Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd. Vardan Environet, Gurgaon Page 162(Chapter-6) 6. ADDITIONAL STUDIES 6.0 INTRODUCTION Mining are associated with several potential hazards that effect to the employee and environment. It would normally require the assistance of emergency services to handle it effectively. The mining operation shall be taken out under the well management & control by the qualified mine manager. Similarly Stone Along with Associated Minerals mines also have impending dangers or risk which need be addressed for which a disaster management plan has been formulated with an aim of taking precautionary steps to avert disasters and also to take such action after the disaster which limits the damage to the minimum. Nevertheless, the following natural/industrial problems may be encountered during the mining operation. 1. Inundation- filling of the mine pit due to excessive rains. 2. Slope failures at the mine faces. 6.1 Public Hearing Public hearing is very significant part of the process of public participation envisaged under the guidelines issued by MoEF, Government of India. It facilitates involvement of all the stake holders of the project which is essential for ensuring smooth running of project and benefitting all sections of society in the process of economic development of the region. The public hearing of stone mining project viz. “Mining of Minor Mineral in the Mines of “Narnaul” with production capacity of 4.0 Million Tonnes Per Annum of stone (ROM) of M/s. A.N.E. Industries Pvt. Ltd at Tehsil Narnaul, District Mahendragarh, Hayana” was conducted on 15-09-2014 at 3:30 pm. The details are appended herewith: 6.1.1 Public Hearing Advertisement

Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 162(Chapter-6)

6. ADDITIONAL STUDIES

6.0 INTRODUCTION

Mining are associated with several potential hazards that effect to the employee and environment.

It would normally require the assistance of emergency services to handle it effectively. The mining

operation shall be taken out under the well management & control by the qualified mine manager.

Similarly Stone Along with Associated Minerals mines also have impending dangers or risk which

need be addressed for which a disaster management plan has been formulated with an aim of

taking precautionary steps to avert disasters and also to take such action after the disaster which

limits the damage to the minimum.

Nevertheless, the following natural/industrial problems may be encountered during the mining

operation.

1. Inundation- filling of the mine pit due to excessive rains.

2. Slope failures at the mine faces.

6.1 Public Hearing

Public hearing is very significant part of the process of public participation envisaged under the

guidelines issued by MoEF, Government of India. It facilitates involvement of all the stake holders of

the project which is essential for ensuring smooth running of project and benefitting all sections of

society in the process of economic development of the region.

The public hearing of stone mining project viz. “Mining of Minor Mineral in the Mines of “Narnaul”

with production capacity of 4.0 Million Tonnes Per Annum of stone (ROM) of M/s. A.N.E. Industries

Pvt. Ltd at Tehsil Narnaul, District Mahendragarh, Hayana” was conducted on 15-09-2014 at 3:30

pm. The details are appended herewith:

6.1.1 Public Hearing Advertisement

Page 2: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 163(Chapter-6)

Dainik Tribune, Dated : 13.8.2014 Times of India Dated : 15.8.2014

Page 3: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 164(Chapter-6)

Amar Ujala, Delhi, Dated : 13.8.2014

Amar Ujala, Chandigarh, Dated : 13.8.2014

6.1.2 Banner of Public Hearing

6.1.2Photographs of Public Hearing

Members of SPCB, Haryana for Public

Hearing

PP along with consultant giving the

presentation

Page 4: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 165(Chapter-6)

Questions raised by the Public

Replies given by Project

Proponent/Consultant

Local Public present for Public Hearing

6.1.3 Minutes of Public Hearing

Page 5: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 166(Chapter-6)

Page 6: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 167(Chapter-6)

Page 7: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 168(Chapter-6)

Page 8: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 169(Chapter-6)

Page 9: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 170(Chapter-6)

Page 10: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 171(Chapter-6)

Page 11: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 172(Chapter-6)

Page 12: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 173(Chapter-6)

Page 13: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 174(Chapter-6)

Page 14: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 175(Chapter-6)

Page 15: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 176(Chapter-6)

Page 16: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 177(Chapter-6)

Page 17: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 178(Chapter-6)

Page 18: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 179(Chapter-6)

Page 19: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 180(Chapter-6)

Page 20: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 181(Chapter-6)

Page 21: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 182(Chapter-6)

Page 22: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 183(Chapter-6)

Page 23: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 184(Chapter-6)

Page 24: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 185(Chapter-6)

Table 6.1: Questions Raised by Public in Public Hearing held on 15-09-2014 and Reply by

ADM/Project Proponent /Environment Consultant

Page 25: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 186(Chapter-6)

S N Detail of Villagers Question Raised Reply given by PP/

Consultant

Action Plan by the Project Proponent

1 Sh. Devkaran Chauhan,

Nagar Parshad,

Village- Raghunathpura

Who will check pollution

measures provided on the

mining?

