The Korea Transport Institute President, Kee Yeon Hwang, Ph.D.
Flyovers: Yes or Not?
Cheong-gye Stream Restoration in
Seoul
Dec 04, 2010
Contents
Demolishing Flyovers
Monitoring Results
Restoration Master Plan
Why restore?
In and Around Cheonggye Stream
Conclusion
I. In and Around Cheonggye Stream
Old Map of Seoul
A wash place in Cheonggye Stream
Bridge on Cheonggye Stream
(Ogansumun)
Early 20C
After War: Urban Squatter until 1970’s
Road building over the Cheonggye
After construction of the overpass
Cheonggye Expressway
Growth Pattern of Seoul
CBD in 2002
Characteristics of CBD
41 thousand
2.5million
420 thousand(11.7% of Seoul)
2 million
70%(Subway & Bus)
12 square km
73 thousand(10.2% of Seoul)
Resident
Moving Pop.
Employment
PassengerVehicle Volume
Transit Use
Area
Firms
Aging Buildings & Declining Business
2002
Beneath the Cheonggye-cheon
Low QoL
Traffic Congestion, too much through traffic
Air pollution, Noise
Relatively low land value
Loss of historic legacy
Air pollution
High-rise and dense development
Traffic Congestion
Degraded cityscape
Convenient Subway Services
6 Subway lines, 30 stations, 12 transfer stations
New Airport Rapid Railways경부고속철도
신공항철도
Declining CBD
For the past 10yr: pop. 40,000, emp. 80,000 reduced
Headquarters: 63% in Gangnam sub-center
Old buildings & narrow streets
Outdated industries
II. Why Restore?
development → conservation, auto → people, efficiency → equity
Why restore?
Paradigm shift of urban management
Safety problems of elevated expressway & covered roads
Need to restore historic legacy and water env’t
Relieving Regional Economic disparity problems in Seoul
III. RestorationMaster Plan
1. Outline
Decision of Cheonggye-cheon Restoration Project, 2002s
2002 : Decision of CRP
Cheonggye-cheon Restoration
Restoration Project in Downtown
Site Location
Site Plan
Length = 5.84km
- Upper stream (Baekwoondongcheon~Junghakcheon) : Restoration planned in long term
- Lower stream (Shindab Bridge~Jungrangcheon) : Launching an improvement plan in 2003
※ Plan of Restoring the Upper Stream and the Lower stream of
Cheonggye-cheon
