Expansion: FDOT. JUNE. JULY. AUGUST. SEPTEMBER. OCTOBER. NOVEMBER. DECEMBER. 30-03. 06-10. 13-17. 20-24. 27-01. 04-08. 11-15. 18-22. 25-29. 01-05. 08-12. 15-19. 22-26. 29-02. 05-09. 12-16. 19-23. 26-30. 03-07. 10-14. 17-21. 24-28. 31-04. 07-11. 14-18. 21-25. 28-02. - PowerPoint PPT Presentation
Citation preview
1
Expansion: FDOT
30-03 06-10 13-17 20-24 27-01 04-08 11-15 18-22 25-29 01-05 08-12 15-19 22-26 29-02 05-09 12-16 19-23 26-30 03-07 10-14 17-21 24-28 31-04 07-11 14-18 21-25 28-02 05-09 12-16 19-23 26-30JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
8.0 INSTALL REFURBISHED RSEs
8.2 FLORIDA
8.2.3 SAIC Installation Support
9.0 BOX-SHIP MICHIGAN RSE SPARES019.1-2 Inventory-Box Michigan RSE Spares
039.3 Ship & Receive Michigan RSE Spares 08
10.0 ITS WORLD CONGRESS
16 20
11.0 DECOMISSION RSEs
& RETURN TO USDOT
EXHIBITOROPERATIONAL
TESTS & DRY RUNS
SYSTEM TESTING
12Test Readiness Review (TRR)
FDOT Installs GPSI-4
FDOT Receives Shipment of 5.9 Ghz Antennas (25
QTY)
FDOT Installs 13 RSEs (Priority to 9 SPaT Sites)
FDOT Installs 1 RSE at
Convention Lot
SWRI Prelim.
HIA Test on I-4
SAIC Ships
Test Bed Vehicle
to FDOT
USDOT & FDOT Vehicle
Use Agrmnt
KAPSCH Radio Survey & SPaT
Test Bed Vehicle w/ OBE & HIAs
Verify Tests
2922
22
29
18