Upload
kalani
View
64
Download
2
Tags:
Embed Size (px)
DESCRIPTION
ESA 2010 transmission programme. Hans Wouters European Commission, Eurostat Unit C2 National and Regional accounts and BoP. Content. Introduction of ESA 2010 ESA 2010 transmission programme (TP) Main reasons for changes transmission programme Enlargement countries and ESA 2010. - PowerPoint PPT Presentation
Citation preview
Eurostat
ESA 2010 transmission programme
Hans WoutersEuropean Commission, Eurostat Unit C2National and Regional accounts and BoP
Eurostat
Content
1. Introduction of ESA 20102. ESA 2010 transmission programme (TP)3. Main reasons for changes transmission
programme4. Enlargement countries and ESA 2010
2
Eurostat
1. Introduction of ESA 2010 (1)• European system of national and regional
accounts• Three parts: legal act, methodological guide,
transmission programme• Revision of ESA 1995
ESA 79 ESA 95 ESA 2010
3
Eurostat
1. Introduction of ESA 2010 (2)
• Consistent with SNA 2008
ESA 2010
• Some concepts more detailed• For specific EU purposes
Contribution EU budget Regional aid – structural funds Excessive deficit procedure 4
Eurostat
1. Introduction of ESA 2010 (3)
• Legally binding Use of ESA methodology Transmission programme
• Into force on 16 July 2013• To be implemented as of 1 September 2014
5
Eurostat
2. ESA 2010 Transmission program (1)
• Set of 23 tables of national accounts data Main aggregates Tables by industry, capital stock Sector accounts Financial accounts Regional accounts Government accounts Input-output – supply-use
6
Eurostat
2. ESA 2010 Transmission program (2)
• Quarterly (4), annual (17) and multi-annual tables (2)
• To be transmitted within specified time limits Varying between 2 and 36 months
• For defined time periods First year varying between 1995 and 2010
• Subject to country-specific (temporary) derogations
7
Eurostat
Gov
2. ESA 2010 Transmission program (3)
PensionsRegional
GDP
Main agg.QSA
QGFS SUTIOT
Detailed breakdowns
Breakdowns
Gov
ASA
Regional
Assets GFCF
COFOG
Fin.acc
8
Eurostat
2. ESA 2010 Transmission program(4)Content TP: requirements per table• List of variables and codes• Breakdowns: industries, products, sectors, type
of assets, geographical breakdown RoW, regions, consumption by purpose, government functions
• Other characteristics: valuation, seasonal adjustment, consolidation, use/res – assets/liab
• Footnotes
9
Eurostat
2. ESA 2010 Transmission program(5)
Code List of variablesBreak-down(2) Current
prices
Previous year's prices and
chain‑linked volumes(10)
B.1g 1.Gross value added at basic prices A*10 x x
D.21 2.a) Taxes on products(3) x x
D.31 2.b) Subsidies on products(3) x x
B.1g* 3. Gross domestic product market prices x x
Etc….
Content TP: part of table 1 (example)
10
Eurostat
3. Main reasons for changes in TP(1)
• Methodological changes • User needs and EU policy needs • Reduction reporting burden • Integration transmission requirements into 1
legal act • Alignment of international standards for data
transmission (SDMX)
11
Eurostat
3. Main reasons for changes in TP(2)
Methodological changes• 44 issues for revision (SNA)• 27 (ESA) issues discussed in handbook
Some major issues• Change in asset boundary – R&D, weapon systems• Change in sector detail• New variables or breakdowns• Treatment of goods sent abroad for processing
12
Eurostat
3. Main reasons for changes in TP(3)
User needs and EU policy needs• Improvement of timeliness• Improved measurement of wealth• Grown interest for ageing population
13
Eurostat
3. Main reasons for changes in TP(4)
Reduction reporting burden• Reasons
MS requests related to reduction of resources Relaxed user requirements
• Some important examples Reduction of backward series No double reporting Drop of distributive variables in main aggregates tables Drop transmission of seasonally adjusted quarterly main
aggregates in previous year's prices Reduction of requirements for industry breakdowns Switch to evolving composition RoW breakdown
14
Eurostat
3. Main reasons for changes in TP(5)
Legal simplification
• Four formerly separate legal acts have been integrated in ESA 2010 legal act Quarterly non-financial accounts by institutional sector Quarterly non-financial accounts for general government Quarterly financial accounts for general government Quarterly government debt
15
Eurostat
3. Main reasons for changes in TP(6)
Alignment of international standards for data transmission (implementing SDMX)• Technical standards have been evolving since last
ESA data transmission programme – chance and challenge
• Decision to use SDMX for NA data exchanges at world-level (SNA and ESA) and to coordinate closely with BOP
• NA data structure definitions (cooperation between ECB, OECD, IMF, WB and UN) coordinated by Eurostat
16
4.Enlargement countries and ESA 2010 (1)
Background: Eurostat work with the EC's• Project work
Multi-country IPA projects National IPA projects Grants
• Assessments• Data transmission
Transmission programme Transmission tools - SDMX
17
4.Enlargement countries and ESA 2010 (2)
Why is ESA2010 and the TP important for IPA countries?• ESA2010 TP provides key national accounts
information• Comparability with EU countries• Compliance is condition for accession EU
18
4.Enlargement countries and ESA 2010 (3)
Introduction of ESA2010 by enlargement countries• ESTAT recommendation: in September 2014• Discussed in IPA 2011 workshop in Nov. '12
EC's will prepare roadmap for implementation• Roadmap contains two parts
Implementation methodological changes Implementation data transmission ESA 2010 TP
19
4.Enlargement countries and ESA 2010 (4)
Roadmap: methodological changes• List of 74 issues• Based on SNA issues and ESA changes• 74 issues analysed and classified by all EC's
20
4.Enlargement countries and ESA 2010 (5)
Roadmap: methodological changes (cont.)• July '13: draft roadmap indicating implementation
status of 74 issues Implemented Not implemented but not relevant Not implemented but impact negligible Not implemented, no plans yet
21
4.Enlargement countries and ESA 2010 (6)
Roadmap: methodological changes (cont.)• End '13: update of draft roadmap• Preliminary conclusion: few changes with high
impact on National Accounts results• EC's will study changes with high impact first• Most EC's will implement changes in September
2014
22
4.Enlargement countries and ESA 2010 (7)
Roadmap: transmission programme
Eurostat and enlargement countries monitor progress compliance with ESA2010• By developing questionnaire• Where 3 groups of tables according to 'level of
importance’ are distinguished• That is updated by enlargement countries at
least once a year23
ESA 2010 transmission programme
Hans WoutersEuropean Commission, Eurostat Unit C2National and Regional accounts and BoP