24
Erebus Putative Seismic- Tremor Infrasound observed at I55US on day 260, 2002, Sep.17 Charles R. Wilson, John V. Olson and Daniel L. Osborne, Geophysical Institute, University of Alaska at Fairbanks, Alaska October 17, 2003

Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

  • Upload
    coby

  • View
    68

  • Download
    0

Embed Size (px)

DESCRIPTION

Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17. Charles R. Wilson, John V. Olson and Daniel L. Osborne, Geophysical Institute, University of Alaska at Fairbanks, Alaska October 17, 2003. Eight sensor array at I55US with Erebus volcano. - PowerPoint PPT Presentation

Citation preview

Page 1: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Erebus Putative Seismic-Tremor Infrasound observed at I55US on

day 260, 2002, Sep.17

Charles R. Wilson, John V. Olson and Daniel L. Osborne, Geophysical Institute, University

of Alaska at Fairbanks, AlaskaOctober 17, 2003

Page 2: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Eight sensor array at I55US with Erebus volcano

Page 3: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Erebus seismic tremor infrasound 9/17/02

Trace Velocity 0.339 Km/sec

Azimuth 339 deg.

Maximum peak-To-peak Amp0.02 Pascal

Page 4: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Abs(fft) tremor infrasound 05:05 to 05:05:30, 260

0.86 sec

Page 5: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Erebus Tremor Infrasound 9/17/02,05:05:30-05:06:00 UT

Velocity 0.308 km/sec

Azimuth341 deg.

Page 6: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Abs(fft) tremor infrasound 12:25 to 12:26 UT day 260

0.89 sec

Page 7: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

abs(fft) Erebus infrasound 13:05 to 13:06, day 260

1.08 sec

Page 8: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

MCCM detector plot Erebus infrasound Sept 17,2002 12:00 to 13:00 UT

MCCM

Trace Velocity

Azimuth340 deg.

Page 9: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

MCCM detector plot for random noise on all eight sensors at I55US

Random Noise Sensor Number 1

MCCM value; 0 to 1

Trace Velocity

Azimuth of arrival

One hour of time

Page 10: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Phase-aligned overlay inner three sensors of tremor infrasound day 260, 04:01 to 04:10 UT

Page 11: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Uncertainty in velocity and azimuth fortremor infrasound day 260, 04:01 to 04:10

Velocity = 307 m/sec +/- 1.35 m/sec

Azimuth = 340 +/- 0.25 deg

Page 12: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Scatter diagrams for velocity, slowness and wavenumber space for tremor inf. Day 260

Page 13: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

MCCM Detector plot, I55US, 9/17/02 filtered data (0.7 to 10 Hz) inner sensors only

MCCM

Velocity

Azimuth

340 deg.

Page 14: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Azimuth of Arrival for 24 hours 9/17/02 I53US

340 deg.

Page 15: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Trace Velocity I53US 09/17/02

0.350 km/s0.30 km/s

Page 16: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

MCCM detector plot, I55US 8/24/02, filtered (0.7 to 10 Hz)

340 deg.

Page 17: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

MCCM plot I55US 6/03/03 filtered (0.70 to 10 Hz)

340 deg.

Page 18: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Tremor signal detector plot day 260 04:00 to 05:00 UT

Page 19: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Tremor signal detector plot day 260 05:00 to 06:00 UT

Page 20: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Continuous-Type Erebus “tremor” signals

• During the year 2002 four episodes have been found in the I55US data set of very low amplitude, continuous-type infrasound from an average azimuth of 340 +/- 0.78 deg, with an average trace velocity of 329.50 +/- 3.0 m/sec

• The average amplitude of these signals is 0.01 Pa, with a duration up to 5 hours

Page 21: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Impulsive Signals from Strombolian-type eruptions from

the lava lake in the Erebus Crater

Phase-aligned overlay of 8 sensor traces

Page 22: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Erebus Crater with lava lake eruption

Page 23: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Strombolian type Erebus signal 8/13/2002

Seconds

Page 24: Erebus Putative Seismic-Tremor Infrasound observed at I55US on day 260, 2002, Sep.17

Statistics of impulsive signals

• 182 Erebus signals received at I55US• Period April 2002 to March 2003 • Average trace vel = 320.5 +/- 6.32 m/sec• Average Azimuth = 336.5 +/- 0.39 deg• The impulsive signals were filtered in the

passband 0.70 to 10 Hz to eliminate the microbarom background

• Impulsive signals are coherent over the entire 8 sensor array of aperture 1.9 km.