA-I-61-2/3-Fl-Al

TVA-I-62-2-P9RI-Al

TVA-i-70-2/3-P2RI-Al

TVA-I-40-3-Fl

TVA-I-82-3-Fl

TVA-1-94-1/2-Fl

WP51\N3CONTD

Page 7: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

0Attachment 2

FORM No3 OWNERS' DATA REPORT FOR NUCLEAR POWER PLANT COMPONENTS4 -BN 1As Required by the Provisions of the ASME Code Rules. Soction Ill. Div. I page I of

I Nam• of Owier__ Tennessee Valley Authority ... .

2 -Ao.•d o, of On .400 W. SuMm

3 Nam, o~f Pio.,'PIl~r .int udi 6.%.l' No

it Hill Drive; Knoxville, TN 37902

Watts Bar Nuclear Plant Unit I

-- Natonat Board No. ,e, Unit N/A

4 Local-on of Power plant Spring City, TN

5. NUCLEAR VESSELS (List flr.iNuclear Vessels end attaCh COpies Of ili N CtrItICtatt Mclders' Data Reports ana NP1 Clerto,cltc

Hol~erS, Parlialm 'Data Reports. Forms N.1. NiA. and N.2.1

C#, il' lcatekld, Mfrt. Serial No. State & State No. Nat'l So. No. Yr Suil

"See- Aý-h- Fenr A _

Attach SuPptlemental Pages As reQuired.

6 N''C'LEAR PIPING (ildentify all Nuclear Piping by listing Certificate Holder's Order No. appearing on Form NPP-I and attach copesof all Data Reports for Nuclear Piping.)

Certificate Maoor IS Order NO. Piping System lIdentlffation Shoo Drawing No.

See Attachment A

Attach supplementtal POP1 ns rquired.

*S.olerental Si sets in form Of issti. Sketches, Or drawifp may be used pro•ided Ill site ii SI i inl. a 11 in.; 121 *-fofrmation in items Itmrou n 3 of tnis Oats Report is ,nciudao on each •hoot; And (3) oath smeet is numbered and the number of %neets is recorded At the teoof th•r form.

Thtis form (E0004) may be obtained from the Order Dept.. ASME. 345 E. 47th St.. New York, N.Y. 1001 7f 12,'8,-

Page 8: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

~- IF"MNRMN.J WO Page 2 of 4

7. NUCLEAR PUMPS & VALVES. (List and Wdentify all Nuclear IlluMs & Vaiws and attach Cooles of all N Certificate Holders" Data

Reports; Forrms NV-1 and NPV.t.I

Ce'..licalr oioldr Pumo Volvo #Irt. Saerial No. State ilio. Nat' ad. No. Yr built

See A-ttachment A

Attach supplemental page as required.

CERTIFICATION OF COMPLETED INSTALLATION1, the undersigned, hive checked all nucleir components Comning under the scope of the ASME Code for Nucleir Vessels

and state that, to the best of my knowledge and belief, the manufacturers of these components have met all the require.

ments of the ASME Code. Section Ill. Attached wre copies of Certificate Holders' Data Reports covering all nuclear corn.

ponentis.

DCae Hqr0 Is. 85

~ Manager of Power and Engineering(Signature and Title of Owner of Nuclear Power Plant)

014,•-105 Expires September 30, 1987(Owner's Certificate of Authoritation, Number. and Date)

CERTIFICATE OF INSPECTIONI. theundersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors aind

the State or Provwnce of Mf and employed by The HSBI&I Co.based on a review of supportng docl:mentltion for comiponeitl and/or ppaurtenances and installation of same described

In this date reporton March _ . state that, to the bestof my knowledge and belief, the

Olner or his oesigee, as applicable. has satisfied applicable Subsections of the ASME Code. SMectio III.

ey signing this c¢rtlficate. neither the Inspector nor his employer makes any warrinty. expresied or implied. Concerning

the components and/or appurtenances end installation of same described In this Owner's latia Rleport. Fuirthermore,neither the Inspector nor his employer ihall be'liable in any manner for any personal injury or property damage or a loss of

any kind arising from or connlected with this activity.

r% March 4, 19 85

Commissions NB 8087 Ohio. (National Soarg, State. Province and No.)(Inspetior)

