    Diploma in Computer ScienceFaculty of Computer and Mathematical Sciences,MARA University of Technology Sarawak,Kota Samarahan Campus,Jalan Meranek,94300 Kota Samarahan,SARAWAK.

    Sir Abang Hamizam bin Abang Mohar,Lecturer of Fundamentals of Entrepreneurship (ENT300),Faculty of Business Management,MARA University of Technology Sarawak,Kota Samarahan Campus,Jalan Meranek,94300 Kota Samarahan,

    SARAWAK. 10 MARCH 2016

    Dear Sir,SUBMISSION OF BUSINESS PROPOSAL

    Referring to the matter above, H.A.R.K. Team Building would like to submit our business plan foryour analysis, evaluation and references. H.A.R.K. Team Building business partners and the siteaddress are as mentioned below:

    Details of partners are as follow: -1. Muhammad Khairul Anwar Bin Suleiman 20146354182. Ahmad Aiman Bin Yunus 20142503943. Rohn Laing Anak Simon Saat 20142866164. Ahmad Hazmi Bin Lawrence 2014447296

    Business address:H.A.R.K. TEAM BUILDING,

    TAMAN WU FUNG,94500 LUNDU,

    SARAWAK

    We hope that our business plan will satisfy your requirement for our subject Fundamentalsof Entrepreneurship (ENT300). We also hope that our business plan will give huge benefits tothose who are interested in doing the same business venture. Thank you.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    2/70

    Yours faithfully,

    …………………………………….

    (MUHAMMAD KHAIRUL ANWAR BIN SULEIMAN)GENERAL MANAGER H.A.R.K. TEAM BUILDING

    …………………………………….

    (MUHAMMAD KHAIRUL ANWAR BIN SULEIMAN)ADMINISTRATIVE MANAGER H.A.R.K. TEAM BUILDING

    …………………………………….

    (AHMAD AIMAN BIN YUNUS)MARKETING MANAGER H.A.R.K. TEAM BUILDING

    …………………………………….

    (ROHN LAING ANAK SIMON SAAT)OPERATIONS MANAGER H.A.R.K. TEAM BUILDING

    …………………………………….

    (AHMAD HAZMI BIN LAWRENCE)FINANCIAL MANAGER H.A.R.K. TEAM BUILDING

  • 8/19/2019 ENT 300 UITM Samarahan 2

    3/70

    H.A.R.K. TEAM BUILDING

    Prepared by:MUHAMMAD KHAIRUL ANWAR BIN SULEIMAN

    AHMAD AIMAN BIN YUNUSROHN LAING ANAK SIMON SAATAHMAD HAZMI BIN LAWRENCE

  • 8/19/2019 ENT 300 UITM Samarahan 2

    4/70

    Content

    Section 1 : Introduction

    Section 2 : Purposes of Business Plan

    Section 3 : Company Background

    Section 4 : Owner’s/Partner’s Background

    Section 5 : Administration Plan

    Section 6 : Marketing Plan

    Section 7 : Operational Plan

    Section 8 : Financial Plan

    Section 9 : Conclusions and Recommendations

    Appendices

  • 8/19/2019 ENT 300 UITM Samarahan 2

    5/70

    Executive Summary

    This business is based on partnership where it consists of four (4) members which hold

    important positions in the company such as General Manager, Administration Manager, Marketing

    Manager, Operation Manager and Financial Manager. The business capital is amounted RM80,000

    with RM20,000 contributions from each partners.

    H.A.R.K. Team Building is a company which focuses on team building activity for

    university students in Malaysia. Team building is an activity that boosts teamwork and discipline

    which are very important for university students. Since most university does not have these team

    building facilities, we are highly confident that our market can be easily developed and spread.

    With loan given as support from Maybank, we are hoping and wishing to make H.A.R.K.

    Team Building able to achieve outstanding demand. Our business is expected to commence on

    2017 and our vision is to make our company the first choice team building centre in Sarawak,

    Malaysia. This will be realized by the full cooperation and efforts among the partners to promote

    the company.

    We will expect our business to become more developed in the near future because team

    building centres are still rare in the land of Malaysia. This is an advantage to us because there are

    few competitors for the same type of business thus allowing the company to gain more profit in

    the long run.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    6/70

    INTRODUCTION

    Our company’s name is H.A.R.K. Team Building. The H.A.R.K. Team Building is a

    service company that provides a place for students to do team building activities. The company is

    located at Taman Wu Fung, 94500 Lundu Sarawak. H.A.R.K. Team Building start its business inthe year 2017.

    PURPOSE OF BUSINESS PLAN

    1. The Entrepreneurs (H.A.R.K. Team Building Managers)

    A business plan will enable the managers of H.A.R.K. Team Building to fully understandthe proposed business. The managers can determine in advance whether there is a marketfor the proposed products or services. Investment and business planning and decisions are

    also better guided with the availability of a Business Plan.

    2. Investors

    Investors will need to fully comprehend the proposed venture before making anyinvestment decision. Hence, the presence of a Business Plan will assist potential investorsin analysing and evaluating the viability of a project.

    3. Financial Institutions

    Business plan assists and help the financial institution to evaluate the capability of the

    proposed project and provide loan for the business. Financial institution involved in this business project is Maybank.

    4. Customers

    Since our business rely on contracts and tenders put out by institutional clients as our mainsource of business, the business plan is essential as part of the tendering process to convincethe customers of the ability and capability of our business to fulfil the requirements of thetendered job.

