608 State St. South Kirkland, WA 98033 www.faira.com [email protected] +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA 94609 Thank you for your interest in this Faira Certified home. We have coordinated the efforts of certified and licensed inspection and title professionals to create the Faira Transparency Reports for this home. The Faira Transparency Reports are a detailed portfolio of information that is prepared on behalf of buyers in preparation for making an informed offer on the property. You may view more detailed information for this home and can make an offer at http://www.faira.com/listings/11680 All of the information in the Faira Transparency Reports was gathered and compiled without any bias or influence from the seller(s). In fact, these reports are materially identical had you as the buyer(s) ordered the same professionals to perform the evaluations on the same date. Nevertheless, Faira takes no obligation of the reports being complete or accurate. The buyers are recommended to conduct their own due-diligence to their satisfaction. Please contact us if you have any questions or would like more information. We’re happy you’ve chosen a Faira Certified home and look forward to the opportunity of working with you! The Faira Team

FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

608 State St. South Kirkland, WA 98033

www.faira.com

[email protected] +1.800.571.FAIR

FAIRA TRANSPARENCY REPORTS

468 60th St, Oakland, CA 94609

Thank you for your interest in this Faira Certified home. We have coordinated the efforts of certified and licensed inspection and title professionals to create the Faira Transparency Reports for this home. The Faira Transparency Reports are a detailed portfolio of information that is prepared on behalf of buyers in preparation for making an informed offer on the property.

You may view more detailed information for this home and can make an offer at

http://www.faira.com/listings/11680 All of the information in the Faira Transparency Reports was gathered and compiled without any bias or influence from the seller(s). In fact, these reports are materially identical had you as the buyer(s) ordered the same professionals to perform the evaluations on the same date. Nevertheless, Faira takes no obligation of the reports being complete or accurate. The buyers are recommended to conduct their own due-diligence to their satisfaction. Please contact us if you have any questions or would like more information. We’re happy you’ve chosen a Faira Certified home and look forward to the opportunity of working with you! The Faira Team

Page 2: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland

March 8, 2018

Home Inspection Report

Christopher Ellis

Faira Real Estate Services

Inspected by:Ordered by:

Jose Lares

HomeGuardIncorporated

608 State Street South

Kirkland, WA 98033

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 3: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Table of Contents

Report Overview 3

Structure 10

Roofing 12

Exterior 13

Electrical 15

Heating System 17

Cooling/Heat Pump System 18

Insulation/Ventilation 19

Plumbing 20

Interior 22

Photographs 25

Maintenance Advice 30

Page 2 of 31468 60th Street, Oakland

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 4: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 3 of 31468 60th Street, Oakland

Report Overview

A GENERAL DESCRIPTION OF THE STRUCTURE

This is a one story single family dwelling. Based on the information provided, the structure was built in 1922. Ongoing

maintenance is required and improvements to the systems of the home will be needed over time.

! - IMMEDIATE RECOMMENDED IMPROVEMENTS

The following is a synopsis of the potentially significant improvements that should be budgeted for over the short term.

Other significant improvements, outside the scope of this inspection, may also be necessary. Please refer to the body of

this report for further details on these and other recommendations. No relative importance should be placed on the

photographs provided in this report. The photographs in this report do not necessarily illustrate all of the damage in any

particular finding. Also, not all problem areas will be supported by photographs. If more than one photograph is available

for a particular item, additional photographs can be found at the end of the report in the section entitled 'Photographs'.

Please contact HomeGuard if you have any questions.

WEATHER CONDITIONS

Dry weather conditions prevailed at the time of the inspection.

Structure

Foundation cracking and/or movement was observed in the foundation walls in

the crawl space. The rate of movement cannot be predicted during a one-time

inspection. A thorough evaluation of this condition is beyond our qualifications.

For additional information we recommend a licensed foundation specialist be

retained. (See Photo 27)

1.

Photo 27

The wood members under the front porch and kitchen show evidence of water

damage. We recommend the services of a licensed structural pest control

operator for investigation of this condition. (See Photo 19)

2.

Photo 19

One or more girders, piers and/or post at various areas of the crawl space have

been altered and added improperly. The existing configuration indicated

improper design and/or workmanship. We recommend repair or replacement, in

accordance with present standards. It is recommended that a qualified licensed

contractor be consulted for further advice on structural improvements. (See

Photo 22) (See Photo 23)

3.

Photo 22

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 5: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 4 of 31468 60th Street, Oakland

Structure

Wood/soil contacts at the pier posts in the crawl space should be eliminated.

This condition is conducive to rot and wood boring insect activity. We

recommend a minimum clearance of six inches be maintained between the soil

and the bottom of the wood line. (See Photo 24)

4.

Photo 24

Water stains were evident in the attic. This could indicate leakage through the

roof covering. We recommend the services of a licensed roofing contractor to

further evaluate this condition. (See Photo 18)

5.

Photo 18

Exterior

The cracked and heaved section of the patio presents a trip hazard. This

condition should be corrected for improved safety. (See Photo 2)

6.

Photo 02

For safety purposes, railing(s) should be provided at the rear steps. (See

Illustration 3J) (See Photo 3)

7.

Photo 03

The window at the left and rear wall shows evidence of water damage to the

sill/jamb. We recommend the advice and services of a general contractor and/or

structural pest control company regarding repairs. (See Photo 15)

8.

Photo 15

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 6: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 5 of 31468 60th Street, Oakland

Exterior

There are metal bars on one or more of the windows which do not all open from

the inside. This is a significant safety hazard. We recommend that all window

bars be removed or modified so they can be opened from the interior in case of

an emergency. (See Photo 4)

9.

Photo 04

The cracked and heaved sections of driveway present a trip hazard. This

condition should be corrected for improved safety. (See Photo 1)

10.

Photo 01

Water damage was observed to the fascia at the rear. We recommend the

services of a licensed general contractor and/or structural pest control company.

(See Photo 7)

11.

Photo 07

Water damage was observed to the wood siding at the rear exterior walls. We

recommend the services of a licensed general contractor and/or structural pest

control company. (See Photo 5) (See Photo 6)

12.

Photo 05

The fence is in satisfactory condition, however one or more fence posts are

loose at the rear. We recommend all loose, damaged or deteriorated posts be

reinforced or replaced as necessary. (See Photo 8)

13.

Photo 08

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 7: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 6 of 31468 60th Street, Oakland

Exterior

Missing hardware was noted at the rear door. We recommend that hinges,

knobs, latches and strike plates be adjusted or replaced to restore full operation.

(See Photo 13)

14.

Photo 13

Electrical

Exposed electrical connections or open junction boxes at the crawlspace should

be corrected. All electrical connections should be made inside approved junction

boxes fitted with proper cover plates. (See Photo 21)

15.

Photo 21

The loose light fixture in the laundry room should be repaired or replaced. (See

Photo 16)

16.

Photo 16

One or more outlets at the front room and bathroom have reversed polarity, i.e.

the hot and neutral connection inside the outlet are wired backwards. These

outlets and the circuit should be investigated and corrected. Based upon our

inspection of a representative number of outlets, we recommend testing of every

outlet at a later date. Repairs or rewiring are recommended at all deficient

locations. (See Illustration 4M) (See Photo 10)

17.

Photo 10

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 8: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 7 of 31468 60th Street, Oakland

Plumbing

The plastic/cast iron waste piping is leaking at the front yard. We recommend all

leaks be repaired. (See Photo 26)

18.

Photo 26

The drain is leaking into the crawl space under the toilet. We recommend all

leaks be repaired. (See Photo 25)

19.

Photo 25

For enhanced safety, it is recommended that the loose or damaged connections

of the water heater venting system be improved. A minimum of 3 screws at each

section of the duct is recommended. (See Illustration 8M) (See Photo 14)

20.

Photo 14

The temperature and pressure relief valve for the water heater lacks a proper

discharge pipe. We recommend the installation of approved piping to an

approved location. (See Photo 17)

21.

Photo 17

Aluminum has been used for a section gas piping at the furnace. We

recommend all improper plumbing materials or methods be corrected as per

local codes. (See Photo 20)

22.

Photo 20

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 9: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 8 of 31468 60th Street, Oakland

Interior

The installation of smoke detectors where missing or removed is required for

added safety. (See Photo 9)

23.

Photo 09

Two floor thresholds at the laundry room floor is missing or improper. This

difference in floor height creates a trip hazard. We recommend a threshold be

installed at this floor transition to eliminate this condition. (See Photo 12)

24.

Photo 12

One or more interior door knobs, latches or hinge hardware is missing at the

bedroom rear door. We recommend all missing hardware be replaced to restore

full operation. (See Photo 11)

25.

Photo 11

California law requires that all homes have a State Fire Marshall approved

Carbon Monoxide Detector be installed outside of the sleeping areas in the

hallway and on each level of the home including basements. At the time of this

inspection a Carbon Monoxide Detector could not be located. We recommend

consulting with the owner to see if a Carbon Monoxide Detector exists and if not

they should be installed in all required locations. (See Photo 9)

26.

Photo 09

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 10: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 9 of 31468 60th Street, Oakland

The Scope of the InspectionAll components designated for inspection in the ASHI standards of practice are inspected, except as may be noted in the

"Limitations" section within the report. This inspection will not disclose compliance with regulatory requirements (codes,

regulation laws, ordinances, etc.)

This inspection is visual only. Only a representative sample of the building and system components was viewed. No

destructive testing or dismantling of building components was performed. The strength, adequacy, effectiveness, or

efficiency of any system or components was not determined. Not all recommended improvements will be identified in this

inspection. Unexpected repairs should still be anticipated. This inspection should not be considered a guarantee or

warranty of any kind. The purpose of our inspection is to provide a general overview of the structure reflecting the

conditions present at the time of this inspection. The inspection is performed by visual means only, reflecting only the

opinions of the inspector. Nothing in the report, and no opinion of the inspector, should be construed as advice to

purchase, or to not purchase, the property. It is the goal of this inspection to put the buyer in a better position to make a

buying decision

Our inspection does not address, and is not intended to address, the possible presence of hazardous plants or animals or

danger from known and unknown environmental pollutants such as, but not limited to, asbestos, mold, radon gas, lead,

urea formaldehyde, underground storage tanks, soil contamination and other indoor and outdoor substances, water

contamination, toxic or flammable chemicals, water or airborne related illness or disease, and all other similar or

potentially harmful substances and conditions. This property was not inspected for the presence or absence of health

related molds or fungi. We are neither qualified, authorized nor licensed to inspect for health related molds or fungi. If you

desire information about the presence or absence health related molds, you should contact the appropriate specialist. Be

aware that many materials used in building construction may potentially contain hazardous substances. Furthermore,

other environmental concerns may exist elsewhere. An environmental specialist should be contacted if additional

information is desired about these issues.

PLEASE NOTE: Important disclosure information and other inspection reports may exist. All present and prior

disclosures along with other inspection reports should be reviewed and any adverse conditions and/or concerns that may

not be mentioned in our report should be addressed prior to the close of escrow. Furthermore, there may be conditions

known by the seller that have not been disclosed to us.

