DOCA0060EN-02 www.schneider-electric.com EVlink Commissioning Guide DOCA0060EN-02 04/2014 EVlink Commissioning Guide 04/2014

EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

EVlink Commissioning Guide

DOCA0060EN-02 04/2014

DO

CA

0060

EN

-02

www.schneider-electric.com

EVlink Commissioning Guide

04/2014

Page 2: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

The information provided in this documentation contains general descriptions and/or technical character-istics of the performance of the products contained herein. This documentation is not intended as a substitute for and is not to be used for determining suitability or reliability of these products for specific user applications. It is the duty of any such user or integrator to perform the appropriate and complete risk analysis, evaluation and testing of the products with respect to the relevant specific application or use thereof. Neither Schneider Electric nor any of its affiliates or subsidiaries shall be responsible or liable for misuse of the information contained herein. If you have any suggestions for improvements or amendments or have found errors in this publication, please notify us.

No part of this document may be reproduced in any form or by any means, electronic or mechanical, including photocopying, without express written permission of Schneider Electric.

All pertinent state, regional, and local safety regulations must be observed when installing and using this product. For reasons of safety and to help ensure compliance with documented system data, only the manufacturer should perform repairs to components.

When devices are used for applications with technical safety requirements, the relevant instructions must be followed.

Failure to use Schneider Electric software or approved software with our hardware products may result in injury, harm, or improper operating results.

Failure to observe this information can result in injury or equipment damage.

© 2014 Schneider Electric. All rights reserved.

2 DOCA0060EN-02 04/2014

Page 3: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Table of Contents

Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5About the Book. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Chapter 1 Presentation of the Commissioning Tool . . . . . . . . . . . . . . . . . . . . . . . . 9Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Chapter 2 Commissioning of a Stand-Alone Charging Station . . . . . . . . . . . . . . . . 112.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Accessing to the Commissioning Tool. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Description of the Commissioning Tool User Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

2.2 Configuration Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16General Settings Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17Socket-Outlets Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18Action Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

2.3 Authentication Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Badge Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

2.4 Updates Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24Firmware Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

2.5 Maintenance Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Action Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

2.6 Users account Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27Password Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Chapter 3 Commissioning of a Cluster Cabinet and Its Charging Stations . . . . . . 293.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Accessing to the Commissioning Tool. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31Description of the Commissioning Tool User Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

3.2 Cluster Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34Commissioning a New Cluster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Adding a Charging Station. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Removing a Charging Station . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38Replacing a Charging Station . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Recommissioning of an Existing Cluster Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40PLC Program Update . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

3.3 Configuration Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Cluster General Settings Sub-Tab. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43Reset Cluster Sub-Tab. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44Charging Station General Settings Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Socket-Outlets Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Action Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

3.4 Authentication Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49Badge Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

3.5 Energy Management Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53General Settings Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54Advanced Settings Sub-Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56Action Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

3.6 Updates Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Firmware Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

3.7 Maintenance Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60Action Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

3.8 Users Account Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61Password Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

DOCA0060EN-02 04/2014 3

Page 4: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

4 DOCA0060EN-02 04/2014

Page 5: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Safety Information

Important Information

NOTICERead these instructions carefully, and look at the equipment to become familiar with the device before trying to install, operate, or maintain it. The following special messages may appear throughout this documentation or on the equipment to warn of potential hazards or to call attention to information that clarifies or simplifies a procedure.

PLEASE NOTEElectrical equipment should be installed, operated, serviced, and maintained only by qualified personnel. No responsibility is assumed by Schneider Electric for any consequences arising out of the use of this material.

A qualified person is one who has skills and knowledge related to the construction and operation of electrical equipment and its installation, and has received safety training to recognize and avoid the hazards involved.

DOCA0060EN-02 04/2014 5

Page 6: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

6 DOCA0060EN-02 04/2014

Page 7: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

About the Book

At a Glance

Document ScopeThis document will guide you through the commissioning of:

an EV•1S•••••• charging stationa cluster cabinet and its EV•1S•••••• charging stations.

The commissioning is done using a commissioning tool which is an application running on an integrated web server in EV•1S•••••• charging stations.

This document explains how to:manage access to the commissioning toolconfigure the cluster cabinet and its EV•1S•••••• charging stationsmanage the user badge listupgrade the firmware

This document is intended for:commissioning operatorssite operators

Validity NoteThe characteristics presented in this document should be the same as those that appear online. In line with our policy of continuous improvement, we may revise content over time to improve clarity and accuracy. In the event that you see a difference between this user guide and online information, use the online information as your reference.

Related Documents

You can download these technical publications and other technical information from our website at www.schneider-electric.com, or from the following intranet Schneider Electric sites:

• the Pl@net intranet site at the address: http://planet.schneider-electric.com• the Shopping kiosk intranet site at the address: http://shoppingkiosk.schneider-electric.com.

Title of Documentation Reference Number

EVlink - Cluster Cabinet Including EVlink MS Energy Management and EVlink MS Supervision – Recommendation Guide

DOCA0059

EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet HRB50435

EVlink - EVW1S•••••• - EVF1S•••••• – Installation and Configuration Guide

DOCA0061

EVlink - EVW1S•••••• - EVF1S•••••• – User Guide DOCA0063

EVlink - NCA91000 GPRS Modem Installation Guide DOCA0033

Unity Loader - A SoCollaborative Software User Manual 33003806

DOCA0060EN-02 04/2014 7

Page 8: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

8 DOCA0060EN-02 04/2014

Page 9: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

EVlink Commissioning GuidePresentation of the Commissioning ToolDOCA0060EN-02 04/2014

Presentation of the Commissioning Tool

Chapter 1Presentation of the Commissioning Tool

Description

IntroductionThe commissioning tool is an application running on an integrated web server that provides authorized operators with an interface for managing a stand-alone charging station or EVlink Parking Standard EV•1S•••••• charging stations with a cluster cabinet. The commissioning tool allows the configuration of EVlink devices and badge management to control access rights.

Network ArchitectureThe commissioning tool can be used in 2 types of architecture:

stand-alone EVlink Parking Standard EV•1S•••••• charging stationsa cluster cabinet with its charging stations

The commissioning tool automatically detects the type of architecture used and adapts the HMI in consequence.

Access RightsThere are 2 levels of access to the commissioning tool:

admin: commissioning operator with full administrator rights authorized to:configure the parameters available in configuration modeupgrade the firmwareperform all user actionsmodify the user and admin passwords

user: authorized only to:manage the authentication functionmanage badgesconfigure the EVlink MS Energy Management option (when available)modify the user account password

Minimum RequirementsThe minimum requirements for using the commissioning tool are:

a computer with:an Ethernet porta web browser

a shielded twisted pair insulated category 5 Ethernet cable with RJ45 connectors

WARNINGUNINTENDED EQUIPMENT OPERATIONIT network architecture must be defined and configured only by qualified personnel.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

WARNINGUNINTENDED EQUIPMENT OPERATIONOnly appropriately trained persons who are familiar with and understand the contents of this guide and all other pertinent product documentation are authorized to work on and with this product.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

DOCA0060EN-02 04/2014 9

Page 10: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Presentation of the Commissioning Tool

Access to the Commissioning Tool InterfaceThe commissioning tool can be accessed through a computer using a standard web browser:

Mozilla Firefox version 12.0 or later (recommended)Microsoft Internet Explorer version 7.0 or laterGoogle Chrome v26.0.1410 or later

10 DOCA0060EN-02 04/2014

Page 11: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

EVlink Commissioning GuideCommissioning of a Stand-Alone Charging StationDOCA0060EN-02 04/2014

Commissioning of a Stand-Alone Charging Station

Chapter 2Commissioning of a Stand-Alone Charging Station

What Is in This Chapter?This chapter contains the following sections:

Section Topic Page

2.1 Introduction 12

2.2 Configuration Tab 16

2.3 Authentication Tab 21

2.4 Updates Tab 24

2.5 Maintenance Tab 26

2.6 Users account Tab 27

DOCA0060EN-02 04/2014 11

Page 12: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Introduction

Section 2.1Introduction

What Is in This Section?This section contains the following topics:

Topic Page

Accessing to the Commissioning Tool 13

Description of the Commissioning Tool User Interface 14

12 DOCA0060EN-02 04/2014

Page 13: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Accessing to the Commissioning Tool

Connecting to the Commissioning ToolThere are several ways to connect the computer to the charging station and access the commissioning tool:

if the stand-alone charging station is not connected to an Ethernet network:open the stand-alone charging station and use the internal Ethernet port (see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet)

if the stand-alone charging station is connected to an Ethernet network:use the Ethernet port of the switch connected to the stand-alone charging station (recommended solution)if no switch is present, use an Ethernet port available on one of the Ethernet devicesotherwise, open the stand-alone charging station and use the internal Ethernet port (see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet)

NOTE: Before proceeding with the hardware connection, check that you have the minimum equipment requirements.

