37
FIGURE 16-1 Pathways for contamination.

FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

Embed Size (px)

Citation preview

Page 1: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-1

Pathways for contamination.

Page 2: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-2

Circumferential cutoff wall.

Page 3: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-3

Upgradient vertical barrier.

Page 4: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-4

Down-gradient vertical barrier.

Page 5: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-5

Embedment of vertical barrier walls.

Page 6: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-6

Soil-bentonite slurry trench cutoff wall construction schematic.

Page 7: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-7

Slurry trench excavation.

Page 8: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-8

Soil-bentonite backfill permeability

test results.

Page 9: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-9

Soil-bentonite backfill hydraulic conductivity.

Page 10: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-10

Grain size distribution for soil-bentonite backfill.

Page 11: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-11

Cement-bentonite permeability test results.

Page 12: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-12

Schematic of diaphragm slurry trench cutoff wall construction.

Page 13: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-13

Vibrated-beam cutoff wall.

Page 14: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-14

DSM augers used to construct a vertical barrier.

Page 15: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-15

Deep soil-mixed cutoff wall.

Page 16: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-16

Composite cutoff wall.

Page 17: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-17

Grouting of rock fractures.

Page 18: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-18

Potential defects in soil-bentonite slurry trench

cutoff walls.

Page 19: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-19

Block displacement technique.

Page 20: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-20

Pump-and-treat performance data for Chem-Dyne Site,

Page 21: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-21

Single extraction well capture zone (not drawn to scale).

Page 22: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-22

Single extraction well capture zone (not drawn to scale).

Page 23: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-23

Partially penetrating single extraction well capture zone (not drawn to scale).

Page 24: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-24

Schematic of air sparging.

Page 25: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-25

NoVOCs well construction.

Page 26: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-26

Section of containment system at Love Canal.

Page 27: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-27

Biopolymer slurry trench.

Page 28: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-28

Schematic of SVE system.

Page 29: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-29

Schematic of soil/soil vapor model.

Page 30: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-30

An SVE system under construction.

Page 31: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-31

Effect of distance from vapor extraction well.

Page 32: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-32

Twin Cities Army ammunition plant ratio of withdrawal rate versus vacuum head.

Page 33: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-33

Twin Cities army ammunition plant vapor pressure drop versus distance.

Page 34: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-34

Effective radius of vacuum-influenced normalized pilot-test vacuum data plot.

Page 35: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-35

Trailer-mounted soil vapor extraction unit.

Page 36: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-36

Plume management for single extraction well, treatment wall curtain, and funnel-and-gate systems.

Page 37: FIGURE 16-1 Pathways for contamination.. FIGURE 16-2 Circumferential cutoff wall

FIGURE 16-37

Funnel and gate system configurations.