Project proponent will provide

APCM to suppress air emission

and HSPCB will check the APCM

and will collect the sample of

air emission and if sample fails

the HSPCB will take action as

per Environmental Laws.

He further added that anybody

can give their objection,

suggestion, comments in this

public hearing and if the unit is

found causing pollution after

commissioning public can make

complaint or give any

suggestion in Regional Office,

HSPCB, Dharuhera against the

mining unit at any time.

Adequate pollution control measures will be

adopted to ensure pollution level within

prescribed limits.

Also Half yearly Compliance Report will be

submitted to MoEF after collecting the data

and will ensure that all the parameters will

be within limit and report will be supplied

to HSPCB to comply the conditions of EC.

Fund Allocation

An amount of Rs. 15.4 Lakhs has been

earmarked as capital cost for

implementation of Environment

management plan along with annual

recurring cost of Rs. 10.87 Lakhs/ annum.

2 Sh. Devender Soni,

Nagar Parshad, Ward

No-11

All APCM should be

provided on mining and

people should not suffer

We will provide all APCM as

mentioned by our consultant in

draft EIA and will control the

Blasting will be conducted as per the

approved Mining Scheme as well as DGMS

guidelines. The people in the nearby areas

Page 26: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 187(Chapter-6)

due to vibration, air

pollution and noise

pollution.

Local people should be

preferred for employment.

We welcome such project

in our village as it will

uplift the socio economic

conditions of the villagers.

pollution accordingly.We will

do blasting in a scientific and

controlled manner and will give

employment to local people on

priority.

will not suffer due to vibrations, air and

noise pollutions due to proper mitigation

measures proposed by the PP.

The details of mitigation measures to reduce

the impact of vibrations, air pollution and

noise pollution are incorporated in Chapter

IV of the Final EIA/EMP Report.

The calculated PPV is 24.23 mm/sec which

is within the permissible limit as per DGMS

circular 7 of 1997.

Following measures will be taken to

minimize the vibration:

1. Blasting shall not be permitted within

100 m of surface structures.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

Page 27: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 188(Chapter-6)

will be ensured.

6. Direction of the hole will be maintained

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

The total manpower required for the

proposed mining project will be 130

persons.

The company will prefer locals on priority

for providing employment opportunities.

3 Sh. Ram Kumar

Village-Raghunathpura

I am residing near the

mining lease for the last 40

years and the mining

process will damage our

houses and crops and it is

not possible for us to

construct new house in

some other place. Deputy

Commissioner Sh Atul

Kumar Divedi asked the

We will do control blasting. If

any house of the nearby villager

is damaged due to mining

activity, we will compensate for

that and we are ready to sign

the written agreement for

compensation with the villagers

for damage done to their houses

and crops if any.

Blasting will be conducted as per the

approved Mining Scheme as well as DGMS

guidelines and there will be no damage to

nearby houses.

The details of mitigation measures to reduce

the impact due to blasting and control of fly

rocks are incorporated in Chapter IV,

Section 4.3.1 and 4.13.23.1 respectively of

the final EIA/EMP Report.

Page 28: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 189(Chapter-6)

project proponent to give

reply to the question asked

by the villager.

Following measures will be taken to

minimize the vibration:

1. Blasting shall not be permitted within

100 m of surface structures.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

will be ensured.

6. Direction of the hole will be maintained

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

Fund Allocation

Along with this adequate compensation will

be given if there is damage to any nearby

houses.

Page 29: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 190(Chapter-6)

4 Sh. Ram Kumar, Village-

Raghunathpura

Due to blasting our homes

will be damaged

As already told we will do

control blasting and will

compensate if houses are

damaged.

Blasting will be conducted as per the

approved Mining Scheme as well as DGMS

guidelines and there will be no damage to

nearby houses.

Also, Ear plugs will be provided to the

persons working in the mining area.

