Meeting of the LDRRF Technical Com
Technical Review of Proposed SchemesC D M P I I
Ministry of Disaster Management Relief
7/23/2019 Final PP TEC 18 Feb14.pdf
2/43
Agenda of the TEC
Review and endorse decisions of thmeeting.
Review proposals against RRAP
submitted by DMCs (Urban & Rura
Any other Business.
7/23/2019 Final PP TEC 18 Feb14.pdf
3/43
Review and endorse decisions of the last LTC mee
7/23/2019 Final PP TEC 18 Feb14.pdf
4/43
Urban Projects
7/23/2019 Final PP TEC 18 Feb14.pdf
5/43
Rural Projects
7/23/2019 Final PP TEC 18 Feb14.pdf
6/43
Decreer Char Union of Faridpur Sadar Uunder Faridpur District
Major Hazard Flood & Sedimentation
River Bank Erosion
Vulnerabilities
Crop loss in case of flash flood
Heavy soil erosion of the village /settlements.
Lack of permanent protectionagainst flood .
Interventions proposed byDMCs/Community people
Killa/School Ground raisin
Plinth Raising
Construction of Flood resi
house Embankment cum road
7/23/2019 Final PP TEC 18 Feb14.pdf
7/43
Decreer Char Union of Faridpur Sadar Upazila under Faridpur D
Target Hazard
Flood
Existing Resources
*Raised Ground
*Embankments cum road
Proposed DRR InterventionsConstruction of 80 FloodResilient Houses with solarpanel & Improved Woven
Impacts & Expected Re
80 ultra poor and vufamilies will have saferesilient shelter on raise
with solar panel and ImWoven.
7/23/2019 Final PP TEC 18 Feb14.pdf
8/43
Construction of 80 Flood Resilient house with Solar Panel and
Woven at Kazam Matabarar Dangi Baparir Cluster Vill
7/23/2019 Final PP TEC 18 Feb14.pdf
9/43
Improved Woven
7/23/2019 Final PP TEC 18 Feb14.pdf
10/43
Decreer Char Union of Faridpur Sadar Upazila under Faridpu
Scheme Name of the Scheme Estimated Budget-
BDT
Beneficiaries Design Da
1 Construction of 80 Flood
Resilient house with Solar
Panel and Improved Woven
at Kazam Matabarar Dangi &
Baparir Cluster Village
93,85,120 435 Room size
Verandah
7/23/2019 Final PP TEC 18 Feb14.pdf
11/43
Gaukandia Union of Durgapur Upazila uNetrokona District
Major Hazard Flash Flood
River Bank Erosion
Flood
Vulnerabilities
Sudden heavy rainfall in the upstream
inundate the vast area Gaukandiaunion through river Someshwari.
Existing infrastructures washaway/breached due to heavy current.
Damage of crops and silted cultivablelands.
Interventions proposed byDMCs/Community people
Killa/Ground raising
Construction or extension ofembankment cum road
River bank protection work
7/23/2019 Final PP TEC 18 Feb14.pdf
12/43
ROAD CUM EMBANKMENT FROM GOURAKHALIKANDA GPS TO BISWA
S
M
E
S
W
A
R
I
RI
V
E
R
BWBD
EMBANKMENT
CDMP-II
EMBANKMEN
T
PROPOSED
EXTENSION
GourakhalikandaPrimary School
BIRISHIRI
7/23/2019 Final PP TEC 18 Feb14.pdf
13/43
Gaukandia Union in Durgapur Upazila under Netrokona
Target Hazards
Flood,River Erosion,Flash Flood
Existing Resources*Two Embankments
*06 School used as temporaryshelter.
Proposed DRR Interventions
One Embankment cum road
Impacts & Expected Re
@ Protect sand depositcultivable land
@ Protect people and homfrom hilly flash flood
@ Shelter for livestock embankment during disast
@ Develop communetwork.
7/23/2019 Final PP TEC 18 Feb14.pdf
14/43
Construction of Embankment cum Road from Gaukandia primary School to adjacent dead
H/O of Shorab at Biswanathapur Village
7/23/2019 Final PP TEC 18 Feb14.pdf
15/43
Gaukandia Union in Durgapur Upazila under Netrokon
Scheme Name of the Scheme Estimated Budget-
BDT
Beneficiaries Design Da
1 Construction of Embankment
cum Road from Gaukandia
primary School to adjacent
Mora Khal near H/O of
Shorab at Biswanathapur
Village
37,67,278 6,500 Length: 1
Top Widt
Bottom W
Height: 3
HFL: .75 m
Soil Type
Side Slop
7/23/2019 Final PP TEC 18 Feb14.pdf
16/43
Poksia Union of Borhanuddin Upazila unBhola District
Major Hazard Cyclone Tidal Surge Flood River Bank Erosion Water logging
Vulnerabilities Lack of permanent structures against
cyclone Crop loss in case of flood Heavy soil erosion of the village /
settlements. Un-availability of raised ground
during flood .