Starting Restoration WorkJuly 2003
Cheonggye Expressway and Samil Expressway
in History
IV. Monitoring Results
1. Monitoring Results
O Over 30% increase of land value since July 2002
→ rents increased in spite of construction
O High demand on redevelopment sites
O Temperature drops because of reduced traffic
→ 2.3% reduction of traffics to CBD
O Reduced noise level
Traffic
Real Estate
Environ-ment
O No serious drop in LOS level
→ only 1.3% decrease on service reported
O 3.6% subway user increases, auto inflow drops
Short Term Monitoring Results
6/23(월,비)
6/25(수)
6/26(목)
6/27(금,비)
6/30(월)
7/1(화)
7/2(수)
7/3(목,비)
7/4(금)
7/7(월)
7/8(화)
7/9(수,비)
7/10(목)
7/11(금)
7/14(월)
7/15(화,비)
7/16(수)
7/17(목)
7/18(금,비)
7/21(월,비)
7/22(화,비)
7/23(수)
7/24(목,비)
7/25(금,비)
00 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.015 2.3 1.8 2.0 1.6 1.8 1.7 1.5 1.8 1.9 2.1 2.2 1.9 1.5 1.5 1.9 1.9 2.1 1.4 2.1 1.7 2.4 1.6 1.8 1.930 2.7 2.0 2.3 2.0 2.7 1.9 2.3 1.6 2.3 2.3 2.2 2.3 1.6 1.9 2.8 2.4 2.2 1.7 2.6 2.4 2.9 1.8 2.2 2.145 4.5 2.2 2.2 2.1 3.8 2.4 1.9 2.3 2.2 3.6 2.7 2.3 2.1 2.3 3.6 2.7 2.4 2.1 2.8 3.7 2.6 2.1 2.6 2.800 5.6 3.3 2.8 2.5 6.5 3.2 3.6 2.4 2.7 4.3 3.4 2.9 2.0 2.9 5.0 3.1 3.2 2.7 4.0 5.1 4.2 2.6 2.6 3.315 6.6 3.9 3.8 3.5 6.9 5.3 4.5 4.0 3.8 5.7 4.8 3.8 3.1 4.1 6.6 4.5 4.1 2.2 5.6 5.7 5.6 3.5 3.3 4.830 9.4 5.6 5.2 4.7 9.1 5.9 6.2 5.9 4.9 8.5 5.6 5.5 4.8 5.1 8.4 5.8 5.8 2.0 7.5 7.5 7.7 4.7 5.1 6.145 11.5 7.2 6.7 5.9 10.8 7.8 7.1 6.9 6.6 9.8 8.1 7.5 6.6 6.1 9.7 8.1 7.2 2.3 10.2 9.3 9.8 6.1 6.7 6.600 14.5 9.3 7.6 8.2 11.8 9.0 9.0 8.6 7.9 12.2 9.7 9.7 7.2 8.8 10.3 9.5 7.5 2.6 13.1 10.9 11.7 7.3 7.1 7.915 17.2 9.2 8.8 8.6 14.0 10.9 10.9 9.6 9.5 13.6 12.0 12.3 9.3 9.2 13.1 10.5 9.9 2.2 16.5 11.6 13.9 7.9 7.8 9.630 18.3 12.6 10.3 10.9 16.4 11.3 11.4 11.9 11.9 14.8 12.9 15.3 10.5 11.1 15.1 13.1 11.9 2.3 18.6 13.6 15.2 10.3 8.6 9.945 19.5 13.4 11.0 12.0 16.7 11.4 12.3 11.5 12.7 17.0 12.9 17.7 11.5 11.5 15.4 13.3 13.3 2.5 23.1 12.4 17.4 10.1 10.7 11.400 18.1 12.6 11.0 12.5 15.7 11.3 12.2 11.1 12.0 14.6 12.3 16.9 10.6 11.9 15.0 13.1 12.0 3.1 22.3 13.4 18.1 10.2 10.4 10.915 16.2 11.0 9.1 11.3 13.2 9.5 10.0 