The details of mitigation measures to

reduce the impact due to blasting are

incorporated in Chapter IV, Section 4.3.1 of

the final EIA/EMP Report.

1. Blasting shall not be permitted within

100 m of surface structures.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

will be ensured.

6. Direction of the hole will be maintained

Page 30: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 191(Chapter-6)

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

Fund Allocation

Along with this, adequate compensation will

be given if there is damage to any nearby

houses.

5 Sh. Surender Kumar

Village.- Raghunathpura

Company does not respect

their commitment and do

not sprinkle water on

roads and earlier company

has not paid any

compensation/ rent of my

land leased to them and

overburden/ boulders are

still lying on my land.

We will respect our

commitment regarding

compensation of damage to any

house.

For the purpose of dust control, wet drilling

will be carried out.

Water sprinkling will be done on the roads

and unpaved roads.

There will be no overburden due to the

proposed mining project and hence, no

overburden will be deposited on the nearby

land.

6 Sh. Ashok Kumar

Village- Raghunathpura

I want to know from

Deputy Commissioner that

who has put marking flags

on my land.

Deputy Commissioner replied

that the mining department or

contractor might have put these

flags and they will reply your

Proper demarcation of mine lease will be

done by Revenue Department and Mining

Department will install pillars.

Page 31: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 192(Chapter-6)

question.

Project proponent replied that

we will check the alignment of

the lease and correct it

accordingly. The mining officer

replied that before starting the

mining activity proper

demarcation of the mine lease

will be done by revenue

department and mining

department will install pillars.

The same is incorporated in Chapter 2,

Section 2.1.2 and Page No…. of the Final

EIA/EMP Report.

7 Sh. Ashok Kumar

Village- Raghunathpura

How project proponent

will ensure that during

blasting no stone lands in

our field

Mining Engineer replied that

department of explosive will

carry out the survey and will

give permission accordingly for

blasting, so chances of stones

damaging their houses or fields

are very remote. The project

proponent also replied that we

will carry out controlled

blasting and we will put nets

and sand bags before blasting to

Control blasting as per the Mining Scheme

will be done with proper charge of

explosives to minimize noise during blasting

and no stone will land in the land of Shri

Ashok Kumar. The details of mitigation

measures to reduce the impact due to

blasting are incorporated in Chapter IV,

Section 4.3.1 of the final EIA/EMP Report.

1. Blasting shall not be permitted within

100 m of surface structures.

Page 32: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 193(Chapter-6)

ensure that no stone lands on

their houses or fields.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

will be ensured.

6. Direction of the hole will be maintained

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

Proper measures will be adopted to prevent

fly rocks, so that no stone lands in the

nearby fields and houses. The details to

prevent Fly rocks are incorporated in

Chapter IV, Section 4.13.23.1 of the Final

EIA/EMP Report.

8 Sh. Deep Chand Soni

Nagar Parshad, Ward

no-21

Houses of the villagers will

be damaged due to

vibration during blasting

We will make a written

agreement with the villagers

and make a committee of local

Proper safety measures will be adopted to

minimize the adverse effects due to mining.

Also adequate compensation in case of any

Page 33: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 194(Chapter-6)

and who will pay the

compensation and we

want a written assurance

from the company and we

want role of

administration in this

regard.

peoples suggested by the

villagers for the compensation

of houses and crops damaged

due to mining activity. The

effect of vibration will be within

the mining lease as control

blasting will be done.

RO Dharuhera replied that

agreement for damage of

houses and crops will be

between project proponent and

villagers. However they can

contact HSPCB in case of any

complaint regarding pollution

due to mining activity.

damage will be paid by the PP to the

villagers.

A written agreement will be made between

the PP and the villagers regarding the

compensation of houses and crops damaged

due to mining activity.

Fund Allocation

Adequate compensation will be given if

there is damage to any nearby houses.

9 Sh. Deep Chand Soni

Nagar Parshad, Ward

no-21

Project proponent should

deposit Rupees 30

thousand per acre in the

bank as compensation

amount of damage of

crops/land.

We are ready to pay suitable

compensation for one year in

advance for damage of

land/crop due to mining

activity.

Assurance regarding adequate

compensation was made by the Project

Proponent.

Fund Allocation

Adequate compensation will be given if

there is damage to any nearby houses.

