Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 162(Chapter-6)
6. ADDITIONAL STUDIES
6.0 INTRODUCTION
Mining are associated with several potential hazards that effect to the employee and environment.
It would normally require the assistance of emergency services to handle it effectively. The mining
operation shall be taken out under the well management & control by the qualified mine manager.
Similarly Stone Along with Associated Minerals mines also have impending dangers or risk which
need be addressed for which a disaster management plan has been formulated with an aim of
taking precautionary steps to avert disasters and also to take such action after the disaster which
limits the damage to the minimum.
Nevertheless, the following natural/industrial problems may be encountered during the mining
operation.
1. Inundation- filling of the mine pit due to excessive rains.
2. Slope failures at the mine faces.
6.1 Public Hearing
Public hearing is very significant part of the process of public participation envisaged under the
guidelines issued by MoEF, Government of India. It facilitates involvement of all the stake holders of
the project which is essential for ensuring smooth running of project and benefitting all sections of
society in the process of economic development of the region.
The public hearing of stone mining project viz. “Mining of Minor Mineral in the Mines of “Narnaul”
with production capacity of 4.0 Million Tonnes Per Annum of stone (ROM) of M/s. A.N.E. Industries
Pvt. Ltd at Tehsil Narnaul, District Mahendragarh, Hayana” was conducted on 15-09-2014 at 3:30
pm. The details are appended herewith:
6.1.1 Public Hearing Advertisement
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 163(Chapter-6)
Dainik Tribune, Dated : 13.8.2014 Times of India Dated : 15.8.2014
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 164(Chapter-6)
Amar Ujala, Delhi, Dated : 13.8.2014
Amar Ujala, Chandigarh, Dated : 13.8.2014
6.1.2 Banner of Public Hearing
6.1.2Photographs of Public Hearing
Members of SPCB, Haryana for Public
Hearing
PP along with consultant giving the
presentation
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 165(Chapter-6)
Questions raised by the Public
Replies given by Project
Proponent/Consultant
Local Public present for Public Hearing
6.1.3 Minutes of Public Hearing
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 166(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 167(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 168(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 169(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 170(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 171(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 172(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 173(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 174(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 175(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 176(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 177(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 178(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 179(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 180(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 181(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 182(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 183(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 184(Chapter-6)
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 185(Chapter-6)
Table 6.1: Questions Raised by Public in Public Hearing held on 15-09-2014 and Reply by
ADM/Project Proponent /Environment Consultant
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 186(Chapter-6)
S N Detail of Villagers Question Raised Reply given by PP/
Consultant
Action Plan by the Project Proponent
1 Sh. Devkaran Chauhan,
Nagar Parshad,
Village- Raghunathpura
Who will check pollution
measures provided on the
mining?
Project proponent will provide
APCM to suppress air emission
and HSPCB will check the APCM
and will collect the sample of
air emission and if sample fails
the HSPCB will take action as
per Environmental Laws.
He further added that anybody
can give their objection,
suggestion, comments in this
public hearing and if the unit is
found causing pollution after
commissioning public can make
complaint or give any
suggestion in Regional Office,
HSPCB, Dharuhera against the
mining unit at any time.
Adequate pollution control measures will be
adopted to ensure pollution level within
prescribed limits.
Also Half yearly Compliance Report will be
submitted to MoEF after collecting the data
and will ensure that all the parameters will
be within limit and report will be supplied
to HSPCB to comply the conditions of EC.
Fund Allocation
An amount of Rs. 15.4 Lakhs has been
earmarked as capital cost for
implementation of Environment
management plan along with annual
recurring cost of Rs. 10.87 Lakhs/ annum.
2 Sh. Devender Soni,
Nagar Parshad, Ward
No-11
All APCM should be
provided on mining and
people should not suffer
We will provide all APCM as
mentioned by our consultant in
draft EIA and will control the
Blasting will be conducted as per the
approved Mining Scheme as well as DGMS
guidelines. The people in the nearby areas
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 187(Chapter-6)
due to vibration, air
pollution and noise
pollution.
Local people should be
preferred for employment.
We welcome such project
in our village as it will
uplift the socio economic
conditions of the villagers.
pollution accordingly.We will
do blasting in a scientific and
controlled manner and will give
employment to local people on
priority.
will not suffer due to vibrations, air and
noise pollutions due to proper mitigation
measures proposed by the PP.
The details of mitigation measures to reduce
the impact of vibrations, air pollution and
noise pollution are incorporated in Chapter
IV of the Final EIA/EMP Report.
The calculated PPV is 24.23 mm/sec which
is within the permissible limit as per DGMS
circular 7 of 1997.
Following measures will be taken to
minimize the vibration:
1. Blasting shall not be permitted within
100 m of surface structures.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 188(Chapter-6)
will be ensured.
