Facility Plan-Timber Layout Presented by:- Bhavnesh Agale-1405005 Pritesh Chitte-1405007 Sanket Sable-1405016 Mahesh Kumar-1405024 Problem Definition

Facility Plan-Timber Layout

Embed Size (px)

Citation preview

Page 1: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 1/24

Facility Plan-Timber Layout

Presented by:-Bhavnesh Agale-1405005

Pritesh Chitte-1405007

Sanket Sable-1405016

Mahesh Kumar-1405024

Page 2: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 2/24

Problem Definition

Page 3: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 3/24

Project Aim Set up a centralized Depot

 Design a facility layout

Determine equipment availability

Project Scope Ensure understanding the BedRock’s current project environment

Knowledge of project environment

Observations and data gathering of various depots and analyzing these data

Determine best methodology and use it to develop facility plan

Conclusion gained from the project problem

Page 4: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 4/24

Problem Objective

Page 5: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 5/24

Primary and support activities

Primary Activities

Scanner Operations

Pecilling Operations

Chipper Operations

Bundling Operation

Buffer Operation

Support activities

Guard House

Parking

Offices

Workshops

Change Rooms

Page 6: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 6/24

Bleskop Service Center Current Layout

Page 7: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 7/24

From to chart

Page 8: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 8/24

Activity Relationship Chart

Page 9: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 9/24

Activity Relationship Chart

Page 10: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 10/24

Space Requirement

Page 11: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 11/24

Relationship Diagram

Page 12: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 12/24

Page 13: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 13/24

Departments in Block Layout

Department 1 Guard House Department 7 Scanner Department 2 Parking  Department 8 Sorted stock pile

Department 3 Offices Department 9 Pencilling operation

Department 4 Workshop Department 10 Chipper operation

Department 5 Change rooms Department 11 Bundling operation

Department 6 Off loading store pile Department 12 Buffer

Page 14: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 14/24

Block Layout 1

Page 15: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 15/24

Block Layout 2

Page 16: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 16/24

Block Layout 3

Page 17: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 17/24

Process Flows

Flow of Employee Employee Type 1: Assign to the offices

Employee Type2: Assign to the Yard

Flow of Timber

Flow of Truck Type 1 : Flow of incoming Trucks

Type 2: Floe of outgoing Trucks

Page 18: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 18/24

Flow of Employees

Page 19: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 19/24

Flow of Timber

Page 20: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 20/24

Flow of Trucks

Page 21: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 21/24

Material Handling

In the block layouts three areas have been demarcated for

material handling, where they will be performing certain

functions and those functions alone. The demarcated

areas will mainly cover the areas that will experience the

most frequent movement by handling equipment on a day

to day basis. The distances covered by handlingequipment within these demarcated areas will be

analyzed and taking in consideration during the evaluation

process

Page 22: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 22/24

Material Handling

Page 23: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 23/24

Evaluation and Analysis

Page 24: Facility Plan-Timber Layout

8/10/2019 Facility Plan-Timber Layout

http://slidepdf.com/reader/full/facility-plan-timber-layout 24/24

Conclusion

The physical site that is required to house a Centralised Depot in the

eMakhazeni area will be of the size 20262 Square Meter 

The proposed facility layout that is recommended to be implemented or used

as a benchmark will be block layout 2 as this was determined the most

feasible design by the weighted factor comparison method