Vanita Saini, PEDistrict Four Project Manager
Florida Department of Transportation
FDOT District Four Major Projects
• US-1 Bascule Bridge Replacement, Jupiter Inlet Palm Beach County – Bid Opening May 2021 – FM# 428400-2
• SR A1A North Causeway Bridge Replacement St. Lucie County – Bid Opening October 2021 - FM# 429936-2
• SR-710 Beeline Hwy Reconstruction/Widening Palm Beach County – Bid Opening March 2022 - FM# 419251-1
• SW 10th Street & I-95 Direct Connector Broward County – I-95 Bid Opening July 2023 - FM# 436964-2
SW 10th Bid Opening July 2024 – FM# 439891-1
Florida Department of Transportation
Project Locations
SR 710 (Northlake Blvd to Blue Heron Blvd)
SW 10th Street Connector
Jupiter US 1 Bridge (CR A1A to Beach Rd)
Not to ScaleSR A1A North Causeway Bridge
Project milestones reflected in the presentation are subject to change; they are based on current project schedules and funding.
Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge• Bridge Length – 915 ft• Roadway Reconstruction – 2,470 ft• Full closure with detour• Intersection improvements and ITS along
detour route• Innovations included
Pre-detour work Hybrid-phased construction – Commission half
of new bridge during detour Precast elements for bascule pier footing Preassembly of bascule leaves Simplified machinery and electrical installation
Location Map
Florida Department of Transportation
INTERSECTION IMPROVEMENT 1US 1 at Beach Rd/Alt A1A at Old Dixie Hwy
INTERSECTION IMPROVEMENT 3US 1 at SR 706
INTERSECTION IMPROVEMENT 2ALT A1A at SR 706
Intersection improvements along detour route
Mitigate community impacts during detour
New ITS features along detour route
SR 5/US-1 Federal Highway Bridge
Florida Department of Transportation
Improved Navigational Clearances
90’ between fenders
25’ @ Center
Existing Bridge Navigational Clearances
21’ @ Fender
Proposed Bridge Navigational Clearances
125’ between fenders
42’ @ Center38’ @ Fender
Florida Department of Transportation
Florida Department of Transportation 7Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge
Twin Double Leaf Bascule Span
Florida Department of Transportation 8Florida Department of Transportation
SR 5/US-1 Federal Highway BridgeTwin Double Leaf Bascule Span
Florida Department of TransportationFlorida Department of Transportation
SR 5/US-1 Federal Highway BridgeProject Status/Schedule
Initial Plans (30%)January 2018
Constructability Review(60%)November 2019
Biddability Preparation(90%)May 2020
Plans CompleteDecember 2020
Bid OpeningMay 26, 2021
Construction Phase beginsJuly 2021
• Design-Bid-Build Project• Current Estimate $126 Million• FDOT PM Bing Wang• Project Website: https://www.fdot.gov/projects/jupiterus1bridge/main
Florida Department of Transportation
Project Location Map
• SR 710 Roadway Reconstruction –3.1 miles
• Northlake Blvd Roadway Reconstruction - 4000 ft.
• Turnpike Bridge Length – 320 ft. 10 Lanes (180 ft. wide) Pre-Stress Concrete
• Lighting, Mast Arm Signalization, Closed Drainage System with Ponds, and Railroad Crossing
SR 710 Beeline Highway Reconstruction / Widening
Florida Department of Transportation
Partial Continuous Flow Intersection• The partial continuous flow intersection will direct vehicles turning left from SR 710 / Beeline
Highway to Northlake Blvd. away from the main intersection to relieve congestion • U-turn movements introduced for left turn movements:
o WBL from Northlake Blvd. to SB SR 710o SBL from SR 710 to EB Northlake Blvd.