Page 34: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 195(Chapter-6)

10 Sh. Karamveer Halwai

Village-Narnaul

Site is 8 km. from the city

and due to earlier mining

activity houses were

damaged and our wells

went dry and the earlier

company gave

compensation of only one

year and ran away with

their machinery.

We cannot comment on the

earlier mine lease holder,

however we assure you to give

suitable compensation if houses

are damaged due to our mining

activity.

The mining activity will not intersect with

the ground water table.

Ultimate pit of mine will be 325 m RL

(ultimate dept of mine 117m) while

general groundwater table of the nearby

area is 44.46 m bgl and surface level is

320m RL so mining activity will not

intersect the groundwater table.

Assurance regarding adequate

compensation was made by the Project

Proponent.

Fund Allocation

Adequate compensation will be given if

there is loss to any nearby houses.

11 Smt. Reshmi

Village- Rasulpur

Our children play outside

our houses and due to

blasting our children may

get injured and our houses

may be damaged. Who will

compensate for that

The effect of vibration will be

within the mining lease due to

controlled blasting. Department

of Explosive will inspect the site

of the mining lease and then

only give permission for

blasting. Blasting will be carried

Control blasting as per the Mining Scheme

will be done with proper charge of

explosives to minimize noise during blasting.

Blasting will be carried out in a controlled

manner under the supervision of highly

trained staff and blasting timing will be

decided with the consent of villagers. There

Page 35: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 196(Chapter-6)

out in a controlled manner

under the supervision of highly

trained staff and blasting timing

will be decided with the

consent of villagers. There will

be no damage to any property

or human life.

will be no damage to any property or human

life. The details of mitigation measures to

reduce the impact due to blasting are

incorporated in Chapter IV, Section 4.3.1 of

the final EIA/EMP Report.

1. Blasting shall not be permitted within

100 m of surface structures.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

will be ensured.

6. Direction of the hole will be maintained

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

Page 36: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 197(Chapter-6)

12 Sh. Jagdish

Village- Raghunathpura

My house is situated near

to mining lease and my

house was earlier damaged

due to mining activity and

the previous company has

not given any

compensation, this should

not happen now

Present mining lease holder will

respect the commitment

regarding compensation for the

houses if any damages due to

our mining activity.

Assurance regarding adequate

compensation was made by the Project

Proponent.

Fund Allocation

An adequate amount of compensation will

be paid in case of any damage to land/ crops

due to the mining activity.

13 Sh. Deep Chand Soni

Nagar Parshad, Ward

no-21

How you will get 12 KLD of

water for drinking and

mining activity, please

specify the source.

We will purchase water from

the tube wells of the nearby

villages and two tankers of

6KLD each will be used for

plantation & dust suppression

and will provide RO/ Filter

water to the labour for drinking

purpose.

Water will be brought by tankers from the

nearby villages. Labours will be provided

filtered water for drinking purpose.

14 Sh. Rohtash

Village- Raghunathpura

Company will give

compensation to the

nearby land holders but

will they also give

compensation to the

We have carried out studies

regarding geography of the area

and we will provide all the

necessary APCM to control the

pollution and will compensate if

Adequate pollution control measures will be

adopted to ensure pollution level within

prescribed limits.

Fund Allocation

Page 37: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 198(Chapter-6)

villagers whose land is

away from the mining

lease. as earlier company

did not pay any

compensation for the

damage caused due to

mining activity.

any damage is done to

crops/houses. As earlier no

public hearing was conducted,

hence no commitment was

made by the earlier project

proponent. We assure you that

all commitments made in this

public hearing will be respected

in true spirit.

An amount of Rs. 15.4 Lakhs has been

earmarked as capital cost for

implementation of Environment

management plan along with annual

recurring cost of Rs. 10.87 Lakhs/ annum.

Adequate compensation will be paid by the

PP to the damage caused to any crops/ land

as agreed during the public hearing.

15 Sh. Rohtash

Village- Raghunathpura

There was a lot of noise

and vibration due to

blasting done by the earlier

company and no

compensation was given.

How the present company

will give compensation for

damage due to mining

activity, we want written

assurance.

We will give compensation for

damage caused to houses. if any

in advance every year. We have

provided Rs 9.24 Lakh for

Corporate Social responsibility.