    5. Company Staffs / Workers

    A business plan helps wor kers to understand the business’ goals and objectives and give aguideline to them regarding their job duties and responsibilities.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    7/70

    BUSINESS/COMPANY BACKGROUND

    COMPANY BACKGROUND

    Name of Company H.A.R.K. Team Building

    Address H.A.R.K. Team Building, Taman Wu Fung, 94500, Lundu,

    Sarawak

    Contact Number 082-467485

    Email [email protected]

    Form Of Business Partnership

    Nature Of Business Service

    Main Activity Team Building

    Business Registration Date 5/6/2016

    Date of Commencement 1/1/2017

    Registration Number 001234567-P

    Name Of Bank Maybank

    Bank Account Number 123456789123

    mailto:[email protected]:[email protected]:[email protected]

  • 8/19/2019 ENT 300 UITM Samarahan 2

    8/70

    BACKGROUND OF OWNER/PARTNERS/DIRECTIORS

    Name Muhammad Khairul Anwar Bin Suleiman

    Identification number 900823-13-5255

    Permanent address Lot 6926 Lorong Bunga Kemuning 5 Taman Desa Matang

    93050 Kuching Sarawak

    Telephone number 013-8222263

    Birth date 23/8/1990

    Age 26

    Marital Status Single

    Academic Qualification Bachelor of Computer Engineering (Hons)

    Skills Computer Programing, Administration, Administration

    Support, Scheduling, Employee Relations

    Experience 3 years of working experience

    Role in Business General Manager & Administration Manager

  • 8/19/2019 ENT 300 UITM Samarahan 2

    9/70

    BACKGROUND OF OWNER/PARTNERS/DIRECTIORS

    Name Ahmad Aiman bin Yunus

    Identification number 890428-12-5815

    Permanent address Lot 771 Taman Gita, 93050, Kuching, Sarawak

    Telephone number 0112-9870171

    Birth date 28/04/1989

    Age 27

    Marital Status Single

    Academic Qualification Bachelor of Information System (Hons)

    Skills Database Management, Scheduling, Accounting

    Experience 3 years of working experience

    Role in Business Marketing Manager

  • 8/19/2019 ENT 300 UITM Samarahan 2

    10/70

    BACKGROUND OF OWNER/PARTNERS/DIRECTIORS

    Name Rohn Laing Anak Simon Saat

    Identification number 890921-13-3323

    Permanent address No.82, Taman Kakai, 94700 Serian, Sarawak.

    Telephone number 013-8297755

    Birth date 21/09/1989

    Age 27

    Marital Status Married

    Academic Qualification Bachelor of Human Resource (Hons)

    Skills Labor Relation, Human Resource Management, Scheduling

    Experience 3 years of working experience

    Role in Business Operation Manager

  • 8/19/2019 ENT 300 UITM Samarahan 2

    11/70

    BACKGROUND OF OWNER/PARTNERS/DIRECTIORS

    Name Ahmad Hazmi Bin Lawrence

    Identification number 910830-13-5327

    Permanent address Lot 225A KPG Stapok, Jalan Batu Kawa,

    93050 Kuching Sarawak

    Telephone number 016-8716964

    Birth date 30/8/1991

    Age 25

    Marital Status Engaged

    Academic Qualification Bachelor of Accounting (Hons)

    Skills Accounting, Spreadsheet, Human Resource Management, Employee

    Relations, Scheduling

    Experience 2 years of working experience

    Role in Business Financial Manager

  • 8/19/2019 ENT 300 UITM Samarahan 2

    12/70

    Administration Plan

  • 8/19/2019 ENT 300 UITM Samarahan 2

    13/70

    H.A.R.K. TEAM BUILDING: INTRODUCTION TO THE ORGANIZATION

    Address

    H.A.R.K. Team Building, Taman Wu Fung, 94500, Lundu, Sarawak.

    Location Plan

    Above is the location plan of H.A.R.K. Team Building. H.A.R.K. Team Building is located near

    the hills of Gunung Gading. This location is chosen due of its wide space which is not restricted

    by nearby buildings. The location is also suitable for all kinds of team building activities because

    of its natural landform such as mountain and hills. This location is also reachable by our target

    market which are the students of UiTM Sarawak Campus, UNIMAS, i-CATS and Swinburne. The

    lack of competitors for the same type of business is also beneficial for us. Disturbance to the

    surroundings are unlikely to occur as the location is far from human residence.

    H.A.R.K. Team Building

  • 8/19/2019 ENT 300 UITM Samarahan 2

    14/70

    Building

  • 8/19/2019 ENT 300 UITM Samarahan 2

    15/70

    H.A.R.K. TEAM BUILDING: OFFICE LAYOUT

    CHAIR

    CHAIR CHAIR

    CHAIR

    TABLE

    BOOK

    SHELF

  • 8/19/2019 ENT 300 UITM Samarahan 2

    16/70

    H.A.R.K. TEAM BUILDING: ORGANIZATIONAL CHART

    Above is the organization chart of H.A.R.K. Team Building. The general manager and

    administration manager of H.A.R.K. Team Building is Muhammad Khairul Anwar Bin Suleiman.

    The marketing manager of H.A.R.K. Team Building is Ahmad Aiman Bin Yunus. Rohn Laing

    Anak Simon Saat is the operation manager and Ahmad Hazmi Bin Lawrence is the financial

    manager.

    Muhammad Khairul AnwarBin Suleiman

    General Manager

    MuhammadKhairul AnwarBin Suleiman

    AdministrationManager

    Ahmad Hazmi BinLawrence

    Financial Manager

    Ahmad Aiman BinYunus

    MarketingManager

    Rohn Laing AnakSimon Saat

    OperationManager

    Clerk Jungle Tracking

    Instructor

    Wall Climbing

    InstructorFlying Fox

    Instructor

  • 8/19/2019 ENT 300 UITM Samarahan 2

    17/70

    H.A.R.K. TEAM BUILDING: ADMINISTRATION PERSONNEL

    Position No. of Personnel

    General Manager 1

    Admin Manager 1

    Marketing Manager 1

    Operation Manager 1

    Financial Manager 1

  • 8/19/2019 ENT 300 UITM Samarahan 2

    18/70

    H.A.R.K. TEAM BUILDING: JOB DESCRIPTION

    Position: General Manager

    Job Description:

    1. Increases management's effectiveness by recruiting, selecting, orienting, training, coaching,

    counselling, and disciplining managers; communicating values, strategies, and objectives;

    assigning accountabilities; planning, monitoring, and appraising job results; developing

    incentives; developing a climate for offering information and opinions; providing educational

    opportunities.

