7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/F Flexible Budgets, Variances, and Management Control: I Chapter 7

Flexible Budgets, Variances, And Management Control: I Chapter 7

Embed Size (px)

Citation preview

Page 1: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 1©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgets, Variances,and Management Control: I

Chapter 7

Page 2: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 2©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Distinguisha static budget

from a flexible budget.

Learning Objective 1

Page 3: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 3©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static and Flexible Budgets

Static BudgetPlanned level ofoutput at start ofthe budget period

Based on

Flexible BudgetBudgeted revenuesand cost based on

actual level of output

Based on

Page 4: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 4©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static Budget Example

Assume that Pasadena Co. manufacturesand sells dress suits.

Budgeted variable costs per suit are as follows:Direct materials cost $ 65Direct manufacturing labor 26Variable manufacturing overhead 24Total variable costs $115

Page 5: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 5©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static Budget ExampleBudgeted selling price is $155 per suit.Fixed manufacturing costs are expectedto be $286,000 within a relevant range

between 9,000 and 13,500 suits.Variable and fixed period costs are ignored.

The static budget for year 2004 is basedon selling 13,000 suits.

What is the static-budget operating income?

Page 6: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 6©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static Budget ExampleRevenues (13,000 × $155) $2,015,000Less Expenses:Variable (13,000 × $115) 1,495,000Fixed 286,000Budgeted operating income $ 234,000

Assume that Pasadena Co. produced and sold10,000 suits at $160 each with actual variablecosts of $120 per suit and fixed manufacturing

costs of $300,000.

Page 7: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 7©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static Budget Example

Revenues (10,000 × $160) $1,600,000 Less Expenses: Variable (10,000 × $120) 1,200,000 Fixed 300,000 Actual operating income $ 100,000

What was the actual operating income?

Page 8: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 8©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static-Budget Variance Example

What is the static-budget variance ofoperating income?

Actual operating income $100,000Budgeted operating income 234,000Static-budget variance of operating income $134,000 U

This is a Level 0 variance analysis.

Page 9: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 9©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static-Budget Variance Example

Static-Budget Based Variance Analysis(Level 1) in (000) Static Budget Actual Variance

Suits 13 10 3 URevenue $2,015 $1,600 $415 UVariable costs 1,495 1,200 296 FContribution margin $ 520 $ 400 $120 UFixed costs 286 300 14 UOperating income $ 234 $ 100 $134 U

Page 10: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 10©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 2

Develop a flexible budgetand compute flexible-budgetvariances and sales-volume

variances.

Page 11: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 11©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Steps in Developing Flexible Budgets

Step 1:Determine budgeted selling price, variable

cost per unit, and budgeted fixed cost.Budgeted selling price is $155,

variable cost is $115 per suit, andthe budgeted fixed cost is $286,000.

Page 12: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 12©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Steps in Developing Flexible Budgets

Step 2:Determine the actual quantity of output.

In the year 2004, 10,000 suits wereproduced and sold.

Step 3:Determine the flexible budget for revenues.

$155 × 10,000 = $1,550,000

Page 13: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 13©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Steps in Developing Flexible Budgets

Step 4:Determine the flexible budget for costs.

Variable costs: 10,000 × $115 = $1,150,000Fixed costs 286,000Total costs $1,436,000

Page 14: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 14©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Variances

Level 2 analysis provides informationon the two components of the

static-budget variance.1. Flexible-budget variance2. Sales-volume variance

Page 15: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 15©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-Budget Variance

Flexible-Budget Variance(Level 2) in (000) Flexible

Budget Actual VarianceSuits 10 10 0Revenue $1,550 $1,600 $ 50 FVariable costs 1,150 1,200 50 UContribution margin $ 400 $ 400 $ 0Fixed costs 286 300 14 UOperating income $ 114 $ 100 $ 14 U

Page 16: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 16©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-Budget Variance

Actual quantity sold: 10,000 suits

Flexible-budgetvariance

$14,000 U

Actual resultsoperating income

$100,000

Flexible-budgetoperating income

$114,000

Page 17: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 17©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-Budget Variance

Total flexible-budget variance= Total actual results

– Total flexible budget for actual sales level

Page 18: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 18©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-Budget Variance