Computer Configuration

Logging On to the Commissioning Tool

Disconnecting from the Commissioning Tool

Default PasswordThe default user password is:

login: userpassword: USER

The default admin password is:login: adminpassword: ADMIN

NOTE: The password is case sensitive.

Step Action

1 Open the local network properties of your computer

2 Open Internet Protocol TCP/IP v4 properties

3 Set the static IP adress properties as following:IP address: 192.168.0.x (where x is a positive integer from 241 to 249)Subnet mask: 255.255.255.0No default gatewayNo DNS serverNo proxy

Step Action

1 Check that your computer is physically connected to the charging station.

2 Open a web browser and type http://192.168.0.102 in the URL field.

3 On the Login page, choose the language, and complete the User Name and Password fields.

NOTE: Check the Remember me on this computer box to store your personal connection information (see page 27) locally on the computer to avoid entering it at each logon.

4 Click the Login button: if the user name and password are correct, the commissioning tool home page appears, otherwise an error message is displayed. (1)

(1) In case of a lost password, contact Schneider Electric for assistance.

Step Action

1 Click the Logout link in the generic menu (see page 14). Then, close the web browser.

2 Disconnect the computer from the Ethernet port.

DOCA0060EN-02 04/2014 13

Page 14: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Description of the Commissioning Tool User Interface

Description of a Commissioning Tool User Interface PageThe appearance of the web page depends on its function. The web page is divided into zones.

For example, the commissioning tool user interface page is composed as follows:

Access Rights to the Commissioning Tool Tabs

Legend Zone Description

1 Generic menu Generic commissioning tool menu selection:user identification areaLogoutlink to generic commissioning tool information

2 Page tabs Tab selection:Configuration: to configure the charging station functionsAuthentication: to manage badge databaseUpdates: to obtain version number and upgrade the firmwareMaintenance: to export the maintenance report, to reset to factory settings or restart the charging stationUsers account: to modify passwords

3 Sub-tabs Sub-tabs corresponding to the page tab selected

4 Display area Display of the parameters corresponding to the tab and sub-tab selected

5 Action buttons Buttons allowing a specific action depending on the page tab selected

Tab Sub-Tab Access Rights

Configuration General settings Administrator and user

Socket-outlets Administrator only

Authentication – Administrator and user

Updates – Administrator only

Maintenance – Administrator and user

Users account – Administrator and user

14 DOCA0060EN-02 04/2014

Page 15: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Parameter TablesThe parameters displayed on a page are described in tables with the following format:

Parameter: the parameter nameAccess Rights: Admin or User

N: parameter that is not displayedR: read-only accessRW: read access and write access

Range: the permitted values for the RW parameterFactory Setting: the factory setting for the RW parameterDescription: provides information about the parameter and restrictions that apply

Parameter Access Rights Range Factory Setting Description

Admin User

– – – – – –

DOCA0060EN-02 04/2014 15

Page 16: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Configuration Tab

Section 2.2Configuration Tab

Objective of the TabDisplay the parameters of the charging station and each socket-outlet.Configure additional functions.

What Is in This Section?This section contains the following topics:

Topic Page

General Settings Sub-Tab 17

Socket-Outlets Sub-Tab 18

Action Buttons 20

16 DOCA0060EN-02 04/2014

Page 17: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

General Settings Sub-Tab

Parameter List

Allow simplified mode 3 ParameterDuring the standard charging process, the electric vehicle sends a signal to the charging station to confirm that it is ready to be charged. In the simplified mode 3, this confirmation is not required.

Set the Allow simplified mode 3 parameter to on to allow charging of an electric vehicle that does not have an internal switch.

Station Location ParameterSome types of electric vehicle emit toxic gases during charging.

The Station location parameter defines the environment in which the electric vehicle charges:Set the Station location parameter to Indoor (factory setting) if the charging station is installed indoors with no ventilation management handled by the building.Set the Station location parameter to Outdoor if the charging station is installed outdoors or indoors with a building ventilation management.

Allow to leave cable connected ParameterSetting the Allow to leave the cable connected to on allows to leave the cable connected to the charging station and to close the charging session without errors.

Parameter Access Rights Range Factory Setting

Description

Admin User

Authentication activation RW RW OffOn

On (1) Enables or disables the authentication function

Authentication strategy (2)

RW RW Reject unknown badgesAllow all badges

Allow all badges

States if badges are recorded or not in the local list of badges.If Allow all badges is selected, no specific verification of badge occurs.Not displayed if Authentication is off

Allow simplified mode 3 RW N onoff

on Allows the execution of the simplified mode 3

Station location RW R IndoorOutdoor

Indoor Defines the environment of the charging station

Allow to leave cable connected

RW RW onoff

off See next paragraph

Cluster management R N NONEPLC

NONE Inform about the status of the charging station (stand-alone or clustered)

Charging station R R – – Defines the type of the charging station

Buzzer presence R R – – Reference of the buzzer of the charging station

RFID reader type R R – – Reference of the RFID reader of the charging station

Commercial reference R N – – Commercial reference of the charging station

Production code R N – – Gives production details of the charging station

Product ID R N – – Unique identifier of the charging station

(1) Off if no RFID reader is present.(2) This parameter is displayed only if Authentication activation is On.

DOCA0060EN-02 04/2014 17

Page 18: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Socket-Outlets Sub-Tab

Parameter ListFor each socket-outlet, the following parameters are displayed:

User Inputs ParametersThere are 2 independent inputs on the electronic board of each socket-outlet inside the charging station. These inputs can be used to modify the behavior of the socket-outlet. Each input has its own associated functions.

Depending on the wiring of these inputs in the charging station, the following values must be selected:

Parameter Access Rights Range Factory Setting

Description

Admin User

Position on the charging station

R N 1 or 2 – Position of each socket-outlet

Socket-outlet type

R N T2T3

– Type of each socket-outlet

Board Type R N – – Type of each electronic board

Serial number R R – – Serial number of the electronic board

User maximum current

RW N From 6 to the Maximum authorized current parameter value

Maximum authorized current parameter value

Maximum charging current of each socket-outlet

Socket-outlet mode

R N Single-phaseThree-phase

– Number of phases of each socket-outlet

User input 1 RW N NOT_USEDCIRCUIT_BREAKING_STATELOAD_ SHEDDING_INPUT

NOT_USED See next paragraph

User input 2 RW N NOT_USEDPULSE_INPUTCONDITIONAL_START

NOT_USED See next paragraph

Load sheding set point

RW N 0...32 0 See next paragraph

Normally open

RW N input1input2

Checked See next paragraph

Maximum authorized current

R N – 32 A Maximum current supported by the electronic board

Parameter Value Description

User input 1 NOT_USED No function is associated with the input number 1.