    2. Develops strategic plan by studying technological and financial opportunities; presenting

    assumptions; recommending objectives.

    3. Accomplishes subsidiary objectives by establishing plans, budgets, and results measurements;

    allocating resources; reviewing progress; making mid-course corrections.

    4. Coordinates efforts by establishing procurement, production, marketing, field, and technical

    services policies and practices; coordinating actions with corporate staff.

    5. Builds company image by collaborating with customers, government, community

    organizations, and employees; enforcing ethical business practices.

    6. Maintains quality service by establishing and enforcing organization standards.

    7. Maintains professional and technical knowledge by attending educational workshops;reviewing professional publications; establishing personal networks; benchmarking state-of-

    the-art practices; participating in professional societies.

    8. Contributes to team effort by accomplishing related results as needed.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    19/70

    Position: Administration Manager

    Job Description:

    1. Maintains administrative staff by recruiting, selecting, orienting, and training employees;

    maintaining a safe and secure work environment; developing personal growth opportunities.

    2. Accomplishes staff results by communicating job expectations; planning, monitoring, and

    appraising job results; coaching, counselling, and disciplining employees; initiating,

    coordinating, and enforcing systems, policies, and procedures.

    3. Provides supplies by identifying needs for reception, switchboard, mailroom, and kitchen;

    establishing policies, procedures, and work schedules.

    4. Provides communication systems by identifying needs; evaluating options; maintaining

    equipment; approving invoices.

    5. Purchases printed materials and forms by obtaining requirements; negotiating price, quality,

    and delivery; approving invoices.

    6. Completes special projects by organizing and coordinating information and requirements;

    planning, arranging, and meeting schedules; monitoring results.

    7. Provides historical reference by developing and utilizing filing and retrieval systems.

    8. Improves program and service quality by devising new applications; updating procedures;

    evaluating system results with users.9. Achieves financial objectives by anticipating requirements; submitting information for

    budget preparation; scheduling expenditures; monitoring costs; analysing variances.

    10. Maintains continuity among corporate, division, and local work teams by documenting and

    communicating actions, irregularities, and continuing needs.

    11. Maintains professional and technical knowledge by attending educational workshops;

    benchmarking professional standards; reviewing professional publications; establishing

    personal networks.

    12. Contributes to team effort by accomplishing related results as needed.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    20/70

    Position: Marketing Manager

    Job Description:

    1. Accomplishes marketing and sales human resource objectives by recruiting, selecting,

    orienting, training, assigning, scheduling, coaching, counselling, and disciplining employees;

    communicating job expectations; planning, monitoring, appraising, and reviewing job

    contributions; planning and reviewing compensation actions; enforcing policies and

    procedures.

    2. Achieves marketing and sales operational objectives by contributing marketing and sales

    information and recommendations to strategic plans and reviews; preparing and completing

    action plans; implementing production, productivity, quality, and customer-service standards;

    resolving problems; completing audits; identifying trends; determining system

    improvements; implementing change.

    3. Meets marketing and sales financial objectives by forecasting requirements; preparing an

    annual budget; scheduling expenditures; analysing variances; initiating corrective actions.

    4. Accomplishes marketing and sales objectives by planning, developing, implementing, and

    evaluating advertising, merchandising, and trade promotion programs; developing field sales

    action plans.

    5. Identifies marketing opportunities by identifying consumer requirements; defining market,competitor's share, and competitor's strengths and weaknesses; forecasting projected

    business; establishing targeted market share.

    6. Improves product marketability and profitability by researching, identifying, and capitalizing

    on market opportunities; improving product packaging; coordinating new product

    development.

    7. Sustains rapport with key accounts by making periodic visits; exploring specific needs;

    anticipating new opportunities.

    8. Provides information by collecting, analysing, and summarizing data and trends.

    9. Protects organization's value by keeping information confidential.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    21/70

    Position: Operations Manager

    Job Description:

    1. Improve the operational systems, processes and policies in support of organizations mission

    specifically, support better management reporting, information flow and management,

    business process and organizational planning.

    2. Manage and increase the effectiveness and efficiency of Support Services (HR, IT and

    Finance), through improvements to each function as well as coordination and communication

    between support and business functions.

    3. Play a significant role in long-term planning, including an initiative geared toward

    operational excellence.

    4. Oversee overall financial management, planning, systems and controls.

    5. Management of agency budget in coordination with the Executive Director.

    6. Development of individual program budgets

    7. Invoicing to funding sources, including calculation of completed units of service.

    8. Payroll management, including tabulation of accrued employee benefits.

    9. Disbursement of checks for agency expenses.

    10. Organization of fiscal documents.

    11. Regular meetings with Executive Director around fiscal planning.12. Supervise and coach office manager on a weekly basis.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    22/70

    Position: Financial Manager

    Job Description:

    1. Accomplishes finance human resource strategies by determining accountabilities;

    communicating and enforcing values, policies, and procedures; implementing recruitment,

    selection, orientation, training, coaching, counselling, disciplinary, and communication

    programs; planning, monitoring, appraising, and reviewing job contributions; planning and

    reviewing compensation strategies.

    2. Develops finance organizational strategies by contributing financial and accounting

    information, analysis, and recommendations to strategic thinking and direction; establishing

    functional objectives in line with organizational objectives.

    3. Establishes finance operational strategies by evaluating trends; establishing critical

    measurements; determining production, productivity, quality, and customer-service strategies;

    designing systems; accumulating resources; resolving problems; implementing change.

    4. Develops organization prospects by studying economic trends and revenue opportunities;

    projecting acquisition and expansion prospects; analysing organization operations; identifying

    opportunities for improvement, cost reduction, and systems enhancement; accumulating

    capital to fund expansion.

    5. Develops financial strategies by forecasting capital, facilities, and staff requirements;identifying monetary resources; developing action plans.

    6. Monitors financial performance by measuring and analysing results; initiating corrective

    actions; minimizing the impact of variances.

    7. Maximizes return on invested funds by identifying investment opportunities; maintaining

    relationships with the investment community.