Page 9: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

B6 .'88 0219 009A7OTTA!1 AVBN-l880222U0002 Page3of 4

TENNESSEE VALLEY AUITHORITY

400 WEST SUMMIT HILL DRIVE, KNOXVILLE, TV 37902WATTS AR IFUCLEAR PLANT UNIT 1

Nuclear vessels, nuclear piping, nuclear pum;s, and nuclear valves comingi

under the scope of the ASK! Code, Section IUI, Division 1, are listed and

identified in the followingi -5 Data leport .,,

SysBt em

Main Steam

Feedwater

Steam GeneratorB1owdown -

Fuel Oil

Fire Protection

Ventilation

Chilled Water

N-5 Data Reports

TVA-1-01-3-PlTVA-l-01-2-12TVA-l-01-2-P3 RI3TVA-l-01-2-P4TVA-1-01-2-P5TVA-1,-0l-2-P6TVA-1-01-3-FITVA-1-01-2-F2'

TVA-1-03-2-P1TVA-l-03-2-P2TVA-1-03-2-P3TVA-1-03-:-P4TVA-1-03-2-P5TVA-1-03-2-P6TVA-1-03-2-P7TVA-1-03-3-P8TVA-1-03-3-P9TVA-1-03-3-PIOTVA-1-03-2-FlTVA-1-03-3-F2'.

TVA-l-15-2-F1 R1

TVA-1-18-3-F1

TVA-1-26-3-Pl R1TVA-1-26-3-P2 R1TVA-1-26-3-P3TVA-1-26-3-P4TVA-1-26-3-Flt

TVA-1-26-2-F2

TVA-1-30-2-Fl

TVA-1-31-2-Fl R2

Systom

Control Air

Service Air

Layup Water

Rediation

Sazplin&

DemineralizedWater

Ice Condenser

Chemical andVol me Control

1-5 Data R orts

TVA-l-32-3-PI R2TVA-1-32-2/3-P2TVA-1-32-2/3-P3 i2?YA-1-32-2/3-P4 R1TVA-1-32-2/3-P5TVA-1-32-2/3-Fl R31

TVA-1-33-2-F1

TVA- 1-41-2-Fl

TVA-1-43-2-PlTVA-1-43-2/3-rZTVA-1-43-2-P3TVA-1-43-2-13ATVA-1-43-3-PATVA-1-43-2-P4ATVA-1-43-2/3-P5TVA-1-43-2/3-P6 R1TVA-1-43-2-P7TVA-1-43-2-11 R12

TVA-59-2-Fl

TVA-61-1-Fl

TVA-2-62-1-P1TVA-1-62-1-P2TVA-1-62-1-P3TVA-1-62-1-P4ýT1A-2-62-2-P5 R1lTVA-l-62-2-P6 R1TVA-l-62-3-P7TVA-l-62-2-P8TVA-l-62-1/2/3-P9 R1TVA-l-62-2/3-PlO R1TVA-l-62-2-PllTVA-l-62-2/3-F1TVA-1-62-3-F2*

ýDIE4 - 1231Q

. A..

Page 10: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Bf '88' 0219 00 9AT`TAOHXM

Page 4 of 4

TNEMSSER VALLEY AUTHOR2ITY400 WEST SUMOIT HILL DRIVE, KNOXVILLE, TM '37902

UATTS RAR NrUCLEALR PLJXT UNIT 1

Syste'

Saf StyInjection

Conta in.¶ent

Cas Treatment

Erergency Raw'Cooiing..Water

Reactor coolant

Componentcooling

1-5 Date Re~ports

&VA-l-4 3-1/2-PiTVA-1-6 3-2-P2TVA-l-63-1/2/3-P3 RITVA-1-4 3-2-PdTVA-1-63-1/2/3-P5 R1TVA-1-6 3-1/2-P6TVA-1-63-2-P7TVA-1-6 3-2-PB7VA-l-6 3-2/3-PlOTVA-2-63-2-Tl'

7VA-l-6d-2 /3 INC-Fl

1-5 Date RePorts

Caz a ih tspray

Reuiduul Hasiesuovel

Waste Dispos

7VA-1-65-3-Fl

t-sA-6 7-3-PiTVA-i -. 7-3-P2TVA-l-6 7-3-P3TVA-1-6 7-3-PdTVA-l-67-2/3-P5 RITVA-1-6 7-3-P67VA-1-6 7-3-P7TVA-1-6 7-3-PBTVA-2-6 7-3-FlTVA-l-6 7-3-72TVA-l-6 7-3-73'

TVA-l-6 8-1-FlTVA-1-66-1-P2,TVA-1-68-l-P37VA-1-6 8-2-Pd7YA-1-6 8-1-FdA7VA-l-68-1/2-71 11'