Interventions proposed by
DMCs/Community people Cyclone Resilience Habitat Killa construction Raising of Graveyard for Bur Plinth Raising of Houses Embankment cum road
7/23/2019 Final PP TEC 18 Feb14.pdf
17/43
Poksia Union of Borhanuddin Upazila under Bhola Dis
Target Hazard
Flood
Existing Resources*Embankments cum road
*Cyclone Shelters
* School & Madrasa fields
Proposed DRR Interventions
Earth raising for Graveyardnear Keramotgonj Bazar
Impacts & Expected Re
People will have safe pburial of dead bodies all tround.
7/23/2019 Final PP TEC 18 Feb14.pdf
18/43
Earth raising for Graveyard near Keramotgon
7/23/2019 Final PP TEC 18 Feb14.pdf
19/43
Poksia Union of Borhanuddin Upazila under Bhola D
Scheme Name of the Scheme Estimated Budget-
BDT
Beneficiaries Design Da
1 Earth raising for Graveyard
near Keramotgonj Bazar
227297.00
( Approx 2.2 lac)
7560 Length: 7
Width: 14
Height: 2
HFL: 1.0 m
7/23/2019 Final PP TEC 18 Feb14.pdf
20/43
Laxmitari Union of Gangachara Upazila under Rangpur D
7/23/2019 Final PP TEC 18 Feb14.pdf
21/43
Laxmitari Union of Gangachara Upazila Rangpur District
Major Hazard Flood
River Bank Erosion
Drought
Tornado
Water logging
Vulnerabilities Crop loss in case of flash flood and
water logging.
Heavy soil erosion of the village /settlements.
Lack of permanent protection againstflood.
Interventions proposed by
DMCs/Community people
Killa/School Ground raising
Plinth Raising
Embankment cum road
7/23/2019 Final PP TEC 18 Feb14.pdf
22/43
L i i U i f G h U il d R
7/23/2019 Final PP TEC 18 Feb14.pdf
23/43
Laxmitari Union of Gangachara Upazila under Rangpur
Target Hazard
Flood & River Bank Erosion
Existing Resources*Raised Ground
*Embankments cum road
*River bank protection cumroad
*GroinProposed DRR Interventions
2 Embankment cum roadschemes
Impacts & Expected Re
140 ultra poor familievulnerable people of thaffected area coveringHector of land will be
resilient to disaster esflood.
7/23/2019 Final PP TEC 18 Feb14.pdf
24/43
Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under L
Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxi
7/23/2019 Final PP TEC 18 Feb14.pdf
25/43
Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxi
7/23/2019 Final PP TEC 18 Feb14.pdf
26/43
Laxmitari Union of Gangachara Upazila under Rangpur D
Scheme Name of the Scheme Estimated Budget-
BDT
Beneficiaries Design Da
1 Embankment cum Road at
Esli Bridge to Sonkar-dah
Madrasa Mor under Laxitary
UP
2596266.26
( Approx 25 lac)
1100 Length: 2
Top Widt
Bottom W
Height: 1
HFL: .7 m
Soil Type
Side Slop
2 Embankment cum Road at
Esli Karar Bridge to Bagarhat
under Laxitary UP
935215.88
( Approx 9 lac)
700 Length: 1
Top Widt
Bottom W
Height: 1
HFL: .6 m
Soil Type
Side Slop
7/23/2019 Final PP TEC 18 Feb14.pdf
27/43
Non-Farm Adaptation in East-Esli village in Laxitary
No of Family: 30 HH
Location : Raised ground at East-Esli Nutun Para previouslyconstructed by CDMP for 30 HH
Support /Option Requested
Rickshaw Van
Shallow machines for irrigation Paddle Rickshaw
Cattle as alternative non-farm support
Estimated amount of fund: 7,22,000 BDT
7/23/2019 Final PP TEC 18 Feb14.pdf
28/43
Bahara and Sullah Union of Shalla Upazila under Sunamgan
General Description of the Unions Villages are isolated and surrounded by
Haor; locally named as AATI. After flash
flood, the entire area gets inundatedwhen erosion of soil takes place due towave action causing damage of HH &disrupts livelihood.
The only rice crop (Boro) is cultivatedand harvest is subject to sudden flashflood and require high ground forstorage.
People use RCC roads for communicationwhich remains submerged for more than6 months.