    8. Reports financial status by developing forecasts; reporting results; analysing variances;

    developing improvements.

    9. Updates job knowledge by remaining aware of new regulations; participating in educational

    opportunities; reading professional publications; maintaining personal networks; participating

    in professional organizations.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    23/70

    H.A.R.K TEAM BUILDING: SCHEDULE OF TASK AND RESPONSIBILITIES

    Employees Fringe Benefits

    1. Annual leave

    An employee shall be entitled to paid annual leave of:a. 8 days for every 12 months of continuous service with the same employer if he has been

    employed by that employer for a period of less than 2 years;

    b. 12 days for every twelve months of continuous service with the same employer if he has

    been employed by that employer for a period of 2 years or more but less than 5 years; and

    c. 16 days for every twelve months of continuous service with the same employer if he has

    been employed by that employer for a period of 5 years or more; and if he has not

    completed 12 months of continuous service with the same employer during the year in

    which his contract of service terminates, his entitlement to paid annual leave shall be in

    direct proportion to the number of completed months of service:

    i. Any fraction of a day of annual leave so calculated which is less than one-half of a

    day shall be disregarded, and where the fraction of a day is one-half or more it shall

    be deemed to be one day.

    ii. An employee who is on paid annual leave becomes entitled to sick leave or

    maternity leave while on such annual leave, the employee shall be granted the sick

    leave or the maternity leave and the annual leave shall be deemed to have not been

    taken.

    2. Public Holidays

    a. Every employee shall be entitled to paid holiday at his ordinary rate of pay on the following

    days in any one calendar year:

    On ten of the gazetted public holidays, four of which shall be-

    i. the National Day;

    ii. the Birthday of the Yang di-Pertuan Agong;iii. the Birthday of the Ruler or the Yang di-Pertua Negeri of the State or the Federal

    Territory Day; and

    iv. the Workers’ Day ; and

  • 8/19/2019 ENT 300 UITM Samarahan 2

    24/70

    v. on any day declared as a public holiday under section 8 of the Holidays Act 1951;

    3. Sick Leave

    An employee shall, after examination at the expense of the employer take a sick leave for not

    more than 3-15 days depending on the circumstances.

    4. Maternity Leave

    An employee shall, after examination at the expense of the employer, take a maternity leave

    for until her child is born. However, the employee can only take her salary for the first month

    after she take her leave and can take her salary only after she starts working again.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    25/70

    H.A.R.K. TEAM BUILDING: SCHEDULE OF REMUNERATION

    Below is the schedule of remuneration of H.A.R.K. Team Building.

    Position No. Monthly

    Salary

    (RM)

    EPF

    (RM)

    11%

    SOCSO

    (RM)

    Total

    Amount

    (RM)

    General

    Manager

    1 2000.00 220.00 35.85 2255.85

    Administrative

    Manager

    1 2000.00 220.00 35.85 2255.85

    Marketing

    Manager

    1 2000.00 220.00 35.85 2255.85

    Operations

    Manager

    1 2000.00 220.00 35.85 2255.85

    Financial

    Manager

    1 2000.00 220.00 35.85 2255.85

    TOTAL 11279.25

  • 8/19/2019 ENT 300 UITM Samarahan 2

    26/70

    H.A.R.K. TEAM BUILDING: OFFICE FURNITURE AND FITTINGS

    H.A.R.K. TEAM BUILDING: OFFICE EQUIPMENT

    Type Price/Unit (RM) Quantity Total Amount (RM)

    Safe Box 299.00 1 299.00

    Laser Fax Printer 636.00 1 636.00

    Small Desktop 1699.00 4 6796.00

    Microsoft Optical Mouse

    200

    35.00 4 140.00

    Monitor 399.00 4 1596.00

    TOTAL 9467.00

    Type Price/Unit (RM) Quantity Total Amount (RM)

    Office Table 269.00 1 269.00

    Office Chair 199.00 4 796.00Book Shelf 159.00 1 159.00

    TOTAL 1224.00

  • 8/19/2019 ENT 300 UITM Samarahan 2

    27/70

    H.A.R.K. TEAM BUILDING: STATIONARIES

    Type Price/Unit (RM) Quantity Total Amount (RM)

    Pen 0.80 20 16.00

    Pencil 0.50 20 10.00

    Ruler 0.80 4 3.20

    A4 Paper 0.45 200 90.00

    Liquid Paper 1.80 4 7.20

    Stapler 2.00 4 8.00

    Staples(1000) 0.40 10 4.00

    Glue 3.00 4 12.00

    TOTAL 150.40

  • 8/19/2019 ENT 300 UITM Samarahan 2

    28/70

    H.A.R.K. TEAM BUILDING: ADMINISTRATIVE BUDGET

    Items Fixed Assets(RM)

    Monthly Expenses(RM)

    Other Expenses(RM)

    Fixed Assets

    Office Furniture and Fittings

    Office Equipment1224.00

    9467.00Monthly ExpensesSalary (EPF + SOCSO)

    Land & Building (RENT)

    Utilities

    11279.25

    5000.00

    130.00Other ExpensesRental Deposit (2 months)

    Stationaries

    Utilities Deposit (2 months)

    1000.00

    150.40

    260.00

    Business License 100.00TOTAL 30691.00 16409.25 10510.40

  • 8/19/2019 ENT 300 UITM Samarahan 2

    29/70

    Marketing Plan

  • 8/19/2019 ENT 300 UITM Samarahan 2

    30/70

    H.A.R.K. TEAM BUILDING: SERVICES DESCRIPTION

    No. Services Name Services Description

    1.

    Flying Fox Activity

    o

    A flying fox is a common way to return participants to the ground at the end of a

    ropes adventure course.

    o designated safety area of 5 metres either

    side of a line corresponding with an

    imaginary line on the ground directly

    beneath the main hawser is to be

    established and rigidly controlled to

    ensure the safe operation of the Flying

    Fox and to protect riders from physical

    interference while traveling.

    o Duration of this activity doing is 3-4

    hours.

    2.