CIRCUIT_BREAKING_ STATE

Input 1 is connected to the auxiliary contact of the power circuit breaker. For more information, see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet.

LOAD_SHEDDING_INPUT Input 1 is used to force load shedding of the socket-outlet.

User input 2 NOT_USED No function is associated with the input number 2.

PULSE_INPUT Input 2 is used as a pulse input: it is used to count the pulses delivered by a metering device. For more information, see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet.

CONDITIONAL_START Input 2 is used as an activation relay: the socket-outlet cannot start charging without activation of input 2.

18 DOCA0060EN-02 04/2014

Page 19: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Normally Open ParametersThe parameter Normally open defines the activation condition of input 1 and input 2:

If checked, the corresponding input is configured as NO (normally open).If unchecked, the corresponding input is configured as NC (normally closed).

NOTE: Contact the installer of the charging station to find out the wiring of the inputs and their NO or NC configuration.

Load Shedding Set Point ParameterThe parameter Load shedding set point defines the maximum current delivered by the charging station during the load shedding action. It is configurable during the commissioning phase.

For example: If Load shedding set point = 8, the current supplied by the charging station will be limited to 8 A during the load shedding action.

DOCA0060EN-02 04/2014 19

Page 20: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Action Buttons

Configuration Management ButtonsThe configuration management buttons are available for admin account. The Export function is available for user account too.

General Buttons

Applying the Configuration to the Charging StationTo take into account all modifications made to the configuration parameters, follow these steps:

Button Action

Import Replaces the current configuration using a .cfg file

Export Saves the current configuration in a .cfg file

Button Action

Save Saves the current configuration

NOTE: If you click another tab before saving the current configuration, all changes are lost.

Cancel Returns to the previously saved configuration

Step Action

1 Click the Save button.

2 In the Maintenance tab, click the Restart button (see page 26).

3 Check that the charging station has correctly rebooted by checking that the socket-outlet available indicator and charging indicator are in the normal state.

20 DOCA0060EN-02 04/2014

Page 21: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Authentication Tab

Section 2.3Authentication Tab

Badge Management

Objective of the TabDisplay the list of RFID badges.Manage the RFID badges.

Parameter List

Privilege Parameter3 privileges can be associated with a badge:

USER: Badge used to charge the electric vehicle in standard mode.VIP: Badge used to charge the electric vehicle in priority mode: more energy is delivered when the Energy management parameter is enabled. It is not available with a stand-alone charging station.ADMIN: Badge used to access specific functions of the charging stations. Refer to the EVlink - Cluster Cabinet Including EVlink MS Energy Management and EVlink MS Supervision – Recommendation Guide for the list of available functions.NOTE: An ADMIN badge cannot be used to charge an electric vehicle.

Action Buttons Description

Parameter Access Rights Range Factory Setting

Description

Admin User

Number R R – – Badge number

Identifier R R – – Unique identifier of the badge

Type RW RW USERVIPADMIN

USER Access level associated with the badge

Comment RW RW 0...50 characters anonymous Additional information associated with the badge identifier

Legend Action Category Button Description

1 RFID reader actions:Add badgesRemove badges

Add/Delete button: select whether to add or remove badgesStart/Stop button: enable or disable the RFID reader

DOCA0060EN-02 04/2014 21

Page 22: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Adding a Badge

Editing a Badge2 badge properties can be modified:

CommentType

Removing BadgesThere are 4 ways to remove badges:

by using the RFID reader on the charging station

individually by clicking the button corresponding to the badge line to be removedby making a multiple selection on the list (limited to the current page)by using the drop-down list Remove all badges function

2 Individual badge management:Modify propertiesRemove badgeSave modificationsCancel modifications

: allows modification of the badge properties

: removes a badge

: saves the new badge properties

: cancels modifications made to the badge properties that have not yet been saved

NOTE:

During the modification of the badge properties:

the button replaces the button

the button replaces the button

3 Multiple badge management:Remove selected badgesRemove all badgesChange badge type

Remove badges selection and Remove all badges: refer to the procedures for removing badgesChange badge type to USER: changes the selected badges to USER privilegeChange badge type to VIP: changes the selected badges to VIP privilegeChange badge type to ADMIN: changes the selected badges to ADMIN privilege

4 Management of all badges with a file:Export all badgesRemove and replace all badges

Export: exports all badges in a .csv fileImport: replaces existing badges using a .csv file

Legend Action Category Button Description

Step Action

1 Toggle the Add/Delete button to the Add position.

2 Toggle the Start/Stop button to the Start position.

3 To add several badges, place each badge, one after the other, against the RFID reader. The charging station emits a beep for each badge correctly added.

4 Wait 30 seconds or toggle the Start/Stop button to the Stop position to finish adding badges.

Step Action

1

Click the button.

2 Edit the Comment and Type badge properties.

3

Click the button to save the changes.

22 DOCA0060EN-02 04/2014

Page 23: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

To remove several badges with the RFID reader, proceed as follows:

To remove several badges with a multiple selection, proceed as follows:

To remove all badges, proceed as follows:

Exporting BadgesTo export all badges in a .csv file, proceed as follows:

Importing BadgesBadge list import uses UTF-8 formatted files. Use a previously exported file for template.

To replace all badges using a .csv file, proceed as follows:

Step Action

1 Toggle the Add/Delete button to the Delete position.

2 Toggle the Start/Stop button to the Start position.

3 To remove several badges, place each badge, one after the other, against the RFID reader. The charging station emits a beep for each badge correctly removed.

4 Wait 30 seconds or toggle the Start/Stop button to the Stop position to finish removing badges.

Step Action

1 Select the badges to be removed using the check boxes.

NOTE: Click upper left check box to select all badges of the current page.

2 Select the Remove badges selection function in the drop-down list.

3 Click OK.

Step Action

1 Select the Remove all badges function in the drop-down list.

2 Click OK.

3 A dialog box appears.

Click OK to confirm the deletion of badges.

Step Action

1 Click Export.

2 Select Save File and click OK. The file is saved in the web browser downloads folder.

Step Action

1 Check the line format of the .csv file to be imported is:IndexUIDCommentsType

2 Click Import.

3 Click Browse, select the desired .csv file, and click Open.

4 Click Import button.

NOTE: Not correctly formatted lines are ignored.

DOCA0060EN-02 04/2014 23

Page 24: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Updates Tab

Section 2.4Updates Tab

Firmware Management

Objective of the TabDisplay the firmware version and IP address of the electronic board and commissioning tool of each socket-outlet.Display the firmware version of the RFID reader and screen of the charging station.Upgrade the firmware.

Parameter List

File RequiredThe names of the files to download are different depending on the firmware to install:

Downloading Files

Parameter Access Rights Description

Admin User

Socket-outlets R N Socket-outlet number, last byte of the socket-outlet IP address

Firmware version of the board

R N Version number of the currently installed application release for the associated socket-outlet number

Commissioning tool version

R N Version number of the currently installed commissioning tool release for the associated socket-outlet number

Firmware version of the RFID reader

R N Version number of the RFID reader of the charging station

Firmware version of the Screen

R N Version number of the screen of the charging station

Compatibility issues R N Conflict status between application, commissioning tool, RFID, and screen versions

File Name Upgrade of...

evse_x.y.zz_armv5l.ipk (where x, y, and z are the version number and armv5l is the processor name)

firmware version of the electronic board

webserver_x.y.zz_armv5l.ipk (where x, y, and z are the version number and armv5l is the processor name)

commissioning tool version

rfid_NNN.hex (where NNN is the version number) firmware version of the RFID reader

Step Action

1 Files are available on the Schneider Electric Pl@net intranet site at http://planet.schneider-electric.com or on the Schneider Electric Shopping kiosk intranet site at http://shoppingkiosk.schneider-electric.com.

