13
ETRAKIT TRAINING INSPECTION SCHEDULING CITY OF FORT WALTON BEACH GROWTH MANAGEMENT DEPARTMENT

ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

ETRAKIT TRAININGINSPECTION SCHEDULING

CITY OF FORT WALTON BEACH

GROWTH MANAGEMENT DEPARTMENT

Page 2: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

ETRAKIT SUMMARY

• Web address: https://ftwb-trk.aspgov.com/eTRAKiT/

• Initial services will include:

• Inspections (scheduling & canceling)

• Permit Status Listings

• Permit Search

• Project Search

• Code Case Search

• BTR Search

• Code Enforcement Issue Reporting

• Future services will include:

• Online Permit Submittals

• Online Project Submittals

• Online BTR Submittals/Renewals

Page 3: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

OVERVIEW

Page 4: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

Menu bar to login

Menu links to eTRAKiTfeatures

Page 5: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

STEP 1: LOG IN

• Click dropdown menu to right of “Log

In” and select “Registered AEC”

• Click dropdown menu to right of

“Registered AEC” and select your

business name.

• Type in your password and click

“LOGIN”

Page 6: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

Menu links to eTRAKiT

features

This area shows all permits that you are associated with in the City.

All un-resulted inspections will

be displayed here

Page 7: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTION SCHEDULING

1. Search through inspection list and find inspection that is ready to be scheduled.

2. Click “Schedule”

Note: Inspections available for scheduling will appear with

“Schedule” in the “Date” column.

Option 1

Page 8: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTION SCHEDULING

1. Search through permit list to find permit.

2. Click the “Inspections” tab

3. Click “Schedule” to schedule applicable inspection.

Option 2

Page 9: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

Any notes such as alarm code

or lockbox code must go in the “Notes”

box.

Verify date and time prior to clicking

“SUBMIT”Click “SUBMIT” when above

information is correct.

Page 10: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTING SCHEDULING

Inspection request has been submitted when you see the date appearing in the date column.

Click the red X to cancel the inspection request.

Page 11: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTION SCHEDULING

Page 12: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTION SCHEDULING

• Once the inspection is requested, City Staff will confirm the Building Inspector’s

availability and will assign the inspection to the Inspector.

• If there is no availability for the date and time requested, City Staff will notify the

contractor and reschedule the inspection as necessary.

Page 13: ETRAKITTRAINING - Fort Walton Beach, Florida · 2019. 9. 3. · Click “Schedule” Note: Inspections available for scheduling will appear with “Schedule” in the “Date” column

INSPECTION SCHEDULING

• Within the permit record, the

Contractor will be able to view the

permit inspection results and notes by

clicking “More Info”.