External Dimple Coil Connector
WT-1305-XXXX-AXX Tool Manual
Manual
Revision Prepared Checked Approved Date
B D. Begg B. Ewing M. Innes 25/09/2014
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305 -
External Dimple Coil Connector.docx Page 2 of 13
Hunting Energy Services (Well Intervention) Ltd
Contents
Hunting Contacts ................................................................................................... 3
Disclaimer .............................................................................................................. 4
1.0 Health and Safety ............................................................................................ 5
1.1 General .................................................................................................... 5
1.2 Precautions .............................................................................................. 6
1.3 PPE .......................................................................................................... 6
1.4 Pressure Control ...................................................................................... 6
2.0 Description ...................................................................................................... 7
3.0 External Dimple Coil Connector Components: .............................................. 7
4.0 Make Up Procedure ......................................................................................... 8
5.0 Disassembly Instructions ................................................................................. 9
6.0 Assembly Instructions ..................................................................................... 9
7.0 Maintenance .................................................................................................. 10
7.1 Recommended Lubricants/Chemicals:.................................................. 10
8.0 Troubleshooting ............................................................................................. 11
9.0 Recommended Spares/Accessories ............................................................... 11
10.0 Transportation.............................................................................................. 11
11.0 Storage Requirements .................................................................................. 12
12.0 Disposal ....................................................................................................... 12
APPENDIX I: Assembly Drawing ...................................................................... 13
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305 -
External Dimple Coil Connector.docx Page 3 of 13
Hunting Energy Services (Well Intervention) Ltd
Hunting Contacts
Hunting Energy Services (Well Intervention) Ltd has offices at several locations around the world. If you
have any problems, queries or require spare parts, please contact a representative located nearest to you.
Alternatively if you have Internet access you can E-mail us or visit our website.
Please quote the Part No and the Serial No in all correspondence as this will help expedite your query.
Internet
Web: www.huntingplc.com
E-mail by Region:
Middle East, North Africa, Caspian:
Asia Pacific:
USA, South America, Mexico:
Canada:
UK, Europe, West Africa, Russia:
United Kingdom
Hunting Energy Services (Well Intervention) Ltd
Badentoy Avenue
Badentoy Industrial Park
Portlethen
Aberdeen
AB12 4YB
Scotland
Tel: + 44 1224 787000
Fax: + 44 1224 787100
United States of America
Hunting Energy Services (Well Intervention) Ltd
1018 Rankin Road
Houston
Texas
77073
Tel: + 1 281 821 5577
Fax: + 1 281 821 6633
Dubai
Hunting Energy Services (Well Intervention) Ltd
Building 23
Oilfield Supply Center
Jebel Ali
P.O. Box 261929
Dubai
UAE
Tel: + 971 4887 6850
Fax: + 971 4887 6849
Singapore
Hunting Energy Services (Well Intervention) Pte Ltd
22 Pioneer Crescent
#05-07 West Park BizCentral
Singapore 628556
Tel: + 65 6863 0668
Fax: + 65 6863 9196
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 4 of 13
Hunting Energy Services (Well Intervention) Ltd
Disclaimer
“All rights reserved. No part of this publication may be reproduced in any material form (including
photocopying or storing it in any medium by electronic means or whether or not transiently or
incidentally to some other use of this publication) without written permission of the copyright owner,
except in accordance with the provisions of the copyright, Design and Patents Act 1988 or under the
terms of a licence issued by the Copyright Licensing Agency. Application for the Copyright owner’s
written permission to reproduce any part of this publication should be addressed to Hunting PLC, 5
Hanover Square, London, SW15 5HQ.
Warning: The doing of an unauthorised act in relation to a copyright work may result in both a civil
action for damages and criminal prosecution.
Whilst every effort has been taken to ensure the accuracy of this publication, the editors and authors
accept no responsibility for any inaccuracies or omissions contained herein.”
This Technical Manual covers the general usage and maintenance of this equipment. This equipment
operates under high pressure. As such a great deal of care must be taken to ensure the safety of those
operating this equipment as well of those in its vicinity. It is critical that an adequate maintenance
regime is kept and that personnel fully understand the purpose and the operation of this equipment
before taking it out into the field.
The procedures described herewith are not intended as a replacement to local laws or regulations, nor
your companies’ policies and procedures. If in any doubt contact your local authority, company
superior or a Hunting Energy Services (Well Intervention) representative.
Failure to perform routine maintenance checks could invalidate manufacturer warranty.