2 Search for EVlink in the Product Fast Access field.

3 On the EVlink product documentation page, click the Software/Firmware tab.

4 Click the EVlink_Maintenance_Managed-Services_2.0_x.y.zip file that contains the charging station application files (Software and documentation).

5 Download the EVlink_Maintenance_Managed-Services_2.0_x.y.zip file to your hard disk.

6 Unzip the downloaded file to access the .ipk or .hex file.

24 DOCA0060EN-02 04/2014

Page 25: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Firmware Upgrade ProcedureThe upgrade procedure can only be performed by an administrator:

Step Action

1 Click the Browse action button to open a browser window.

2 In the browser window, find and select the previously downloaded charging station firmware package .ipk file, and then click Open.

3 Depending on the element to upgrade:Click Install to upgrade the electronic board firmware or the commissioning tool (.ipk packages).Click Upgrade RFID to install a new version of RFID reader (.hex file).

NOTE: If the current version is newer than the downloaded version, downgrade is not authorized. A message displays that socket-outlet firmware is up-to-date.

4 When the installation is complete, click Reboot to restart the charging station.

DOCA0060EN-02 04/2014 25

Page 26: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Maintenance Tab

Section 2.5Maintenance Tab

Action Buttons

Objective of the TabExports the maintenance report to be sent to the customer care center of the country.Resets all parameters of the charging station electronic board to factory settings (administrator only).Restarts the stand-alone charging station.

Export Maintenance Report Button

Configuration ButtonThe factory setting buttons are available only for admin account:

Restart Button

Button Name Action

Export Exports the maintenance report to be sent to the customer care center of the country.

Button Name Action

Restore Resets all parameters of the charging station electronic board to factory settings

Button Name Action

Restart Restarts the stand-alone charging station

26 DOCA0060EN-02 04/2014

Page 27: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

Users account Tab

Section 2.6Users account Tab

Password Management

Objective of the TabModify the passwords.

User List Action Buttons

User Detail Parameter

Security PoliciesThe password and account management must be compliant with the company IT policy.

The commissioning tool is a tool for reading and writing data, and controls the state of the system, with full access to all data in your application. If, however, there are security concerns over these functions, you must at a minimum assign a secure password to the commissioning tool. For reasons of security for your installation, you must immediately upon first login change the default password.

NOTE: A secure password is one that has not been shared or distributed to any unauthorized personnel and does not contain any personal or otherwise obvious information. Further, a strong password contains a combination of upper and lower case letters, numbers, and special characters. You should choose a password length of at least 8 characters.

Modifying the Password of the Selected AccountTo modify the password of the selected account, proceed as follows:

Username Button Icon Access Rights Action

Admin User

admin RW N Allows modification of the admin password

user RW RW Allows modification of the user password

Parameter Access Rights Description

Admin User

New password RW RW Editable field for entering the new password (hidden characters)

Confirm new password RW RW Editable field for confirming the new password (hidden characters)

WARNINGUNAUTHORIZED DATA ACCESS

Immediately change the default password to a new, secure password.Do not distribute the password to unauthorized or otherwise unqualified personnel.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

Step Action

1 Enter the new password in the New password field.

2 Enter this new password in the Confirm new password field for confirmation.

3 Click Save password to update the password.

DOCA0060EN-02 04/2014 27

Page 28: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Stand-Alone Charging Station

28 DOCA0060EN-02 04/2014

Page 29: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

EVlink Commissioning GuideCommissioning of a Cluster Cabinet and Its Charging StationsDOCA0060EN-02 04/2014

Commissioning of a Cluster Cabinet and Its Charging Stations

Chapter 3Commissioning of a Cluster Cabinet and Its Charging Stations

What Is in This Chapter?This chapter contains the following sections:

Section Topic Page

3.1 Introduction 30

3.2 Cluster Commissioning 34

3.3 Configuration Tab 42

3.4 Authentication Tab 49

3.5 Energy Management Tab 53

3.6 Updates Tab 58

3.7 Maintenance Tab 60

3.8 Users Account Tab 61

DOCA0060EN-02 04/2014 29

Page 30: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Introduction

Section 3.1Introduction

What Is in This Section?This section contains the following topics:

Topic Page

Accessing to the Commissioning Tool 31

Description of the Commissioning Tool User Interface 32

30 DOCA0060EN-02 04/2014

Page 31: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Accessing to the Commissioning Tool

Connecting to the Commissioning ToolUse the process described below to connect the computer to the charging station and access the commissioning tool:

NOTE: Before proceeding with the hardware connection, check that you have the minimum equipment requirements.

Computer Configuration

Logging On to the Commissioning Tool

Disconnecting from the Commissioning Tool

Default PasswordThe default user password is:

login: userpassword: USER

The default admin password is:login: adminpassword: ADMIN

NOTE: The password is case sensitive.

Step Action

1 Open the cluster cabinet.

2 Connect the computer on a free port of one of the Ethernet switches connected to the PLC.

Step Action

1 Open the local network properties of your computer

2 Open Internet Protocol TCP/IP v4 properties

3 Set the static IP adress properties as following:IP address: 192.168.0.x (where x is a positive integer from 241 to 249)Subnet mask: 255.255.255.0No default gatewayNo DNS serverNo proxy

Step Action

1 Check that your computer is connected to the Ethernet network of charging stations.

2 Open a web browser and type http://192.168.0.1 in the URL field.

3 On the Login page, choose the language, and complete the User Name and Password fields.

NOTE: Check the Remember me on this computer box to store your personal connection information (see page 61) locally on the computer to avoid entering it at each logon.

4 Click the Login button: if the user name and password are correct, the commissioning tool home page appears, otherwise an error message is displayed. (1)

(1) In case of a lost password, contact Schneider Electric for assistance.

Step Action

1 Click the Logout link in the generic menu (see page 32). Then, close the web browser.

2 Disconnect the computer from the Ethernet port.

DOCA0060EN-02 04/2014 31

Page 32: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Description of the Commissioning Tool User Interface

Description of a Commissioning Tool User Interface PageThe appearance of the web page depends on its function. The web page is divided into zones.

For example, the commissioning tool user interface page is composed as follows:

Access Rights to the Commissioning Tool Tabs

Legend Zone Description

1 Generic menu Generic commissioning tool menu selection:user identification areaLogoutlanguagelink to generic commissioning tool information

2 Page tabs Tab selection:Configuration: to configure the charging station functionsAuthentication: to manage badge databaseEnergy Management: to manage the parameters of the EVlink MS Energy Management optionUpdates: to upgrade charging stations and rfid firmwareUsers account: to modify passwords

3 Sub-tabs Sub-tabs corresponding to the page tab selected

4 Display area Display of the parameters corresponding to the tab and sub-tab selected

5 Action buttons Buttons allowing a specific action depending on the page tab selected

6 Device selection tree

Connected charging station selection:Cluster: to access to the cluster cabinet tabs and sub-tabs.Station X: to access to the EVlink Parking Standard EV•1S•••••• charging station number X tabs and sub-tabs.Station Sarel: to indicate EVlink Parking Standard NCA•••• charging stations are present in the cluster. They cannot be selected.

