16
 COSMOTE Date: 14-02-2006  Version: 01 Ericsson RBS Commissioning Guide Ericsson RBS Commissioning Guide 1/16

Ericsson RBS Commissioning Guide

Embed Size (px)

DESCRIPTION

Ghide for commissioning Ericsson RBS

Citation preview

Page 1: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 1/16

 

COSMOTE

Date: 14-02-2006

 Version: 01

Ericsson RBS Commissioning

Guide 

Ericsson RBS Commissioning Guide

1/16

Page 2: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 2/16

 

Ericsson RBS Commissioning Guide

1. Preparation for Commissioning 

1.1  Tools Required

The commissioner before go to site for commissioning, he must have thefollowing materials with him:

·  Torques for plug-unplug units (if needed)

·  Screwdriver and krone-tool for installing PCM line (if needed).

·  Voltmeter to measure voltage.

·  Laptop more than 1000MHz, 512MB memory, WinXP or Win2000.

·  The latest version of OMT (currently it is R29_3).

·  Serial cable 9pin male - 9pin female for connection.

1.2  Last Check 

Before begin the commissioning make some last checks.

·  Cabinet is well fixed and grounded

·  DC voltage to cabinet is -48VDC (be careful of the polarity).

·  In case of 2106 power cables are connected correctly on power board.Neutral and grounding are not connected on the same bar. 

·  All internal cables of the cabinet are connected and there is no obvious

sign of damage.

Ericsson RBS Commissioning Guide

2/16

Page 3: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 3/16

 

2. Commissioning Procedure

2.1  Creating Database

Open OMT. Don’t connect to RBS but create first the IDB. Select

ConfigurationàCreate IDB 

Ericsson RBS Commissioning Guide

3/16

Page 4: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 4/16

 

Let transmission line G.703 and create type of cabinet by clicking on New.

If you have created already a new IDB and want to erase it click on Clear All.

It will erase all old data.

Ericsson RBS Commissioning Guide

4/16

Page 5: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 5/16

 

Select the type of the cabinet.

2206Cabinet Type: 2206

Power System: -48VDC (Also +24VDC, 120-250VAC optional backup)Climate System: Fan+Filter 

2106Cabinet Type: 2106

Power System: 200-250 outdoor battery

Air. Cond + heat exch.

Click OK 

 Now it is time to create the cells for the cabinet. Here we will discuss the usual

configuration with 3 cell of 900MHz without TMA. Create a new Antenna Sector 

 by clicking on New 

Ericsson RBS Commissioning Guide

5/16

Page 6: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 6/16

 

By clicking New a new window Antenna Systems for Sector 0 will be shown.

Click on New to create the cells.

Frequency: GSM 900 (other options GSM 800, GSM 1800, GSM 1900)CDU type: CDU G (other options CDU F)

TMA: No (other options Yes)

Tx combining: Uncombined (other options dTRU hybrid combiner, HCU,

HCU_RX antenna sharing)

Ericsson RBS Commissioning Guide

6/16

Page 7: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 7/16

 

When finish with the cells click OK  

Ericsson RBS Commissioning Guide

7/16

Page 8: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 8/16

 

One more window will be shown. From here select the configuration of the RBS.

In our case it is SCC (Site Cell Configuration) 3x2 and No of Ant 3x2.

Save IDB in you computer before step forward.

Ericsson RBS Commissioning Guide

8/16

Page 9: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 9/16

 

Select ConfigurationàDefineàAlarm Inlets… The dialog to define external

alarms will be shown. You will define only external alarms. All the alarms are of 

type breaking. Also Id is different for every alarms. Follow the next table. It is the

case where you have Ericsson 2206 with MPB and Sunlight.

ERICSSON+MPB+SUNLIGHT  

Position

on Krone

Alarm

Inlet

Declaration of the alarm in RBS Level

5 0/1 MPB DOOR OPEN 1

2 0/2 MPB TEMPERATURE TOO HIGH 2

0/3 FIRE SUSPECTED 2

3 0/4 MPB LOW TEMPERATURE 2

7 0/5 MPB FIRE DETECTED 2

6 0/6 MPB LOSS OF MAIN AC 2

10 0/7 MPBGENERAL ALARM 2

14 0/8 PSU SUNLIGHT BATTERY DISCHARGE 2

20 0/9 GENERATOR ON 2

8 0/10 MPB AIR CONDITION FAILURE 29 0/11 MPB AVIATION LIGHT BREAKDOWN 1

4 0/12 MPB OIL LEVEL TOO LOW 2

13 0/13 PSU SUNLIGHT MAINS FAILURE 2

11 0/14 PSU SUNLIGHT RECTIFIER URGENT 2

16 0/15 PSU SUNLIGHT RECTIFIER NON

URGENT

2

12 0/16 PSU SUNLIGHT DC VOLTAGE<47V 2

In case that we have 2106 declare the alarms as next

Alarm Inlet Declaration of the alarm in RBS Level

2/16 Fire Alarm 2

3/16 Smoke Alarm 2

Ericsson RBS Commissioning Guide

9/16

Page 10: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 10/16

 