PLEASE NOTE: Work performed by others will be reinspected, upon request, for a fee of $195.00 for each trip out to the

property.

Pictures are provided to assist in clarifying some of the findings made in the report. No relative importance should be

placed on these pictures. There are likely to be significant comments that do not have pictures associated with them.

Please read the report thoroughly.

Sections of this building appear to have been remodeled. We recommend consultation with the owner or local municipality

to determine whether the necessary permits were obtained, inspections performed and final signatures received.

BINDING ARBITRATION PROVISION

Any controversy or claim arising out of or relating to the inspection performed by HomeGuard Incorporated shall be settled by

final and binding arbitration filed by the aggrieved party with and administered by the American Arbitration Association (hereafter

referred to as "AAA") in accordance with its Construction Arbitration Rules in effect at the time the claim is filed. The Rules,

information and forms of the AAA may be obtained and all claims shall be filed at any office of the AAA or at Corporate

Headquarters, 335 Madison Avenue, Floor 10, New York, New York 10017-4605. Telephone: 212-716-5800, Fax: 212-716-5905,

Website: http://www.adr.org/. The arbitration of all disputes shall be decided by a neutral arbitrator, and judgment on the award

rendered by the arbitrator may be entered in any court having competent jurisdiction thereof. Any such arbitration will be

conducted in the city nearest to the property that was inspected by HomeGuard Incorporated having an AAA regional office.

Each party shall bear its own costs and expenses and an equal share of the administrative and arbitrators’ fees of arbitration.

This arbitration Agreement is made pursuant to a transaction involving interstate commerce, and shall be governed by the

Federal Arbitration Act, 9 U.S.C. Sections 1-16. THE PARTIES UNDERSTAND THAT THEY WOULD HAVE HAD A RIGHT OR

OPPORTUNITY TO LITIGATE THROUGH A COURT AND TO HAVE A JUDGE OR JURY DECIDE THEIR CASE, BUT THEY

CHOOSE TO HAVE ANY AND ALL DISPUTES DECIDED THROUGH ARBITRATION. BY SIGNING THIS AGREEMENT, THE

PARTIES ARE GIVING UP ANY RIGHT THEY MIGHT HAVE TO SUE EACH OTHER.

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 11: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 10 of 31468 60th Street, Oakland

Structure

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

Foundation cracking and/or movement was observed in the foundation walls in the crawl space. The rate of

movement cannot be predicted during a one-time inspection. A thorough evaluation of this condition is beyond our

qualifications. For additional information we recommend a licensed foundation specialist be retained. (See Photo 27)

! 1.

One or more girders, piers and/or post at various areas of the crawl space have been altered and added improperly.

The existing configuration indicated improper design and/or workmanship. We recommend repair or replacement, in

accordance with present standards. It is recommended that a qualified licensed contractor be consulted for further

advice on structural improvements. (See Photo 22) (See Photo 23)

! 2.

Wood/soil contacts at the pier posts in the crawl space should be eliminated. This condition is conducive to rot and

wood boring insect activity. We recommend a minimum clearance of six inches be maintained between the soil and

the bottom of the wood line. (See Photo 24)

! 3.

Water stains were evident in the attic. This could indicate leakage through the roof covering. We recommend the

services of a licensed roofing contractor to further evaluate this condition. (See Photo 18)

! 4.

There is a condition known as efflorescence on portions of the foundation walls. This fuzzy material is a salt deposit

left when moisture in the foundation evaporates on the inside of the foundation. This indicates an occasional surplus

of moisture on the outside of the foundation. Steps could be taken to improve the exterior drainage (See “Roofing”

section downspout locations for additional comments/recommendations in regard to this condition).

5.

All debris and/or trash should be removed from the crawl space. This will aid in future inspections.6.

There is evidence of moisture entry and periodic accumulation of water in the crawl space. This condition may vary

seasonally and/or with precipitation intensity. This condition should be monitored to determine if excessive moisture is

present. If excessive moisture develops, upgrading of the drainage system should then be considered. The owner

should consult a licensed soils specialist for further information.

7.

It would be wise to consider incorporating a moisture barrier on the crawl space floor throughout. The application of a

moisture barrier membrane will help provide additional protection against fungus damage to sub area-structure

flooring and related components. With expansive soil conditions existing in the region the application of a moisture

barrier will contribute to providing a level of soil stability.

8.

The wood members under the front porch and kitchen show evidence of water damage. We recommend the services

of a licensed structural pest control operator for investigation of this condition. (See Photo 19)

! 9.

The floor members show evidence of water stains under the bathrooms and/or kitchen area. The area is now dry and

the stains appear to be from past leaks. We recommend periodic inspection of this area for evidence of active leakage

and repairs if necessary.

10.

Structural components concealed behind finished surfaces could not be inspected.•

Only a representative sampling of visible structural components was inspected.•

Furniture and/or storage restricted access to some of the structural components.•

This is a visual inspection to the accessible areas only. Assessing the structural integrity of a building is beyond the scope

of a typical inspection. A certified professional engineer is recommended where there are structural concerns about the

building.

LIMITATIONS:

ITEM DESCRIPTIONS:

Attic (Access) • Attic Method Of Inspection: From the Access • Location: Closet

Roof Structure • Rafters • Solid Plank

Ceiling Structure • Joist

Wall Structure • Wood Frame

Floor Structure • Board and Plank Subfloor • Wood Columns • Wood Floor Beams • Wood Joist

Crawlspace/Basement

(Access)

• Location: Exterior

Foundation • Poured Concrete

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 12: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 11 of 31468 60th Street, Oakland

The attic was viewed from the attic access hatch only due to insulation covering the wood members. If further

inspection of this area is desired catwalks or planks will need to be installed over the exposed ceiling joists. When

access has been provided we will return and further inspect this area.

Insulation within the roof attic cavity obstructed the view of some structural members, plumbing and electrical

components.•

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 13: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 12 of 31468 60th Street, Oakland

Roofing

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

Due to the height of the chimney and/or presence of a spark arrestor which was not removed during our examination,

the interior of the chimney was not inspected. We recommend the advise and servicing of a licensed masonry

contractor or fireplace specialist.

1.

Debris was noted inside the gutters. We recommend the downspouts and gutters be cleaned out.2.

The downspouts discharge water adjacent to the structure. Water should be directed to flow at least 5 feet away from

the building at the point of discharge. The installation of underground drainage where applicable will help control

surface drainage.

3.

Prior repairs to the roofing are evident. For further evaluation of these repairs we recommend a licensed roofing

contractor be consulted. (See Illustration 2J)

4.

This is a visual inspection to the accessible areas only. Roofing life expectancies can vary depending on several factors.

Any estimates on remaining life are approximations only. This assessment of the roof does not preclude the possibility of

leakage. Leakage can develop at any time and may depend on rain intensity, wind direction, ice build up, etc.

LIMITATIONS:

We recommend reviewing a roof inspection report performed by a licensed roof inspector on this structure.

ITEM DESCRIPTIONS:

Roof • Composition shingle • Method of inspection: From The Roof.

Chimney • Masonry

Gutters and Downspouts • Downspouts Discharge Location: Above Grade • Installation Of Gutters/Downspouts:

Full • Metal

Illustration 2J

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 14: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 13 of 31468 60th Street, Oakland

Exterior

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

The cracked and heaved section of the patio presents a trip hazard. This condition should be corrected for improved

safety. (See Photo 2)

! 1.

For safety purposes, railing(s) should be provided at the rear steps. (See Illustration 3J) (See Photo 3) ! 2.

The window at the left and rear wall shows evidence of water damage to the sill/jamb. We recommend the advice and

services of a general contractor and/or structural pest control company regarding repairs. (See Photo 15)

! 3.

There are metal bars on one or more of the windows which do not all open from the inside. This is a significant safety

hazard. We recommend that all window bars be removed or modified so they can be opened from the interior in case

of an emergency. (See Photo 4)

! 4.

The cracked and heaved sections of driveway present a trip hazard. This condition should be corrected for improved

safety. (See Photo 1)

! 5.

Water damage was observed to the fascia at the rear. We recommend the services of a licensed general contractor

and/or structural pest control company. (See Photo 7)

! 6.

Water damage was observed to the wood siding at the rear exterior walls. We recommend the services of a licensed

general contractor and/or structural pest control company. (See Photo 5) (See Photo 6)

! 7.

The fence is in satisfactory condition, however one or more fence posts are loose at the rear. We recommend all

loose, damaged or deteriorated posts be reinforced or replaced as necessary. (See Photo 8)

! 8.

Missing hardware was noted at the rear door. We recommend that hinges, knobs, latches and strike plates be

adjusted or replaced to restore full operation. (See Photo 13)

! 9.

The walkway shows evidence of minor cracking. The cracks could be sealed for a better appearance and to prevent

moisture intrusion.

10.

Vegetation growing on or within 6" of exterior walls should be kept trimmed away from siding, window trims and the

eaves.

11.

There are some larger than normal sized cracks in the driveway. The cracks could be sealed for a better appearance

and to prevent moisture intrusion.

12.

MAINTENANCE ITEMS & GENERAL INFORMATION

There is no functional garage or covered parking space on this property. Some jurisdictions require at least one

covered parking area. No action is required, but the lack of a garage may impact the issuance of permits for future

remodeling and/or additions.

13.

This home was constructed without the use of a weep screed at the base of the stucco. Although this was an

accepted construction method it can allow condensation to build up and not drain properly. For further information we

recommend appropriate trades be consulted.

14.

ITEM DESCRIPTIONS:

Lot Topography • Level grade

Driveway • Concrete

Walkway & Sidewalks • Concrete

Retaining Walls/Abutments • None

Fencing/Gates • Wood

Porch/Deck, Patio Covers • Brick/Pavers • Concrete

Stairs/Railings/Landings • Concrete

Exterior Walls • Stucco • Wood Siding

Fascia, Eaves and Rafters • Open Rafters • Wood

Windows • Metal • Vinyl

Doors • Metal • Wood

Garage/Carport • None

The Swimming Pool Safety

Act

• Not Applicable

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 15: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 14 of 31468 60th Street, Oakland

The exterior appears to have been recently painted. Water stains and/or cracks may not be visible at the time of our

inspection. If, at a later date, water stains and/or cracks are discovered, we recommend further inspection by the

appropriate trade.

15.

A representative sample of exterior components was inspected.•

The inspection does not include an assessment of geological conditions, site stability and property surface drainage

runoff.•

This is a visual inspection to the accessible areas only.

LIMITATIONS:

Illustration 3J

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 16: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 15 of 31468 60th Street, Oakland

Electrical

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

Exposed electrical connections or open junction boxes at the crawlspace should be corrected. All electrical

connections should be made inside approved junction boxes fitted with proper cover plates. (See Photo 21)

! 1.

Several of the interior outlets and/or switches are loose in their boxes. We recommend a general tightening and "tune-

up" of all of the loose receptacles.

2.

The missing switch cover plates at various areas should be replaced.3.

