    Meeting of the LDRRF Technical Com

    Technical Review of Proposed SchemesC D M P I I

    Ministry of Disaster Management Relief

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    2/43

    Agenda of the TEC

    Review and endorse decisions of thmeeting.

    Review proposals against RRAP

    submitted by DMCs (Urban & Rura

    Any other Business.

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    3/43

    Review and endorse decisions of the last LTC mee

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    4/43

    Urban Projects

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    5/43

    Rural Projects

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    6/43

    Decreer Char Union of Faridpur Sadar Uunder Faridpur District

    Major Hazard Flood & Sedimentation

    River Bank Erosion

    Vulnerabilities

    Crop loss in case of flash flood

    Heavy soil erosion of the village /settlements.

    Lack of permanent protectionagainst flood .

    Interventions proposed byDMCs/Community people

    Killa/School Ground raisin

    Plinth Raising

    Construction of Flood resi

    house Embankment cum road

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    7/43

    Decreer Char Union of Faridpur Sadar Upazila under Faridpur D

    Target Hazard

    Flood

    Existing Resources

    *Raised Ground

    *Embankments cum road

    Proposed DRR InterventionsConstruction of 80 FloodResilient Houses with solarpanel & Improved Woven

    Impacts & Expected Re

    80 ultra poor and vufamilies will have saferesilient shelter on raise

    with solar panel and ImWoven.

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    8/43

    Construction of 80 Flood Resilient house with Solar Panel and

    Woven at Kazam Matabarar Dangi Baparir Cluster Vill

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    9/43

    Improved Woven

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    10/43

    Decreer Char Union of Faridpur Sadar Upazila under Faridpu

    Scheme Name of the Scheme Estimated Budget-

    BDT

    Beneficiaries Design Da

    1 Construction of 80 Flood

    Resilient house with Solar

    Panel and Improved Woven

    at Kazam Matabarar Dangi &

    Baparir Cluster Village

    93,85,120 435 Room size

    Verandah

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    11/43

    Gaukandia Union of Durgapur Upazila uNetrokona District

    Major Hazard Flash Flood

    River Bank Erosion

    Flood

    Vulnerabilities

    Sudden heavy rainfall in the upstream

    inundate the vast area Gaukandiaunion through river Someshwari.

    Existing infrastructures washaway/breached due to heavy current.

    Damage of crops and silted cultivablelands.

    Interventions proposed byDMCs/Community people

    Killa/Ground raising

    Construction or extension ofembankment cum road

    River bank protection work

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    12/43

    ROAD CUM EMBANKMENT FROM GOURAKHALIKANDA GPS TO BISWA

    S

    M

    E

    S

    W

    A

    R

    I

    RI

    V

    E

    R

    BWBD

    EMBANKMENT

    CDMP-II

    EMBANKMEN

    T

    PROPOSED

    EXTENSION

    GourakhalikandaPrimary School

    BIRISHIRI

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    13/43

    Gaukandia Union in Durgapur Upazila under Netrokona

    Target Hazards

    Flood,River Erosion,Flash Flood

    Existing Resources*Two Embankments

    *06 School used as temporaryshelter.

    Proposed DRR Interventions

    One Embankment cum road

    Impacts & Expected Re

    @ Protect sand depositcultivable land

    @ Protect people and homfrom hilly flash flood

    @ Shelter for livestock embankment during disast

    @ Develop communetwork.

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    14/43

    Construction of Embankment cum Road from Gaukandia primary School to adjacent dead

    H/O of Shorab at Biswanathapur Village

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    15/43

    Gaukandia Union in Durgapur Upazila under Netrokon

    Scheme Name of the Scheme Estimated Budget-

    BDT

    Beneficiaries Design Da

    1 Construction of Embankment

    cum Road from Gaukandia

    primary School to adjacent

    Mora Khal near H/O of

    Shorab at Biswanathapur

    Village

    37,67,278 6,500 Length: 1

    Top Widt

    Bottom W

    Height: 3

    HFL: .75 m

    Soil Type

    Side Slop

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    16/43

    Poksia Union of Borhanuddin Upazila unBhola District

    Major Hazard Cyclone Tidal Surge Flood River Bank Erosion Water logging

    Vulnerabilities Lack of permanent structures against

    cyclone Crop loss in case of flood Heavy soil erosion of the village /

    settlements. Un-availability of raised ground

    during flood .