9.1 9.3 12.8 10.7 14.3 7.8 10.3 12.3 10.8 9.9 2.8 20.4 11.6 17.1 8.3 9.5 10.730 14.3 11.4 7.8 9.7 10.6 7.6 9.1 7.2 9.0 11.3 9.3 12.5 6.6 8.5 10.9 8.8 10.0 3.9 17.7 9.8 13.8 7.9 8.4 9.745 14.6 10.0 9.1 10.2 10.6 8.0 9.7 6.7 8.7 11.3 8.9 10.3 6.9 8.0 9.6 10.1 10.0 3.6 16.6 9.3 13.8 7.8 8.9 9.700 14.1 9.6 8.2 10.9 9.6 7.5 10.1 6.9 8.8 10.8 9.8 11.3 7.5 9.6 8.7 10.3 9.9 4.0 15.6 9.6 13.2 8.1 8.4 11.115 14.4 9.6 8.8 11.4 9.5 8.1 9.9 7.3 9.0 10.0 9.8 9.6 7.5 10.1 8.8 9.5 9.0 4.7 13.9 9.6 11.8 8.1 9.1 11.230 12.5 9.6 9.3 11.9 9.5 8.7 10.2 7.9 8.9 9.3 11.0 10.3 8.1 10.2 8.2 9.9 10.6 4.6 13.3 9.3 11.1 8.5 9.5 10.845 13.0 9.2 9.7 12.9 8.8 9.2 11.0 7.7 10.2 10.7 10.4 9.3 9.0 9.8 8.6 10.7 11.0 5.0 14.1 9.7 11.5 8.9 10.4 11.000 12.4 9.0 10.9 13.1 10.7 9.0 10.3 8.7 9.8 10.5 10.8 9.1 9.1 9.9 9.0 11.9 10.8 5.6 13.3 10.0 10.9 10.3 11.1 11.815 12.1 10.1 11.2 13.0 10.0 9.5 11.1 8.3 9.3 9.4 11.1 9.6 8.8 10.2 10.3 11.9 11.0 6.6 12.2 11.2 10.5 11.8 11.5 11.030 12.3 10.1 11.3 13.9 10.3 8.9 10.4 7.8 9.5 9.5 11.0 9.8 9.2 11.3 9.4 12.0 12.5 5.6 12.6 10.9 11.3 11.5 11.6 12.845 12.1 9.0 10.8 13.9 10.4 9.7 10.8 7.7 10.5 10.4 11.1 9.9 9.4 11.3 9.0 11.4 12.0 6.4 12.6 11.1 10.1 10.9 12.2 12.800 11.1 9.1 10.4 14.3 10.8 9.2 11.5 8.4 9.8 9.7 11.4 10.0 9.1 11.5 9.1 10.7 12.4 7.1 12.1 10.2 9.8 11.2 11.1 12.615 11.3 8.9 9.6 13.8 9.3 9.1 11.2 8.6 9.3 9.7 11.0 9.9 8.5 10.6 9.4 10.7 12.0 8.0 10.7 11.0 10.1 10.2 11.9 11.930 9.6 8.1 8.4 12.4 8.3 9.4 9.5 7.5 8.1 9.0 9.0 10.0 7.9 9.6 8.3 11.0 11.0 7.3 9.0 9.7 8.5 8.9 10.0 10.545 9.5 7.0 8.1 13.1 7.2 6.3 8.7 7.0 7.6 8.3 8.7 9.1 6.4 7.8 7.3 8.9 9.7 6.9 8.8 9.2 8.8 7.9 8.9 9.100 8.1 6.4 7.1 11.0 5.9 6.3 7.6 5.8 6.9 6.3 8.2 8.7 6.1 6.6 7.0 7.8 8.5 7.2 7.4 8.3 8.0 7.7 8.0 9.615 7.3 6.0 6.4 10.9 6.6 5.8 6.8 5.6 7.1 6.9 7.4 7.5 5.3 7.0 6.2 8.0 7.1 6.0 7.4 8.0 9.5 7.2 8.4 8.430 7.9 6.3 7.2 11.1 6.8 6.6 7.7 5.2 6.7 7.2 7.4 8.4 6.4 6.7 6.4 7.9 7.8 6.0 7.7 9.0 8.5 7.6 8.9 8.345 9.1 6.7 7.7 11.5 8.2 7.3 8.2 6.0 7.7 8.4 7.9 8.7 7.2 8.2 7.2 8.3 8.1 5.9 8.8 9.6 9.3 7.9 9.0 9.800 9.3 8.7 8.5 12.5 9.8 8.9 9.0 7.2 8.6 8.6 9.0 10.7 8.4 9.1 8.6 9.5 9.5 6.1 11.2 10.4 11.0 9.6 9.4 