 Next define the delays for the feeders ConfigurationàDefineàDelay…

Here you must define the delay for each feeder. Don’t touch ESB (External

Synchronization Bus)

To calculate the electrical delay you open the corresponding excel file (900MHz

or 1800MHz). At OMT you must fill the sum of the electrical delay of feeder and jumper (column H)

Repeat for all feeders.

 Next select configurationàDefineàHardware Info… Here you can set the

hardware information of every unit. Select IDM 0 and fill the HW information of 

the cabinet.

Ericsson RBS Commissioning Guide

10/16

Page 11: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 11/16

 

Then define the loss of feeders. ConfigurationàDefineàLoss…. At the new

window that will appear we will fill only the losses for the feeders. From the

Excel file you opened before add the attenuation of feeders and jumper (Column

F)

 Next you sill define PCM line. ConfigurationàDefineàPCM….

Transmission Interface: G.703 (E1)

 Network Topology: Stand Alone (Other options is cascade, if another site is

activated from the same line after this cabinet).

Sync source: PCMA.

Leave the next parameters as they are.

Ericsson RBS Commissioning Guide

11/16

Page 12: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 12/16

 

At the next step you will define the present RUs and remove those RUs that do

not exist. Select ConfigurationàDefineàPresent RUs. Usually you must

remove PSU-3 and some TRU that don’t exist.

Select ConfigurationàDefineàTEI… and set the TEI number of DXU. This

TEI number is given from OMC. Cabinets on the same line must have different

TEI values.

Ericsson RBS Commissioning Guide

12/16

Page 13: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 13/16

 

Save IDB. Connect to RBS and then select ConfigurationàInstall IDB.

Speak with OMC to unlock the site. Be careful that units are at remote mode.

2.2  Checking the external alarms

Check the external alarms of RBS. Refer to manual of each equipment on how to

simulate them. Make sure that you don’t leave active alarm when leaving from

site.

2.3  Checking Climate Unit of 2106

On CCU of 2106 there is a button that tests the operation of climate unit. Push it

and see if a fault will occur.

Ericsson RBS Commissioning Guide

13/16

Page 14: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 14/16

 

Puch test button to test climate unit

Ericsson RBS Commissioning Guide

14/16

Page 15: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 15/16

 

2.4  Checking Battery Backup

Close the AC main breaker of the site. In case of 2106, cabinet must continue

working from the batteries. In case of 2206 Power System will provide thenecessary power from its own batteries.

2.5  Integration

Integration is very important procedure because we can test the performance of 

RBS. If done correctly it is possible to detect many errors during installation or 

commissioning.

·  Check with a compass the direction of the antennae. Directions must be the

same with those at Work Order.

·  Make sure that feeders are connected to the correct antenna and start from the

correct filter. Also cable connections between units inside cabinet must be

correct.

·  Make calls from every channel of every TRU. Speak with the center to lock some TRU if necessary.

·  Check that the cells look at the correct direction.

·  Make handover between the cells

·  Make handover to a nearby site and write down the cell id.

Ericsson RBS Commissioning Guide

15/16

Page 16: Ericsson RBS Commissioning Guide

7/16/2019 Ericsson RBS Commissioning Guide

http://slidepdf.com/reader/full/ericsson-rbs-commissioning-guide 16/16

 

Contents

Ericsson RBS Commissioning Guide .........................................................................2

1. Preparation for Commissioning ......................................................................21.1 Tools Required .......................................................................................2

1.2 Last Check..............................................................................................2

2. Commissioning Procedure..............................................................................3

2.1 Creating Database...................................................................................3

2.2 Checking the external alarms ................................................................13

2.3 Checking Climate Unit of 2106............................................................. 13

2.4 Checking Battery Backup .....................................................................15

2.5 Integration ............................................................................................15

Ericsson RBS Commissioning Guide

16/16