    Interventions proposed by

    DMCs/Community people Cyclone Resilience Habitat Killa construction Raising of Graveyard for Bur Plinth Raising of Houses Embankment cum road

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    17/43

    Poksia Union of Borhanuddin Upazila under Bhola Dis

    Target Hazard

    Flood

    Existing Resources*Embankments cum road

    *Cyclone Shelters

    * School & Madrasa fields

    Proposed DRR Interventions

    Earth raising for Graveyardnear Keramotgonj Bazar

    Impacts & Expected Re

    People will have safe pburial of dead bodies all tround.

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    18/43

    Earth raising for Graveyard near Keramotgon

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    19/43

    Poksia Union of Borhanuddin Upazila under Bhola D

    Scheme Name of the Scheme Estimated Budget-

    BDT

    Beneficiaries Design Da

    1 Earth raising for Graveyard

    near Keramotgonj Bazar

    227297.00

    ( Approx 2.2 lac)

    7560 Length: 7

    Width: 14

    Height: 2

    HFL: 1.0 m

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    20/43

    Laxmitari Union of Gangachara Upazila under Rangpur D

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    21/43

    Laxmitari Union of Gangachara Upazila Rangpur District

    Major Hazard Flood

    River Bank Erosion

    Drought

    Tornado

    Water logging

    Vulnerabilities Crop loss in case of flash flood and

    water logging.

    Heavy soil erosion of the village /settlements.

    Lack of permanent protection againstflood.

    Interventions proposed by

    DMCs/Community people

    Killa/School Ground raising

    Plinth Raising

    Embankment cum road

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    22/43

    L i i U i f G h U il d R

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    23/43

    Laxmitari Union of Gangachara Upazila under Rangpur

    Target Hazard

    Flood & River Bank Erosion

    Existing Resources*Raised Ground

    *Embankments cum road

    *River bank protection cumroad

    *GroinProposed DRR Interventions

    2 Embankment cum roadschemes

    Impacts & Expected Re

    140 ultra poor familievulnerable people of thaffected area coveringHector of land will be

    resilient to disaster esflood.

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    24/43

    Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under L

    Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxi

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    25/43

    Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxi

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    26/43

    Laxmitari Union of Gangachara Upazila under Rangpur D

    Scheme Name of the Scheme Estimated Budget-

    BDT

    Beneficiaries Design Da

    1 Embankment cum Road at

    Esli Bridge to Sonkar-dah

    Madrasa Mor under Laxitary

    UP

    2596266.26

    ( Approx 25 lac)

    1100 Length: 2

    Top Widt

    Bottom W

    Height: 1

    HFL: .7 m

    Soil Type

    Side Slop

    2 Embankment cum Road at

    Esli Karar Bridge to Bagarhat

    under Laxitary UP

    935215.88

    ( Approx 9 lac)

    700 Length: 1

    Top Widt

    Bottom W

    Height: 1

    HFL: .6 m

    Soil Type

    Side Slop

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    27/43

    Non-Farm Adaptation in East-Esli village in Laxitary

    No of Family: 30 HH

    Location : Raised ground at East-Esli Nutun Para previouslyconstructed by CDMP for 30 HH

    Support /Option Requested

    Rickshaw Van

    Shallow machines for irrigation Paddle Rickshaw

    Cattle as alternative non-farm support

    Estimated amount of fund: 7,22,000 BDT

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    28/43

    Bahara and Sullah Union of Shalla Upazila under Sunamgan

    General Description of the Unions Villages are isolated and surrounded by

    Haor; locally named as AATI. After flash

    flood, the entire area gets inundatedwhen erosion of soil takes place due towave action causing damage of HH &disrupts livelihood.

    The only rice crop (Boro) is cultivatedand harvest is subject to sudden flashflood and require high ground forstorage.

    People use RCC roads for communicationwhich remains submerged for more than6 months.

    90% of inhabitants use open toilets. Within 4 to 5 km there is no markets or

    even graveyard for burial. No Electricity

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    29/43

    Bahara and Sullah Union of Shalla Upazila under Sunamganj Dis

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    30/43

    Bahara and Sullah Union of Shalla Upazila under Sunamganj Dis

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    31/43

    Bahara and Sullah Union of Shalla Upazila under Sunamganj D

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    32/43

    Bahara and Sullah Union of Shalla Upazila under Sunamgonj

    Major Hazard

    Flash flood Wave action

    Inundation

    Sanitation

    Vulnerabilities Crop loss in case of flash flood

    Heavy soil erosion of the village / settlements.