    Canoeing Activity

    o Canoeing is a sport or recreational

    activity which involves paddling a canoe

    with a single-bladed paddleo Safety precautions of canoeing includes

    wearing a lifejacket, understanding cold

    water safety and performing safety check

    regularly.

    o Duration of this activity doing is 4 hours

  • 8/19/2019 ENT 300 UITM Samarahan 2

    31/70

    3.

    Jungle Trekking Activity

    o Jungle trekking is a recreational

    activating whereas one explores the lush

    and green forest or mountain.

    o A professional advisor is required to keep

    track of all participants to avoid unwanted

    things to happen to them.

    o Duration of this activity doing is 6 hours.

    4.

    Wall Climbing Activity

    o Wall climbing is an activity where

    participants climb an artificially

    constructed wall with grips for hands and

    feet.

    o Safety ropes are tied to climbers in case a

    misstep happens which usually leads to

    falling from the wall.

    o Duration of this activity doing is 4-5

    hours.

    Therefore,

    Each activity of team building will be paid by RM15.

    RM 15 x 4 activities = RM60 per person.

    Foods and Drinks provided from H.A.R.K. Team Building

  • 8/19/2019 ENT 300 UITM Samarahan 2

    32/70

    H.A.R.K. TEAM BUILDING: TARGET MARKET

    Our target market are students from 4 universities:

    1. MARA University of Technology (UiTM) Sarawak Campus,

    2. University of Malaysia, Sarawak(UNIMAS),

    3. International Collage of Advanced Technology Sarawak (i-CATS),

    4. Swinburne University of Technology Sarawak Campus.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    33/70

    H.A.R.K. TEAM BUILDING: MARKET SIZE

    Below is calculation for our market size:

    1. UiTM

    Estimated each university will send 1 course with 20 students (per package)

    From 23 Undergraduates Programs (from 7,000 students),

    23 x 20 = 460 students.

    Estimated every course will send its student to team building every semester

    (1 year = 2 semester).

    460 x 2 = 920 students every year.

    Every student pays RM60 to join team building.

    920 x 60 = RM55200

    2. UNIMAS

    Estimated each university will send 1 course with 10 students (per package)

    From 30 Undergraduates Programs (from 12,000 students)

    30 x 10 = 300 students.

    Estimated every course will send its student to team building every semester

    (1 year = 2 semester).

    300 x 2 = 600 students every year.

    Every student pays RM60 to join team building.

    600 x 60 = RM36000

  • 8/19/2019 ENT 300 UITM Samarahan 2

    34/70

    3. i-CATS

    Estimated each university will send 1 course with 116 students (per package)

    From 10 Undergraduates Programs (from 2,500 students)

    10 x 116 = 1160 students.

    Estimated every course will send its student to team building every semester

    (1 year = 2 semester).

    1160 x 2 = 2320 students every year.

    Every student pays RM60 to join team building.

    2320 x 60 = RM139200

    4. SWINBURNE

    Estimated each university will send 1 course with 80 students (per package)

    From 15 Undergraduates Programs (from 5,500 students)

    15 x 80 = 1200 students.

    Estimated every course will send its student to team building every semester

    (1 year = 2 semester).

    1200 x 2 = 2400 students every year.

    Every student pays RM60 to join team building.

    2400 x 60 = RM144000

    TOTAL MARKET SIZE = RM55200 + RM36000 + RM139200 + RM144000

    = RM 374400

  • 8/19/2019 ENT 300 UITM Samarahan 2

    35/70

    H.A.R.K. TEAM BUILDING: MAIN COMPETITORS

    NAME OF COMPETITOR STRENGTH WEAKNESS

    Damai Beach Resort, Kuching i. Environmentalconditions are good

    ii. Safety guaranteed

    i. Expensive priceii. Lack of facilities

    Sumiran Eco-Camp, Kuching i. Cheap priceii. Complete of

    facilities

    i. Environmentalconditions are bad

    ii. Not safety guaranteed

  • 8/19/2019 ENT 300 UITM Samarahan 2

    36/70

    H.A.R.K. TEAM BUILDING: MARKET SHARE

    Market share is the division of market or sales between companies that are running the same typeof business activities. It will be considered number of competitors, experience, strength andweaknesses. We have two business competition that are offering the same services in Kuching.

    Basically, the market shares before the involvement of our company, H.A.R.K. Team Building,two of our competition holds 55% and 45% respectively of total market share and can obtainincome about RM 374400 per year. The following table explains about the market share division

    before and after our company enters the market.

    Table 1: Market Share before entrance of H.A.R.K. Team Building

    Pie Chart for Market Share Before Entrance of H.A.R.K. Team Building

    No. Business Name Market Share (RM) Percentage (%)

    1. Damai Beach Resort, Kuching 205920 55

    2. Sumiran Eco-Camp, Kuching 168480 45

    Total 374400 100

    Damai Beach Resort55%Sumiran Eco-Camp

    45%

    Market Share Before Entrance of H.A.R.K. Team Building

    Damai Beach Resort, Kuching Sumiran Eco-Camp, Kuching

  • 8/19/2019 ENT 300 UITM Samarahan 2

    37/70

    Table 2: Market Share after entrance of H.A.R.K. Team Building

    Pie Chart for Market Share After Entrance of H.A.R.K. Team Building

    No. Business Name Market Share (RM) Percentage (%)

    1. Damai Beach Resort, Kuching 168480 45

    2. Sumiran Eco-Camp, Kuching 112320 30

    3. H.A.R.K. Team Building, Lundu 93600 25

    Total 374400 100

    Damai Beach Resort,Kuching

    45%Sumiran Eco-Camp,

    Kuching30%

    H.A.R.K Team Building25%

    Market Share After Entrance of H.A.R.K Team Building

    Damai Beach Resor t, Kuching Sumiran Eco-Camp, Kuching H.A.R.K Team Building, Lundu

