FABRICATION OF STEEL COMPOSITE GIRDER DETAILS OF WORK EXECUTED BY SANFILED (INDIA) LIMITED S. No. Name & Description of work Contract awarding authority Authority under whom work executed Date of Award of the contract Agreement No. & Date Cost of Work (Rs.) Status 1 Fabrication, supply & Site supervision work of Steel Composite Girder for Railway Mumbai division ROB of KM-22/11-12 for Nardana Town bypass NH-3 NHAI/ Sadbav Engineering Ltd., Ahmedabad NHAI/ Sadbav Engineering Ltd., Ahmedabad 16.01.12 16.01.12 1,13,63,202/- Completed 2 Fabrication & supply of Steel Composite Girder with site supervision of ROB at Shobhapur Gate in lieu pf L.C. No. 318/SPL at KM994/5-6 on JBP-KTE Section of Jabalpur Division of West Central Railway WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur 11.10.12 Dtd 11.10.12 MOU dtd. 11.10.12 68,53,860/- Completed 3. Fabrication of Steel Composite Girder for Bridge No. 582 between Indore & Lokman Nagar Station for Western Railway. Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani DTD. 31.10.12 3,58,04,440/- Completed 4. Fabrication of Steel Composite Girder for Construction of ROB in Level crossing no. 259, at Rajendra Nagar Near Indore Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani DTD. 28.15.13 1,92,79,677/- Completed 5. Fabrication of Steel Composite Girder for Construction of ROB at LC No. 256 between ROW & MHOW near Indore Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani DTD. 26.10.13 1,12,24,644/- Completed 6. Fabrication of 06 Nos. 20.4 restricted Height Girder (25 T Loading standard) based on RDSO/B-11040; Additional work awarded for Fabrication of 01 no. 20.4 restricted height girder based on RDSO Drawing NO. RDSO/B-11041 DEN (East) North Central Railway, Jhansi ADEN, Mahoba 27.09.13 A/W/E/254 dtd 19.12.2013 1,23,57,784.30 Completed/ Additional work is in progress Cont….2/

FABRICATION OF STEEL COMPOSITE GIRDER …sanfieldindia.in/upload/jobref_girder.pdf · fabrication of steel composite girder details of work executed by sanfiled (india) limited s

  • Upload
    vanlien

  • View
    238

  • Download
    3

Embed Size (px)

Citation preview

Page 1: FABRICATION OF STEEL COMPOSITE GIRDER …sanfieldindia.in/upload/jobref_girder.pdf · fabrication of steel composite girder details of work executed by sanfiled (india) limited s

FABRICATION OF STEEL COMPOSITE GIRDER

DETAILS OF WORK EXECUTED BY SANFILED (INDIA) LIMITED

S. No.

Name & Description of work Contract awarding authority

Authority under whom work executed

Date of Award of the contract

Agreement No. & Date

Cost of Work (Rs.)

Status

1 Fabrication, supply & Site supervision work of Steel Composite Girder for Railway Mumbai division ROB of KM-22/11-12 for Nardana Town bypass NH-3

NHAI/ Sadbav Engineering Ltd., Ahmedabad

NHAI/ Sadbav Engineering Ltd., Ahmedabad

16.01.12 16.01.12 1,13,63,202/- Completed

2 Fabrication & supply of Steel Composite Girder with site supervision of ROB at Shobhapur Gate in lieu pf L.C. No. 318/SPL at KM994/5-6 on JBP-KTE Section of Jabalpur Division of West Central Railway

WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur

WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur

11.10.12 Dtd 11.10.12 MOU dtd. 11.10.12

68,53,860/- Completed

3. Fabrication of Steel Composite Girder for Bridge No. 582 between Indore & Lokman Nagar Station for Western Railway.

Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani

Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani

DTD. 31.10.12

3,58,04,440/- Completed

4. Fabrication of Steel Composite Girder for Construction of ROB in Level crossing no. 259, at Rajendra Nagar Near Indore

Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani

Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani

DTD. 28.15.13 1,92,79,677/- Completed

5. Fabrication of Steel Composite Girder for Construction of ROB at LC No. 256 between ROW & MHOW near Indore

Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani

Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani

DTD. 26.10.13 1,12,24,644/- Completed

6. Fabrication of 06 Nos. 20.4 restricted Height Girder (25 T Loading standard) based on RDSO/B-11040; Additional work awarded for Fabrication of 01 no. 20.4 restricted height girder based on RDSO Drawing NO. RDSO/B-11041

DEN (East) North Central Railway, Jhansi

ADEN, Mahoba 27.09.13 A/W/E/254 dtd 19.12.2013

1,23,57,784.30 Completed/ Additional work is in progress

Cont….2/

Page 2: FABRICATION OF STEEL COMPOSITE GIRDER …sanfieldindia.in/upload/jobref_girder.pdf · fabrication of steel composite girder details of work executed by sanfiled (india) limited s

Page:2

S. No.

Name & Description of work Contract awarding authority

Authority under whom work executed

Date of Award of the contract

Agreement No. & Date

Cost of Work (Rs.)

Status

7. Fabrication & Supply of RH Girder based on RDSO Drawing NO RDSO/B-11040 for LHS work at Malanpur on Gwalior-Bhind Section.

DEN (North) NCR, Jhansi/ GEETA CONSTRUCTIONS

DEN (North) NCR, Jhansi/ GEETA CONSTRUCTIONS

DTD 20.02.14

DTD 20.02.14

21.04 Lakh Completed

8. Fabrication & Supply of RH Girder based on RDSO Drawing NO RDSO/B-11040 for LHS work at Malanpur on Gwalior-Bhind Section.

DEN, (North) NCR Jhansi/ NARWANI CONSTURCTION CO.

DEN, (North) NCR Jhansi/ NARWANI CONSTURCTION CO.

DTD 20.02.14

DTD 20.02.14

21.04 Lakh Completed

9. Fabrication and supply of steel Composite Girder of 36 m span based on RDSO Drawing for Construction of ROB at Simhasth Bypass Road, Ujjain, M.P.

Sr. DEN, Western Railway, Ratlam/ Kalyan Toll Infrastructure Ltd.

RITES, Mumbai/ Western Railway

DTD. 30.09.13 DTD. 30.09.13 3,20,00,000/- Work-in-Progess

10. Supply of Fabrication (04 nos.) RH Girders Clear Span 18.330 m Total Length 20.40 M as per RDSO Drawing NO. RDSO/B-11040

Sr. DEN (Co), WCR, Bhopal

XEN/ADEN, WCR, Bhopal

DTD. 17.09.14 BPL/W/2013-14/27/08

95,13,884/- Work-in-Progess

11. BMC FLYOVER SITE, HABIBGANJ, BHOPAL

BHOPAL , MUNICIPAL CORP. / NCC LTD

WCR BHOPAL , NCCL/BMC-ROB/2014-15/313,

DTD. 27.02.15 15700000/-

WORK IN PROGRESS