    Facility/Plant Layout

    Plant Layout is most effective arrangement ofmachines, processing equipment and servicedepartments to have the best co-ordination &

    efficiency of man, machine and material in a plant .

    For a factory which is already in operation what is

    Facility layout ?

  • 8/9/2019 2 Facility Layout

    2/16

    Factors affecting Layout

    Types of industries

    Types of Production system

    Job shop production

    Type of product

    Volume of production

  • 8/9/2019 2 Facility Layout

    3/16

    Types of industries

    Synthetic process based

    Eg: Limestone + clay Cement

    Analytic process basedEg : Crude oil petroleum products

    Conditioning process based

    Eg :Jute products, milk products

    Extractive process based

    Eg : Bauxite Al ,

    Sugarcane juice Jaggery, sugar

  • 8/9/2019 2 Facility Layout

    4/16

    Types of production system

    Continuous production

    Std., high volume, capital intensive Pdts.

    Pdts made to store in inventory

    Continuous product flow

    Leaf springs

    Job shop production

    Made to order, low volume, labor-intense Pdts. Interrupted pdt flow

    Space aircrafts, space vehicles.

  • 8/9/2019 2 Facility Layout

    5/16

    Types of production system

    Batch Production

    medium volume of same type of item or pdt

    May be produced once or on regular interval

    Generally Plant capacity > demand

    General purpose machine but having productionrate

    Industrial equipt, furniture , plastic molding.

    Type of pdt.

    Product is heavy or light, large or small, liquid orsolid

  • 8/9/2019 2 Facility Layout

    6/16

    Types of Layout

    Fixed position Layout

    Major part of pdt remains in fixed space

    Limited space

    Different material at different stages

    Volume required is huge

    Ship building industry

  • 8/9/2019 2 Facility Layout

    7/16

    Types of Layout

    Process or Function Layout

    Low volume , high variety prodn

    All machines/eqpts of same type are grouped inone section or area

    All drilling machines, etc.

    Different sequence of operations

    Eg : patients Radiology, nursing beds, etc.

    Product Layout Flow of material unidirectionally

    Backtracking avoided

    Automobiles, refrigerators, sugar , steel, cementetc.

  • 8/9/2019 2 Facility Layout

    8/16

    Types of Layout

    Retail Layout

    Many products are exposed to customer

    Dairy pdts on oneside of supermkt &backery pdts on another.

    Objective profitability maximization

    Slotting manufactures have to pay fees for positioning Services -> Ambient conditions like lightning, sound, smell,

    temperature.

    Spatial layout & functionality

    Warehousing &Storage layout

    Optimise handling cost & cost of warehouse space

    .

  • 8/9/2019 2 Facility Layout

    9/16

    Combination Layout

    Process + Product Layout

    Office Layout

    Information more important

    Technology cellular phones, space utilisation,Internet, laptop computers

    Virtual companies require few employee

  • 8/9/2019 2 Facility Layout

    10/16

    Cross docking

    Avoid placing of materials, supplies in storage byprocessing them as received

    SLP

    Collect Data abt Current & forecasted prodn units

    PQRST

    Product,Supporting activities, Route,

    Supporting activites, Timing

  • 8/9/2019 2 Facility Layout

    11/16

    A Travel Chartis a simple table that is useful where thereare multiple (and possibly irregular) movement betweenplaces. It is a variation on the Check Sheet, indicatingmovements from and to any combination of a given setof locations.

  • 8/9/2019 2 Facility Layout

    12/16

    Gant Charts (Sequencing

    Technique)

    How each machine /work centre is planned for different joborders

    Scheduled start & finish times

    Word document

  • 8/9/2019 2 Facility Layout

    13/16

    LOB (Sequencing Technique)

  • 8/9/2019 2 Facility Layout

    14/16

    LOB

    Compare scheduled v/s Actual Units

    with period (Units Y, Time X)

    Find deviation , take corrective action

    If possible take preventive measures Forecast future performance

  • 8/9/2019 2 Facility Layout

    15/16

    Johnsons Rule

    Maiden Charm(Un) ltd beauty Pdts, go through twooperations: Preparation & Finishing at the respectivetwo places& in that order. The operation times atthese work- centres are given below:

    How should the above items be sequenced so thatthe total completion time is minimized ?

    BeautyPdts\hrs

    Preparationhrs

    Finishing Hrs

    Baby Blue 1 3

    Virgin White 4 2

    Shy Pink 5 4

    Daring Purple 2 5

  • 8/9/2019 2 Facility Layout

    16/16

    Use of computers for Scheduling

    Computers /software are requiredfor Production Analysis

    PPC software, SAP/ERP