23
JULY 7, 2016 FCPS BUS FACILITY FEASIBILITY STUDY

FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

Embed Size (px)

Citation preview

Page 1: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

J U LY 7 , 2 0 1 6

F C P S B U S FA C I L I T Y F E A S I B I L I T Y S T U DY

Page 2: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

AGENDA

• Welcome and introductions

• Updates on Phase 1 BOE Presentation on July 13

• Overview of Phase 2

• Discuss opportunities for stakeholder outreach

• Develop rubric for evaluation of candidate sites

• Next steps

Page 3: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

W E L C O M E A N D I N T R O D U C T I O N S

Page 4: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

PROJECT TEAM

• Holly Nelson, Facilities Planner (Project

Manager)

• Tom Buckley, Transportation Manager

• Mark Maggitti, Fleet Manager

• Brad Ahalt, Senior Project Manager

(Construction)

• Heather Clabaugh, Construction

Accountant

• Amanda Rhoderick, Route Surveyor

• Tiana Haile, Community Engagement

Coordinator

• Beth Pasierb, Supervisor of Facilities

Planning

• Ruth Biser, Secretary (Facilities Planning)

• Steve Bolling, Bus Driver

• Todd Eudy, Bus Driver

Page 5: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

U P D A T E S O N P H A S E 1 B O E P R E S E N T A T I O NJ U LY 1 3 , 2 0 1 6 , 2 P M

Page 6: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

PHASE 1 BOE PRESENTATION

• Scheduled for 2 PM on July 13

– We are one of the first agenda items

– Time could be pushed back a little bit if there is a closed session

• 15 minute presentation

• Informational item only but we may get some feedback on directions to take in the second and

third phase of the project

Page 7: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

O V E R V I E W O F P H A S E 2 –F E A S I B I L I T Y P H A S EJ U LY – D E C E M B E R 2 0 1 6

Page 8: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

FEASIBILITY PHASE

• Goal: evaluate the feasibility of potential bus facility locations against the priorities we identified

in the first phase of the study

• Priorities

– Efficiency and Cost Effectiveness

– Stewardship of Resources

– Security

– Health and Safety

Page 9: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

PHASE 2 AND 3 SCHEDULE

Phase Project Task Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17

Develop Rubric for Site

Evaluation

Investigation of Site Resources

Evaluation of Site Resources

Engineering Analysis of Top

Sites

Compile Report on Sites

Evaluated (Phase 2)

Development of Solution

Scenarios

Develop Recommendation

Compile Report on

Recommendation (Phase 3)

1, 2, 3Public/Stakeholder Input

1, 3BOE Meetings

2

3

Page 10: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

P H A S E 2 S TA K E H O L D E R O U T R E A C H

Page 11: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

OPPORTUNITIES FOR STAKEHOLDER OUTREACH

• August in-service day for bus drivers

• Garage staff meetings

• Public involvement opportunities?

Page 12: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

D E V E L O P M E N T O F S I T E E V A L U AT I O N R U B R I C

Page 13: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

TEAM PRIORITIES

• Efficiency and cost effectiveness

• Stewardship of resources

• Security

• Health and safety

Page 14: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

FUTURE FACILITY NEEDS (2040)

*This inventory of spaces could include the existing spaces. The configuration of services will be

determined during Phase 2 of the project.

• Building spaces:

– Bus maintenance – 15 bus repair bays, 2 quick service bays, 2 support vehicle repair bays

– Parts and tire storage – more than double the existing space

– Bus wash – 1 wash bay

– Routing and dispatch

– Restrooms, showers, break rooms

– Driver training

• Current transportation facilities are 11,600 square feet – new facility needs to be

approximately 48,500 square feet

Page 15: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

FUTURE PARKING NEEDS

*This inventory of parking could include the existing parking. The configuration of services will be

determined during Phase 2 of the project.

• New facility needs to accommodate vehicles visiting the facility for service, Transportation

Department staff, visitors, and bus drivers who park at the facility

• Existing facility has only 115 real bus parking spaces and 150 vehicle spaces

• New facility needs to have at least 250 bus parking spaces and 208 vehicle spaces

Page 16: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

SUMMARY

• Approximately 13.5 acres are needed to accommodate the facility and parking needs (current

site takes up about 3.5 acres of the Hayward Road Annex parcel)

• During Phase 2 we will think about the configuration of bus services

– Some of the space and parking needs can be met at the existing facility

– Add to the existing services at Hayward Road?

– Provide services in another location?

– Opportunities for partnerships with other organizations?

Page 17: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

EFFICIENCY AND COST EFFECTIVENESS

Priority How to measure/compare sites

FCPS bus maintenance facilities will

have adequate space for vehicle

maintenance and tool storage.

Will be the same from site to site (bay size has been determined).

FCPS will have the capacity to

complete routine maintenance and

repairs in a cost-effective manner.

Must have a total of 13.5 acres.

Individual site must be at least 3.5 acres.

The FCPS bus garage will have

adequate capacity for storage of

vehicle parts.

Must have total specified in space summary.

FCPS will provide bus facilities and

services in geographically efficient

locations.

Number of students within a certain radius

Access to highways – distance to on ramps, drive time to centroid

of feeders

Number of bus routes by feeder area (with and without special

needs)

Page 18: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

STEWARDSHIP OF RESOURCES

Priority How to measure/compare sites

FCPS will provide adequate facilities

for vehicle washing to prolong the

life of the vehicles.

Would like to have wash bay at each site but if not possible, drive

time from each feeder area to the site.

FCPS strives to maintain its building

stock and evaluate facilities for

replacement on a regular basis.

Same for each site. May evaluate current facility for renovation or

replacement.

FCPS plans for facilities to operate

at an efficient capacity by

monitoring student populations and

planning for new facility capacity

where necessary.

Additional acreage for expansion in the future.

Page 19: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

SECURITY

Priority How to measure/compare sites

FCPS will minimize security risks. Ability to have a fence? Ability to have security cameras? Ability to

provide lighting?

Number of currently unsecured buses that could be secured.

FCPS will provide adequate fleet

vehicle parking.

Provide minimum acreage.

Page 20: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

HEALTH AND SAFETY

Priority How to measure/compare sites

FCPS will provide equipment to help

mechanics perform their jobs efficiently

and effectively.

No difference in sites.

FCPS will provide adequate facilities for

employee breaks.

Number of employees interested in a break room in that area.

FCPS will comply with environmental

codes and regulations.

Cost of SWPPP compliance

Page 21: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

OTHER CRITERIA

Other criteria to evaluate

Zoned appropriately, not near too much residential zoning, cost to get zoning changed

Access to large roads with capacity for additional traffic

Cost of land, cost to develop (grading, infrastructure, etc)

Cost of one site vs. multiple sites

Funding from other sources or partnership with other entities

Page 22: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

N E X T S T E P S

Page 23: FCPS BUS FACILITY FEASIBILITY STUDY · •Develop rubric for evaluation of candidate sites ... FEASIBILITY PHASE ... in the first phase of the study

NEXT STEPS

• July 13, ~ 2 PM Phase 1 BOE presentation

• July 21 – continue discussion of rubric, plan August outreach

• August 4 – begin discussion of FCPS and other sites