7VA-1-70-3-PITVA-l-70-3-F2 R1TVA-1-70-3-P3 11TVA- 1-70-3-Pd

TYA-l70-3P5 XTvA-i.-70-3-P7 R1TYA-1-70-3-PS RITVA-1-70-3-PIOTV-41-70-2/3-Yl*

Spent Fuelcooling

PKakeup Wate:

Flood ModeBoration

Control RodDrive

Upper Headinj ection

RadiationMoni toring

TYA-1-72-2-PlTYA-1-72-2-P2-TVA-2-72-2-Fl'

t TVA-2-74-2-Pl RlTVA-i-74-2-P2TVA-74-2-TITVA-l-7d-2-YZ KiTVA-l-74-2-r3*

al TVA-2-77-3-Pl R1TVA-l-7 7-3-12 R.1TVA-l-7 7-3-13 RlrVA-2-77-2/3-Pd R1TVA-l-7 7-3-FlTYA-l-7 7-3-72TVA-1-7 7-3-73'

TVA-l-78-2-Pl-TvA-l-7 5-2/3-rlt

r TVA-81-3-71 XiTVA-81-1-T2 Rl

* TVA-2-81-2/3-F3*

TTA-l-84-2/3-PiTVA-l-84-3-Fi'

TVA-2-85-1-PI

TVA-l-8 7-2-FlTVA-l-8 7-2-P2TVA-1-97-2-FlTVL-l-8 7-2-72'

TVA-1-go-2-PlTVA-1-90-2/3-IFl'