6. Direction of the hole will be maintained
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
The total manpower required for the
proposed mining project will be 130
persons.
The company will prefer locals on priority
for providing employment opportunities.
3 Sh. Ram Kumar
Village-Raghunathpura
I am residing near the
mining lease for the last 40
years and the mining
process will damage our
houses and crops and it is
not possible for us to
construct new house in
some other place. Deputy
Commissioner Sh Atul
Kumar Divedi asked the
We will do control blasting. If
any house of the nearby villager
is damaged due to mining
activity, we will compensate for
that and we are ready to sign
the written agreement for
compensation with the villagers
for damage done to their houses
and crops if any.
Blasting will be conducted as per the
approved Mining Scheme as well as DGMS
guidelines and there will be no damage to
nearby houses.
The details of mitigation measures to reduce
the impact due to blasting and control of fly
rocks are incorporated in Chapter IV,
Section 4.3.1 and 4.13.23.1 respectively of
the final EIA/EMP Report.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 189(Chapter-6)
project proponent to give
reply to the question asked
by the villager.
Following measures will be taken to
minimize the vibration:
1. Blasting shall not be permitted within
100 m of surface structures.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
will be ensured.
6. Direction of the hole will be maintained
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
Fund Allocation
Along with this adequate compensation will
be given if there is damage to any nearby
houses.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 190(Chapter-6)
4 Sh. Ram Kumar, Village-
Raghunathpura
Due to blasting our homes
will be damaged
As already told we will do
control blasting and will
compensate if houses are
damaged.
Blasting will be conducted as per the
approved Mining Scheme as well as DGMS
guidelines and there will be no damage to
nearby houses.
Also, Ear plugs will be provided to the
persons working in the mining area.
The details of mitigation measures to
reduce the impact due to blasting are
incorporated in Chapter IV, Section 4.3.1 of
the final EIA/EMP Report.
1. Blasting shall not be permitted within
100 m of surface structures.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
will be ensured.
6. Direction of the hole will be maintained
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 191(Chapter-6)
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
Fund Allocation
Along with this, adequate compensation will
be given if there is damage to any nearby
houses.
5 Sh. Surender Kumar
Village.- Raghunathpura
Company does not respect
their commitment and do
not sprinkle water on
roads and earlier company
has not paid any
compensation/ rent of my
land leased to them and
overburden/ boulders are
still lying on my land.
We will respect our
commitment regarding
compensation of damage to any
house.
For the purpose of dust control, wet drilling
will be carried out.
Water sprinkling will be done on the roads
and unpaved roads.
There will be no overburden due to the
proposed mining project and hence, no
overburden will be deposited on the nearby
land.
6 Sh. Ashok Kumar
Village- Raghunathpura
I want to know from
Deputy Commissioner that
who has put marking flags
on my land.
Deputy Commissioner replied
that the mining department or
contractor might have put these
flags and they will reply your
Proper demarcation of mine lease will be
done by Revenue Department and Mining
Department will install pillars.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 192(Chapter-6)
question.
Project proponent replied that
we will check the alignment of
the lease and correct it
accordingly. The mining officer
replied that before starting the
mining activity proper
demarcation of the mine lease
will be done by revenue
department and mining
department will install pillars.
The same is incorporated in Chapter 2,
Section 2.1.2 and Page No…. of the Final
EIA/EMP Report.
7 Sh. Ashok Kumar
Village- Raghunathpura
How project proponent
will ensure that during
blasting no stone lands in
our field
Mining Engineer replied that
department of explosive will
carry out the survey and will
give permission accordingly for
blasting, so chances of stones
damaging their houses or fields
are very remote. The project
proponent also replied that we
will carry out controlled
blasting and we will put nets
and sand bags before blasting to
Control blasting as per the Mining Scheme
will be done with proper charge of
explosives to minimize noise during blasting
and no stone will land in the land of Shri
Ashok Kumar. The details of mitigation
measures to reduce the impact due to
blasting are incorporated in Chapter IV,
Section 4.3.1 of the final EIA/EMP Report.
1. Blasting shall not be permitted within
100 m of surface structures.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 193(Chapter-6)
ensure that no stone lands on
their houses or fields.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
will be ensured.
6. Direction of the hole will be maintained
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
Proper measures will be adopted to prevent
fly rocks, so that no stone lands in the
nearby fields and houses. The details to
prevent Fly rocks are incorporated in
Chapter IV, Section 4.13.23.1 of the Final
EIA/EMP Report.
8 Sh. Deep Chand Soni
Nagar Parshad, Ward
no-21
Houses of the villagers will
be damaged due to
vibration during blasting
We will make a written
agreement with the villagers
and make a committee of local
Proper safety measures will be adopted to
minimize the adverse effects due to mining.