The missing outlet cover plates at various areas should be replaced. Based upon our inspection of a representative

number of outlets we recommend checking every outlet to make sure they all have covers.

4.

One or more of the light fixture bulbs are missing at various areas. We recommend all missing bulbs be replaced and

proper operation of the light fixture be verified.

5.

The loose light fixture in the laundry room should be repaired or replaced. (See Photo 16) ! 6.

One or more outlets at the front room and bathroom have reversed polarity, i.e. the hot and neutral connection inside

the outlet are wired backwards. These outlets and the circuit should be investigated and corrected. Based upon our

inspection of a representative number of outlets, we recommend testing of every outlet at a later date. Repairs or

rewiring are recommended at all deficient locations. (See Illustration 4M) (See Photo 10)

! 7.

MAINTENANCE ITEMS & GENERAL INFORMATION

The service ground wire runs into the enclosed wall, therefore it was inaccessible and determining its method of

grounding connections to the structure was not noted at this time. This note is for general information only.

8.

Arc fault circuit breakers were noted in the main or branch electric circuit panel. Arc fault breakers help protect against

fires caused by arcing wires and are designed to trip by sensing a short that causes a massive amount of electricity to

pass through the circuit.

9.

DISCRETIONARY IMPROVEMENTS AND/OR UPGRADES

Additional outlets in some areas of the home may be desirable.10.

No exterior 120 volt outlet was noted on the structure. Although not required as an upgrade we recommend the

installation of an exterior rated outlet be considered.

11.

The installation of ground fault circuit interrupter "GFCI" devices is advisable on exterior, garage, bathroom, laundry,

and some kitchen outlets. Any whirlpool or swimming pool equipment should also be fitted with "GFCI"s. A ground

fault circuit interrupter "GFCI" offers protection from shock or electrocution. Please note that "GFCI" may already be in

one or more of these areas. See "description" section above for exact location of any "GFCI" which may be present on

this property. (See Illustration 4L)

12.

This is a visual inspection to the accessible areas only. The inspection does not include (if applicable) low voltage

systems, telephone wiring, intercoms, alarm systems, TV cable, timers, central vacuum systems, exterior sprinkler

systems, exterior landscape lighting or exterior motion sensor lights. Also smoke detectors out of reach were only visually

inspected unless noted otherwise. We recommend these systems be checked by interested parties for proper operation

LIMITATIONS:

Evidence of remodeling or modifications to the electrical system were evident. Inquire with the owner as to their nature

and any permits that may have been required. Evaluation of permits, identifying the extent of modifications and code

compliance are beyond the scope of this inspection.

ITEM DESCRIPTIONS:

Service • 120/240 volt main service

Service Entrance • Overhead Service Wires

Service Ground • Copper Ground Wire

Main Disconnect • Breakers • Main Service Rating: 125 Amps

Main Distribution Panel • Breakers • Panel Rating (Amps): 125

Branch/Auxillary Panel • None

Distribution Wiring • Aluminum Wire • Copper Wire

Outlets, Switches & Lights • Grounded

Ground Fault Circuit

Interrupters

• Bathroom • Kitchen

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 17: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 16 of 31468 60th Street, Oakland

Due to inaccessibility of concealed wiring or undocumented improvements of the structure, we are unable to predict

whether the number of circuits within a home will be sufficient for the needs of the occupants during a typical home

inspection. If fuses blow or breakers trip regularly, this may indicate that additional loads or remodeling modifications

may have been added to existing circuits.

Due to inaccessibility of concealed wiring or undocumented improvements of the structure, we are unable to predict

whether the number of circuits within a home will be sufficient for the needs of the occupants during a typical home

inspection. If fuses blow or breakers trip regularly, this may indicate that additional loads or remodeling modifications

may have been added to existing circuits.

Electrical components concealed behind finished surfaces could not be inspected.•

According to "ASHI" standards only a representative sampling of outlets and light fixtures were tested.•

Furniture and/or storage may have restricted access to some electrical components.•

Exterior light fixtures on motion or light sensors were not tested.•

when possible.

Illustration 4L Illustration 4M

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 18: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 17 of 31468 60th Street, Oakland

Heating System

COMMENTS:

MAINTENANCE ITEMS & GENERAL INFORMATION

The data plate on the heating system was not visible or legible at the time of this inspection.1.

There is currently no permanently installed cooling system installed on the property. While not required, it might be

desirable depending on weather conditions in the area. If interested parties would like further information on the types

of cooling systems available, we recommend consulting with a licensed HVAC contractor for more information.

2.

DISCRETIONARY IMPROVEMENTS AND/OR UPGRADES

When furnace replacement is performed, consideration should be given to installing a "high efficiency" system.3.

As per ASHI standards determining furnace heat supply adequacy or inadequacy, distribution balance or sizing of the

unit or units is not a part of this inspection.•

The wall mount and/or window mounted air conditioning unit (if applicable) was not inspected and are excluded from

this report.•

Heating and/or air conditioning registers where accessible were visually inspected. Manual operation of the registers

was not performed.•

Heating and/or air conditioning registers where accessible were visually inspected. Manual operation of the registers

was not performed.•

As per ASHI standards the heat exchanger of the furnace was not inspected and interior portions of the heater were

restricted. For additional information we recommend the services of a licensed heating contractor. As a free public

service, the local utility company (PG&E) will perform a "safety" review of the heat exchanger and other gas operated

components. We recommend that you take advantage of this service before the next seasonal operation.

Inspection of the heater and/or air conditioner thermostat is limited to operating the units(s) on and off function only.

Testing of the thermostat timer, temperature accuracy, clock, set back functions, etc. were not performed.•

This is a visual inspection to the accessible areas only. The inspection of the heating system is general and not technically

exhaustive. A detailed evaluation of the furnace heat exchanger is beyond the scope of this inspection.

LIMITATIONS:

We recommend a licensed HVAC contractor be retained for further evaluation of the heating unit.

The typical life cycle for a heating unit such as this is 20-25 years. The heating system is older and may be approaching

the end of its life cycle. Some units will last longer; others can fail prematurely. Please be aware that shutting the gas off

to this unit for any reason could cause the heat exchanger to contract and crack.

ITEM DESCRIPTIONS:

Primary Source Heat • Gas

Heating System • Age (years): unk • BTU's: unk • Gravity Floor Heater • Manufacturer: unk

Distribution/Ducting • Radiators

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 19: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 18 of 31468 60th Street, Oakland

Cooling/Heat Pump System

COMMENTS:

This is a visual inspection to the accessible areas only. Air conditioning and heat pump systems, like most mechanical

components, can fail at any time.

LIMITATIONS:

ITEM DESCRIPTIONS:

Cooling System • None

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 20: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 19 of 31468 60th Street, Oakland

Insulation/Ventilation

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

Missing, compressed, or uneven insulation in various areas of the attic should be replaced or evened out to improve

the insulating value in these areas.

1.

The attic fiberglass insulation has been installed backwards. We recommend consideration be given to reinstalling the

insulation with the moisture barrier against the living space.

2.

There are no functional windows or fans in the laundry for ventilation. As a upgrade we recommend an exhaust fan

that discharges to the building exterior be considered.

3.

Insulation/ventilation type and levels in concealed areas cannot be determined. No destructive tests were performed.•

Insulation/ventilation type and levels in concealed areas cannot be determined. No destructive tests were performed.•

Potentially hazardous materials such as Asbestos and Urea Formaldehyde Foam Insulation (UFFI) cannot be

positively identified without a detailed inspection and laboratory analysis. This is beyond the scope of the inspection.•

Potentially hazardous materials such as Asbestos and Urea Formaldehyde Foam Insulation (UFFI) cannot be

positively identified without a detailed inspection and laboratory analysis. This is beyond the scope of the inspection.•

An analysis of indoor air quality is beyond the scope of this inspection.•

Any estimates of insulation "R" values or depths are rough average values.•

This is a visual inspection to the accessible areas only.

LIMITATIONS:

ITEM DESCRIPTIONS:

Attic/Roof Insulation • Depth (inches): 4-6” • Fiberglass

Exterior Walls Insulation • Unknown

Crawlspace Insulation • None

Attic/Roof Ventilation • Gable vents • Soffit vents

Crawlspace Ventilation • Exterior wall vent(s)

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 21: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 20 of 31468 60th Street, Oakland

Plumbing

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

The plastic/cast iron waste piping is leaking at the front yard. We recommend all leaks be repaired. (See Photo 26) ! 1.

For enhanced safety, it is recommended that the loose or damaged connections of the water heater venting system be

improved. A minimum of 3 screws at each section of the duct is recommended. (See Illustration 8M) (See Photo 14)

! 2.

The temperature and pressure relief valve for the water heater lacks a proper discharge pipe. We recommend the

installation of approved piping to an approved location. (See Photo 17)

! 3.

Aluminum has been used for a section gas piping at the furnace. We recommend all improper plumbing materials or

methods be corrected as per local codes. (See Photo 20)

! 4.

The drain is leaking into the crawl space under the toilet. We recommend all leaks be repaired. (See Photo 25) ! 5.

There is a gap between the tub spout and wall at the bathroom bathtub which should be sealed to prevent moisture

intrusion.

6.

DISCRETIONARY IMPROVEMENTS AND/OR UPGRADES

To reduce the risk of contamination of supply water, installation of anti-siphon devices on exterior hose bibs are

recommended.

7.

Water and gas shut-off valves, including but not limited to seismic, excess flow shut-off valves and gas fireplace

valves where applicable, were not operated or tested. Identification of these devices is limited to the accessible areas

only.

Water and gas shut-off valves, including but not limited to seismic, excess flow shut-off valves and gas fireplace

valves where applicable, were not operated or tested. Identification of these devices is limited to the accessible areas

only.

Portions of the plumbing system concealed by finishes and/or storage (below sinks, below the structure and beneath

the yard) were not inspected.•

Water pressure and water quality is not tested. The effect of lead content in solder and/or supply lines is beyond the

scope of the inspection.•

Water pressure and water quality is not tested. The effect of lead content in solder and/or supply lines is beyond the

scope of the inspection.•

Inspection of any water conditioning system (filters, purifiers, softeners, etc.) is beyond the scope of this inspection

and are excluded from this report.•

Inspection of any lawn sprinkler system is beyond the scope of this inspection and are excluded from this report

(unless noted otherwise).•

The interior portions of the water heater were restricted. For additional information we recommend the services of a

licensed plumbing contractor. As a free public service, the local utility company (PG&E) will perform a "safety" review

of the interior of the water heater and other gas operated components. We recommend that you take advantage of

this service before the next seasonal operation.

This is a visual inspection to the accessible areas only.