rwnd - 1231Q

Page 11: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Page No.10/24/95,

TVASYSTEMNUMBER

001

003

015

026

0 0

WATTS BAR NUCLEAR PLANTUNIT 1

ASME N-5 CODE DATA REPORT SUPPLEMENTS

TVA N-5 CODE DATASYSTEM SUPPLEMENTTITLE REPORT

MAIN STEAM

FEEDWATER

STEAM GENERATOR BLOWDOWN

HIGH.PRESSURE FIREPROTECTION

TVA-1-01-2-F2-S1

TVA-1-01-3-PI-S1

TVA-1-01-2-P3-SI

TVA-1-01-2-P4-S1

TVA-1-01-2-P5-S1

TVA-1-01-2-P6-Sl

TVA-1-03-2-F1-S1

TVA-l-03-3-F2-SI

TVA-1-03-2-P1-S1

TVA-1-03-2-P2-Si

TVA-1-03-2-P3-SI

TVA-1-03-2-P4-SI

TVA-1-03-2-P5-S1

TVA-1-03-2-P6-SI

TVA-1-03-2-P7-Sl

TVA-1-03-3-P8-SI

TVA-1-03-3-P8-S2

TVA-1-03-3-P9-SI

TVA-1-03-3-P9-S2

TVA-1-03-3 -P10-S1

TVA-1-15-2-FI-SI

TVA-1-2 6-3-Fl-Si

TVA-1-26-3-PIRI-S1

Page 12: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Page No.10/24/95

TVASYSTEMNUMBER

030

031

032

0WATTS BAR NUCLEAR PLANT

UNIT 1ASME N-5 CODE DATA REPORT SUPPLEMENTS

TVA N-5 CODE DATASYSTEM SUPPLEMENTTITLE REPORT

VENTILATION

CHILLED WATER

CONTROL AIR

SERVICE AIR

RADIATION SAMPLING

ICE CONDENSER

CHEMICAL AND VOLUME CONTROL

033

043

061

062

TVA-1-26-3-P2Rl-SI

TVA-1-26-3-P3-Sl

TVA-1-26-3 -P4-Si

TVA-1-30-2-FI-S1

TVA-1-31-2-FIR2-S1

TVA-1-32-2/3-FIRI-SI

TVA-1-32-3-PIR2-S1

TVA-1-32-3-P1R2-S2

TVA-1-32-2/3-P2-S1

TVA-1-32-2/3-P3R1-S1

TVA-1-32-2/3-P4RI-SI

TVA-1-32-2/3-P4RI-S2

TVA-1-32-2/3-P5-S1

TVA-1-33-2-Fl-S1

TVA-1-43-2-F1-S1

TVA-1-43-2-P1-SI

TVA-1-43-2/3-P2-SI

TVA-1-43-3-P4-S1

TVA-1-43-2/3-P5-Sl

TVA-1-43-2-P7-Sl

TVA-I-61-2-FI-S1

TVA-1-62-2/3-Fl-Si

TVA-1-62-1-PI-SI

TVA-1-62-1-P2-SI

Page 13: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Page No.10/24/95

TVASYSTEMNUMBER

063

3

WATTS BAR NUCLEAR PLANTUNIT 1

ASME N-5 CODE DATA REPORT SUPPLEMENTS

TVA N-5 CODE DATASYSTEM SUPPLEMENTTITLE REPORT

SAFETY INJECTION

064

065

CONTAINMENT PENETRATIONS

EMERGENCY GAS TREATMENT

TVA-1-62-I-P3-SI

TVA-1-62-1-P4-SI

TVA-I-62-2-P5Ri-SI

TVA-1-62-2-P6R1-S1

TVA-i-62-3-P7-SI

TVA-I-62-2-P8-SI

TVA-1-62-2-P8-S2

TVA-1-62-1/2/3-P9R1-SI

TVA-i-62-2/3-PIOR1-S1

TVA-i-62-2/3-Pll-S2

TVA- 1-62-2 -P11-Si

TVA-1-63-2-F1-SI

TVA-1-63-1/2-P1-SI

TVA-1-63-2-P2-Si

TVA-1-63-1/2/3-P3RI-S1

TVA-i-63-2-P4-Si

TVA-1-63-2-P4-S2

TVA-1-63-1/2/3-P5RI-S1

TVA-1-63-1/2-P6-S1

TVA-1-63-2-P7-Sl

TVA-1-63-2-P8-S1

TVA-i-63-2/3-PiO-Sl

TVA-i-64-2/3-MC.-FI-Si

TVA-1-65-3-FI-SI

Page 14: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Page No.10/24/95

TVASYSTEMNUMBER

067

068

070

WATTS BAR NUCLEAR PLANTUNIT 1

ASME N-5 CODE DATA REPORT SUPPLEMENTS

TVA N-5 CODE DATASYSTEM SUPPLEMENTTITLE REPORT

ESSENTIAL RAW COOLING WATI

REACTOR COOLANT

COMPONENT COOLING

ER TVA-1-67-3-FI-S1

TVA-1-67-3-F2-SI

TVA-1-67-3-P1-Sl

TVA-1-67-3-P2-S!

TVA-1-67-3-P3-SI

TVA-1-67-3-P3-S2

TVA-1-67-3-P4-S i\

TVA-1-67-2/3-P5R1-Sl

TVA-1-67-3-P6-S1

TVA-1-67-3-P7-SI

TVA-1-67-3-P7-S2

-TVA-1-67-3-P8-Sl -

TVA-1-68-1/2-FlRl-Sl

TVA-1-68-1-PI-S1

TVA-1-68-1-P2-S1

TVA-1-68-I-P3-S1

TVA-1-68-2-P4-Sl

TVA-1-70-2/3-FI-Sl

TVA-1-70-3-P2R1-S1

TVA-,-I70-3-P3RI-SI

TVA-1-70-3-P4-SI

TVA-I-70-3-P5-Sl

TVA-1-70-3-P7RI-S1

TVA-I-70-3-P8Rl-SI

Page 15: Forwards ASME Section III N-3 code data repts & N-5 code ... · Data Reports. These reports are provided in accordance with ASME Section III requirements and TVA's commitments outlined

Page No.10/24/95

TVASYSTEMNUMBER

072

5

WATTS BAR NUCLEAR PLANTUNIT 1

ASME N-5 CODE DATA'REPORT SUPPLEMENTS

TVA N-5 CODE DATASYSTEM SUPPLEMENTTITLE REPORT

CONTAINMENT SPRAY

074 RESIDUAL HEAT REMOVAL

077

078

084

090

WASTE DISPOSAL

SPENT FUEL COOLING

FLOOD MODE BORATION

RADIATION MONITORING

TVA-1-70-3-P1O-S1

TVA-1-72-2"FI-S1

TVA-1-72-2-PI-S1

TVA-1-72-2-P2-S1

-TVA-1-72-2-P2-S2

TVA-1-74-1"-F-SI

TVA-1-74-2-F2Rl-SI

TVA-1-74-2-F3-SI

TVA-1-74-2-PIRI-S1

TVA-1-74-2-P2-Sl1

TVA-1-77-3-FI-SI

TVA-1-77-3-PIR1-S1

TVA-1-77-3-P2-SI

TVA-1-77-3-P3R1-SI

TVA-1-77-3-P4RI-S1

• TVA-1-78-2/3-F1-S1

TVA-1-78-2-P1-Sl

TVA-1-84-3-F1-SI

TVA-1-84-2/3-PI-Sl

TVA-1-90-2/3-Fl-Sl

*TVA-1-90-2-PI-SI