    Lack of permanent/insufficient protection

    against wave. Un-hygienic toilet.

    Un-availability of drinking water.

    Village remains isolated from other villages,union, upazila.

    Interventions proposed by DMCs/Com

    @Construction of Killa

    @Protection wall

    @Killa connecting road

    @Community Toilet & Sanitary latrine

    @Tube-well

    @Grave yard raising

    @Solar system

    @Tree plantation

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    33/43

    Bahara and Sullah Union of Shalla Upazila under Sunamgonj Distric

    Target Hazard

    FloodExisting Resources

    Flood Shelters

    Submerged RCC roads constructed by LGED

    Embankment constructed by BWDB

    Proposed DRR Interventions

    Comprehensive scheme including@3 Nos of Killa@7 Village and Killa Protection Walls@0ne Killa connecting road@ 130 nos Sanitary latrine@10 nos Deep Tube-wells@Sultanpur,Bhatgaon,Kartikpur and ShobjiMohal grave yard raising@35 Solar system & Tree plantation@ One Foot bridge connecting village and

    High school

    Impacts & Expected Result

    Killa can be used as storageand shelter for Livestock in hseason, use as market place, and social gathering round the

    Village will be permanently pfrom flood/Haor wave action.

    Graveyard will facilitate funerflood and in dry season as well

    Improved WatSan .

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    34/43

    Bahara Union of Shalla Upazila under Sunamgonj D

    Scheme Name of the Scheme Estimated

    Budget-BDT

    Beneficiaries Design Data

    1 Comprehensive scheme at Meda.

    Interventions: i) Construction of Killa ii)Killa Protection wall iii) Killa

    connecting road iv) Community Toilet

    v) Tube-well

    8,804,625 3,000 As attached

    2 Comprehensive scheme at Shantipur.Interventions: i)Village Protection wall

    ii) Sultanpur grave yard raising iii)

    Sanitary latrine iv) Tube-well v) Solar

    system vi) Tree plantation

    8604714 330

    3 Comprehensive scheme at Harinagar.Interventions: i) Killa Protection

    wall ii) Construction of

    Killa iii) Sanitary

    latrine iv) Tube-well

    3643424 6000

    4 Comprehensive scheme at Bhatgaon.Interventions: i)Village Protection wall

    ii)Bhatgaon grave yard raising

    4383660 1000

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    35/43

    Sullah Union of Shalla Upazila under Sunamganj

    Schem

    e

    Name of the Scheme Estimated

    Budget-BDT

    Beneficiaries Desi

    1 Comprehensive scheme at Bolorampur.Interventions: i) Raise school field ii) Foot bridge

    connect to school and village iii) Tree plantation

    iv) Solar panel

    788340 420 As A

    2 Comprehensive scheme at Kartikpur (Notunhati).Interventions: i) Village protection wall ii) Kartikpur

    Graveyard raising iii) Sanitary latrine iv) Tube-

    well

    3914857 230

    3 Comprehensive scheme at Rowa Notunhati(Bagerhat). Interventions: i) Village protection wall

    ii) Sanitary latrine iii) Tube-well

    4663902 300

    4 Comprehensive scheme at Graam Sullah.Interventions: i) Construction of Killa ii) Raam

    shallah sbojimohol ghrave yard raising.

    2183323 7000

    5 Construction of village protection at Kandigaon by CCblock.

    2157269 1800

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    36/43

    Section of Brick Retaining Wall

    75mm BFS

    150mm Sand Filling

    375

    500

    625

    750

    875

    1000

    Filter materials (Brick Bats)

    1300 mm

    300mm

    Earth side

    GL

    150mm CC

    Earth Filling

    250

    300mm

    300mm

    300mm

    300mm

    300mm

    300mm

    300mm

    375mm

    Non-farm livelihood options in Haor areas of Sunamganj

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    37/43

    1. Duck Rearing (at least 50+), with cage and small capital - Tk 20,000x 50 = 1,000,00

    2. Sewing Machine (Sewing Machine + capital to buy clothes) - Tk 20,000X 50 = 1,000

    3. Small business (capital support) 2/3 small shops in one village - Tk 20,000X 10 = 20

    4.Handicrafts (if bamboo or other locally available grass varieties are available)