Tab Tab Sub-Tab Access Rights

Cluster Configuration General settings Administrator and user

Reset cluster Administrator only

Authentication – Administrator and user

Energy Management General settings Administrator and user

Advanced settings Administrator only

Updates – Administrator only

Users account – Administrator and user

Station Configuration General settings Administrator and user

Socket-outlets Administrator only

Authentication – Administrator and user

Updates – Administrator only

Maintenance – Administrator and user

Users account – Administrator and user

32 DOCA0060EN-02 04/2014

Page 33: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Parameter TablesThe parameters displayed on a page are described in tables with the following format:

Parameter: the parameter nameAccess Rights: Admin or User

N: parameter that is not displayedR: read-only accessRW: read access and write access

Range: the permitted values for the RW parameterFactory Setting: the factory setting for the RW parameterDescription: provides information about the parameter and restrictions that apply

Parameter Access Rights Range Factory Setting Description

Admin User

– – – – – –

DOCA0060EN-02 04/2014 33

Page 34: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Cluster Commissioning

Section 3.2Cluster Commissioning

OverviewThe procedures described in this section are only applicable for cluster equipped with EV•1S•••••• charging stations.

What Is in This Section?This section contains the following topics:

Topic Page

Commissioning a New Cluster 35

Adding a Charging Station 37

Removing a Charging Station 38

Replacing a Charging Station 39

Recommissioning of an Existing Cluster Cabinet 40

PLC Program Update 41

34 DOCA0060EN-02 04/2014

Page 35: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Commissioning a New Cluster

OverviewThe commissioning of a cluster cabinet made with EV•1S•••••• charging stations is used to define the composition of the cluster and the parameters of each charging stations and socket-outlets.

PrerequisitesThe procedures described in this section require the following material:

SD card:Reference NCA84000: EVlink MS Cluster Management Software, orReference NCA82000: EVlink MS Energy & Cluster Management Software

USB cable: reference BMX XCA USB H018Computer

Commissioning a New Cluster ProcessFollow this procedure when commissioning a new cluster cabinet:

Each stage is detailed below.

The commissioning is finished when all charging stations are displayed on the cluster tree. You can then proceed with the specific configuration of your cluster cabinet.

Checking Circuit Breakers in the Cluster Cabinet

Downloading the PLC Program

Installing Unity Loader

Stage Description

1 Check circuit breakers in the cluster cabinet

2 Download the PLC program

3 Install Unity Loader

4 Connect the PLC and computer

5 Energize the cluster cabinet

6 Load the program into the PLC

7 Check the PLC output wiring (EVlink MS Supervision option)

8 Assign an IP address to the charging station

Step Action

1 Check that the pre-commissioning conditions in factory and on site are met (refer to EVlink Cluster Cabinet Including EVlink MS Energy Management and EVlink MS Supervision Recommendation Guide).

2 Check each circuit breaker of each charging station in the cluster cabinet is switched off.

Step Action

1 Files are available on the Schneider Electric Pl@net intranet site at http://planet.schneider-electric.com or on the Schneider Electric Shopping kiosk intranet site at http://shoppingkiosk.schneider-electric.com.

2 Search for EVlink in the Product Fast Access field.

3 On the EVlink product documentation page, click the Software/Firmware tab.

4 Download the PLC program corresponding to the order (program names: EVLinkClusterManager or EVLinkClusterManager_WithEM).

Step Action

1 Download Unity Loader software from the Schneider Electric site at http://www.schneider-electric.com.

2 Install Unity Loader program on the computer (refer to Unity Loader - a SoCollaborative Software User Manual).

DOCA0060EN-02 04/2014 35

Page 36: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Connecting the PLC and Computer

Energizing the Cluster Cabinet

Loading the Program Into the PLC

Checking the PLC Output Wiring (EVlink MS Supervision Option)

Assigning an IP Address to the Charging Station

Step Action

1 Insert the SD card in the BMX P34 2••• CPU of the PLC.

2 Connect the USB cable between the PLC and the computer (you may have to install drivers if requested).

Step Action

1 Switch on the circuit breakers of the cluster cabinet auxiliaries (QMN, QPC1, QF1).

2 Switch on the switch disconnector of the cluster cabinet (QG1).

3 Push the emergency stop button and check the opening of the switch disconnector.

4 Switch on the circuit breakers of the PLC supply and auxiliaries (QAUX, QU1, QPLC).

5 Configure the PLC backup battery (UBATT) depending on the installation to be set up for the customer.

Step Action

1 Transfer the PLC program using Unity Loader.

2 Set the PLC in RUN mode.

Step Action

1 Check the modem wiring in the cluster cabinet.

2 Power up and commission the modem according to the instructions in the EVlink NCA91000 GPRS Modem Installation Guide.

3 Check the wiring of the illuminated indicator bank to the BMX DDM 16025 I/O module of the PLC.

Step Action

1 Switch on the control circuit breaker (Q1) of the charging station 1.

2 Set the computer IP address to 192.168.0.x (x = 241...249).

3 Enter the IP address 192.168.0.1 in the Internet browser of your computer.

4 Wait until the login screen or the cluster main screen of the commissioning tool appears. In case of connection errors, press the F5 key.

5 At the login screen, enter username and password.

6 Switch on the control circuit breaker of charging station 2.

7 Wait until the charging station is displayed on the device selection tree.

8 Repeat steps 6 to 7 for each charging station.

36 DOCA0060EN-02 04/2014

Page 37: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Adding a Charging Station

OverviewA new EV•1S•••••• charging station to an existing cluster cabinet is identified and added by the PLC as soon as the charging station is connected to the Ethernet network and energized.

Adding Charging Station ProcessFollow this procedure to add a charging station:

Each stage is detailed below.

The commissioning is finished when all the charging stations are displayed. You can then proceed with the specific configuration of your cluster cabinet.

Check the Added Charging Station Status

Assigning an IP Address to the Charging Station

NOTE: If you encounter an error during the process, reset the configuration of the cluster (see page 60).

Stage Description

1 Check the added charging station status

2 Assign an IP address to the charging station

Step Action

1 Check that the control circuit breaker of the added charging station is switched off.

2 Check the charging station is connected to the Ethernet network.

Step Action

1 Set the computer IP address to 192.168.0.x (x = 241...249).

2 Enter the IP address 192.168.0.1 in the Internet browser of your computer.

3 Wait until the login screen or the cluster main screen appears.

4 At the login screen, enter username and password.

5 Switch on the control circuit breaker of the charging station to add.

6 Wait until the charging station is displayed on the cluster tree.

DOCA0060EN-02 04/2014 37

Page 38: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Removing a Charging Station

Removing a Charging StationA charging station cannot be removed from the commissioning tool. If a charging station is no longer used, switch off the control circuit breaker.

In order to completely remove a charging station, it is necessary to restore the factory settings of the whole cluster and restart the full commissioning process.

38 DOCA0060EN-02 04/2014

Page 39: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Replacing a Charging Station

OverviewWhen a charging station in a cluster cabinet is replaced, the new charging station must have the same number of socket-outlets.

In order to completely remove a charging station, it is necessary to restore the factory settings of the whole cluster and restart the full commissioning process.

Replacing a Charging Station ProcessFollow this procedure when replacing a charging station:

Step Action

1 Check that the control circuit breaker of the new charging station is switched off.

2 Check that the charging station is connected to the Ethernet network.

3 Switch on the control circuit breaker of the charging station.

4 Configure the charging station using the commissioning tool.

DOCA0060EN-02 04/2014 39

Page 40: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Recommissioning of an Existing Cluster Cabinet

OverviewYou have to execute again the commissioning procedure in the following cases:

The SD card has failed.The SD card has to be replaced due to licensing change level.The cluster has been reset with the commissioning tool.

In these cases, you have to execute the same procedure for commissioning as for a new charging station.

40 DOCA0060EN-02 04/2014

Page 41: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

PLC Program Update

OverviewYou have to update the PLC program in the following cases:

The PLC has been replaced.The PLC CPU has been replaced.A new PLC program version is available.

PLC Program Update ProcessFollow this procedure to update the PLC program of the PLC:

Each stage is detailed below.