Control blasting as per the Mining Scheme

will be done with proper charge of

explosives to minimize noise during

blasting. The details of mitigation measures

to reduce the impact due to blasting are

incorporated in Chapter IV, Section 4.3.1 of

the final EIA/EMP Report.

1. Blasting shall not be permitted within

100 m of surface structures.

2. PPV at a distance of 100 m from the shot

hole shall not exceed 10mm/sec.

3. The flying fragments shall not project

Page 38: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 199(Chapter-6)

beyond the distance of 3 m.

4. Proper spacing & burden will be

maintained.

5. Optimum utilization of the explosives

will be ensured.

6. Direction of the hole will be maintained

towards free face.

7. Electric delay detonator will be used.

8. Deck charging will be practiced for

required fragmentation.

Proper measures will be adopted to

minimize noise pollution and prevention of

fly rocks.

Fund Allocation

Adequate compensation will be given if

there is loss to any nearby houses.

16 Sh. Atul Kumar Divedi

Deputy Commissioner,

Maendergarh

The money provided for

social economic

responsibility Rs 9.24 Lakh

is very less, you should

We will raise this amount to Rs

20 Lakh for Corporate Social

responsibility.

An amount of Rs. 20 Lakh has been

earmarked for CSR activities.

Fund Allocation

An amount of Rs. 20 Lakhs has been

Page 39: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 200(Chapter-6)

increase the same. allocated for the CSR activities.

17 Sh. Deep Chand Soni

Nagar Parshad, Ward

no-21

We advise the project

proponent to get the

survey of all houses done

before mining activities is

carried out, so that there is

no dispute later on

regarding quantum of

damage to houses due to

mining activity and

employment to local

people should be given.

Project proponent replied that

we will carry out the survey of

the houses of nearby mining

lease and as earlier told we will

give compensation for damage

to houses if any. We will give

preference to local people for

employment.

A detailed Socio Economic Survey was

carried out and is incorporated in Chapter III

in section 3.12 of the Final EIA/EMP Report.

The mining activity will require 130. Nos. of

manpower `and locals will be preferred.

18 Sh. Sunder

DFO, Mahendergarh

Khasra no 387 is

surrounded by Aravali

plantation and project

proponent will have to

take permission from

Government of India for

RO, HSPCB, Dharuhera replied

that siting norms are decided

by the Government of Haryana

and not by HSPCB, Forest

Department can raise the issue

of siting norms for mining with

Page 40: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 201(Chapter-6)

the road passing through

the Aravali plantation.

Environmental department

should set up criteria for

mining activity as already

existing in case of stone

crushers.

There are number of

Chitals existing in village

Rasulpur and due to this

mining activity their

existence will be disturbed.

This area is covered under

general section-4 and

project proponent will

have to take permission

from Forest department &

Government of India.

Govt of Haryana.

Consultant of the project

proponent replied that we will

take necessary permission if the

area is covered under General

Section-4.

RO, HSPCB, Dharuhera asked

the project proponent to take

permission from the competent

authority for the road passing

through Aravali plantation.

Project proponent replied

that We will take the necessary

permission from the competent

authority if our road passes

through Aravali plantation.

RO, HSPCB asked the project

proponent to provide 2000

plants per year.

Project proponent agreed to do

the same.

There is no proposal of road that passes

through Aravali plantation.

Page 41: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 202(Chapter-6)

2000 plants per year will be planted. A

detailed plantation plan is incorporated in

Chapter VIII, Section 8.7.2.2 and Page no… of

the Final EIA/EMP Report.

Fund Allocation

An amount of Rs. 0.30 Lakhs (30,000

thousand) is allocated for green belt

development.

19 Sh. Atul Kumar Divedi,

Deputy Commissioner,

Mahendergarh

Project Proponent should

give Telephone No. and

name of the contact person

so that people of the village

can contact in case of any

emergency and they

should also adopt this

village and also provide

and operate all the

necessary APCM required.

We will provide all required

APCM, will adopt this village

and Name of the contact person

Sh. Iqbal and his Telephone No.

is 9911565555.

10 Conclusion The public hearing held smoothly and ended with a vote of thanks to the chair.

Page 42: Final EIA/EMP Report of Narnaul Stone along with ...environmentclearance.nic.in/writereaddata/Public Hearing... · Final EIA/EMP Report of Narnaul Stone along with associated minor

Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.

Vardan Environet, Gurgaon Page 203(Chapter-6)