1 Chapter 1 – Introduction Introduction This chapter provides a brief overview of the F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah (the project), including its location and key features. 1.1 Project overview Roads and Maritime Services (Roads and Maritime) is seeking approval to construct and operate the project. This project would comprise a new, twin motorway tunnel between the New M5 at Arncliffe and President Avenue at Kogarah. The project would be located mainly within the Bayside local government area (LGA), with a small area in the Canterbury Bankstown LGA around nine kilometres to the southwest of the Sydney Central Business District (CBD). The project would be predominately located underground, with the majority of the motorway operational surface infrastructure located within land that has been previously reserved for the F6 Extension (the existing F6 reserved corridor). Figure 1-1 depicts the project and its surrounding location. Project features are outlined in section 1.2, and are provided in greater detail in Chapter 6 (Project description). Once complete, it would improve connections and travel times between the A1 Princes Highway and other arterial roads, south of President Avenue, and the Sydney CBD. It would also improve connections for residents and businesses within the broader regional area, promoting and supporting economic development in areas to the south such as Sutherland and the Illawarra. The project would form the first stage of the F6 Extension. The existing F6 reserved corridor between Arncliffe and Loftus was reserved in the 1950s to ensure land was available to accommodate the required road infrastructure for a future connection to link the existing A1 Princes Highway at Loftus with the Sydney motorway network at Arncliffe. Much of that same reservation remains in place today and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought under Part 5, Division 5.2 (State significant infrastructure) of the Environmental Planning and Assessment Act 1979 (NSW) (EP&A Act), requiring an environmental impact statement (EIS). If approved, it would be carried out generally in accordance with its description in this EIS and any conditions issued upon approval of the project, taking into account subsequent response to submissions and any preferred infrastructure report. F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah 1-1

F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

1

Chapter 1 – Introduction

Introduction

This chapter provides a brief overview of the F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah (the project), including its location and key features.

1.1 Project overview Roads and Maritime Services (Roads and Maritime) is seeking approval to construct and operate the project. This project would comprise a new, twin motorway tunnel between the New M5 at Arncliffe and President Avenue at Kogarah.

The project would be located mainly within the Bayside local government area (LGA), with a small area in the Canterbury Bankstown LGA around nine kilometres to the southwest of the Sydney Central Business District (CBD). The project would be predominately located underground, with the majority of the motorway operational surface infrastructure located within land that has been previously reserved for the F6 Extension (the existing F6 reserved corridor).

Figure 1-1 depicts the project and its surrounding location. Project features are outlined in section 1.2, and are provided in greater detail in Chapter 6 (Project description).

Once complete, it would improve connections and travel times between the A1 Princes Highway and other arterial roads, south of President Avenue, and the Sydney CBD. It would also improve connections for residents and businesses within the broader regional area, promoting and supporting economic development in areas to the south such as Sutherland and the Illawarra.

The project would form the first stage of the F6 Extension. The existing F6 reserved corridor between Arncliffe and Loftus was reserved in the 1950s to ensure land was available to accommodate the required road infrastructure for a future connection to link the existing A1 Princes Highway at Loftus with the Sydney motorway network at Arncliffe. Much of that same reservation remains in place today and forms part of the study area being considered in investigations for the F6 Extension.

Approval for the project is being sought under Part 5, Division 5.2 (State significant infrastructure) of the Environmental Planning and Assessment Act 1979 (NSW) (EP&A Act), requiring an environmental impact statement (EIS). If approved, it would be carried out generally in accordance with its description in this EIS and any conditions issued upon approval of the project, taking into account subsequent response to submissions and any preferred infrastructure report.

F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah 1-1

Page 2: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

Chapter 1 - Introduction

I

~ \

BEXLEYN0~

f <

y X

ALLAWAH

\

\ - \ < \ \,,,

)( '>- r 'I'"' \,

, ' l

LEGEND

'-

BEXLEY X

x~ ~

\-~

" ~ <

y<.