    5. Boat & net (small boat and net) to catch fish - Tk 25,000X 10 = 250,000

    6. Large Engine boat for transportation purpose (in a group of 3 or 4) depending upon

    to Tk 75,000, one boat for a group of 3) (This can be used in emergency as well) at lea

    each village. Say: 4 Nos@ 75000/=300000 tk

    7. Power Tiller (this can be a good option, during flood they can use the engine to run

    during dry season they can use it as short transportation, ploughing purpose (one goo

    power tiller costs Tk 125,000, can be given to a group of 4 person). Say 4 Nos @ 1250

    BDT

    Estimated Cost Total: 3250000 BDT

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    38/43

    Mathurapur village of Munshigonj Union under Shyamnagar Upazi

    Satkhira District

    Major Hazard

    Cyclone Tidal Surge

    Salinity

    Water logging

    River Erosion

    Arsenic

    Vulnerabilities Displaced people due to river bank erosion

    Lack of permanent/sufficient structure forshelter during cyclone

    Unhygienic toilet.

    Unavailability of drinking water.

    Village remain isolated from other village,Union, Upazila lacks from livelihood.

    Interventions proposed by DMCs/Comm

    @Construction of Killa@Cyclone Shelter

    @ Cyclone resilience Habitat

    @ Re-excavation of canal

    @Embankment cum road

    @Pond excavation

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    39/43

    Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira D

    Target Hazard

    Cyclone,Salanity

    Existing Resources

    Cyclone Shelters

    Embankment constructed by BWDB

    Proposed DRR Interventions

    Comprehensive scheme including@65 Nos Cyclone Resilient Habitat

    @Earth raising for cyclone Resilienthabitat@Rain water harvesting

    @65 Sanitary latrine

    @1 Deep Tube-well

    @ BFS road

    @Income generation support

    Impacts & Expected Resu

    65 river erosion ultra-poor fismen families will have

    Safe cyclone resilience habitdevelop raised land

    Healthy environments by ussanitary latrine and Rain Waharvesting facilities,

    Families can use Pond thougconnecting BFS road.

    65 river erosion ultra-poor ffamilies will get livelihood su

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    40/43

    Mathurapur village of Munshigonj Union under Shyamnag

    Upazila in Satkhira District

    Scheme Name of the Scheme Estimated Budget-

    BDT

    Beneficiaries Design Da

    1 Cyclone resilience Habitat for 65

    Fishermen community located

    at Mathurapur adjacent of

    Caritas Habitat project

    26361727.00

    ( Approx 2.63 Crore)

    625 As attach

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    41/43

    Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkh

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    42/43

    Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Sat

    Cyclone resilience Habitat for 65 Fishermen community lo

  • 7/23/2019 Final PP TEC 18 Feb14.pdf

    43/43

    y yMathurapur adjacent of Caritas Habitat project

    Sl# Name of InterventionCost per Unit in

    BDT

    Number of

    Intervention

    1

    Earth rising for Cyclone Resilient habit place includes by

    product pond 3,486,387.00 1.00

    2 Land Cost (4 Acor @ 7.5 lac including registration cost) 3,000,000.00 1.00

    3Construction of Cyclone resilient habit including Toilet

    and Rain water harvesting 226,739.00 65.00

    4 Installation of Rain Rain Water Harvesting Cyclone 19,993.00 65.00

    5 Installation of Sanitary latrine 10,000.00 65.00

    6 Installation of shallow tube well 10,000.00 5.00

    7 Installation of Deep tube well 62,613.00 1.00

    8 Construction of meeting room 801,738.00 1.00

    9 Construction of 800 m long BFS Road at habit place 673,409.00 1.00

    10 Livelihood asset -Boat 10,000.00 65.00

    11 Livelihood asset -Net 5,000.00 1.00

    12 Income generating support-Swing machine (10 families) 15,000.00 10.00

    13 Income generating support-Cow for 45 families 15,000.00 45.00

    14 Income generating support-Cash for 5 families for shop 15,000.00 5.00

    15 Skill training/Awareness (3 batches) 15,000.00 3.00

    Total