Downloading the PLC Program

Installing Unity Loader

Connecting the PLC and Computer

Loading the Program Into the PLC

Stage Description

1 Download the PLC program to the computer

2 Install Unity Loader on the computer

3 Connect the PLC and computer

4 Load the program into the PLC

Step Action

1 Files are available on the Schneider Electric Pl@net intranet site at http://planet.schneider-electric.com or on the Schneider Electric Shopping kiosk intranet site at http://shoppingkiosk.schneider-electric.com.

2 Search for EVlink in the Product Fast Access field.

3 On the EVlink product documentation page, click the Software/Firmware tab.

4 Download the PLC program corresponding to your order (program names: EVLinkClusterManager or EVLinkClusterManager_WithEM).

Step Action

1 Download Unity Loader software from the Schneider Electric site at http://www.schneider-electric.com.

2 Install the Unity Loader software on your local computer.

Step Action

1 If the CPU was changed, insert the SD card in the BMX P34 2••• CPU of the PLC.

2 Connect the USB cable (reference BMX XCA USB H018) between the PLC and the computer (you may have to install drivers if requested).

Step Action

1 Transfer the PLC program using Unity Loader.

2 Set the PLC in RUN mode.

DOCA0060EN-02 04/2014 41

Page 42: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Configuration Tab

Section 3.3Configuration Tab

Objective of the TabDisplay and configure centralized parameters shared by all charging stations on the cluster.Display the parameters of each charging station and its socket-outlets.Configure additional functions.Define the location of the badge database.

What Is in This Section?This section contains the following topics:

Topic Page

Cluster General Settings Sub-Tab 43

Reset Cluster Sub-Tab 44

Charging Station General Settings Sub-Tab 45

Socket-Outlets Sub-Tab 46

Action Buttons 48

42 DOCA0060EN-02 04/2014

Page 43: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Cluster General Settings Sub-Tab

Related DeviceThis sub-tab appears if Cluster is selected in the device selection tree.

These parameters are applied to all EVlink Parking Standard EV•1S•••••• charging stations connected to the cluster.

Parameter List

Authentication location ParameterThe badge list can be stored on different support depending on the value of the parameter Authentication location:

Supervision: the badge list is stored to a remote server.Centralized list: the badge list is stored locally as a unique list for all charging stations of the cluster.Charging Station: the badge list is stored locally in each charging station.Disable: authentication function is disabled.

Allow simplified mode 3 ParameterDuring the standard charging process, the electric vehicle sends a signal to the charging station to confirm that it is ready to be charged. In the simplified mode 3, this confirmation is not required.

Set the Allow simplified mode 3 parameter to on to allow charging of an electric vehicle that does not have an internal switch.

Ventilation Management ParameterThe Ventilation management defines if the building handles ventilation or not.

Set the Ventilation management to No to deny electric vehicles with toxic gases to charge.Set the Ventilation management to Yes to all electric vehicles to charge.

NOTE: If the charging station is outdoor, all electric vehicles will charge, no matter what the value of ventilation management parameter is.

Parameter Access Rights Range Factory Setting

Description

Admin User

Authentication location RW RW SupervisionCentralized listCharging stationDisable

Supervision Defines where the badge list is stored

Authentication strategy when communication lost

RW RW Reject all badgesAllow all badges

Allow all badges

Allows or not all users to charge the electric vehicle in case the authorization takes too long

Authentication timeout RW RW 0...60 s 10 s Defines the waiting time after an authentication request is sent. After this delay, the parameter Authentication strategy when communication lost defines the access to the charging station.

Energy management R R DisabledEnabled

– Displays the status of the EVlink MS Energy Management option

Allow simplified mode 3 RW R onoff

on Allows the execution of the simplified mode 3

Ventilation management RW R YesNo

No Defines whether a ventilation system is present and controlled by the building

DOCA0060EN-02 04/2014 43

Page 44: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Reset Cluster Sub-Tab

Objective of the TabReset the cluster configuration to factory settings: charging stations are removed from the PLC and each charging station in the cluster is reset to its factory settings.

Related DeviceThis sub-tab appears if Cluster is selected in the device selection tree.

Reset Cluster ProcessThe reset procedure can only be performed by an administrator.

Step Action

1 Click the Reset cluster button.

2 When a message appears, confirm the reset action.

3 Execute the commissioning procedure for cluster and its charging stations again (see page 40).

44 DOCA0060EN-02 04/2014

Page 45: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Charging Station General Settings Sub-Tab

Related DeviceThis sub-tab appears if an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

These parameters are specific to the selected EVlink Parking Standard EV•1S•••••• charging station.

Parameter List

Station Location ParameterSome types of electric vehicle emit toxic gases during charging.

The Station location parameter defines the environment in which the electric vehicle charges:Set the Station location parameter to Indoor (factory setting) if the charging station is installed indoors with no ventilation management handled by the building.Set the Station location parameter to Outdoor if the charging station is installed outdoors or indoors with a building ventilation management.

Allow to leave cable connected ParameterSet the Allow to leave the cable connected to on allows to leave the cable connected to the charging station and to close the charging session without errors.

Parameter Access Rights Range Factory Setting

Description

Admin User

Station Location RW R IndoorOutdoor

Indoor Defines the environment of the charging station

Allow to leave cable connected

RW RW onoff

off See next paragraph

Charging Station R R – – Defines the type of the charging station

Buzzer presence R R – – Reference of the buzzer of the charging station

RFID reader type R R – – Reference f the RFID reader of the charging station

Commercial reference R N – – Commercial reference of the charging station

Production Code R N – – Gives production details of the charging station

Product ID R N – – Unique identifier of the charging station

DOCA0060EN-02 04/2014 45

Page 46: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Socket-Outlets Sub-Tab

Related DeviceThis sub-tab appears if an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

These parameters are specific to the selected EVlink Parking Standard EV•1S•••••• charging station.

Parameter ListFor each socket-outlet, the following parameters are displayed:

User Inputs ParametersThere are 2 independent inputs on the electronic board of each socket-outlet inside the charging station. These inputs can be used to modify the behavior of the socket-outlet. Each input has its own associated functions.

Depending on the wiring of these inputs in the charging station, the following values must be selected:

Parameter Access Rights Range Factory Setting

Description

Admin User

Position on the charging station

R N 1 or 2 – Position of each socket-outlet

Socket-outlet type

R N T2T3

– Type of each socket-outlet

Board Type R N – – Type of each electronic board

Serial Number R R – – Serial number of the electronic board

User maximum current

RW N From 6 to the Maximum authorized current parameter value

Maximum authorized current parameter value

Maximum charging current of each socket-outlet

Socket-outlet mode

R N Single-phaseThree-phase

– Number of phases of each socket-outlet

User input 1 RW N NOT_USEDCIRCUIT_BREAKING_STATELOAD_ SHEDDING_INPUT

NOT_USED See next paragraph

User input 2 RW N NOT_USEDPULSE_INPUTCONDITIONAL_START

NOT_USED See next paragraph

Load sheding set point

RW N 0...32 0 See next paragraph

Normally open RW N input1input2

Checked See next paragraph

Maximum authorized current

R N – 32 A Maximum current supported by the electronic board

Parameter Value Description

User input 1 NOT_USED No function is associated with the input number 1.

CIRCUIT_BREAKING_ STATE

Input 1 is connected to the auxiliary contact of the power circuit breaker. For more information, see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet.

LOAD_ SHEDDING_INPUT Input 1 is used to force load shedding of the socket-outlet.

User input 2 NOT_USED No function is associated with the input number 2.

PULSE_INPUT Input 2 is used as a pulse input: it is used to count the pulses delivered by a metering device. For more information, see the EVlink - EVW1S•••••• - EVF1S•••••• – Instruction Sheet.

CONDITIONAL_START Input 2 is used as an activation relay: the socket-outlet cannot start charging without activation of input 2.