  • 8/19/2019 ENT 300 UITM Samarahan 2

    38/70

    H.A.R.K. TEAM BUILDING: SALES FORECAST

    The table below shows our sales forecast for year 2017

    Month Sales Collection (RM) Remarks

    January 28000 Initial opening

    February 34500 Promotion

    March 31200

    April 30000 Final Exam

    May 31200

    June 31200

    July 31200

    August 33300 Promotion

    September 31200

    October 30200 Final Exam

    November 31200

    December 31200

    Total 2017 374400

    Total 2018 (10%) 411840

    Total 2019 (20%) 494208

    We will get sales forecast:

    Calculation for 2018

    RM 374400 x 10% = RM 37440RM 37440 + RM 374400 = RM 411840

    Calculation for 2019

    RM 411840 x 20% = RM 82368

    RM 82368 + RM 411840 = RM 494208

  • 8/19/2019 ENT 300 UITM Samarahan 2

    39/70

    H.A.R.K. TEAM BUILDING: MARKET STRATEGY

    1. Price Strategy

    Although H.A.R.K. Team Building service is high-end and safe in terms of quality of, our

    pricing structure remains affordable. Our pricing structure is also based on the activities

    provided. For our services, we provide a fixed price at RM60 per person. Our pricing structures

    are based on the fixed cost pricing. The pricing also is based on the cost from the initial outlay

    and also on the value of the students’ place on this service.

    2. Place Strategy

    H.A.R.K Team Building is located at Lundu, Sarawak. The purpose of our services to operate

    the team building activities within Lundu, Sarawak is that our service business is aiming the

    university’s student and the population meets our target by provided beautiful scenery and

    comfortable outdoor camp. Besides, we held our services in Lundu because Lundu is one of

    the most visited recreational area.

    3. Promotion Strategies

    H.A.R.K Team Building introduces new service which is called as “Team Building Activities”

    such as flying fox, canoeing, wall climbing, and jungle-trekking. Since we are not the first to

    introduce this service in Sarawak, we need to implement an aggressive marketing promotion

    to introduce our service to people. As starter, promotion of H.A.R.K Team Building is done

    through non-media channel. As for our services, we promote our service through banner,

    signboard and Facebook page which the total budgeted cost for the first year is about RM 2430.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    40/70

    i. Banner

    The important method in order to promote our company is to display our banner to the

    students because this is an easy way for them to get to know our service. In the banner,

    stated the name of our service, contact number, address and details about our service. So

    the customers can easily contact, ask or deal with us. The cost of the banner is RM 150 per

    banner and we put one banner in four different universities (UiTM Sarawak, UNIMAS, i-

    CATS, Swinburne).

    ii. Signboard

    Secondly, we also use signboard as one of our marketing strategies. Signboard put on front

    of building. Its function for advertise business to people. As a sign for people which don’t

    see building.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    41/70

    iii. Facebook page

    Lastly, we also created a Facebook page to promote our service. This is the most effective

    promotional strategy as everything is about Internet nowadays. We will establish our own

    official business page and in fact, this is very easy to be done. It is totally free and we can

    update our current doings every now and then without complex barriers so that our

    customer will never be outdated. Information about our price list, packages offered and

    other services would be available on the website. We also would to provide opportunities

    for customers’ comment, suggestion and idea so that they know their voices are heard.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    42/70

    H.A.R.K TEAM BUILDING: MARKETING BUDGET

    Marketing budget is essential to business plan. This report of the budget will help to estimate the

    amount of capital needed to require materials that help to market strategy.

    TOTAL MARKETING BUDGET

    Fixed Asset Cost + Monthly Expenses + Other Expenses

    RM 0 + RM 30 + RM 2400 = RM 2430

    Items Fixed

    Assets Cost

    (RM)

    Monthly

    Expenses

    (RM)

    Other Expenses

    (RM)

    Marketing Personnel

    Stationery 30

    Promotion

    Signboard

    Banner (RM 150 x 4 universities)

    1800

    600

    Total Expenses (RM) - 30 2400

  • 8/19/2019 ENT 300 UITM Samarahan 2

    43/70

    Operational Plan

  • 8/19/2019 ENT 300 UITM Samarahan 2

    44/70

    H.A.R.K. TEAM BUILDING: FLOW CHART PROCESS FOR CUSTOMER

    RESERVATION SERVICE

    Consultation

    Customer fills areservation form

    Customer payingdeposit

    Gives customer a receipt and business card

    Customer

    Customer leave

    Flow chart above show the process of customer reservation service. First process is making anappointment with the customer and then meets the customer. After that consult the customerto increase their interest in H.A.R.K Team Building. If the customer interested, customer will

    be given a reservation form and fill it directly. Customer has to pay deposit which is 5% fromtheir total price. For example: 50 student x Rm60 = Rm3000. So customer has to pay 5% fromrm3000 which is Rm150 and at the end of the event, the deposit will be given back to thecustomer. After paying deposit customer will be given a receipt and a business card and thencustomer leave.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    45/70

    H.A.R.K TEAM BUILDING: FLOW CHART PROCESS FOR CUSTOMER

    REGISTRATION SERVICE

    Customer

    Give customer brochure aboutH.A.R.K Team building details

    Gives customer short briefing

    Register

    Bring customer to theirdorm

    Have a meeting withcustomers

    Flow chart above show the process of customer registration service. First process is customer

    come to H.A.R.K. Team Building office. After that customer register and then bring them to

    their dorm so they can put all their bags and item. Next, have a meeting with customers and

    give them a short briefing about base camp and safety. At the end of meeting, customers will

    be given a brochure about H.A.R.K. Team Building details.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    46/70

    H.A.R.K. TEAM BUILDING: FLOW CHART PROCESS FOR FIRE DRILL

    Alerting the alarm

    Staff and customerevacuate the building

    Staff and customer goes tothe assembly point (Field)

    Staff checks attendance of everycustomer and make sure they

    are in good condition

    Check situation and callfor help if needed

    Keep calm

    Flow chart above show the process of Fire drill. First process is alerting the alarm to notice all

    the customers and staff. After that customer and staff have to evacuate the building and goes

    to the assembly (Field). Staffs have to check attendance of every customer and make sure they

    are in good condition. After checking the attendance, they have to check the situation and callfor help if needed and then keep calm.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    47/70