LIMITATIONS:

ITEM DESCRIPTIONS:

Main Water Valve • Location: Exterior Front

Supply Piping • Copper Pipe

Drain/Waste/Vent • Galvanized Steel • Plastic

Cleanout • Location: Crawl Space

Main Gas Valve • Location: Exterior Side

Water Heaters • Approximate Age (years): 2 • Capacity (gallons): 38 • Gas • Location: Closet •

Manufacturer: Rheem

Seismic Gas Shut-off • Not Present

Excess Flow Gas Shut-off • Not Present

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 22: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 21 of 31468 60th Street, Oakland

The interior portions of the water heater were restricted. For additional information we recommend the services of a

licensed plumbing contractor. As a free public service, the local utility company (PG&E) will perform a "safety" review

of the interior of the water heater and other gas operated components. We recommend that you take advantage of this

service before the next seasonal operation.

HomeGuard Incorporated does not determine if any fixtures or toilets are water conserving.•

Illustration 8M

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 23: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 22 of 31468 60th Street, Oakland

Interior

COMMENTS:

RECOMMENDATIONS/OBSERVATIONS - '!' indicates an immediate improvement recommendation item.

INTERIOR

The installation of smoke detectors where missing or removed is required for added safety. (See Photo 9) ! 1.

Two floor thresholds at the laundry room floor is missing or improper. This difference in floor height creates a trip

hazard. We recommend a threshold be installed at this floor transition to eliminate this condition. (See Photo 12)

! 2.

One or more interior door knobs, latches or hinge hardware is missing at the bedroom rear door. We recommend all

missing hardware be replaced to restore full operation. (See Photo 11)

! 3.

California law requires that all homes have a State Fire Marshall approved Carbon Monoxide Detector be installed

outside of the sleeping areas in the hallway and on each level of the home including basements. At the time of this

inspection a Carbon Monoxide Detector could not be located. We recommend consulting with the owner to see if a

Carbon Monoxide Detector exists and if not they should be installed in all required locations. (See Photo 9)

! 4.

Some of the interior floors were noted to squeak when walked on. This does not affect the functional use of the floor.

Squeaks can usually be eliminated by additional attachment of the subfloor to the floor joist.

5.

Difficult to operate or non-functional window latches/locks in the front bedroom should be cleaned, adjusted and/or

repaired for increased security and full use of these areas.

6.

The fireplace chimney should be cleaned and inspected prior to the close of escrow. (See Illustration 9J)7.

One or more interior closet doors have loose, damaged, and/or missing hardware at the rear bedroom. We

recommend that the tracks, wheels and/or latches be adjusted or replaced to restore full operation.

8.

The operation of some of the sliding windows is rough. We recommend they be cleaned, lubricated and adjusted for

smoother operation.

9.

One or more interior doors do not latch properly. We recommend that hinges, latches and strike plates be adjusted to

restore full operation.

10.

Past repairs were noted in the interior of the home. We recommend consultation with the sellers regarding the reason

for the repairs and what permits and inspections were obtained to complete the work.

11.

The waste disposer responded to normal operator controls, however, was unusually noisy. The unit may be nearing

the end of its useful service life. For attention to the conditions noted and/or cost estimates, if necessary, we

recommend the advice of a qualified appliance technician.

12.

Minor cracks and/or erosion of the rear wall of the fireplace are normal and should not be of a concern in the

immediate future unless or until the bricks become deeply eroded or loose.

13.

It may be desirable to replace the window screens where missing or damaged.14.

There is evidence of Vermin activity in the attic and crawlspace. It is likely that this infestation is also in inaccessible

areas. The owner is advised to contact the appropriate tradesperson for any remedial measures necessary.

15.

ITEM DESCRIPTIONS:

Kitchen Appliances Tested • Exhaust Hood • Gas Range • Waste Disposer

Wall Finishes • Drywall/Plaster • Wood

Ceiling Finishes • Drywall/Plaster

Floors • Laminate Flooring • Tile/Stone • Wood

Doors • Hollow Core • Sliding

Window Style and Glazing • Double Pane • Double/Single Hung • Fixed Pane • Sliders

Stairs/Railings • Not Present

Fireplace/Wood Stove • Masonry Fire Box

Cabinets/Countertops • Marble/Granite • Wood

Laundry Facilities/Hookup • 120 Volt Circuit for Washer • Dryer vent noted • Gas Piping for Dryer • Hot and Cold

Water Supply for Washer • Waste Standpipe for Washer

Other Components Inspected • Carbon Monoxide Detector • Smoke Detector

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 24: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 23 of 31468 60th Street, Oakland

KITCHEN

The base and/or side of the kitchen cabinet sink shelf is delaminated and shows evidence of past moisture in this

area. This is mainly a cosmetic consideration and repair of this condition is optional. In any case, this area should be

periodically monitored for future leaks from the sink and/or plumbing fixtures.

16.

BATHROOMS

A gap was noted at the escutcheons at the hall bathroom. We recommend sealing this trim piece for a better

appearance and to avoid leakage in this area.

17.

MAINTENANCE ITEMS & GENERAL INFORMATION

INTERIOR

ENVIRONMENTAL ISSUES:

Issues Based on the age of this home, there is a possibility the structure may contain asbestos such as ceiling

texture, insulation on the distribution piping and/or transit piping and siding. This can only be verified by laboratory

analysis. The Environmental Protection Agency (E.P.A.) reports that asbestos represents a health hazard if “friable”

damaged, crumbling, or in any state that allows the release of fibers. If replacement necessitates the removal of the

acoustic ceiling or insulation, a specialist should be engaged. If any sections of this insulation are indeed friable, or

become friable over time, a specialist should be engaged. Further guidance is available from the Environmental

Protection Agency (E.P.A.). Due to the age of construction, it is likely that there are other materials within the home

that contain asbestos but are not identified by this inspection report.

18.

The evaluation of the thermal pane windows ("dual pane/glazed") is limited to accessible windows exhibiting

noticeable conditions at the time of our inspection, such as condensation and/or evidence of moisture developing

between the panes of glass. Due to the known design and/or characteristics associated with thermal pane windows,

conditions may be discovered at a later date, however seal failure can occur at any time.

19.

KITCHEN

Carbon monoxide is a colorless, odorless gas that can result from a faulty fuel burning furnace, range, water heater,

space heater or wood stove. Proper maintenance of these appliances is the best way to reduce the risk of carbon

monoxide poisoning. For more information, consult the Consumer Product Safety Commission CPSC at

www.cpsc.gov for further guidance.

20.

Furniture, storage, appliances and/or wall hangings restricted the inspection of the interior.•

No access was gained to the wall cavities of the home.•

Kitchen appliances were operated unless noted otherwise. However they were not inspected for installation according

to manufacturer specifications and were not evaluated for performance, efficiency or adequacy during their operation.

No refrigerators whether "built in" or portable are operated, inspected or tested.

All appliances not "built in" to the structure such as washing machine, dryer, refrigerator and/or countertop microwaves

were not inspected and are excluded from this report. No refrigerators whether "built in" or portable are operated,

inspected or tested.

All appliances not "built in" to the structure such as washing machine, dryer, refrigerator and/or countertop microwaves

were not inspected and are excluded from this report. No refrigerators whether "built in" or portable are operated,

inspected or tested.

Fireplace screens or doors were not inspected (unless otherwise noted) and are excluded from this report.•

Testing of the oven cleaning function is beyond the scope of this inspection. For proper operation and testing of this

function we recommend consultation with the existing homeowner.•

Testing of the oven cleaning function is beyond the scope of this inspection. For proper operation and testing of this

function we recommend consultation with the existing homeowner.•

This is a visual inspection to the accessible areas only. Assessing the quality of interior finishes is highly subjective.

Issues such as cleanliness, cosmetic flaws, quality of materials, architectural appeal and color are outside the scope of

this inspection. Comments are general, except where functional concerns exist. Due to texturing and painting of interior

surfaces there is no possible way of determining point of origin of any gypsum (sheetrock) material without destructive

testing. HomeGuard Incorporated does not perform any destructive testing. Smoke detectors and carbon monoxide

detectors were not manually tested. The sensors of these units are not tested. Both smoke detectors and carbon

monoxide detectors have a limited life span and should be replaced according to the manufactures instructions.

LIMITATIONS:

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 25: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 24 of 31468 60th Street, Oakland

Illustration 9J

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 26: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 25 of 31468 60th Street, Oakland

Photographs

No relative importance should be placed on the photographs provided in this report. The photographs in this

report do not necessarily illustrate all of the damage in any particular finding. Also, not all problem areas will

be supported with photographs. Please contact HomeGuard if you have any questions.

Photo 01 Photo 02

Photo 03 Photo 04

Photo 05 Photo 06

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 27: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 26 of 31468 60th Street, Oakland

Photo 07 Photo 08

Photo 09 Photo 10

Photo 11 Photo 12

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 28: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 27 of 31468 60th Street, Oakland

Photo 13 Photo 14

Photo 15 Photo 16

Photo 17 Photo 18

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 29: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 28 of 31468 60th Street, Oakland

Photo 19 Photo 20

Photo 21 Photo 22

Photo 23 Photo 24

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 30: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 29 of 31468 60th Street, Oakland

Photo 25 Photo 26

Photo 27 Photo 28

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 31: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 30 of 31468 60th Street, Oakland

Maintenance Advice

UPON TAKING OWNERSHIP

After taking ownership of a new home, there are some maintenance and safety issues that should be addressed

immediately. The following checklist should help you undertake these improvements.

Change the locks on all exterior entrances, for improved security.

Check that all windows and doors are secure. Improve window hardware as necessary. Security rods can be added

to sliding windows and doors. Considerations could also be given to a security system.

Install smoke detectors on each level of the home. Ensure that there is a smoke detector outside all sleeping areas.

Replace batteries on any existing smoke detectors and test them. Make a note to replace batteries again in one year.

Create a plan of action in the event of a fire in your home. Ensure that there is an operable window or door in

every room of the house. Consult with your local fire department regarding fire safety issues and what to do in

the event of a fire.

Examine driveways and walkways for trip hazards. Undertake repairs where necessary.

Examine the interior of the home for trip hazards. Loose or torn carpeting and flooring should be repaired.

Undertake improvements to all stairways, decks, porches and landings where there is a risk of falling or stumbling.

Review your home inspection report for any items that require immediate improvement or further investigation.

Address these areas as required.

Install rain caps and vermin screens on all chimney flues, as necessary.

Investigate the location of the main shut-offs for the plumbing, heating and electrical systems. If you attend the home

inspection, these items have been pointed out to you.

REGULAR MAINTENANCE

EVERY MONTH

Check that fire extinguisher(s) are fully charged. Re-charge if necessary.

Examine heating/cooling air filters and replace or clean as necessary.

Inspect and clean humidifiers and electronic air cleaners.

If the house has hot water heating, bleed radiator valves.

Clean gutters and downspouts. Ensure that downspouts are secure, and that the discharge of the downspouts is

appropriate. Remove debris from window wells.

Carefully inspect the condition of shower enclosures. Repair or replace deteriorated grout and caulk. Ensure that

water is not escaping the enclosure during showering. Check below all plumbing fixtures for evidence of leakage.

Repair or replace leaking faucets or shower heads.

Secure loose toilets, or repair flush mechanisms that become troublesome.

SPRING AND FALL

Examine the roof for evidence of damage to roof covering, flashings and chimneys.