- • The project in tunnel - The project on surface - Permanent power supply line • • • On-road cycleway

I 1

L

'I ARNCl.lF:FE

New Ms i,

, I I I I I

\ I I l I ,.C 1

J (,

~

,-

MONTEREY

f-1-fl

f t L L I1P

Tt I

r r I I

!!l, ,r

- Road • • Railway line

Waterway Waterbody

-- Shared cycle and pedestrian pathways Parks and recreation

Figure 1-1 Project overview and location

I 'I ! Ll ,. I I

I I j l ~ I //

f~ )fl' ~ I/ ✓ I' y I

A

ENMORE

.\ \-

I

\,

/ ( csfl~

,cP,.. t;l,e1-~ MASCOT

Botany Bay

a 0.5

' I I j

1 km

1-2

Page 3: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

Chapter 1 – Introduction

1.2 Project features Key components of the project would include:

• An underground connection to the existing stub tunnels at the New M5 at Arncliffe

• Twin motorway tunnels (around four kilometres in length) between the New M5 at Arncliffe and President Avenue, Kogarah

• A tunnel portal and entry and exit ramps connecting the tunnels to the surface

• An intersection with President Avenue, including widening and raising of President Avenue

• Intersection improvements at the President Avenue / Princes Highway intersection

• Mainline tunnel stubs to allow for connections to future stages of the F6 Extension

• Shared cycle and pedestrian pathways connecting Bestic Avenue, Rockdale to Civic Avenue, Kogarah via Rockdale Bicentennial Park (including an on-road cycleway)

• An Operational Motorway Control Centre to be located off West Botany Street, Rockdale

• Ancillary infrastructure and operational facilities for signage (including electronic signage), ventilation structures and systems at Rockdale, fire and safety systems, and emergency evacuation and smoke extraction infrastructure

• A permanent power supply connection from the Ausgrid Canterbury subtransmission substation to the operational facility at West Botany Street

• Temporary construction ancillary facilities and temporary works to facilitate the construction of the project.

Project features are shown on Figure 1-2.

1.3 Project benefits The project would deliver the following key benefits and opportunities:

• Improved network productivity on the metropolitan network, with more trips forecast or longer distances travelled on the network in shorter timeframes

• Reduced congestion on surface roads, including Princes Highway and The Grand Parade, by providing an underground motorway alternative. This would also enhance the use of surface roads for public transport and cyclists

• Improved accessibility and connectivity for active transport modes

• Improved travel times for some bus services by decreasing traffic along the Princes Highway, and other arterial roads, particularly towards the Sydney CBD, and improved accessibility to the nearby local train stations, thereby supporting greater use of public transport

• Improved intersection operation and traffic flow, leading to a reduction in traffic incidents. Changes to surface road layouts and provision of additional pedestrian and cyclist links would make it safer for pedestrians and cyclists

• Enabler of place making along sections of the Princes Highway and The Grand Parade due to the reduction of the number of vehicles on these roads, resulting in improvements to urban amenity.

Further transport outcomes and social and economic benefits associated with the project are discussed in this EIS.

F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah 1-3

Page 4: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

Chapter 1 - Introduction

Indicative only, subject to design development

TURRELLA •••I i1·

WOLLI CREEK ~f1 \ 8 ,:X\ Stfee

~IS

2/ ~ ~~ # ~ Station ~~ OJ!~r -T""-ir----------, "~ 0 Ci) ~~/ Underground

BARDWELL 00,. <?-o~ ~ ,! +. , + connection with VALLEY >!Jo<:-~ ~~ ~,.7 New M5 Motorway

-:....-:...-:_-=-=--- ~~o~ ~' .....r~ ' ~~~~ ~ ~~

~e<:-~0 ---::;.._-:_-:_-:.::-,_ ARNCLIFFE _.f!y/~ ,-• 0~ -----=-=-=---~-----..;:r--- _.,# -- --~ ~~

\,o~ <?-oeo • ~ ~ ~ ~ ~ ?/\ . /;

\ -~ .. /;~ ,,,,,,- •• IIi~

\ .· ,,\ ,r·~-\ Gardiner Park ;. I Tunnels

~ ·~ -\ Banksia ,., ____ __.

\ Station J f\ \V .s,- ;__ .

- - - .,51 - t- - BANKSIA

l t /•••••

Rockdale Station

(J)

t / • II I I /

ROCKDALE ,, ;

, JJ I

Bestic Street a5 f!!