10.715 10.8 8.8 9.1 12.3 10.9 9.1 9.7 8.1 9.5 10.0 9.7 11.6 9.1 9.8 9.4 10.4 10.5 6.1 11.9 11.2 12.1 10.5 11.1 11.530 12.8 10.1 11.1 13.8 12.0 9.9 10.7 9.0 11.2 11.4 12.2 13.6 10.7 10.4 10.4 11.2 11.7 6.4 11.5 12.8 13.2 11.2 11.4 12.245 12.8 11.1 11.5 15.0 12.7 12.1 11.2 9.9 12.3 11.7 12.2 12.3 10.3 11.0 10.9 12.6 12.5 6.8 12.7 13.6 13.1 12.0 12.2 14.000 13.7 11.8 11.4 14.5 15.0 12.9 12.7 9.9 12.6 13.2 13.0 12.9 11.6 12.3 12.7 14.1 13.5 6.8 13.3 12.9 14.9 13.4 13.5 14.015 14.2 12.4 13.1 16.5 14.9 13.3 13.4 10.9 12.8 12.6 13.0 12.3 11.3 13.0 13.2 13.3 13.8 6.5 13.8 15.8 15.4 13.1 14.4 15.530 14.5 13.4 11.9 16.0 15.9 13.3 13.9 11.2 13.9 14.3 13.8 12.2 12.2 14.4 14.0 14.3 15.7 6.4 12.1 15.3 15.5 14.2 14.0 14.845 13.3 13.5 13.0 18.1 16.4 13.5 13.6 11.6 13.6 14.2 13.4 12.7 12.4 14.2 13.8 14.7 14.4 7.4 13.4 15.6 14.9 13.5 14.7 15.900 13.7 12.9 13.2 17.1 15.6 15.9 13.9 11.7 13.0 14.6 14.5 12.5 12.8 15.4 14.9 15.4 15.4 7.2 14.7 16.7 16.3 13.4 14.9 16.015 13.5 13.1 13.7 17.8 17.6 16.0 13.4 11.1 13.8 14.2 13.3 11.9 12.5 14.3 14.3 14.6 15.7 8.1 14.6 16.4 15.5 13.7 14.5 16.030 14.4 13.2 13.4 18.3 16.5 14.7 14.6 10.8 13.4 13.7 12.0 14.5 12.0 14.0 14.2 15.3 16.1 7.8 13.5 17.1 15.8 14.2 14.5 16.545 13.5 13.1 13.6 18.2 16.2 15.4 13.8 11.6 12.1 13.4 12.1 14.8 12.6 13.8 15.3 15.0 15.1 7.0 13.0 16.3 15.0 13.3 14.1 15.500 14.1 13.1 14.6 18.2 14.8 15.3 13.8 10.9 12.6 13.0 12.6 14.5 12.4 13.4 15.1 13.8 15.2 7.2 11.8 15.8 15.8 13.9 12.9 16.415 14.7 12.7 13.6 17.6 15.9 14.9 13.6 10.9 12.4 12.9 12.3 13.4 12.8 14.4 14.1 14.3 15.5 7.8 11.7 14.3 14.7 13.2 13.4 14.930 13.9 12.6 13.7 17.7 14.9 13.3 13.6 9.8 13.0 13.5 12.9 12.0 12.2 14.3 14.2 15.1 15.1 7.3 11.5 14.5 13.9 12.9 13.6 15.345 11.7 13.0 13.2 17.9 15.4 13.8 13.0 10.4 13.1 12.5 12.1 11.8 11.7 14.3 13.3 14.4 14.5 8.3 10.6 15.5 15.0 13.7 12.8 16.000 11.3 13.3 13.2 17.9 14.4 13.1 13.4 10.3 13.2 13.2 12.9 10.7 11.4 15.0 13.6 14.7 15.4 8.0 10.5 16.4 14.1 12.4 14.0 14.615 13.3 13.1 13.0 18.0 14.7 12.8 13.7 10.8 12.2 13.4 12.3 11.3 12.0 15.4 13.8 14.8 15.9 8.3 10.6 17.5 15.7 13.7 13.6 14.630 16.2 14.6 14.9 20.4 16.9 14.5 16.0 12.3 14.4 14.6 