Also adequate compensation in case of any
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 194(Chapter-6)
and who will pay the
compensation and we
want a written assurance
from the company and we
want role of
administration in this
regard.
peoples suggested by the
villagers for the compensation
of houses and crops damaged
due to mining activity. The
effect of vibration will be within
the mining lease as control
blasting will be done.
RO Dharuhera replied that
agreement for damage of
houses and crops will be
between project proponent and
villagers. However they can
contact HSPCB in case of any
complaint regarding pollution
due to mining activity.
damage will be paid by the PP to the
villagers.
A written agreement will be made between
the PP and the villagers regarding the
compensation of houses and crops damaged
due to mining activity.
Fund Allocation
Adequate compensation will be given if
there is damage to any nearby houses.
9 Sh. Deep Chand Soni
Nagar Parshad, Ward
no-21
Project proponent should
deposit Rupees 30
thousand per acre in the
bank as compensation
amount of damage of
crops/land.
We are ready to pay suitable
compensation for one year in
advance for damage of
land/crop due to mining
activity.
Assurance regarding adequate
compensation was made by the Project
Proponent.
Fund Allocation
Adequate compensation will be given if
there is damage to any nearby houses.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 195(Chapter-6)
10 Sh. Karamveer Halwai
Village-Narnaul
Site is 8 km. from the city
and due to earlier mining
activity houses were
damaged and our wells
went dry and the earlier
company gave
compensation of only one
year and ran away with
their machinery.
We cannot comment on the
earlier mine lease holder,
however we assure you to give
suitable compensation if houses
are damaged due to our mining
activity.
The mining activity will not intersect with
the ground water table.
Ultimate pit of mine will be 325 m RL
(ultimate dept of mine 117m) while
general groundwater table of the nearby
area is 44.46 m bgl and surface level is
320m RL so mining activity will not
intersect the groundwater table.
Assurance regarding adequate
compensation was made by the Project
Proponent.
Fund Allocation
Adequate compensation will be given if
there is loss to any nearby houses.
11 Smt. Reshmi
Village- Rasulpur
Our children play outside
our houses and due to
blasting our children may
get injured and our houses
may be damaged. Who will
compensate for that
The effect of vibration will be
within the mining lease due to
controlled blasting. Department
of Explosive will inspect the site
of the mining lease and then
only give permission for
blasting. Blasting will be carried
Control blasting as per the Mining Scheme
will be done with proper charge of
explosives to minimize noise during blasting.
Blasting will be carried out in a controlled
manner under the supervision of highly
trained staff and blasting timing will be
decided with the consent of villagers. There
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 196(Chapter-6)
out in a controlled manner
under the supervision of highly
trained staff and blasting timing
will be decided with the
consent of villagers. There will
be no damage to any property
or human life.
will be no damage to any property or human
life. The details of mitigation measures to
reduce the impact due to blasting are
incorporated in Chapter IV, Section 4.3.1 of
the final EIA/EMP Report.
1. Blasting shall not be permitted within
100 m of surface structures.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
will be ensured.
6. Direction of the hole will be maintained
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 197(Chapter-6)
12 Sh. Jagdish
Village- Raghunathpura
My house is situated near
to mining lease and my
house was earlier damaged
due to mining activity and
the previous company has
not given any
compensation, this should
not happen now
Present mining lease holder will
respect the commitment
regarding compensation for the
houses if any damages due to
our mining activity.
Assurance regarding adequate
compensation was made by the Project
Proponent.
Fund Allocation
An adequate amount of compensation will
be paid in case of any damage to land/ crops
due to the mining activity.
13 Sh. Deep Chand Soni
Nagar Parshad, Ward
no-21
How you will get 12 KLD of
water for drinking and
mining activity, please
specify the source.
We will purchase water from
the tube wells of the nearby
villages and two tankers of
6KLD each will be used for
plantation & dust suppression
and will provide RO/ Filter
water to the labour for drinking
purpose.
Water will be brought by tankers from the
nearby villages. Labours will be provided
filtered water for drinking purpose.
14 Sh. Rohtash
Village- Raghunathpura
Company will give
compensation to the
nearby land holders but
will they also give
compensation to the
We have carried out studies
regarding geography of the area
and we will provide all the
necessary APCM to control the
pollution and will compensate if
Adequate pollution control measures will be
adopted to ensure pollution level within
prescribed limits.
Fund Allocation
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 198(Chapter-6)
villagers whose land is
away from the mining
lease. as earlier company
did not pay any
compensation for the
damage caused due to
mining activity.
any damage is done to
crops/houses. As earlier no
public hearing was conducted,
hence no commitment was
made by the earlier project
proponent. We assure you that
all commitments made in this
public hearing will be respected
in true spirit.
An amount of Rs. 15.4 Lakhs has been
earmarked as capital cost for
implementation of Environment
management plan along with annual
recurring cost of Rs. 10.87 Lakhs/ annum.