Look in the attic (if accessible) to ensure that roof vents are not obstructed. Check for evidence of leakage,

condensation or vermin activity. Level out insulation if needed.

Trim back tree branches and shrubs to ensure that they are not in contact with the house.

Inspect the exterior walls and foundation for evidence of damage, cracking or movement. Watch for bird nests or other

vermin or insect activity.

Survey the basement and/or crawl space walls for evidence of moisture seepage.

Look at overhead wires coming to the house. They should be secure and clear of trees or other obstructions.

Ensure that the grade of the land around the house encourages water to flow away from the foundation.

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 32: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Page 31 of 31468 60th Street, Oakland

Inspect all driveways, walkways, decks, porches, and landscape components for evidence of deterioration, movement

or safety hazards.

Clean windows and test their operation. Improve caulking and weather-stripping as necessary. Watch for evidence

of rot in wood windows frames. Paint and repair window sills and frames as necessary.

Test all ground fault circuit interrupter (GFCI) devices, as identified in the inspection report.

Shut off isolating valves for exterior hose bibs in the fall, if below freezing temperatures are anticipated.

Test the Temperature and Pressure Relief (TPR) Valve on water heaters.

Inspect for evidence of wood boring insect activity. Eliminate any wood/soil contact around the perimeter of the home.

Test the overhead garage door opener, to ensure that the auto-reverse mechanism is responding properly. Clean and

lubricate hinges, rollers and tracks on overhead doors.

Replace or clean exhaust hood filters.

Clean, inspect and/or service all appliances as per the manufacturer's recommendations.

ANNUALLY

Replace smoke detector batteries.

Have the heating, cooling and water heater systems cleaned and serviced.

Have chimneys inspected and cleaned. Ensure that rain caps and vermin screens are secure.

Examine the electrical panels, wiring and electrical components for evidence of overheating. Ensure that all

components are secure. Flip the breakers on and off to ensure that they are not sticky.

If the house utilizes a well, check and service the pump and holding tank. Have the water quality tested. If the

property has a septic system, have the tank inspected (and pumped as needed).

If your home is in an area prone to wood destroying insects (termites, carpenter ants, etc.), have the home

inspected by a licensed specialist. Preventive treatments may be recommended in some cases.

PREVENTION IS THE BEST APPROACH

Although we've heard it many times, nothing could be more true than the old cliche "an ounce of prevention is worth a

pound of cure." Preventative maintenance is the best way to keep your house in great shape. It also reduces the risk of

unexpected repairs and improves the odds of selling your house at fair market value, when the time comes.Please feel free to contact our office should you have any questions regarding the operation or maintenance of your

home. Enjoy your home!

q

q

q

q

q

q

q

q

q

q

q

q

q

q

q

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 33: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

$505.00

Invoice No: LIV561969P

Report No: 441527 TPR

Invoice Date: 3/8/2018

Inspection: 3/8/2018

Address: 468 60th Street

Oakland CA, 94609

Escrow#:

Christopher Ellis

Faira Real Estate Services

608 State Street South

Kirkland, WA 98033

Invoice

Property Information:

Bill To:

Billing Information:

DUE UPON RECEIPT

Complete

Total Due: $505.00

HomeGuardIncorporated

Please remit to 510 Madera Ave., San Jose, CA 95112

There is a $25 fee for all returned checks

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900 Report No. 441527

Page 34: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Dear HomeGuard Customer,

Thank You for choosing HomeGuard Incorporated to inspect your home. Enclosed is your inspection report, which includes our findings, recommendations, and repair prices. Please review the enclosed report and repair proposals and feel free to call me with any comments or questions.

Sincerely Yours,

Curtis ReeseVice PresidentGeneral Manager

Contact the HomeGuard Repair Team at 855-331-1900 or email us [email protected]

Schedule your repairs today...

We get the work donewhen you need it!

We will expedite allrequired paperwork!

HomeGuard stands behind its repairs!

Page 35: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland

March 8, 2018

Christopher Ellis

Faira Real Estate ServicesInspected by:Ordered by:

Diego Tamayo Cazarez

Roof Inspection Report

HomeGuardIncorporated

608 State Street South

Kirkland, WA 98033

Page 36: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland Page 1 of 4

The roof of the dwelling at the above property has been inspected by a qualified inspector employed by HomeGuard Incorporated. The professional opinion of the inspector contained in this report is solely an opinion and does not constitute a warranty or guarantee. The inspector has inspected all exterior roof components and documented in general terms the type of roof, its intended life and overall condition at the time of this inspection. Where accessible, HomeGuard Incorporated has noted all conditions that may compromise any inspected roof component’s ability to shed water and/or realize its intended life. Verification of actual roof performance and/or troubleshooting of existing conditions, such as water testing, are NOT included in the scope of our inspection unless specifically requested and mentioned in our report. This inspection should not be considered a guarantee of actual roof performance, as performance is contingent upon the condition of internal system components not accessible to our inspector. This roof was not inspected for conformance to local building codes. The inspector has not inspected the attic area nor did the inspector perform a visual interior inspection looking for past or present roof performance issues. All present and prior disclosures along with other inspection reports should be reviewed and addressed prior to the close of escrow.

GENERAL DESCRIPTION:Unless specifically mentioned in this report, the following are NOT included in this report: decks, balconies, detached structures, patio covers, out buildings, sheds and bonus rooms. The structure is a one story single family residence. The roof is a dimensional composition shingle, tan in color and is the 1st layer. The typical life expectancy of this roofing material is 25 to 30 years. The pitch of the roof appears to be 4:12-low slope. The roof shows the wear characteristics of being approximately 10-15 year(s) old. The overall condition of the roof is fair. The estimated remaining serviceable life of the roof is 10 years. The rear low slope roof area is built up modified bitumen in fair condition.

SCOPE OF THE INSPECTION:

FINDINGS:Previous repairs have been performed to the roofing system at the field, noted repair(s) were performed improperly and may allow water entry into the structure. (See Photo 1)

1.

RECOMMENDATION:Repair the areas of prior repair at the field, as needed to make water tight.

The plumbing jack flashing are not adequately sealed at the collars. (See Photo 2)2.

RECOMMENDATION:Seal all plumbing vent collars where needed to ensure a watertight condition.

There are damaged shingles in the field. (See Photo 3)3.

RECOMMENDATION:Install a metal shim to cover hole and replace any damaged shingles.

The utility flashing is not properly integrated into the roofing system, the water shedding ability of this area cannot be guaranteed. (See Photo 4)

4.

RECOMMENDATION:Properly integrate the utility flashing into the roof system, where needed to ensure a water impermeable condition.

There are areas of the roof surface that have been sealed with mastic. The mastic is showing signs of wear and tear and must be resealed. Mastic is usually used around skylights, pipe vents, corner seams and other penetrations to help ensure a watertight seal. The typical serviceable life of mastic before it begins to crack is 3 to 5 years. (See Photo 5)

5.

RECOMMENDATION:Apply new coat of mastic at areas of the roof that have been previously sealed with mastic or where needed to ensure a watertight seal.

Report No. 441527HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 37: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland Page 2 of 4

The chimney shoulder flashing shows cracked solder joints, this condition allows direct water entry into the structure. (See Photo 6)

6.

RECOMMENDATION:Seal the solder joints, where necessary to ensure a watertight condition.

The chimney counter flashing requires sealing. (See Photo 7)7.

RECOMMENDATION:Seal the chimney counter flashing as required to ensure a watertight condition.

On the low slope roof area.8.

There are areas of the roof surface that have been sealed with mastic. The mastic is showing signs of wear and tear and must be resealed. Mastic is usually used around skylights, pipe vents, corner seams and other penetrations to help ensure a watertight seal. The typical serviceable life of mastic before it begins to crack is 3 to 5 years. (See Photo 8) (See Photo 9)

9.

RECOMMENDATION:Apply new coat of mastic at areas of the roof that have been previously sealed with mastic or where needed to ensure a watertight seal.

The pipe flashing is not properly integrated into the roofing system, the water shedding ability of this area cannot be guaranteed. (See Photo 10)

10.

RECOMMENDATION:Replace pipe flashing for a sheet metal pipe flashing and install a modified bitumen patch.

SUMMARY:The cost to service item(s) 1-7, 9 and 10 is $1,125.00.

Report No. 441527HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 38: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland Page 3 of 4

Report PhotographsThe photographs in this report do not necessarily illustrate all of the damage in any particular finding. Also, not all problem areas will be supported by photographs. Please contact HomeGuard if you have any questions.

Photo 1 Photo 2

Photo 3 Photo 4

Photo 5 Photo 6

Report No. 441527HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 39: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

468 60th Street, Oakland Page 4 of 4

Photo 7 Photo 8

Photo 9 Photo 10

Report No. 441527HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 40: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

AUTHORIZATION AGREEMENT

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

468 60th Street, Oakland

“Contractors are required by law to be licensed and regulated by the Contractors State License Board, which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning the contractor may be referred to the Registrar, Contractors State License Board, Post Office Box 26000, Sacramento, California 95826. “State law requires anyone who contracts to do construction work to be licensed by the Contractors State License Board in the license category in which the contractor is going to be working—if the total price of the job is $500 or more (including labor and materials). “Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license, the Contractors State License Board may be unable to assist you with a complaint. Your only remedy against an unlicensed contractor may be in civil court, and you may be liable for damages arising out of any injuries to thecontractor or his or her employees. “You may contact the Contractors State License Board to find out if this contractor has a valid license. The Board has complete information on the history of licensed contractors, including any possible suspensions, revocations, judgments, and citations. The Board has offices throughout California. Please check the government pages of the White Pages for theoffice nearest you or call 1-800-321-CSLB for more information.”

Not to hold HomeGuard Incorporated responsible for any acts of God.

HOMEGUARD INCORPORATED AGREES:1.2.3.

To perform all repairs in a workmanlike manner. We assume no responsibility for work performed by others.To be bound to perform this work for the price quoted above for a period of 30 days.To use reasonable care in the performance of our work but to assume no responsibility for damage to any hidden pipes, wiring, or other facilities or to any shrubs or other life.

OWNER OR OWNER'S AGENT AGREE:1.2.3.

To pay for services rendered including any additional services requested, upon completion of work.To pay a service charge of 1.5 percent per month or portion of any month beyond 30 days after completion.To grant HomeGuard Incorporated a security interest in the above described real property to secure payment of the sum for work and/or inspection(s) completed.

BOTH PARTIES AGREE:1.

2. If any additional work is deemed necessary by the local building inspector, said work will not be performed without additional authorization from the owner or owner's agent.

HomeGuard Incorporated is authorized to proceed with the work outlined in the recommendations of the roof report no. 441527 for the property located at 468 60th Street, Oakland. The amount due will be payable upon completion of work. It is understood that the contract price does not include the charge of the inspection report or re-inspection fees. Inspection number 441527 is attached hereto and incorporated herein:

If additional damage is discovered by HomeGuard Incorporated during the performance of work, the company agrees to notify the owner or owner's agent of the amount of the damage and the cost to perform the additional work. This work will be performed upon written authorization.