    H.A.R.K. TEAM BUILDING: OPERATION HOUR AND BUSINESS HOUR

    Operation Hour

    Days TimeMonday – Sunday 24 Hour

    Business Hour

    Days TimeMonday – Thursday 8.00am – 1.00 pm & 2.00 pm – 4.00 pmFriday – Saturday 8.00 am – 12.00 pm & 2.00 pm – 4.00 pm

    Sunday Close

  • 8/19/2019 ENT 300 UITM Samarahan 2

    48/70

    H.A.R.K. TEAM BUILDING: OPERATIONS PERSONNEL

    Position No. of Staff Required

    Clerk 1

    Activity instructor-Jungle trekking-Wall climbing-Flying fox

    3

  • 8/19/2019 ENT 300 UITM Samarahan 2

    49/70

    H.A.R.K. TEAM BUILDING: SCHEDULE OF TASK AND RESPONSIBILITIES

    Position Task and Responsibilities

    Clerk

    - Answer phones and greet clients warmly- Help organize office activities

    - Take and deliver messages- Sort and distribute incoming mail- Perform basic bookkeeping duties- Reroute call to appropriate people- Schedule meetings

    Jungle trekking instructor

    - Prepare checklist for item that should be bought- Give briefing about rules and regulation- Make sure participants is healthy- Make sure participants wearing a suitable clothes and

    footwear.- Prepare aid kit- Bring participants on the right trek- Monitor all participant while in the jungle- Help participants in need

    Wall climbing instructor

    - Give briefing about rules and regulation- Teach participants how to climb and come down from

    the wall- Make sure all equipment is safe to use- Monitor participants while climbing the wall

    Flying fox instructor

    - Give briefing about rules and regulation- Teach participants how to sliding down the flying fox.- Make sure all equipment is safe to use- Make sure participants are ready to go.

  • 8/19/2019 ENT 300 UITM Samarahan 2

    50/70

    H.A.R.K. TEAM BUILDING: SCHEDULE OF REMUNERATION

    Position No. of StaffRequired

    Salary/Month(RM)

    EPF (RM)8 %

    SOCSO(RM)

    Total(RM)

    Clerk 1 900.00 72.00 16.65 988.65Activity instructor-Jungle trekking-Wall climbing-Flying fox

    3 650.00 52.00 11.35 2140.05

    TOTAL 3128.70

    H.A.R.K. TEAM BUILDING: MACHINE AND EQUIPMENT REQUIREMENT

    Item Quantity

    ( Unit )

    Price/Unit

    ( RM )

    Total Price

    ( RM )

    Single canoe 6 750.00 4500.00

    Canoe double paddle 6 125.00 750.00

    Life jacket 10 45.00 450.00

    Flying fox (Full set equipment) 2 2476.00 4952.00

    Flying fox rope (11mm x 85M

    length)

    1 2900.00 2900.00

    Wall climbing (Full set equipment) 2 2550.00 5100.00

    Table (10m x 1m) 5 560.00 2800.00

    Table (2m x 1m) 3 112.00 336.00

    Benches (10m x 0.5m) 10 350.00 3500.00

    Freezer 1 529.00 529.00

    Refrigerator 620L fridge 2 door 1 2799.00 2799.00

    TOTAL 28616.00

  • 8/19/2019 ENT 300 UITM Samarahan 2

    51/70

    H.A.R.K. TEAM BUILDING: MISCELLANEOUS EQUIPMENT REQUIREMENT

    Item Quantity Price / Units

    ( RM )

    Total

    ( RM )

    Mattress 170 30.00 5100.00

    Pillow 170 20.00 3400.00

    Blanket 170 15.00 2550.00

    Microphone Standtripod

    3 36.00 108.00

    Double fold stretcher 1 350.00 350.00

    First aid kit PVClarge

    1 59.00 59.00

    Cone (10pcs) 1 45.00 45.00

    Baseball 2 70.00 140.00

    Aluminum alloy baseball bat

    1 99.00 99.00

    Baseball gloves 9 83.00 747.00

    Soccer ball 2 58.00 116.00

    Plastic Chair 101 20.00 2020.00

    Gas stove 1 155.00 155.00

    TOTAL 14889.00

  • 8/19/2019 ENT 300 UITM Samarahan 2

    52/70

    H.A.R.K. TEAM BUILDING: MATERIALS EQUIPMENT REQUIREMENT

    Item Quantity

    (Unit)

    Price/Unit

    ( RM )

    Total Price

    ( RM )

    CCTV

    (4CH 960H DVR x1

    700TVL Dome Cam. X 4

    HDD 1TB x 1)

    3 1010.00 3030.00

    Portable PA System 1 650.00 650.00

    Hailer(Megaphone with whistle) 1 240.00 240.00

    Solar security spotlight 6 149.90 899.00

    TOTAL 4819.00

  • 8/19/2019 ENT 300 UITM Samarahan 2

    53/70

    H.A.R.K. TEAM BUILDING: H.A.R.K TEAM BUILDING BASE AREA LAYOUT

    Security GuardHut

    Hill

    H.A.R.K Teambuilding base area layout is based on process. We placed office at the front of the main gates because the first

    process to be carried out is at the office where customer can make reservation and a place to make a registration and after

    registration, customer will be to bring to their dorm where the dorm is just behind the office and it will make the customer easier

    to deal with the management if there is any problem. Dining hall and multipurpose hall is placed besides the dorm and the office

    so it near for the customer to go to there. Barbeque and campfire site is placed between male and female dorm so it will be easier

    for them to make and event for barbeque and chilling. Other than that, field, wall for wall climbing, mud field, lake, flying fox

    are placed around the base camp so it easier for customer to make their event. Field is a place for them to make field activities

    such as soccer and softball. Mud field is for mud activities and at the center of the mud field there is a log for them to crossing

    the mud field and doing their activities such as mud fight. The shower next to the mud field is for cleaning their self from the

    mud. Wall is for wall climbing activity and we provide 2 full set of wall climbing equipment. The lake is for kayaking activity

    and the kayak that we provide only limit for 6 people. Above the lake there is a flying fox for flying fox activity. The hill behind

    the base camp is for jungle trekking purpose.