Adequate compensation will be paid by the
PP to the damage caused to any crops/ land
as agreed during the public hearing.
15 Sh. Rohtash
Village- Raghunathpura
There was a lot of noise
and vibration due to
blasting done by the earlier
company and no
compensation was given.
How the present company
will give compensation for
damage due to mining
activity, we want written
assurance.
We will give compensation for
damage caused to houses. if any
in advance every year. We have
provided Rs 9.24 Lakh for
Corporate Social responsibility.
Control blasting as per the Mining Scheme
will be done with proper charge of
explosives to minimize noise during
blasting. The details of mitigation measures
to reduce the impact due to blasting are
incorporated in Chapter IV, Section 4.3.1 of
the final EIA/EMP Report.
1. Blasting shall not be permitted within
100 m of surface structures.
2. PPV at a distance of 100 m from the shot
hole shall not exceed 10mm/sec.
3. The flying fragments shall not project
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 199(Chapter-6)
beyond the distance of 3 m.
4. Proper spacing & burden will be
maintained.
5. Optimum utilization of the explosives
will be ensured.
6. Direction of the hole will be maintained
towards free face.
7. Electric delay detonator will be used.
8. Deck charging will be practiced for
required fragmentation.
Proper measures will be adopted to
minimize noise pollution and prevention of
fly rocks.
Fund Allocation
Adequate compensation will be given if
there is loss to any nearby houses.
16 Sh. Atul Kumar Divedi
Deputy Commissioner,
Maendergarh
The money provided for
social economic
responsibility Rs 9.24 Lakh
is very less, you should
We will raise this amount to Rs
20 Lakh for Corporate Social
responsibility.
An amount of Rs. 20 Lakh has been
earmarked for CSR activities.
Fund Allocation
An amount of Rs. 20 Lakhs has been
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 200(Chapter-6)
increase the same. allocated for the CSR activities.
17 Sh. Deep Chand Soni
Nagar Parshad, Ward
no-21
We advise the project
proponent to get the
survey of all houses done
before mining activities is
carried out, so that there is
no dispute later on
regarding quantum of
damage to houses due to
mining activity and
employment to local
people should be given.
Project proponent replied that
we will carry out the survey of
the houses of nearby mining
lease and as earlier told we will
give compensation for damage
to houses if any. We will give
preference to local people for
employment.
A detailed Socio Economic Survey was
carried out and is incorporated in Chapter III
in section 3.12 of the Final EIA/EMP Report.
The mining activity will require 130. Nos. of
manpower `and locals will be preferred.
18 Sh. Sunder
DFO, Mahendergarh
Khasra no 387 is
surrounded by Aravali
plantation and project
proponent will have to
take permission from
Government of India for
RO, HSPCB, Dharuhera replied
that siting norms are decided
by the Government of Haryana
and not by HSPCB, Forest
Department can raise the issue
of siting norms for mining with
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 201(Chapter-6)
the road passing through
the Aravali plantation.
Environmental department
should set up criteria for
mining activity as already
existing in case of stone
crushers.
There are number of
Chitals existing in village
Rasulpur and due to this
mining activity their
existence will be disturbed.
This area is covered under
general section-4 and
project proponent will
have to take permission
from Forest department &
Government of India.
Govt of Haryana.
Consultant of the project
proponent replied that we will
take necessary permission if the
area is covered under General
Section-4.
RO, HSPCB, Dharuhera asked
the project proponent to take
permission from the competent
authority for the road passing
through Aravali plantation.
Project proponent replied
that We will take the necessary
permission from the competent
authority if our road passes
through Aravali plantation.
RO, HSPCB asked the project
proponent to provide 2000
plants per year.
Project proponent agreed to do
the same.
There is no proposal of road that passes
through Aravali plantation.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 202(Chapter-6)
2000 plants per year will be planted. A
detailed plantation plan is incorporated in
Chapter VIII, Section 8.7.2.2 and Page no… of
the Final EIA/EMP Report.
Fund Allocation
An amount of Rs. 0.30 Lakhs (30,000
thousand) is allocated for green belt
development.
19 Sh. Atul Kumar Divedi,
Deputy Commissioner,
Mahendergarh
Project Proponent should
give Telephone No. and
name of the contact person
so that people of the village
can contact in case of any
emergency and they
should also adopt this
village and also provide
and operate all the
necessary APCM required.
We will provide all required
APCM, will adopt this village
and Name of the contact person
Sh. Iqbal and his Telephone No.
is 9911565555.
10 Conclusion The public hearing held smoothly and ended with a vote of thanks to the chair.
Final EIA/EMP Report of Narnaul Stone along with associated minor minerals mine of M/s. A.N.E. Industries Pvt. Ltd.
Vardan Environet, Gurgaon Page 203(Chapter-6)