90% of inhabitants use open toilets. Within 4 to 5 km there is no markets or
even graveyard for burial. No Electricity
7/23/2019 Final PP TEC 18 Feb14.pdf
29/43
Bahara and Sullah Union of Shalla Upazila under Sunamganj Dis
7/23/2019 Final PP TEC 18 Feb14.pdf
30/43
Bahara and Sullah Union of Shalla Upazila under Sunamganj Dis
7/23/2019 Final PP TEC 18 Feb14.pdf
31/43
Bahara and Sullah Union of Shalla Upazila under Sunamganj D
7/23/2019 Final PP TEC 18 Feb14.pdf
32/43
Bahara and Sullah Union of Shalla Upazila under Sunamgonj
Major Hazard
Flash flood Wave action
Inundation
Sanitation
Vulnerabilities Crop loss in case of flash flood
Heavy soil erosion of the village / settlements.
Lack of permanent/insufficient protection
against wave. Un-hygienic toilet.
Un-availability of drinking water.
Village remains isolated from other villages,union, upazila.
Interventions proposed by DMCs/Com
@Construction of Killa
@Protection wall
@Killa connecting road
@Community Toilet & Sanitary latrine
@Tube-well
@Grave yard raising
@Solar system
@Tree plantation
7/23/2019 Final PP TEC 18 Feb14.pdf
33/43
Bahara and Sullah Union of Shalla Upazila under Sunamgonj Distric
Target Hazard
FloodExisting Resources
Flood Shelters
Submerged RCC roads constructed by LGED
Embankment constructed by BWDB
Proposed DRR Interventions
Comprehensive scheme including@3 Nos of Killa@7 Village and Killa Protection Walls@0ne Killa connecting road@ 130 nos Sanitary latrine@10 nos Deep Tube-wells@Sultanpur,Bhatgaon,Kartikpur and ShobjiMohal grave yard raising@35 Solar system & Tree plantation@ One Foot bridge connecting village and
High school
Impacts & Expected Result
Killa can be used as storageand shelter for Livestock in hseason, use as market place, and social gathering round the
Village will be permanently pfrom flood/Haor wave action.
Graveyard will facilitate funerflood and in dry season as well
Improved WatSan .
7/23/2019 Final PP TEC 18 Feb14.pdf
34/43
Bahara Union of Shalla Upazila under Sunamgonj D
Scheme Name of the Scheme Estimated
Budget-BDT
Beneficiaries Design Data
1 Comprehensive scheme at Meda.
Interventions: i) Construction of Killa ii)Killa Protection wall iii) Killa
connecting road iv) Community Toilet
v) Tube-well
8,804,625 3,000 As attached
2 Comprehensive scheme at Shantipur.Interventions: i)Village Protection wall
ii) Sultanpur grave yard raising iii)
Sanitary latrine iv) Tube-well v) Solar
system vi) Tree plantation
8604714 330
3 Comprehensive scheme at Harinagar.Interventions: i) Killa Protection
wall ii) Construction of
Killa iii) Sanitary
latrine iv) Tube-well
3643424 6000
4 Comprehensive scheme at Bhatgaon.Interventions: i)Village Protection wall
ii)Bhatgaon grave yard raising
4383660 1000
7/23/2019 Final PP TEC 18 Feb14.pdf
35/43
Sullah Union of Shalla Upazila under Sunamganj
Schem
e
Name of the Scheme Estimated
Budget-BDT
Beneficiaries Desi
1 Comprehensive scheme at Bolorampur.Interventions: i) Raise school field ii) Foot bridge
connect to school and village iii) Tree plantation
iv) Solar panel
788340 420 As A
2 Comprehensive scheme at Kartikpur (Notunhati).Interventions: i) Village protection wall ii) Kartikpur
Graveyard raising iii) Sanitary latrine iv) Tube-
well
3914857 230
3 Comprehensive scheme at Rowa Notunhati(Bagerhat). Interventions: i) Village protection wall
ii) Sanitary latrine iii) Tube-well
4663902 300
4 Comprehensive scheme at Graam Sullah.Interventions: i) Construction of Killa ii) Raam
shallah sbojimohol ghrave yard raising.