Actual Budgeted Amount Amount

Selling price $160 $155Variable cost 120 115Contribution margin $ 40 $ 40

Page 19: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 19©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-Budget Variance

Why is the flexible-budget variance $14,000 U?Selling-price variance $50,000 FActual variable costs exceededflexible budget variable costs 50,000 UActual fixed costs exceededflexible budget fixed costs 14,000 UTotal flexible-budget variance $14,000 U

Page 20: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 20©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Sales-Volume Variance

Sales-Volume Variance(Level 2) in (000) Flexible Static Sales-Volume

Budget Budget VarianceSuits 10 13 3 URevenue $1,550 $2,015 $465 UVariable costs 1,150 1,495 295 FContr. margin $ 400 $ 520 $120 UFixed costs 286 286 0Operating income $ 114 $ 234 $120 U

Page 21: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 21©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Sales-Volume Variance

Actual quantity sold: 10,000 suits

Sales-volumevariance

$120,000 U

Flexible-budgetoperating income

$114,000

Static-budgetoperating income

$234,000

Page 22: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 22©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Sales-Volume Variance

Total sales-volume variance $120,000 U

=

Actual sales unit – Master budgeted sales units13,000 – 10,000 = 3,000×

Budgeted contribution margin per unit $40

Page 23: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 23©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Budget Variances

Static-budgetvariance

$134,000 U

Flexible-budgetvariance

$14,000 U

Level 1

Sales-volumevariance

$120,000 ULevel 2

Page 24: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 24©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 3

Explain why standard costs areoften used in variance analysis.

Page 25: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 25©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Standards

Pasadena’s budgeted cost for each variabledirect cost item is computed as follows:

Standard inputallowed for

one output unit

Standard costper input unit

×

Page 26: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 26©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Standards

4.00 square yards allowed per output unit at $16.25 standard cost per square yard.

Standard cost per output unit 4.00 × $16.25 = $65.00

Page 27: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 27©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Standards

2.00 manufacturing labor-hours of inputallowed per output unit at $13.00 standard

cost per hour.Standard cost per output unit

2.00 × $13.00 = $26.00

Page 28: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 28©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 4

Compute price variancesand efficiency variances

for direct-cost categories.

Page 29: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 29©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Actual Data

Direct materials purchased and used:42,500 square yards at $15.95

Labor hours: 21,500 at $12.90Cost of direct materials = $677,875

Cost of direct manufacturing labor = $277,350

Page 30: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 30©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Price Variance Example

Direct-material price variance

Actual price – Budgeted price

× Actualquantity

($15.95 – $16.25) × 42,500 = $12,750 F=

=

Page 31: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 31©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Price Variance Example

Direct-labor price variance

Actual price – Budgeted price

× Actualquantity

($12.90 – $13.00) × 21,500 = $2,150 F=

=

Page 32: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 32©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Price Variance Example

What is the journal entry when the materials pricevariance is isolated at the time of purchase?

Materials Control 690,625Direct-Materials Price Variance 12,750Accounts Payable Control 677,875To record direct materials purchased

Page 33: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 33©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Efficiency Variance Example

Direct-material efficiency variance

Actual quantity – Standard

quantity× Standard

price

(42,500 – 40,000) × $16.25 = $40,625 U=

=

Page 34: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 34©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Efficiency Variance Example

Direct-labor efficiency variance

Actual quantity – Standard

quantity× Standard

price

(21,500 – 20,000) × $13.00 = $19,500 U=

=

Page 35: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 35©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Efficiency Variance

What is the journal entry to record materials used?Work in Process Control 650,000Direct-Materials Efficiency Variance 40,625

Materials Control 690,625To record direct materials used

Page 36: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 36©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Price and Efficiency VarianceWhat is the journal entry for direct manufacturing labor?