4.

NOTICE TO OWNER - LICENSING

If a Home Inspection has been or will be performed by HomeGuard, Incorporated on this property, the following consumer disclosure applies:(A) The same company that performs the roof inspection and roof repairs will perform the home inspection on the same property.(B) Any repairs that are authorized by the consumer are for the repairs identified in the roofing contractor’s roof inspection report and no repairs identified in the home inspection are authorized or allowed as specified in the roof inspection.(C) The consumer has the right to seek a second opinion.

NOTICE TO OWNER - HOME INSPECTION

Report No. 441527

Page 1 of 4Contractors License No. 729266 Initials__________ __________

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 41: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

AUTHORIZATION AGREEMENT

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

468 60th Street, Oakland

NOTICE TO OWNER - MECHANICS LIEN“Under the California Mechanics’ Lien Law, any contractor, subcontractor, laborer, supplier, or other person or entity who helps to improve your property, but is not paid for his or her work or supplies, has a right to place a lien on your home, land, or property where the work was performed and to sue you in court to obtain payment. This means that after a court hearing, your home, land, and property could be sold by a court officer and the proceeds of the sale used to satisfy what you owe. This can happen even if you have paid your contractor in full if the contractor’s subcontractors, laborers, or suppliers remain unpaid. To preserve their rights to file a claim or lien against your property, certain claimants such as subcontractors or material suppliers are each required to provide you with a document called a “Preliminary Notice.” Contractors and laborers who contract with owners directly do not have to provide such notice since you are aware of their existence as an owner. A preliminary notice is not a lien against your property. Its purpose is to notify you of persons or entities that may have a right to file a lien against your property if they are not paid. In order to perfect their lien rights, a contractor, subcontractor, supplier, or laborer must file a mechanics’ lien with the county recorder which then becomes a recorded lien against your property. Generally, the maximum time allowed for filing a mechanics’ lien against your property is 90 days after substantial completion of your project.

TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY, YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS:(1) Require that your contractor supply you with a payment and performance bond (not a license bond), which provides that the bonding company will either complete the project or pay damages up to the amount of the bond. This payment and performance bond as well as a copy of the construction contract should be filed with the county recorder for your further protection. The payment and performance bond will usually cost from 1 to 5 percent of the contract amount depending on the contractor’s bonding ability. If a contractor cannot obtain such bonding, it may indicate his or her financial incapacity.

(2) Require that payments be made directly to subcontractors and material suppliers through a joint control. Funding services may be available, for a fee, in your area which will establish voucher or other means of payment to your contractor. These services may also provide you with lien waivers and other forms of protection. Any joint control agreement should include the addendum approved by the registrar.

(3) Issue joint checks for payment, made out to both your contractor and subcontractors or material suppliers involved in the project. The joint checks should be made payable to the persons or entities which send preliminary notices to you. Those persons or entities have indicated that they may have lien rights on your property, therefore you need to protect yourself. This will help to insure that all persons due payment are actually paid.

(4) Upon making payment on any completed phase of the project, and before making any further payments, require your contractor to provide you with unconditional “Waiver and Release” forms signed by each material supplier, subcontractor, and laborer involved in that portion of the work for which payment was made. The statutory lien releases are set forth in exact language in Section 3262 of the Civil Code. Most stationery stores will sell the “Waiver and Release” forms if your contractor does not have them. The material suppliers, subcontractors, and laborers that you obtain releases from are those persons or entities who have filed preliminary notices with you. If you are not certain of the material suppliers, subcontractors, and laborers working on your project, you may obtain a list from your contractor. On projects involving improvements to a single-family residence or a duplex owned by the individuals, the persons signing these releases lose the right to file a mechanics’ lien claim against your property. In other types of construction, this protection may still be important, but may not be as complete. To protect yourself under this option, you must be certain that all material suppliers, subcontractors, and laborers have signed the “Waiver and Release” form. If a mechanics’ lien has been filed against your property, it can only be voluntarily released by a recorded “Release of Mechanics’ Lien” signed by the person or entity that filed the mechanics’ lien against your property unless the lawsuit to enforce the lien was not timely filed. You should not make any final payments until any and all such liens are removed. You should consult an attorney if a lien is filed against your property.”

Report No. 441527

Page 2 of 4Contractors License No. 729266 Initials__________ __________

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 42: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

AUTHORIZATION AGREEMENT

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

468 60th Street, Oakland

The minimum service charge for any work is $250. HomeGuard Incorporated will certify the repaired roof section(s) mentioned below to be leak-free for a period of 1 year after the corrective repairs noted below have been performed by HomeGuard.

HomeGuard warrants roof components, designed as such, to be free of readily apparent defects. If leakage should occur due to a readily apparent defect, HomeGuard will repair the covered roof components at no charge within thirty (30) days of notification. The exceptions and exclusions from the terms of this warranty are as follows:

1. HomeGuard Incorporated is not responsible for any interior or exterior damage caused by any leak that may develop.2. HomeGuard Incorporated is not responsible for removal of standing water after roof work has been completed. 3. HomeGuard Incorporated is not responsible for leaks caused by vandalism, work performed by others, or acts of God.4. HomeGuard Incorporated is not responsible for leaks caused by accumulated debris on the roof.5. HomeGuard Incorporated is not responsible for leaks in gutter systems, sidewalls or roof area under solar systems unless specifically warranted in the repair contract.6. HomeGuard Incorporated is not responsible for leaks that are the result of inadequate protection caused by the original manufacturer's specifications.

At no time does HomeGuard Inc. warrant the performance and/or condition of the following: proprietary roofing systems, metal/metallic roofing systems, deck coatings, corrugated roof covers, patio covers, patio decks, internal roof components, tar and gravel roofs, exterior structural components, or roof slopes under 2:12.

Claims under this warranty must be reported to HomeGuard Incorporated within three (3) days of the discovery of the leak.

NOTICE TO OWNER - LIMITED LEAK-FREE WARRANTY

Corrective items:

$1,125.00Items 1, 2, 3, 4, 5, 6, 7, 9, 10

Report No. 441527

Page 3 of 4Contractors License No. 729266 Initials__________ __________

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 43: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

AUTHORIZATION AGREEMENT

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

468 60th Street, Oakland

Any controversy or claim arising out of or relating to the inspection performed by HomeGuard Incorporated shall be settled by final and binding arbitration filed by the aggrieved party with and administered by the American Arbitration Association (hereafter referred to as "AAA") in accordance with its Construction Arbitration Rules in effect at the time the claim is filed. The Rules, information and forms of the AAA may be obtained and all claims shall be filed at any office of the AAA or at Corporate Headquarters, 335 Madison Avenue, Floor 10, New York, New York 10017-4605. Telephone: 212-716-5800, Fax: 212-716-5905, Website: http://www.adr.org/. The arbitration of all disputes shall be decided by a neutral arbitrator, and judgment on the award rendered by the arbitrator may be entered in any court having competent jurisdiction thereof. Any such arbitration will be conducted in the city nearest to the property that was inspected by HomeGuard Incorporated having an AAA regional office. Each party shall bear its own costs and expenses and an equal share of the administrative and arbitrators’ fees of arbitration. This arbitration Agreement is made pursuant to a transaction involving interstate commerce, and shall be governed by the Federal Arbitration Act, 9 U.S.C. Sections 1-16. THE PARTIES UNDERSTAND THAT THEY WOULD HAVE HAD A RIGHT OR OPPORTUNITY TO LITIGATE THROUGH A COURT AND TO HAVE A JUDGE OR JURY DECIDE THEIR CASE, BUT THEY CHOOSE TO HAVE ANY AND ALL DISPUTES DECIDED THROUGH ARBITRATION. BY SIGNING THIS AGREEMENT, THE PARTIES ARE GIVING UP ANY RIGHT THEY MIGHT HAVE TO SUE EACH OTHER.

BINDING ARBITRATION PROVISION

ESCROW PHONE NO:__________________________

Print Name_____________________________

Print Name_____________________________

ESCROW OFFICER:____________________________

Name of person providing access ___________________________ Phone Number ______________________

ESCROW CO/NO:________________________________

BY:______________________, HomeGuard Incorporated

X________________________ __________

X________________________ __________

OWNER OR OWNERS AGENT DATE

PLEASE BE SURE TO SIGN AND SEND ALL PAGES

Report No. 441527

Page 4 of 4Contractors License No. 729266

HomeGuard Incorporated 58 Wright Brothers Avenue, Livermore, CA 94551 (855) 331-1900

Page 44: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Other:

Complete

Report No. 441527

Invoice Date: 3/8/2018

Inspection: 3/8/2018

Notice of Completion:

$0.00

$0.00

$0.00

Address: 468 60th StreetOakland CA, 94609

Escrow No.

Christopher EllisFaira Real Estate Services608 State Street SouthKirkland, WA 98033

Invoice

Total Due: $0.00

Property Information:

Bill To:

Billing Information:

Invoice No: LIV561691R

DUE UPON RECEIPT - Please remit to: 510 Madera Ave., San Jose, CA 95112There is a $25 fee for all returned checks.

HomeGuardIncorporated

Page 45: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Dear HomeGuard Customer,

Thank You for choosing HomeGuard Incorporated to inspect your home. Enclosed is your inspection report, which includes our findings, recommendations, and repair prices. Please review the enclosed report and repair proposals and feel free to call me with any comments or questions.

Sincerely Yours,

Curtis ReeseVice PresidentGeneral Manager

Contact the HomeGuard Repair Team at 855-331-1900 or email us [email protected]

Schedule your repairs today...

We get the work donewhen you need it!

We will expedite allrequired paperwork!

HomeGuard stands behind its repairs!

Page 46: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Key to Items on diagram: [1] Section 1 Items [2] Section 2 Items [3] Unknown Further Inspection Items

3/8/2018 Page 1 of 9

None noted

Subarea One story, single family wood framed residence with stucco and wood siding exterior.

468

General Description:

Other Tags Posted:

Inspection Tag Posted:

FRONT

3A1F 1B1C 1C1D 1A 1F1I 1G1H 1F 3A 2A 2B 2A 3A 1F 1F 1F 1F 1E 3B 3B 3A1F

1H

WOOD DESTROYING PESTS AND ORGANISM INSPECTION REPORT

60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

Ordered By: Report Sent to:Property Owner/Party in Interest:

COMPLETE REPORT LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT

Christopher Ellis

An inspection has been made of the structure(s) shown on the diagram in accordance with the Structural Pest Control Act. Detached porches, detached steps, detached decks and any other structures not on the diagram were not inspected.

Subterranean Termites Drywood Termites Fungus / DryRot Other Findings Further Inspection

If any of the above boxes are checked, it indicates that there were visible problems in accessible areas. Read the report for details on checked items.