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 5 of 13
Hunting Energy Services (Well Intervention) Ltd
1.0 Health and Safety
1.1 General
Personnel using this manual to perform maintenance should have basic training in the following
disciplines:
• Manual handling
• MSDS and COSHH
• Use of workshop equipment
• Use of hand tools (PUWER)
Other basic courses may be required depending on regulations in the location/region that the
equipment is being used.
Safety is everyone’s responsibility, anyone can stop an operation should they deem an act unsafe no
matter what their position is within an organisation.
By following this document, using hand tools correctly, and following working practices the risk of
injury will be reduced to negligible.
CAUTION
• Read service manual before operating
• Observe all safety precautions
• This system is capable of producing high fluid pressures - appropriate considerations are
required
• Check that only qualified personnel are in immediate area around equipment
• Suitable PPE must be worn at all times
• Do not try to tighten or loosen connections under pressure
• Do not weld, file or use metal stamps on the pressure equipment - these can create cracks
which could result in structural damage/failure
• Do not attach anything to this equipment unless you are sure of its pressure rating
• Watch for trapped pressure. Bleed off fully before breaking down tool
Observe the maximum allowable operating pressure of all system components.
Observe the operating conditions of components.
Never stand under suspended loads or in the lifting area!
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 6 of 13
Hunting Energy Services (Well Intervention) Ltd
1.2 Precautions
A competently deemed person must be in attendance when performing maintenance on this
equipment. To be deemed competent the individual should have received training on the subject
followed by being observed performing the tasks to the required standard over a time period.
Personnel competence criteria are defined by the technician’s employer.
Hand tools that have not been maintained can lead to accidents; therefore all equipment must be
inspected before use.
1.3 PPE
Basic personal protective equipment must be worn at all times during the maintenance procedures.
There may be the need to use more specific items when using specialised tools, these rules must be
followed to reduce risk of injury. Basic items deemed by Hunting for maintenance personnel are as
follows:
• Safety footwear
• Safety glasses
• Hand protection
• Long sleeved coverall
Some workshop regulations deem that hard hats / bump caps and hearing protection must be worn in
maintenance shops, these will be defined by the policy owner. If working in the field, all of the above
items may need to be worn at all times, once again, this is defined by the company / client’s policies.
1.4 Pressure Control
Working with pressure exposes personnel to one of the greatest risks in our industry hence all
personnel must have received formal training on this subject. Company / Client pressure guidelines
must be adhered to with no deviation from the policies. Personnel performing pressure tests must
observe regulations concerning pressure test bays and operating instructions for pumps. All equipment
must be rated for the pressure being applied and certified.
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 7 of 13
Hunting Energy Services (Well Intervention) Ltd
2.0 Description
The External Dimple Coil Connector is an external type connector for coil tubing. A Dimple Jig is
first used to imprint the dimples on the coil. The External Coil Connector is then fitted on the OD of
the coil. Locking screws are then located through the Connector onto the dimples to fasten the
Connector onto the coil.
3.0 External Dimple Coil Connector Components:
Item # Description
1 External Dimple Connector
2 Coil
3 Hex Soc Set Screw
4 O-Ring
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 8 of 13
Hunting Energy Services (Well Intervention) Ltd
4.0 Make Up Procedure
• The coiled tubing should be dressed prior to being dimpled with the External Dimple Jig
Assembly and should be cut square and chamfered with a file. Measure length inside Dimple
Jig (4) and mark Coiled tubing to match
• Push Dimple Jig (4) onto dressed coiled tubing
• Marked length should sit flush with Dimple Jig end face
• If marked length is not flush, use slide Hammer (3) to knock on end of Dimple Jig until line is
flush with end face
• Turn Dimpling Screw (5) a couple of turns. Repeat for Dimpling Screw at 180 degrees.
Repeat this procedure until all 12 off screws are inserted
• Using an Allen Key fully tighten Dimpling Screw onto coil until Dimpling Screw Head
shoulders out on Dimple Jig OD. Repeat this process for all 12 off Dimpling Screws
Note: Dimpling Screw Head must bottom out on OD of Dimple Jig.
• Remove all Dimple Screws from Dimple Jig (4) and remove from coiled tubing
Note: If Dimple Jig cannot be pulled from the coiled tubing use Hammer Slide and knock
against face of Top Sub (1).