46 DOCA0060EN-02 04/2014

Page 47: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Normally Open ParametersThe parameter Normally open defines the activation condition of input 1 and input 2:

If checked, the corresponding input is configured as NO (normally open).If unchecked, the corresponding input is configured as NC (normally closed).

NOTE: Contact the installer of the charging station to find out the wiring of the inputs and their NO or NC configuration.

Load Shedding Set Point ParameterThe parameter Load shedding set point defines the maximum current delivered by the charging station during the load shedding action. It is configurable during the commissioning phase.

For example: If Load shedding set point = 8, the current supplied by the charging station will be limited to 8 A during the load shedding action.

DOCA0060EN-02 04/2014 47

Page 48: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Action Buttons

Configuration Management ButtonsThese buttons appear if a charging station is selected in the device selection tree.

The configuration management buttons are available only for admin account:

General Buttons

Applying the Configuration to the Charging StationTo take into account all modifications made to the configuration parameters, follow these steps:

Button Action

Import Replaces the current configuration using a .cfg file

Export Saves the current configuration in a .cfg file

Button Action

Save Saves the current configuration

NOTE: If you click another tab before saving the current configuration, all changes are lost.

Cancel Returns to the previously saved configuration

Reboot Apply modification after changing a parameter. The button flashes to indicate that the configuration has been changed but changes have not been saved.

Step Action

1 Click the Save button.

2 Restart all charging stations to complete configuration changes by clicking the blinking Reboot button.

3 Check that the charging station has correctly rebooted by checking that the socket-outlet available indicator and charging indicator are in the normal state (the restart process takes 30 s).

48 DOCA0060EN-02 04/2014

Page 49: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Authentication Tab

Section 3.4Authentication Tab

Badge Management

Objective of the TabDisplay the list of RFID badges.Manage the RFID badges.

Related DeviceThis sub-tab appears if Cluster or an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

Parameter List

Type Parameter3 privileges can be associated with a badge:

USER: Badge used to charge the electric vehicle in standard mode.VIP: Badge used to charge the electric vehicle in priority mode. More energy is delivered when the Energy management option is present.ADMIN: Badge used to access specific functions of the charging stations. Refer to the EVlink - Cluster Cabinet Including EVlink MS Energy Management and EVlink MS Supervision – Recommendation Guide for the list of available functions.NOTE: An ADMIN badge cannot be used to charge an electric vehicle.

Parameter Access Rights Range Factory Setting

Description

Admin User

Number R R – – Badge number

Identifier R R – – Unique identifier of the badge

Type RW RW USERVIPADMIN

USER Access level associated with the badge

Comment RW RW 0...50 characters anonymous Additional information associated with the badge identifier

DOCA0060EN-02 04/2014 49

Page 50: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Action Buttons Description

Adding a Badge

Legend Action Category Button Description

1 RFID reader actions:Select a charging stationAdd badgesRemove badges

Charging station • : select the charging station to be used to read badgesAdd/Delete button: select whether to add or remove badgesStart/Stop button: enable or disable the RFID reader of the selected charging station

2 Individual badge management:Modify propertiesRemove badgeSave modificationsCancel modifications

: allows modification of the badge properties

: removes a badge

: saves the new badge properties

: cancels modifications made to the badge properties that have not yet been saved

NOTE:

During the modification of the badge properties:

the button replaces the button

the button replaces the button

3 Multiple badge management:Remove selected badgesRemove all badgesChange badge type

Remove badges selection and Remove all badges: refer to the procedures for removing badgesChange badge type to USER: changes the selected badges to USER privilegeChange badge type to VIP: changes the selected badges to VIP privilegeChange badge type to ADMIN: changes the selected badges to ADMIN privilege

4 Management of all badges with a file:Export all badgesRemove and replace all badges

Export: exports all badges in a .csv fileImport: overwrites existing badge list using a .csv file

Step Action

1 Toggle the Add/Delete button to the Add position.

2 Toggle the Start/Stop button to the Start position.

3 To add several badges, place each badge, one after the other, against the RFID reader. The charging station emits a beep for each badge correctly added.

4 Wait 30 seconds or toggle the Start/Stop button to the Stop position to finish adding badges.

50 DOCA0060EN-02 04/2014

Page 51: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Editing a Badge2 badge properties can be modified:

CommentType

Removing BadgesThere are 4 ways to remove badges:

by using the RFID reader on the charging station

individually by clicking the button corresponding to the badge line to be removedby making a multiple selection on the list (limited to the current page)by using the drop-down list Remove all badges function

To remove several badges with the RFID reader, proceed as follows:

To remove several badges with a multiple selection, proceed as follows:

To remove all badges, proceed as follows:

Step Action

1

Click the button.

2 Edit the Comment and Type badge properties.

3

Click the button to save the changes.

Step Action

1 Toggle the Add/Delete button to the Delete position.

2 Toggle the Start/Stop button to the Start position.

3 To remove several badges, place each badge, one after the other, against the RFID reader. The charging station emits a beep for each badge correctly removed.

4 Wait 30 seconds or toggle the Start/Stop button to the Stop position to finish removing badges.

Step Action

1 Select the badges to be removed using the check boxes.

NOTE: Click upper left check box to select all badges of the current page.

2 Select the Remove badges selection function in the drop-down list.

3 Click OK.

Step Action

1 Select the Remove all badges function in the drop-down list.

2 Click OK.

3 A dialog box appears.

Click OK to confirm the deletion of badges.

DOCA0060EN-02 04/2014 51

Page 52: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Exporting BadgesTo export all badges in a .csv file, proceed as follows:

Importing BadgesBadge list import uses UTF-8 formatted files. Use a previously exported file for template.

To replace all badges using a .csv file, proceed as follows:

Step Action

1 Click Export.

2 Select Save File and click OK. The file is saved in the web browser downloads folder.

Step Action

1 Check the line format of the .csv file to be imported is:IndexUIDCommentsType

2 Click Import.

3 Click Browse, select the desired .csv file, and click Open.

4 Click Import.

NOTE: Not correctly formatted lines are ignored.

52 DOCA0060EN-02 04/2014

Page 53: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Energy Management Tab

Section 3.5Energy Management Tab

OverviewThis tab appears if Cluster is selected in the device selection tree.

Objective of the tab:Configure the energy available for the cluster cabinet and its charging stations.Configure the load shedding priority.Configure the VIP privilege value.Configure additional functions.

What Is in This Section?This section contains the following topics:

Topic Page

General Settings Sub-Tab 54

Advanced Settings Sub-Tab 56

Action Buttons 57

DOCA0060EN-02 04/2014 53

Page 54: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

General Settings Sub-Tab

Parameter List

Configuration Set-up ParameterThe cluster cabinet can adapt its power consumption based on the total power consumption of the entire site by connecting a global energy consumption power meter to the cluster cabinet.

Set the Configuration set-up parameter to dynamic to allow a dynamic management of the power consumption by the cluster cabinet. The cluster cabinet can manage the power consumption of each charging station. In this configuration, a power meter on the incoming line is required. The power delivered by cluster is: (Maximum power to cluster – (Value of power meter on incoming line – Power used by cluster)).

If the Configuration set-up parameter is set to static, the consumption of the cluster cabinet and its charging stations is defined only by the Max power to cluster parameter.

Energy Repartition Scenario ParameterPriority to charge the connected electric vehicles is taken into account with the Configuration set-up parameter:

Set it to 3kW Priority to charge a maximum number of electric vehicles simultaneously regardless of their battery capacity.Set it to Balanced Power to split energy among the batteries according to their own capacity and in a proportional way when there is not enough energy to charge all the connected electric vehicles.