Work in Process Control 260,000Direct ManufacturingLabor Efficiency Variance 19,500

Direct-ManufacturingLabor Price Variance 2,150Wages Payable 277,350

To record liability for direct manufacturing labor

Page 37: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 37©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budget MaterialVariance Example

ActualCost

$677,875

BQ × BP40,000 × $16.25

$650,000

AQ × BP42,500 × $16.25

$690,625

$12,750 F $40,625 U

$27,875 U

Page 38: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 38©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budget LaborVariance Example

ActualCost

$277,350

BQ × BP20,000 × $13.00

$260,000

AQ × BP21,500 × $13.00

$279,500

$2,150 F $ 19,500 U

$17,350 U

Page 39: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 39©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Static-budget varianceMaterials $167,125 FLabor 60,650 FTotal $227,775 F

Flexible-budget varianceMaterials $27,875 ULabor 17,350 UTotal $45,225 U

Sales-volume varianceMaterials $195,000 FLabor 78,000 FTotal $273,000 F

Level 1

Level 2

Variance Analysis

Level 2

Page 40: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 40©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible-budget varianceMaterials $27,875 ULabor 17,350 UTotal $45,225 U

Price varianceMaterials $12,750 FLabor 2,150 FTotal $14,900 F

Efficiency varianceMaterials $40,625 ULabor 19,500 UTotal $60,125 U

Level 2

Level 3

Variance Analysis

Level 3

Page 41: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 41©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 5

Explain why purchasingperformance measures should

focus on more factors thanjust price variances.

Page 42: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 42©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Performance MeasurementUsing Variances

Effectiveness is the degree to which apredetermined objective or target is met.Efficiency is the relative amount of inputsused to achieve a given level of output.Variances should not solely be used to

evaluate performance.

Page 43: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 43©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

When to Investigate Variances

When should variances be investigated?Subjective judgments

Rules of thumb as “investigate all variancesexceeding $10,000 or 25% of expected cost,

whichever is lower.”

Page 44: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 44©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 6

Integrate continuousimprovement

into variance analysis.

Page 45: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 45©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Continuous Improvement

Assume that the budgeted direct materials cost foreach suit that Pasadena Co. manufactures is $65.

Pasadena Co. wants to implement continuousimprovement budgets based on a target 1%

materials cost reduction each period. What should the budgeted cost be for the

next 3 subsequent periods?

Page 46: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 46©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Continuous Improvement

Prior Period Reduction Revised Budgeted in Budgeted

Amount Budget AmountThis Period: – – $65.00Period 1: $65.00 $0.650 $64.35Period 2: $64.35 $0.644 $63.71Period 3: $63.71 $0.637 $63.07

Page 47: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 47©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 7

Perform variance analysis inactivity-based costing systems.

Page 48: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 48©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting andActivity-Based Costing

Materials costs and direct manufacturing laborcosts are examples of output-unit level costs.

Batch-level costs are resources sacrificedon activities that are related to a group of

units of product(s) or service(s) rather thanto each individual unit of product or service.

Page 49: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 49©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting andActivity-Based Costing

Denver Co. produces metal planters (MP).Assume that material-handling labor costs vary

with the number of batches produced ratherthan the number of units in a batch.

Material-handling labor costs are direct batchlevel costs that vary with the number of batches.

Page 50: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 50©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting and Activity-Based Costing

Static ActualBudget Amounts

Units produced and sold 18,000 15,660Batch size 180 174Number of batches 100 90Material-handling labor-hours per batch 5.00 5.20

Page 51: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 51©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting and Activity-Based Costing

Static ActualBudget Amounts

Total labor-hours 500 468Cost per material-handling labor-hour $14.00 $14.50Total material-handling

labor cost $7,000 $6,786

Page 52: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 52©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting andActivity-Based Costing

How many batches should have been employedto produce the actual output units?

15,660 units ÷ 180 units per batch = 87 batchesHow many material-handling hours

should have been used?87 batches × 5 hours/batch = 435 hours

Page 53: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 53©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Flexible Budgeting andActivity-Based Costing

What is the flexible budget formaterial-handling labor-hours?

435 hours × $14.00/labor-hour = $6,090 Flexible-budget costs $6,090 Actual costs 6,786 Flexible-budget variance $ 696 U

Page 54: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 54©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Price and Efficiency Variances

Price variance = ($14.50 – $14.00) × 468 = $234 UEfficiency variance = (468 – 435) × $14.00 = $462 U Total variance $696 U

Page 55: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 55©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Learning Objective 8

Describe benchmarkingand how it is used

in cost management.

Page 56: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 56©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

Benchmarking

It refers to the continuous process ofmeasuring products, services, and activities

against the best levels of performance.

Page 57: Flexible Budgets, Variances, And Management Control: I Chapter 7

7 - 57©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster

End of Chapter 7