Faira Real Estate Services608 State Street SouthKirkland, WA 98033

Nadi AhkterFaira Real Estate900 E Hamilton AveCampbell, CA 95008

Catherine Jones-Watts468 60th StreetOakland, CA 94609

441527

58 Wright Brothers AvenueLivermore, CA 94551(855) 331-1900 • Fax (925) 294-1816

PR1452

HomeGuardIncorporated

HomeGuard #: Escrow #:Registration #:

You are entitled to obtain copies of all reports and completion notices on this property filed with the board during the preceeding two years. To obtain copies contact: Structural Pest Control Board, 2005 Evergreen Street, Suite1500, Sacramento, California 95815.

NOTE: Questions or problems concerning the above report should be directed to the manager of the company. Unresolved questions or problems with services performed may be directed to the Structural Pest Control Board at (916)561-8700, (800) 737-8188 or www.pestboard.ca.gov.

Inspected by: Michael T Bartley License#: FR30986 Signature:________________________________________________

Page 47: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 2 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

AREAS NOT INSPECTED PLEASE READThis report is an inspection for wood destroying pests and organisms to a furnished, occupied structure. Some areas of the structure were inaccessible for inspection due to furnishings, appliances, floor covering, and/or stored personal property. We did not inspect areas immediately under furnishings or appliances, nor did we inspect inside finished walls or ceilings. Our inspection does not include any electrical, heating, air conditioning, structural adequacy, pest other than wood destroying pest or mechanical systems of the structure and will not detect building code violations. The plumbing was inspected and only the leaks outlined in our report were found at this time. However, we assume no responsibility for leaks that occur after the date of this inspection. There may be health related issues associated with the findings reflected in this report. We are not qualified to and do not render an opinion concerning any such health issues. The inspection report was limited to the visible and accessible areas only. Questions concerning health related issues, which may be associated with the findings or recommendations reflected in this report, the presence of mold, the release of mold spores or concerning indoor air quality should be directed to a Certified Industrial Hygienist. We did not inspect the interior of enclosed abutments or hollow stucco rails. As is standard practice within our industry and since our inspectors do not carry a 30' ladder on their vehicle, the eaves, wood siding and wood windows above 11' were only inspected visually from the ground. Upon request and at an additional charge HomeGuard Incorporated will return to the property and further inspect these inaccessible areas by probing the wood members. The inaccessible areas listed above which were not inspected will be inspected upon the owner's request and will be conditional to additional inspection fees.

NOTE: WE GUARANTEE ALL REPAIRS DONE BY THIS COMPANY FOR ONE (1) YEAR AND FUMIGATIONS FOR A PERIOD OF THREE (3) YEARS FROM THE DATE OF COMPLETION WITH THE EXCEPTION OF PLUMBING, GROUTING, CAULKING, RAIN GUTTERS AND RE-SETTING OF TOILETS WHICH ARE GUARANTEED FOR 30 DAYS FROM THE DATE OF COMPLETION. WE CANNOT GUARANTEE WORK PERFORMED BY OTHERS. WE MAKE NO GUARANTEE AGAINST FUTURE INFECTIONS, ADVERSE CONDITIONS, OR CONDITIONS PRESENT BUT NOT EVIDENT AT THE TIME OF OUR INSPECTION.

THE EXTERIOR SURFACE OF THE ROOF WAS NOT INSPECTED. IF YOU WANT THE WATER TIGHTNESS OF THE ROOF DETERMINED, YOU SHOULD CONTACT A ROOFING CONTRACTOR WHO IS LICENSED BY THE CONTRACTORS STATE LICENSE BOARD.

NOTICE: Reports on this structure prepared by various registered companies should list the same findings (i.e. termite infestations, termite damage, fungus damage, etc.). However, recommendations to correct these findings may differ from company to company. You have the right to seek a second opinion from another company.

"This company will reinspect repairs done by others within four months of the original inspection. A charge, if any, can be no greater than the original inspection fee for each reinspection. The reinspection must be done within ten (10) working days of request. The reinspection is a visual inspection and if inspection of concealed areas is desired, inspection of work while in progress will be necessary. Any guarantees must be received from parties performing repairs." Work performed by others will be reinspected for a fee of $195.00 for each trip out to the property. Open wall and open floor inspections are desirable if certification is required.

Page 48: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 3 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

THIS IS A SEPARATED REPORT WHICH IS DEFINED AS SECTION I AND SECTION II CONDITIONS EVIDENT ON THE DATE OF INSPECTION. SECTION I CONTAINS ITEMS WHERE THERE IS EVIDENCE OF ACTIVE INFESTATION, INFECTION, OR CONDITIONS THAT HAVE RESULTED IN OR FROM INFESTATION OR INFECTION. SECTION II ITEMS ARE CONDITIONS DEEMED LIKELY TO LEAD TO INFESTATION OR INFECTION BUT WHERE NO VISIBLE EVIDENCE OF SUCH WAS FOUND. FURTHER INSPECTION ITEMS ARE DEFINED AS RECOMMENDATIONS TO INSPECT AREA(S) WHICH DURING THE ORIGINAL INSPECTION DID NOT ALLOW THE INSPECTOR ACCESS TO COMPLETE HIS INSPECTION AND CANNOT BE DEFINED AS SECTION I OR SECTION II.

Section 1 Items1A. FINDING: The window jamb has been damaged by fungus at the area indicated on the

diagram. (See Picture 3) (See Picture 7)Remove and replace all the damaged wood members. If any damage is found to extend into any enclosed areas a supplemental report and bid will be issued.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1B. FINDING: The trim has been damaged by fungus at the area indicated on the diagram. (See Picture 4)Remove and replace all the damaged wood members. If any damage is found to extend into any enclosed areas a supplemental report and bid will be issued.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1C. FINDING: There is a minor amount of fungus damage at the siding. (See Picture 4) (See Picture 6)Hollow out this area and fill the void with a plastic filler.RECOMMENDATION:**********(SECTION 1 ITEM)**********

1D. FINDING: Fungus damage was noted to the rafter tail and trim as indicated on the diagram. (See Picture 5)Remove and replace the end of the damaged rafter tail and install a new sister section alongside for support.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1E. FINDING: Fungus damage and subterranean termite damage were noted to the support framing and substrate of the porch. The moisture membrane under the porch has failed and leakage through this membrane has contributed to the infection (See Picture 8) (See Picture 9) (See Picture 10) (See Picture 11)Break out and remove existing concrete and membrane. Remove and replace all damaged wood members and install new moisture membrane. Form and pour a new concrete cap.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

Page 49: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 4 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

1F. FINDING: Subterranean termites were noted subarea. (See Picture 9) (See Picture 10) (See Picture 11) (See Picture 12) (See Picture 14)Chemically treat the complete exterior soil at probable termite entry points with Termidor: Termidor HE(Fipronil:5-amino-1-(2,6-dichloro-4-(trifluoromethyl) pheyl)-4-((1,R,S)-trifluoromethyl)sulfinyl)-1-H-pyrazole-3-carbonitrile and break down and brush away all subterranean termite migratory tubes. In conventional construction, this may include, rodding or trenching the soil around the foundation walls, drilling attached slabs such as patios, porches, sidewalks, or driveways that abut the structure and treat the area on the interior of the foundation where the termites were found. A ground stop device will be used to prevent drilling into concealed pipes, conduit or electrical wiring however if this were to happen it will be the owners responsibility and expense to repair any damage done. The holes drilled into any concrete slab, while performing the treatments, will be plugged with mortar. It will be the owners responsibility to have these areas repaired to match the existing surfaces as desired. NOTE: In order to perform this treatment the property must be vacant for the period during and 3 hours after the treatment has been completed.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1G. FINDING: The toilet in the hall bathroom is leaking at the base. (See Picture 13)Reinstall the toilet correctly using no-seep toilet seal. If upon removing the toilet a cracked toilet or a damaged closet flange is revealed there will be additional charges.

NOTE: Above finding contributing to infection noted in 1H of this report.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1H. FINDING: There is a surface fungus condition located hall bathroom subarea, subfloor and mudsill. (See Picture 13) (See Picture 15)Scrape or wire brush this area and treat with a registered fungicide Timbor (Disodium Octoborate Tetrahydrate). NOTE: In order to perform this treatment the property must be vacated for the treatment and three hours after the treatment has been completed.

NOTE: This must be performed by a registered termite company or completely removed by owner/other trades.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

1I. FINDING: The stucco sheathing has been damaged by subterranean termites at subarea as indicated on the diagram. (See Picture 14)Reinforce these wood members as necessary. If damage is found to extend into inaccessible areas, a supplemental report will be issued with any findings, recommendations and bids.

RECOMMENDATION:

**********(SECTION 1 ITEM)**********

Section 2 ItemsNOTE: A tiled surface was noted over the kitchen, hall bathroom and laundry floors.

There is no outward sign of infestation or infection however we cannot represent the condition of floors beneath the tiled areas.

Page 50: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 5 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

2A. FINDING: Water stains were noted at the attic roof sheathing. This could indicate possible leakage through the roof covering.The owner is advised to contact a licensed roofing contractor to inspect the roof covering and make any revisions deemed necessary.

RECOMMENDATION:

**********(SECTION 2 ITEM)**********

2B. FINDING: Some of the grout is loose or missing around the ceramic tile in the hall bathroom floor adjacent to tub.Reseal the area in the most practical way. Owner to maintain in a water tight condition.

RECOMMENDATION:

**********(SECTION 2 ITEM)**********

Further Inspection Items3A. FINDING: This home was constructed without the use of a weep screed at the base of the

stucco. Although this was an accepted construction method it does create an area that can allow subterranean termites to access the home without being detected. This area can also allow condensation to build up and not drain properly. (See Picture 1)If further information is desired it will be necessary to install a series of test holes to allow for further inspection. All findings recommendations and bids will be issued in a supplemental report.

RECOMMENDATION:

**********(FURTHER INSPECTION ITEM)**********

3B. FINDING: The abutments as indicated on the diagram, are inaccessible for inspection. (See Picture 2)Install test holes through the exterior stucco to allow for further inspection. All findings, recommendations, and bids will be issued on a supplemental report.

RECOMMENDATION:

**********(FURTHER INSPECTION ITEM)**********

NOTE: State law requires that you be given the following information:

CAUTION-PESTICIDES ARE TOXIC CHEMICALS. Structural Pest Control Companies are registered and regulated by the Structural Pest Control Board, and apply pesticides which are registered and approved for use by the California Department of Pesticide Regulation and the United States Environmental Protection Agency. Registration is granted when the state finds that based on existing scientific evidence there are no appreciable risks if proper use conditions are followed or that the risks are outweighed by the benefits The degree of risk depends upon the degree of exposure, so exposure should be minimized.If within 24 hours following application, you experience symptoms similar to common seasonal illness comparable to the flu, contact your physician or poison control center and your pest control company immediately.

For further information contact any of the following:HOMEGUARD INCORPORATED (408) 993-1900Poison Control Center: (800) 876-4766Alameda County Agricultural Commission (510) 670-5232Alameda County Health Department (510) 267-8000Contra Costa County Agricultural Commission (925) 646-5250Contra Costa County Health Department (925) 646-6014

Page 51: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 6 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

San Joaquin Agricultural Commission (209) 953-6000San Joaquin Health Department (209) 468-3420

Structural Pest Control Board (800) 737-81882005 Evergreen Street Ste. #1500, Sacramento, CA 95815-3831

Local treatment is not intended to be an entire structure treatment method. If infestations of wood-destroying pests extend or exist beyond the areas of local treatment, they may not be exterminated.