2183323 7000
5 Construction of village protection at Kandigaon by CCblock.
2157269 1800
7/23/2019 Final PP TEC 18 Feb14.pdf
36/43
Section of Brick Retaining Wall
75mm BFS
150mm Sand Filling
375
500
625
750
875
1000
Filter materials (Brick Bats)
1300 mm
300mm
Earth side
GL
150mm CC
Earth Filling
250
300mm
300mm
300mm
300mm
300mm
300mm
300mm
375mm
Non-farm livelihood options in Haor areas of Sunamganj
7/23/2019 Final PP TEC 18 Feb14.pdf
37/43
1. Duck Rearing (at least 50+), with cage and small capital - Tk 20,000x 50 = 1,000,00
2. Sewing Machine (Sewing Machine + capital to buy clothes) - Tk 20,000X 50 = 1,000
3. Small business (capital support) 2/3 small shops in one village - Tk 20,000X 10 = 20
4.Handicrafts (if bamboo or other locally available grass varieties are available)
5. Boat & net (small boat and net) to catch fish - Tk 25,000X 10 = 250,000
6. Large Engine boat for transportation purpose (in a group of 3 or 4) depending upon
to Tk 75,000, one boat for a group of 3) (This can be used in emergency as well) at lea
each village. Say: 4 Nos@ 75000/=300000 tk
7. Power Tiller (this can be a good option, during flood they can use the engine to run
during dry season they can use it as short transportation, ploughing purpose (one goo
power tiller costs Tk 125,000, can be given to a group of 4 person). Say 4 Nos @ 1250
BDT
Estimated Cost Total: 3250000 BDT
7/23/2019 Final PP TEC 18 Feb14.pdf
38/43
Mathurapur village of Munshigonj Union under Shyamnagar Upazi
Satkhira District
Major Hazard
Cyclone Tidal Surge
Salinity
Water logging
River Erosion
Arsenic
Vulnerabilities Displaced people due to river bank erosion
Lack of permanent/sufficient structure forshelter during cyclone
Unhygienic toilet.
Unavailability of drinking water.
Village remain isolated from other village,Union, Upazila lacks from livelihood.
Interventions proposed by DMCs/Comm
@Construction of Killa@Cyclone Shelter
@ Cyclone resilience Habitat
@ Re-excavation of canal
@Embankment cum road
@Pond excavation
7/23/2019 Final PP TEC 18 Feb14.pdf
39/43
Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira D
Target Hazard
Cyclone,Salanity
Existing Resources
Cyclone Shelters
Embankment constructed by BWDB
Proposed DRR Interventions
Comprehensive scheme including@65 Nos Cyclone Resilient Habitat
@Earth raising for cyclone Resilienthabitat@Rain water harvesting
@65 Sanitary latrine
@1 Deep Tube-well
@ BFS road
@Income generation support
Impacts & Expected Resu
65 river erosion ultra-poor fismen families will have
Safe cyclone resilience habitdevelop raised land
Healthy environments by ussanitary latrine and Rain Waharvesting facilities,
Families can use Pond thougconnecting BFS road.
65 river erosion ultra-poor ffamilies will get livelihood su
7/23/2019 Final PP TEC 18 Feb14.pdf
40/43
Mathurapur village of Munshigonj Union under Shyamnag
Upazila in Satkhira District
Scheme Name of the Scheme Estimated Budget-
BDT
Beneficiaries Design Da
1 Cyclone resilience Habitat for 65
Fishermen community located
at Mathurapur adjacent of
Caritas Habitat project
26361727.00
( Approx 2.63 Crore)
625 As attach
7/23/2019 Final PP TEC 18 Feb14.pdf
41/43
Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkh
7/23/2019 Final PP TEC 18 Feb14.pdf
42/43
Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Sat
Cyclone resilience Habitat for 65 Fishermen community lo
7/23/2019 Final PP TEC 18 Feb14.pdf
43/43
y yMathurapur adjacent of Caritas Habitat project
Sl# Name of InterventionCost per Unit in
BDT
Number of
Intervention
1
Earth rising for Cyclone Resilient habit place includes by
product pond 3,486,387.00 1.00
2 Land Cost (4 Acor @ 7.5 lac including registration cost) 3,000,000.00 1.00
3Construction of Cyclone resilient habit including Toilet
and Rain water harvesting 226,739.00 65.00
4 Installation of Rain Rain Water Harvesting Cyclone 19,993.00 65.00
5 Installation of Sanitary latrine 10,000.00 65.00
6 Installation of shallow tube well 10,000.00 5.00
7 Installation of Deep tube well 62,613.00 1.00
8 Construction of meeting room 801,738.00 1.00
9 Construction of 800 m long BFS Road at habit place 673,409.00 1.00
10 Livelihood asset -Boat 10,000.00 65.00
11 Livelihood asset -Net 5,000.00 1.00
12 Income generating support-Swing machine (10 families) 15,000.00 10.00
13 Income generating support-Cow for 45 families 15,000.00 45.00
14 Income generating support-Cash for 5 families for shop 15,000.00 5.00
15 Skill training/Awareness (3 batches) 15,000.00 3.00
Total