• Ensure that the O-Rings (4) are fitted in the bore of the Connector (1) as per assembly
procedure
• Measure length inside Connector (1) and mark Coiled tubing to match
• Ensure a liberal coating of grease is applied to the inside of the Connector (1) & the OD of the
coiled tubing
• Push Connector onto coiled tubing and line up screw holes of Connector (1) with the dimples
on coiled tubing
• Marked length should sit flush with Connector end face
• If marked length is not flush, use slide Hammer (3) to knock on end of Connector until line is
flush with end face
• Insert Set Screws (3) into Connector (1) landing out in the dimples on the coil
• Pull test and pressure test as per operational requirements
Note: Refer to Assembly drawing for tool end connections in Appendix 1.
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 9 of 13
Hunting Energy Services (Well Intervention) Ltd
5.0 Disassembly Instructions
Generally, if the connector is to be disassembled it will still be attached to a piece of coil. If this is the
case the following applies, if not disassembly is simply the reverse of the assembly procedure.
Item numbers called out in this document correspond with assembly drawings in Appendix 1.
• Remove all Set Screws (3) from the Connector (1)
• If for any reason it is not possible to remove the connector from the coil, simply cut the coil
approx. 10” from the Connector (1) and ship back to workshop for Disassembly
• Remove O-Rings (4) from Connector (1). (Typ. 2 places)
6.0 Assembly Instructions
Clean and inspect all parts prior to assembly. De-burr any rough edges and buff all seal surfaces
where required. All seals and sealing surfaces should be lubricated with multipurpose grease and
threads should be coated with an anti-seize compound prior to make-up.
Item numbers called out in this document correspond with assembly drawings in Appendix I.
• Fit O-Rings (4) into the Connector (1). (Typ 2 off places)
• Insert Set Screws (3) into the Connector (1). (Typ. 12 places)
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 10 of 13
Hunting Energy Services (Well Intervention) Ltd
7.0 Maintenance
• Completely disassemble all components and clean thoroughly before inspecting for wear,
corrosion or damage
• Threaded connections must be inspected thoroughly
• Elastomers showing any wear should be replaced
BEFORE EVERY JOB:
• Certification should be checked to confirm equipment compliance with operational needs
• Confirm all component pieces are tightened correctly
• Pressure test and function as per operational requirements
AFTER EVERY JOB:
• Disassemble, clean and inspect all components
• Inspect all seals and sealing surfaces, replace as necessary
• Check all threaded connections
• Reassemble as per the assembly instructions
WHEN CHECKING COMPONENTS FOR DAMAGE OR WEAR:
Particular attention should be paid to:
• Seals
• Threads
• Set Screws
Lubricate all seals and install new seals if required.
Many companies have established preventive maintenance programs that require re-certification of
the equipment on a quarterly, semi-annual, or annual basis. These policies / procedures can only
supersede Hunting recommended maintenance if they are more intensive.
If in doubt contact your local Hunting office for clarification.
7.1 Recommended Lubricants/Chemicals:
• Multipurpose Grease
• Dry Film Lube
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 11 of 13
Hunting Energy Services (Well Intervention) Ltd
8.0 Troubleshooting
9.0 Recommended Spares/Accessories
Re-dress kits are available for all External Dimple Coil Connectors. For part number refer to Assembly Drawing in Appendix 1.
Recommended Accessories:
• Thread protector (plastic)
• Hand tools associated with the redress process
For accessories that do not have part numbers stated contact the Hunting sales department for details.
10.0 Transportation
The Hunting External Dimple Coil Connector should be transported:
• Fully assembled
• With thread protectors fitted
Problem Possible Cause Solution
Won't Hold
Pressure Damage to O-Rings
Disassemble, Check For Sharp
Edges, Clean Up Sharp Edges and
Fit New O-Rings
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 12 of 13
Hunting Energy Services (Well Intervention) Ltd
11.0 Storage Requirements
Draining after Testing:
All equipment shall be drained, dried and lubricated after testing and prior to storage or shipment.
Age Control of Non-Metallic Materials:
• Indoor storage
• Maximum temperature not to exceed 49 °C (120 °F)
• Protected from direct natural light
• Stored unstressed
• Stored away from contact with liquids
• Protected from ozone and radiographic damage
12.0 Disposal
Hunting does not have a working life limit for its coiled tubing equipment. Good maintenance and
correct adherence to procedures will increase the longevity of the equipment.
.
G:\HESWI\Engineering\From Welltonic Engineering\1 - Misc\Welltonic Tool Manuals\01. Approved\Editable Word Docs\1305
- External Dimple Coil Connector.docx Page 13 of 13
Hunting Energy Services (Well Intervention) Ltd
APPENDIX I: Assembly Drawing