• Level of Service improvements for peak hour design year 2042• Reduces Right of Way impacts
Florida Department of Transportation
Partial Continuous Flow Intersection
Florida Department of Transportation
Partial Continuous Flow Intersection N
Florida Department of Transportation
Initial Plans (30%)March 2019
Constructability Review(60%)Feb 2020
Biddability Preparation(90%)April 2021
Plans CompleteNov 2021
Bid OpeningMarch 2022
Construction Phase beginsAugust 2022
Project Status/ScheduleSR 710 – Beeline Highway
• Design-Bid-Build Project• Current Estimate $117 Million• FDOT PM Donovan Pessoa
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWWLocation Map
15
SR A1A North Causeway Bridge
15
Florida Department of TransportationFlorida Department of Transportation
Channel Vertical ClearanceSR A1A North Bridge Over ICWW
New SR A1A Bridge length: 4152.5 ft
85 ft Channel Clearance
Replacement of structurally and functionally deficient bridge
85 ft
125 ft
85 ft
125 ft
25 ft
90 ft
85 ft
Florida Department of Transportation
• Roadway Reconstruction • Juanita Ave Extension – 520 ft. – New Construction• Marina Access Rd. – 560 ft. – New Construction • Old Dixie Hwy – 2000 ft. – Reconstruction• Sunny Lane – 500 ft. – New Construction• Pedestrian Ramp for East Coast Greenway – 800 ft. – New Construction
• Lighting, Mast Arm Signalization, Drainage, and Railroad Crossing Gates
SR A1A North Bridge Over ICWW
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWW
18
Observation Deck
Observation Deck Path
East CoastGreenway
Ramp
SR A1A Bridge
Indian River Lagoon
Florida Department of TransportationFlorida Department of Transportation
SR A1A North Bridge Over ICWW
Observation DeckEast CoastGreenwayRamp
SR A1A Bridge
Indian River Lagoon
Florida Department of TransportationFlorida Department of Transportation
Project Status/ScheduleSR A1A North Bridge
Initial Plans (30% Complete)
March 2018
Biddability Submittal (90%
Complete)January 2021
Construction Complete
2026
Constructability Submittal (60%
Complete)May 2020
Plans CompleteJune 2021
Letting (Bid Opening)
October 27, 2021
Construction Begins
January 2022
• Design Bid Build Project• Current Cost Estimate: $79 Million• FDOT PM Donovan Pessoa, PE• Website: www.SRA1ANorthBridge.com
Florida Department of TransportationFlorida Department of Transportation
Project LocationSW 10th Street Connector
869
T O L L
Regional Linkage Need
Limited Access Highway System
Hillsboro Blvd
SW 10th Street Connector PD&E
Study
I-95 PD&E Study
Sawgrass / Turnpike InterchangePD&E Study Po
wer
line
Rd
PD&E Project FPIDs and Limits
FPID # 437153-1 – Sawgrass / Turnpike Interchange Study
FPID # 439891-1 – SW 10th Street
FPID # 436964-2 – I-95 from SW 10th
Street to Hillsboro Blvd
Florida Department of TransportationFlorida Department of Transportation
Connections to I-95SW 10th Street Connector
I-95 General Use Lanes
845
SW 10th St.
SW 12
thAv
e.
WB Sawgrass Expressway
EB Sawgrass Expressway
Powe
rline R
d.
LEGENDConnector LanesLocal/General Use LanesI-95 Express Lanes
Florid
a’s Tu
rnpik
e
Newport Center
Connector Lanes
Local SW 10th Street
I-95 Express Lanes
EB Egress
WB Ingress
EB IngressWB Egress
Two Alternatives:One with Ramps
One without Ramps, serving Powerline Road
EB Connector to BothI-95 General Use and
Express Lanes NB and SB
Both I-95 General Use and Express Lanes NB and SB
to WB Connector
Florida Department of TransportationFlorida Department of Transportation
I-95/SW 10th St Connector – Direct ConnectionsSW 10th Street Connector
Florida Department of TransportationFlorida Department of Transportation
Program Delivery ApproachSW 10th Street Connector
Florida Department of TransportationFlorida Department of Transportation
Program Delivery ApproachSW 10th Street Connector
Florida Department of TransportationFlorida Department of Transportation
TSM&O 7-Corridors Smart Work Zone/ATMSSW 10th Street Connector
Florida Department of TransportationFlorida Department of Transportation
Rendering Comparison – SW 10th StreetSW 10th Street Connector
Florida Department of TransportationFlorida Department of Transportation
Project Status/ScheduleSW 10th Street Connector
• Design-Build Projects• Current Estimate $821 Million (all five projects)• FDOT PM Vanita Saini, PE• Website: www.SW10Street.com
PD&E StudyComplete –Fall 2021
I-95/SW 10th StInterchangeAdvertisement –Summer 2022
I-95/SW 10th StInterchangeLetting –Summer 2023
I-95/SW 10th StInterchangeBegin Construction –Spring 2024
Smart WorkZone EndConstruction –Summer 2025
Smart WorkZone ProjectAdvertisement –Spring 2022
Smart WorkZone Letting –Winter 2023
SW 10th StConnectorAdvertisement –Fall 2023
SW 10th StConnectorLetting –Summer 2024
Florida Department of TransportationFlorida Department of Transportation
SW 10th Street Video