/;j

t-./!l0

Q'.J

Barton Park

/ ,• { Mccarthyf , Reserve

BEXLEY BRIGHTON-LE-SANDS

Frys Resecve

Hogben Park

Kogarah e'-Station ~'i:>~0

G) <?-e~e<:-

Intersection upgrade

I I ' s '

I /Y.s'tr6I / Sfl I / G \ I / \\\\ Rockdale

L Bicentennial

' 7 Park+

Widening and upgrade works

ark North

.. ____ , I I I I

'J'!'<.'!'<.I I

I I

MASCOT

KYEEMAGH

Botany Bay

KOGARAH

j carborough a5 f!!

?i5 'al E MONTEREY J

Full permanent power supplyline alignment is shown in Chapter 6 (Project description).

0

President Avenue intersection 0 250 500 m

LEGEND

- ■ The project in tunnel - The project on surface - - ,On-road cycleway - Shared cycle and pedestrian pathways )( President Avenue shared cycle and

pedestrian bridge

Figure 1-2 Project features

1::1 Tunnel stub

n Tunnel portal

0 Water quality basin

■ Water treatment facility

+ Rockdale ventilation facility

G Motorway operations complex

- Road

- Permanent power supply line Waterway New M5 Tunnel • • Railway line

GJ Arncliffe ventilation facility* G) Railway station

* Under construction as part of the New M5 Motorway project

Parks and recreation

1-4

Page 5: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

EIS is divided into seven volumes

Volumes 1 to 2 comprises:

1 I Introduction

Provides an overview of the project.

2 I Assessment process

Outlines the statutory requirements and explains the steps in the assessment and approval process.

3 I Consultation

Outlines the consultation acti vities undertaken , issues raised and how these issues have been addressed , as well as outlining the consultation acti vities planned .

4 I Strategic context and project need

Provides the strategic context and the need for the project , including the consequences of not proceeding .

5 I Project alternatives and options

Outlines the alternatives and options considered in developing the project.

6 I Project description

Provides a detailed description of the project including the route alignment , design standards and key design features.

7 I Construction

Describes how the project is likely to be constructed .

8-23 I Environmental assessment

Provides an assessment of environmental impacts and presents management and mitigation measures.

24 I Project Synthesis

Presents a synthesis of the EIS including the justification for the project.

Volumes 3 to 7 comprises:

Appendices

A Statutory requirements

B Draft community consultation framework

C Place making and urban design

D Traffic and transport technical report

E Air quality technical report

F Human health technical report

G Noise and vibration technical report

H Biodiversity development assessment report

Social and economic supporting information

J Contamination technical report

K Groundwater technical report

L Surface water technical report

M Flooding technical report

N Statements of heritage impact

0 Methodologies

Chapter 1 – Introduction

1.4 Purpose of this environmental impact statement This EIS has been prepared in accordance with the relevant provisions of the EP&A Act. This EIS has been prepared to address the Secretary’s Environmental Assessment Requirements (SEARs) issued by the Planning Secretary on 23 January 2018 and the relevant provisions of Part 3 of Schedule 2 of the Environmental Planning and Assessment Regulation 2000 (NSW).

In accordance with Division 5.2 of the EP&A Act, this EIS presents an assessment of potential environmental issues identified during the planning and assessment of the project. The assessment considers the area directly or indirectly affected by construction and operation of the project, as relevant to each technical assessment. This EIS also provides the proposed management and mitigation measures to mitigate impacts both during construction and operation.

This EIS will be placed on public exhibition and will provide an opportunity for the community, government agencies and other interested parties to comment on the project. Roads and Maritime will consider this feedback and respond to issues raised in a submissions report. Further details on the assessment process for the project are provided in Chapter 2 (Assessment process).

The SEARs are provided in Appendix A (Statutory requirements), along with a reference to where these have been addressed in this EIS.

F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah 1-5

Page 6: F6 Extension Stage 1 EIS Volume 1A · 2020. 4. 7. · and forms part of the study area being considered in investigations for the F6 Extension. Approval for the project is being sought

Chapter 1 – Introduction

(blank page)

F6 Extension Stage 1 from New M5 Motorway at Arncliffe to President Avenue at Kogarah 1-6