  FILMING SCHEDULE [X PRODUCTION] Production Contact Numbers Director, Producer, Camera operator and Mic Operator  Aima 07950795713 Rohima 07952338582 Thahmina 07852176962 Useful Contact Numbers Luke Williams [email protected] rhamlets.sch.uk Callum Macintosh cmacintosh@ce ntral.towerhamlets.sc h.uk Technical Requirements and Equipment Tripod Standard lens 2 x radio mics Boom GoPro Camera Lighting equipment Canon Camera Panasonic Camera IMPORTANT INFORMATION Warm Clothing Gloves Food Props Masks Teacher note  Journal Earphones

Filming Schedule

Embed Size (px)

Citation preview

FILMING SCHEDULE[X PRODUCTION]

Production Contact Numbers

Director, Producer, Camera operator and Mic Operator Aima 07950795713Rohima07952338582Thahmina07852176962

Useful Contact Numbers

Luke [email protected] [email protected]

Technical Requirements and Equipment

TripodStandard lens2 x radio micsBoomGoPro CameraLighting equipmentCanon CameraPanasonic Camera

IMPORTANT INFORMATION

Warm ClothingGlovesFood

Props

MasksTeacher noteJournalEarphones

Health and Safety

LOCAL POLICE STATION:Bethnal Green Police Station12 Victoria Park Square Tower Hamlets E2 9NZNumber: 101

LOCAL HOSPITAL A&E:Royal London HospitalWhitechapel RoadLondonE1 1BBNumber: 020 7377 7000

First Aid Kit will be taken

RISK ASSESSMENT:

HazardWho might be harmed and how?How will I prevent it from happening

Crossing over roads to get to places.Both directors and cast could drop equipment and cause havoc on the roads.We will make sure to pay attention to traffic lights and when crossing roads, we will look carefully before crossing. Also, we could try to just stay on one side of the pavement rather than crossing over to other sides.

Inside the Aspire building and on the rooftop.In this situation, the main actor and the director may be harmed because of anything that may be lying about whilst shooting.In this case, we will make sure that there is nothing laying around the place such as bags so we are working in a clear and organised setting.

The public - ParkIt could harm the public in case there is any equipment laying around on the floor, which wouldnt be professional.To prevent this we will make sure to keep out belongings organised and out of the way to ensure that the public are not affected by anything.

PropsWe could be harmed by things that are lying around for instance we could trip over the fog machine in Scene 1.We will make sure that all props are shown to the cast, to make it clear that it is there in order for no one to trip over anything.

Locations - ChurchIn this location, we could get hurt by anything that the church has left for example if the chairs are left lying around in a disoriented position, one of us could trip over it.To prevent this, we will go to all locations beforehand in order to clear the space so that nothing is in the way. But we will ask for permission to do this, and put things back if needed.

The weatherIf the weather is extremely bad such as extreme winds and heavy rain it will be hard to produce anything and to control equipment.In order to prevent this, we will make sure we take a weather check before leaving and pack umbrellas etc. so that we are prepared for it.

FILMING SCHEDULE

WEDNESDAY 3RD DECEMBER 2014:

TIME:LOCATION:ACTION:

4:00pmS1: Tower Hamlets GraveyardMeet actors - Mizannur

4:00 4:15pmS1: Tower Hamlets GraveyardSet up equipment and plan positioning of actors

4:15 5:00pmS1: Tower Hamlets GraveyardFILM

5:00 5:10pmS1: Tower Hamlets GraveyardBreak

5:10 5:30pmS1: Tower Hamlets GraveyardGo over footage and check whether to record again.

5:30pmDEPARTDEPART

SATURDAY 6TH DECEMBER 2014:

TIME:LOCATION:ACTION:

11:00amS3: CFGS Sixth FormMeet actors Mizannur, Faizur

11:00 11:15amS3: CFGS Sixth FormSet up equipment and plan positioning of actors

11:15 1:00pmS3: CFGS Girls School BasementFILM

1:00 1:30pmS3: CFGS Girls SchoolGo over footage and check whether to record again

1:30pmDEPARTDEPART

SATURDAY 13TH DECEMBER 2014:

TIME:LOCATION:ACTION:

12:00pmS1: CFGS Sixth FormMeet actors Mizannur, Faizur

12:00 12:15pmS1: CFGS Sixth FormSet up equipment and plan positioning of actors

12:15 1:00pmS1: CFGS Sixth Form RooftopFILM

1:00 1:10pmS2: CFGS Girls SchoolMove to A Block and set up equipment

1:10 3:00pmS2: CFGS Girls School FILM

3:00 3:30pmS5: Victoria ParkTravel to next location (Church)

3:30 5:00pmS5: Victoria ParkFILM

5:00 5:30pmS5: Victoria ParkGo over footage and check whether to record again.

5:30pmDEPARTDEPART

SATURDAY 10TH JANURARY 2015:

TIME:LOCATION:ACTION:

11:30amS6: Victoria ParkMeet actors Mizannur, Faizur

11:30 11:45pmS6: Victoria ParkSet up equipment and plan positioning of actors

11:45 1:00pmS6: Victoria ParkFILM

1:00 1:30pmS6: Victoria ParkGo over footage and check whether to record again.

1:30 2:00pmVictoria Park to ChurchTravel to next location (Church)

2:00 2:30pmS4: Bethnal Green Simple Gifts ChurchSet up equipment and plan positioning of actors.

2:30 4:00pmS4: Bethnal Green Simple Gifts ChurchFILM

4:00 4:30pmS4: Bethnal Green Simple Gifts ChurchGo over footage and check whether to record again.

4:30pmDEPARTDEPART

SATURDAY 17TH JANURARY 2015:

TIME:LOCATION:ACTION:

12:00pmS7: CFGS Sixth FormMeet actors Mizannur, Faizur

12:00 12:10pmS7: CFGS Sixth Form LibrarySet up equipment and plan positioning of actors.

12:10 2:00pmS7: CFGS Sixth Form LibraryFILM

2:00 2:10pmS8: CFGS Sixth Form Media RoomSet up equipment and plan positioning of actors.

2:10 4:00pmS8: CFGS Sixth Form Media RoomFILM

4:00 4:10pmS9: Outside CFGS Sixth Form Set up equipment and plan positioning of actors.

4:10 5:00pmS9: Outside CFGS Sixth FormFILM

5:00 5:30pmS9: CFGS Sixth FormGo over footage and check whether to record again.

5:30pmDEPARTDEPART