NOTE: If damage is found to extend into any inaccessible areas a supplemental report will be issued listing additional findings, recommendations and bids.

NOTE: Should the further inspection items noted in this report not be performed, HomeGuard Incorporated will assume no liability for any infestations or infection which may be concealed in these areas.

NOTE: HomeGuard Incorporated recommends that all desired further inspection items be performed prior to any treatments being performed.

NOTE: HomeGuard Incorporated assumes no liability for, nor do we guarantee work performed by others. All guarantees, warranties, and permits if required should be obtained from the parties performing the repairs.

NOTE: If any of the wood repairs outlined in the above report are done by others, an open inspection must be performed by this company if a certification is desired.

NOTE: Please be aware that current law dictates that homes constructed prior to 1978 require a company performing the repairs be a Lead Certified Renovation Firm with Certified Renovators. HomeGuard Incorporated is a Lead Certified Renovation Firm, certification number NAT-64235-2 and when required will follow all lead safe work practices as prescribed by the United States Environmental Protection Agency.

NOTE: Thank you for choosing HomeGuard Incorporated to perform your inspections. If you have any questions regarding this report, please e-mail Michael Bartley at [email protected]. Please bear in mind that the inspectors have full schedules during the day and will make every effort to make contact with you when he is available.

If you require further assistance or wish to schedule work as recommended in this report, please feel free to contact our office. We are here to assist you!

Page 52: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 7 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

Report Pictures:Pictures are provided to assist in clarifying some of the findings made in this report. No relative importance should be placed on these pictures. There are likely to be significant comments that do not have pictures associated with them. The pictures in this report do not illustrate all of the damage associated with a particular item. Please read the report thoroughly and contact the inspector if you have any specific questions.

Picture 1 Picture 2

Picture 3 Picture 4

Picture 5 Picture 6

Page 53: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 8 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

Picture 7 Picture 8

Picture 9 Picture 10

Picture 11 Picture 12

Page 54: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

3/8/2018 Page 9 of 9468 60th Street Oakland 94609Building No. Street City ZIP Date of Inspection Number of Pages

Picture 13 Picture 14

Picture 15

Page 55: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

For the total sum listed above, HomeGuard Incorporated is authorized to proceed with the work described in the above listed item(s) of their termite report no. 441527 for the property located at 468 60th Street, Oakland. This amount will be due and payable upon completion of work. It is understood that the contract price does not include the charge of the structural pest control inspection report or re-inspection fees.

HOMEGUARD INCORPORATED AGREES:1.

2.3.

To be bound to perform this work for the price quoted in our cost breakdown for a period not to exceed 30 days.To use reasonable care in the performance of our work but to assume no responsibility for damage to any hidden pipes, wiring, or other facilities or to any, plant life, rain gutters, roofs; nor for damage or dirtying of stucco, plaster, paint, wall paper or other "finish-work" adjacent to areas where work is performed.

OWNER OR OWNER'S AGENT AGREES:1.

2.

3.

To pay for services rendered upon completion of work. This contract may be canceled at any time by the customer. In the event of such action, customer agrees to pay HomeGuard Incorporated in full for all items already completed, and time and material for all items only partialy completed. Time and material is calculated at the rate of one hundred and fifty dollars per man-hour and the cost of materials plus 25%. The customer also agrees that in the case of cancelation of the contract prior to starting the job, to pay all costs that have been incurred by Homeguard, such as permits, materials and any other associated costs. In the case of non-payment by owner, reasonable attorney fees and costs of collection shall be paid by the owner whether suit be filed or not.

To pay for service charge of 1.5 percent per month or portion of any month beyond 30 days after completion.

Owner grants HomeGuard Incorporated, a security interest in the above described real property to secure payment of the sum for work and inspeciton fee completed.

4.

5.

If additional damage is discovered by HomeGuard Incorporated, during the performance of work, company agrees to notify owner or agent of the amount of the damage and the cost of additional work to be done. This work will not be performed unless owner agrees.

If any additional work, plans or engineering is deemed necessary by the local building inspector, said work will not be performed without additional authorization from owner or owner's agent.

AUTHORIZATION AGREEMENT468 60th Street, Oakland - Report No. 441527

4. To replace damaged wood members with material which resembles, as closely as possible, the existing wood members with standard grade, readily available wood members.

To guarantee all repairs completed by this company for one year from the date of completion except for plumbing, grouting, caulking, and resetting of toilets, which will be guaranteed for 30 days.

6. All plumbing repairs bid in this report are for only the specific repair that is identified. Many times when performing plumbing repairs it becomes necessary to repair or replace adjacent plumbing because of the age or fragility of these components. When this happens the owner or agent will be notified and said repairs will require additional cost and authorization.

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

HomeGuardIncorporated

PLEASE BE SURE TO SIGN AND SEND ALL PAGES

Items to be performed:_____________________________________________________________

_______________________________________________________Total Price $______________

7. Prices provided in this report do not include the cost associated with obtaining permits. Permits will be obtained at an additional cost based on net cost of permit plus $300.

Page 1 of 3 Initials_____ ______58 Wright Brothers Avenue, Livermore, CA 94551HomeGuard Incorporated

Page 56: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

This job has been bid as if all section one items are being performed. If the owner would like to select individual items, it may require HomeGuard Incorporated to provide a new price for these items. The minimum service charge is $225 regardless of the price on the individual item.

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

AUTHORIZATION AGREEMENT468 60th Street, Oakland - Report No. 441527

HomeGuardIncorporated

NOTICE TO OWNER "Under the California Mechanics Lien Law any structural pest control company which contracts to do work for you, any contractor, subcontractor, laborer, supplier or other person who helps improve your property, but is not paid for his or her work or supplies, has a right to enforce a claim against your property. This means that after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your structural pest control company in full if the subcontractor, laborers or suppliers remain unpaid. To preserve their right to file a claim or lien against your property, certain claimants such as subcontractors or material suppliers are required to provide you with a document entitled "Preliminary Notice". Prime contractors and laborers for wages do not have to provide this notice. A Preliminary Notice is not a lien against your property. Its purpose is to notify you of persons who may have a right to file a lein against your property if they are not paid."

NOTICE "The charge for service that this company subcontracts to another registered company may include the company's charges for arranging and administering such services that are in addition to the direct costs associated with paying the subcontractor. You may accept HomeGuard Incorporated's bid or you may contract directly with another registered company licensed to perform the work. If you choose to contract directly with another registered company, HomeGuard Incorporated will not in any way be responsible for any act or omission in the performance of work that you directly contract with another to perform."

Section 1:

1A OthTrd 1B OthTrd 1C OthTrd 1D OthTrd 1E OthTrd 1F WillBid 1G OthTrd

1H OthTrd 1I OthTrd $0Section 1plus non-bid items plus permit fees

Section 2:

2A Owner 2B OthTrd $0Section 2plus non-bid items plus permit fees

Further Inspe

3A OthTrd 3B OthTrd $0F.I.plus non-bid items plus permit fees

Page 2 of 3 Initials_____ ______58 Wright Brothers Avenue, Livermore, CA 94551HomeGuard Incorporated

Page 57: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

AUTHORIZATION AGREEMENT

BINDING ARBITRATION PROVISION

OWNER OR OWNERS AGENT DATE

X________________________ __________

BY:______________________, HomeGuard Incorporated

ESCROW CO/NO:_______________________________

Name of person providing access ___________________________ Phone Number ______________________

ESCROW OFFICER:____________________________

Print Name_____________________________ ESCROW PHONE NO:___________________________

IS UPGRADING OR CHOICE OF LINOLEUM OR TILE DESIRED? Yes___ No___there may be additional charges for special materials chosen*****If there is no choice, neutral colors will be installed

PLEASE BE SURE TO SIGN AND SEND ALL PAGES

Upgrades (if requested) List each upgrade separately:

estimated cost: initials:

estimated cost: initials:

estimated cost: initials:

estimated cost: initials:

I authorize HomeGuard, Incorporated to complete the above listed upgrades. I also agree to pay for these upgrades upon completion of the repairs.

Signature

estimated cost: initials:

Any controversy or claim arising out of or relating to the inspection performed by HomeGuard Incorporated shall be settled by final and binding arbitration filed by the aggrieved party with and administered by the American Arbitration Association (hereafter referred to as "AAA") in accordance with its Construction Arbitration Rules in effect at the time the claim is filed. The Rules, information and forms of the AAA may be obtained and all claims shall be filed at any office of the AAA or at Corporate Headquarters, 335 Madison Avenue, Floor 10, New York, New York 10017-4605. Telephone: 212-716-5800, Fax: 212-716-5905, Website: http://www.adr.org/. The arbitration of all disputes shall be decided by a neutral arbitrator, and judgment on the award rendered by the arbitrator may be entered in any court having competent jurisdiction thereof. Any such arbitration will be conducted in the city nearest to the property that was inspected by HomeGuard Incorporated having an AAA regional office. Each party shall bear its own costs and expenses and an equal share of the administrative and arbitrators’ fees of arbitration. This arbitration Agreement is made pursuant to a transaction involving interstate commerce, and shall be governed by the Federal Arbitration Act, 9 U.S.C. Sections 1-16. THE PARTIES UNDERSTAND THAT THEY WOULD HAVE HAD A RIGHT OR OPPORTUNITY TO LITIGATE THROUGH A COURT AND TO HAVE A JUDGE OR JURY DECIDE THEIR CASE, BUT THEY CHOOSE TO HAVE ANY AND ALL DISPUTES DECIDED THROUGH ARBITRATION. BY SIGNING THIS AGREEMENT, THE PARTIES ARE GIVING UP ANY RIGHT THEY MIGHT HAVE TO SUE EACH OTHER.

To schedule work, email or fax this signed Authorization Agreement, or call directly:[email protected] (925) 294-1818 (855) 331-1900email: Fax: Direct:

468 60th Street, Oakland - Report No. 441527

HomeGuardIncorporated

Phone No______________________________

email____________________________________________________________________________

Page 3 of 358 Wright Brothers Avenue, Livermore, CA 94551HomeGuard Incorporated

Page 58: FAIRA TRANSPARENCY REPORTS 468 60th St, Oakland, CA …

Other:

Invoice No: LIV562187T

Report No. 441527TPR

Invoice Date: 3/9/2018

Inspection: 3/8/2018 $315.00

$0.00

$0.00

Address: 468 60th StreetOakland CA, 94609

Escrow#:

Christopher EllisFaira Real Estate Services608 State Street SouthKirkland, WA 98033

Invoice

Property Information:

Bill To:

Billing Information:

Complete

Notice of Completion:

Total Due: $315.00

HomeGuardIncorporated

DUE UPON RECEIPTPlease remit to 510 Madera Ave., San Jose, CA 95112

There is a $25 fee for all returned checks