Parameter Access Rights Range Factory Setting

Description

Admin User

Configuration set-up RW RW staticdynamic

static Defines the energy management behavior

Energy Contract RW RW 1...32000 55 kVA Defines the energy contract of the entire site

Maximum charging duration

RW RW 0 (no limit)...99h59mn

0 Defines the maximum charging duration for an electric vehicle

Maximum authorized energy on load

RW RW 0 (no limit)...9999 0 Defines the maximum authorized energy delivered for an electric vehicle

Energy repartition scenario

RW RW 3kW PriorityBalanced Power

3kW Priority

Defines the energy repartition scenario in case of load shedding

Socket-outlet limitation RW RW Max PowerLimited Power

Max Power Enables the socket-outlet limitation of power by selecting Limited Power

Mono-phased maximum power

RW RW 1...10 3.4 kVA Defines the maximum power of a single phase socket-outlet

Mono-phased load-shedding floor value

RW RW 1...20 8 A Defines the minimum current of a single phase socket-outlet

Tri-phased maximum power

RW RW 1...50 22 kVA Defines the maximum power of a 3-phase socket-outlet

Tri-phased load-shedding floor value

RW RW 1...20 14 A Defines the minimum current of a 3-phase socket-outlet

Load-shedding priority RW RW Charge durationEnergy delivered

Charge duration

Defines the load-shedding priority

VIP privilege RW RW 100...200% 120% Defines the percentage of power that a VIP badge can use

Max power to cluster RW N 1 to Energy contract

Energy contract

Defines the limit of power available for the cluster cabinet and its charging stations

54 DOCA0060EN-02 04/2014

Page 55: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Load-Shedding Priority ParameterIn case of overload, the cluster cabinet stops the charging of electric vehicle by taking into account the Load-shedding priority parameter:

Set it Charge duration to stop in priority the charge of the electric vehicle that has been connected the longest. Charging of the vehicle that has been connected the longest is stopped.Set it Energy delivered to stop in priority the charge of the electric vehicles that have loaded the most energy.

DOCA0060EN-02 04/2014 55

Page 56: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Advanced Settings Sub-Tab

Parameter List

Parameter Access Rights Range Factory Setting

Description

Admin User

Tri-phased voltage reference RW N – 400 Defines the 3-phase voltage reference (can change between countries)

56 DOCA0060EN-02 04/2014

Page 57: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Action Buttons

General Buttons

Button Action

Save Saves the current energy management configuration

NOTE: If you click another tab before saving the energy management configuration, all changes are lost.

Cancel Returns to the previously saved energy management configuration

DOCA0060EN-02 04/2014 57

Page 58: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Updates Tab

Section 3.6Updates Tab

Firmware Management

Objective of the TabDisplay the firmware version and IP address of the electronic board and commissioning tool of each socket-outlet.Display the firmware version of the RFID reader and screen of each charging station.Upgrade the firmware on each charging station (electronic board, commissioning tool, and RFID reader).

Related DeviceThis sub-tab appears if Cluster or an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

Parameter List

File RequiredThe names of the files to download are different depending on the firmware to install:

Downloading Files

Parameter Access Rights Description

Admin User

Plugs R N Socket-outlet number

Firmware version of the board

R N Version number of the currently installed application release for the associated socket-outlet number

Commissioning tool version

R N Version number of the currently installed commissioning tool release for the associated socket-outlet number

Firmware version of the RFID reader

R N Version number of the RFID reader of the charging station

Firmware version of the Screen

R N Version number of the screen of the charging station

Compatibility issues R N Conflict status between application, commissioning tool, RFID, and screen versions

File Name Upgrade of...

evse_x.y.zz_armv5l.ipk (where x, y, and z are the version number and armv5l is the processor name)

firmware version of the electronic board

webserver_x.y.zz_armv5l.ipk (where x, y, and z are the version number and armv5l is the processor name)

commissioning tool version

rfid_NNN.hex (where NNN is the version number) firmware version of the RFID reader

Step Action

1 Files are available on the Schneider Electric Pl@net intranet site at http://planet.schneider-electric.com or on the Schneider Electric Shopping kiosk intranet site at http://shoppingkiosk.schneider-electric.com.

2 Search for EVlink in the Product Fast Access field.

3 On the EVlink product documentation page, click the Software/Firmware tab.

4 Click the EVlink_Maintenance_Managed-Services_2.0_x.y.zip file that contains the charging station application files (Software and documentation).

5 Download the EVlink_Maintenance_Managed-Services_2.0_x.y.zip file to your hard disk.

6 Unzip the downloaded file to access the .ipk or .hex file.

58 DOCA0060EN-02 04/2014

Page 59: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Firmware Upgrade ProcedureThe upgrade procedure can only be performed by an administrator:

Step Action

1 Click the Browse action button to open a browser window.

2 In the browser window, find and select the previously downloaded charging station firmware package .ipk file, and then click Open.

3 Depending on the element to upgrade:Click Install to upgrade the electronic board firmware or the commissioning tool (.ipk packages).Click Upgrade RFID to install a new version of RFID reader (.hex file).

NOTE: If the current version is newer than the downloaded version, downgrade is not authorized. A message displays that socket-outlet firmware is up-to-date.

4 When the installation is complete, click Reboot to restart the charging station.

DOCA0060EN-02 04/2014 59

Page 60: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Maintenance Tab

Section 3.7Maintenance Tab

Action Buttons

Objective of the TabRestart the stand-alone charging station.

Related DeviceThis tab appears if an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

Restart Button

Button Name Action

Restart Restarts the stand-alone charging station

60 DOCA0060EN-02 04/2014

Page 61: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Users Account Tab

Section 3.8Users Account Tab

Password Management

Objective of the TabModify the passwords.

Related DeviceThis sub-tab appears if Cluster or an EVlink Parking Standard EV•1S•••••• charging station is selected in the device selection tree.

User List Action Buttons

User Detail Parameter

Security PoliciesThe password and account management must be compliant with the company IT policy.

The commissioning tool is a tool for reading and writing data, and controls the state of the system, with full access to all data in your application. If, however, there are security concerns over these functions, you must at a minimum assign a secure password to the commissioning tool. For reasons of security for your installation, you must immediately upon first login change the default password.

NOTE: A secure password is one that has not been shared or distributed to any unauthorized personnel and does not contain any personal or otherwise obvious information. Further, a strong password contains a combination of upper and lower case letters, numbers, and special characters. You should choose a password length of at least 8 characters (maximum 20).

Username Button Icon Access Rights Action

Admin User

admin RW N Allows modification of the admin password

user RW RW Allows modification of the user password

Parameter Access Rights Description

Admin User

New password RW RW Editable field for entering the new password (hidden characters).

Confirm new password RW RW Editable field for confirming the new password (hidden characters).

WARNINGUNAUTHORIZED DATA ACCESS

Immediately change the default password to a new, secure password.Do not distribute the password to unauthorized or otherwise unqualified personnel.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

DOCA0060EN-02 04/2014 61

Page 62: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

Commissioning of a Cluster Cabinet and Its Charging Stations

Modifying the Password of the Selected AccountTo modify the password of the selected account, proceed as follows:

Step Action

1 Enter the new password in the New password field.

2 Enter this new password in the Confirm new password field for confirmation.

3 Click Save to update the password.

62 DOCA0060EN-02 04/2014

Page 63: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••
Page 64: EVlink Commissioning Guide - - 04/2014 · DOCA0060EN-02 04/2014 7 About the Book At a Glance Document Scope This document will guide you through the commissioning of: zan EV•1S••••••

As standards, specifications and designs change from time to time, please ask for confirmationof the information given in this publication.

DOCA0060EN-02

Schneider Electric Industries SAS35, rue Joseph MonierCS30323F - 92506 Rueil Malmaison Cedex

www.schneider-electric.com 04/2014