14.3 13.3 13.0 16.1 14.8 16.5 17.7 8.7 13.3 21.3 17.9 15.1 14.9 16.945 17.8 16.1 16.6 23.5 17.5 16.5 18.2 14.0 16.4 15.8 17.0 15.5 15.4 17.5 16.6 17.8 19.8 9.0 14.9 22.0 19.2 17.2 16.7 18.000 19.4 17.3 17.8 23.1 18.1 17.1 19.0 14.2 16.6 16.8 18.3 17.4 15.3 19.3 17.9 18.6 21.4 8.7 15.1 23.5 20.6 17.2 17.5 20.215 17.5 16.2 17.4 23.6 17.0 16.5 18.3 14.2 16.3 17.0 17.5 16.9 15.9 19.8 17.3 18.1 21.7 8.3 15.2 23.3 19.7 16.4 18.4 21.430 19.8 15.8 17.2 22.2 16.9 17.0 18.9 14.3 16.0 16.7 17.5 17.2 15.0 18.8 17.2 19.5 22.4 7.5 16.0 22.7 21.2 15.5 18.5 20.945 17.1 16.1 15.5 22.6 16.4 14.9 18.1 12.5 16.1 15.6 16.9 15.5 14.3 18.3 16.4 18.0 21.8 6.7 13.9 21.5 18.5 14.3 19.2 20.800 15.7 13.3 12.9 19.7 15.5 12.4 15.5 11.4 14.6 13.9 15.5 13.4 12.9 17.5 14.2 15.7 19.9 5.9 12.5 20.0 18.5 11.2 16.9 19.515 13.7 11.7 12.3 18.3 13.3 12.3 13.8 10.3 12.2 12.5 13.1 11.0 12.2 15.7 11.9 15.3 18.6 7.1 10.5 16.6 16.2 10.7 15.6 18.330 11.3 11.0 11.5 14.7 11.4 11.2 13.0 9.2 11.6 11.7 12.5 9.7 10.3 14.9 10.4 15.0 16.7 5.6 9.2 15.4 14.9 10.2 13.3 17.445 10.0 9.0 10.4 13.9 10.5 10.1 10.5 7.9 10.7 10.0 10.7 8.0 9.5 13.7 8.9 12.6 15.8 4.8 8.3 12.7 14.4 7.4 11.7 15.700 8.6 8.6 8.3 11.9 8.8 9.2 9.6 7.0 8.9 8.6 8.6 6.6 8.3 11.9 7.7 11.4 14.8 5.3 6.7 11.2 12.6 5.9 10.9 15.115 7.6 6.7 7.7 10.9 8.4 7.9 8.6 6.5 8.4 7.8 8.1 5.9 6.6 10.8 6.6 12.1 12.8 5.7 6.5 10.0 11.2 5.1 10.1 13.730 7.0 7.5 7.9 10.3 7.4 8.1 8.1 6.6 8.3 7.9 8.6 5.8 6.7 10.9 6.5 11.6 11.8 5.1 6.7 9.9 10.5 5.9 10.7 12.245 5.8 7.5 7.0 8.8 6.9 7.1 8.0 5.5 7.7 6.3 7.9 5.3 6.3 9.8 5.9 10.9 13.0 6.2 6.5 8.2 10.5 5.9 12.0 11.6
0~4% 17~23% 23~100%
21
날짜시간
20
6
7
8
15
16
9
10
The Rate of under 10km/h links in Seoul
17
11
12
18
19
13
14
범 례
4~7% 7~10% 10~13% 13~17%
Traffic Delay: before & after Restoration work
Ø CBD Volume decrease 10.3% in 2004, 29.9% in 2005
Ø No Significant Change from June 2003. to Dec. 2003
Ø Morning Peak : 17~18 Km/h
Ø Afternoon Peak : 12 Km/h
Traffic Volume & Speed Changes
0.0
5.0
10.0
15.0
20.0
25.0
1월 2월 3월 4월 5월 6월 7월 8월 9월 10월 11월 12월
도심평균속도(오후)
A.M. Peak Speed Ave. P.M. Peak Speed Ave.
Average speed(a.m.) Average speed(p.m.)
Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
Km/h Km/h
Ø Bus 3.2% increase
Ø Subway
- Seoul : 6% increase
- CBD : 13.7% increase
Mass Transit Passenger Change
지하철이용승객 현황
3,000
3,500
4,000
4,500
5,000
5,500
6,000
1월 2월 3월 4월 5월 6월 7월 8월 9월 10월 11월 12월
(천명:인)
2003년 2004년
대중교통 체계 개편
청계천 복원공사
<bus> <subway>
Bus Passengers Subway Passengers
CRP
Reform Bus System
Reform Bus System
CRP
Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
Year
Year
1,000 person1,000 person
2. Before & After
Before 1950 1960-1970
1980-2005
present
1950
Before
After
After
Before
After
Before
3. Positive Externalities
Dismantling Flyovers & Open Sky
Turning car lanes into open plaza
Oct. 2009
May 1 2004 Opened
→ Restrained Traffic Flow
→ Pedestrian Square
Before After
Reform of Seoul Plaza
숭례문 광장
서울역
광화문광장
Seoul
Plaza
Urban Stream Renaissance
River Renaissance
around the country
Ichon Master Plan NanpoJamwon Master Plan
Youido Master Plan
V. Flyover Demolition
Construction of Flyover in Seoul
Increase capacity at the intersection (20)
Overpass rail line (23)
Highway construction (17)
Overcome surface gap (33)
Background of Demolition
Obstructing the view of cityscape
Discontinuation of Bus Rapid Transit
(BRT)
Background of Demolition
Safety management request
Queue spillback from the bottleneck
Background of Demolition
Drastic lane change
Weaving movement at the foot of the
flyover
Demolition Plan
▶ Maintaining necessary flyovers for basic traffic function
▶ Demolish flyovers primarily which are
- not worsening congestion even after demolition
- unsafe for being constructed before 90s,
- obstructing the view of cityscape
- widening slum area
Demolition Plan
- in 2009 : 2 flyovers- in 2010 : 5 flyovers- after 2011 : 9 flyovers
Dismantling Flyover
2009201020112012
2
1
3
6
4
5
78
10
9
11
12
13
15
14
16
Traffic Effect After Demolition
No.
of
Int.
Peak
Hour
Before After Variation
Volume
(pcu/hr)
Delay
(sec/pcu)
Volume
(pcu/hr)
Delay
(sec/pcu)
Volume
(pcu/hr)
Delay
(sec/pcu)
1
A.M. 6,988 104.9 8,866 134.8 △1,350 △29.9
P.M. 6,937 93.1 8,794 36.3 △1,543 ▼56.8
2
A.M. 9,154 147.3 8,819 71.1 ▼335 ▼76.2
P.M. 8,734 101.3 8,743 64.7 △9 ▼36.6
Surveyed volume and intersection delay after demolition
No. of
Int.
Delay (sec/veh) Variation
(sec/veh)
No. of
Int.
Delay (sec/veh)Variation
Before After Before After
3 146.6 155.9 △9.3 10 181.5 169.2 ▼12.3
4 135.6 153.1 △17.5 11 - - -
5 39.8 64.9 △25.1 12 96.2 117.6 △21.4
6 15.4 83.1 △67.7 13 115.1 155.6 △40.5
7 134.4 136.7 △2.30 14 125.1 184.0 △58.9
8 - - - 15 - - -
9 - - - 16 - - -
Estimated Intersection Delay by traffic flow model
Traffic Effect After Demolition
After
Cityscape : Before and After
Before
After
Cityscape : Before and After
Before
VI. Conclusion
▶ Activated flyover construction before 1990
- Increased capacity at the intersections
▶ Paradigm shift of urban management
- Green growth, Cityscape protection
▶ Demolition flyover in Seoul
- Cheonggye-cheon and 2 flyovers over intersection
- Very positive opinions among citizens
Conclusion
Thank You
Before CRPAfter CRP