    Dining Hall

    MultipurposeHall

    Field

    Wall

    Male Dorm

    Barbeque and

    Camp Site

    Female Dorm

    Office

    Lake

    Flying FoxTower

    Mud Field

    Entrance

    Shower

  • 8/19/2019 ENT 300 UITM Samarahan 2

    54/70

    H.A.R.K. TEAM BUILDING: MALE/ FEMALE DORM & SECURITY GUARD

    HUT LAYOUT

    Toilet andshower

    Male and female dorm has five toilets and a place to take a shower. 80 units of mattress, pillow

    and blanket is provided to each dorm and the arrangement is depending on the customers itself.

    Security guard hut has a toilet and a place to take a shower. Besides, there is a table and chair

    for them to doing their work.

    Mattress and Pillow

    Table

    Toilet andshower

    Chair

    Male/Female Dorm

    Security guard hut

  • 8/19/2019 ENT 300 UITM Samarahan 2

    55/70

    H.A.R.K. TEAM BUILDING: DINING HALL LAYOUT

    Table

    Gas stove

    Refrigerator

    Freezer

    Benches

    In the dining hall there is kitchen area provided. In the kitchen, there is a freezer and refrigerator

    provided for the caterer to put their raw material. 2 tables (2m x 1m) and a gas stove also

    provided for the caterer to prepare the meals. In the dining hall, there is 5 tables (10m x 1m)

    and 2 benches (10m x 0.5m) for each table for the customer to take their meals.

    TableTable

  • 8/19/2019 ENT 300 UITM Samarahan 2

    56/70

    H.A.R.K. TEAM BUILDING: MULTIPURPOSE HALL

    Stage

    Multipurpose hall is a place for the customer to do their indoor activities. Plastic chairs are

    arranged at the center of the hall for the audience to seat and enjoy their event. The plastic chair

    can be move aside so they can have a bigger space to do their indoor activity and stage is placed

    in front of the hall.

    Stair

    Chair Chair

    Stair

  • 8/19/2019 ENT 300 UITM Samarahan 2

    57/70

    H.A.R.K TEAM BUILDING: OPERATIONAL BUDGET

    Item Fixed Asset( RM )

    MonthlyExpenses

    ( RM )

    OtherExpenses

    ( RM )

    Fixed Asset:- Machine and Equipment- Materials Equipment

    28616.004819.00

    Monthly Expenses:- Salary + EPF + SOCSO- Utilities (Electricity + water)

    Sub contract:- Security services (900 x 2)- Cleaner services (750 x 3)- Catering services (Rm15 per person

    for breakfast, lunch, dinner) x 160 student

    3128.70850.00

    1800.002250.002400.00

    Other Expenses:- Utilities deposit (2 month)- Miscellaneous Equipment

    1700.0014889.00

    TOTAL 33435.00 10428.70 16589.00

  • 8/19/2019 ENT 300 UITM Samarahan 2

    58/70

    Financial Manager

  • 8/19/2019 ENT 300 UITM Samarahan 2

    59/70

    H.A.R.K. TEAM BUILDING: PROJECT IMPLEMENTATION COST SCHEDULE

    Cost

    1,2249,467

    28,6164,819

    Working Capital 1 months 16,409

    3010,42929,619

    Contingencies 5% 5,031

    TOTAL 105,644

    Project Implementation Cost

    Requirements

    Fixed AssetsLand & BuildingOffice & Fittings

    Machine & Equipments

    Office Equipments

    Material Equipments

    Pre-Operations & Other Expenditure

    Adm inis trative

    MarketingOperations

  • 8/19/2019 ENT 300 UITM Samarahan 2

    60/70

    H.A.R.K. TEAM BUILDING: SOURCES OF FINANCE SCHEDULE

    Loan Hire-Purchase

    Cash Existing F. Assets

    1,224

    9,467

    17,794 10,822

    2,819 2,000

    16,40930

    10,429

    29,619

    5,031

    25,644 80,000

    Sources of Finance

    Own Contribution

  • 8/19/2019 ENT 300 UITM Samarahan 2

    61/70

    H.A.R.K. TEAM BUILDING: LOAN AMORTIZATION (REPAYMENT) SCHEDULE

    25,644

    5%3

    Year Principal Interest Total Payment Principal Balance

    - - 25,644 1 8,548 1,282 9,830 17,096 2 8,548 855 9,403 8,548 3 8,548 427 8,975 -

    4 0 0 - - 5 0 0 - - 6 0 0 - - 7 0 0 - - 8 0 0 - - 9 0 0 - -

    10 0 0 -

    Baki Tahunan

    A m o u n t

    Interes t Rate Durat ion (yr s)

    Method

    LOAN REPAYMENT SCHEDULE

  • 8/19/2019 ENT 300 UITM Samarahan 2

    62/70

    H.A.R.K. TEAM BUILDING: HIRE-PURCHASE REPAYMENT SCHEDULE

    5%Durat ion (yr s) 5 Year Principal Interest Total Payment Principal Balance

    - - -

    1 - - - -

    2 - - - - 3 - - - -

    4 - - - -

    5 - - - -

    6 - - - -

    7 - - - -

    8 - - - -

    9 - - - - 10 - - - -

    Amount

    Interes t Rate

    HIRE-PURCHASE REPAYMENT SCHEDULE

  • 8/19/2019 ENT 300 UITM Samarahan 2

    63/70

    H.A.R.K. TEAM BUILDING: FIXED ASSET DEPRECIATION SCHEDULE

    1,224 9,467Straight Line Straight Line

    5 5 Annual Accumulated Annual Accumulated

    Year Depreciation Depreciation Book Value Year Depreciation Depreciation Book Value

    - - 1,224 - - 9,467

    1 245 245 979 1 1,893 1,893 7,574

    2 245 490 734 2 1,893 3,787 5,680

    3 245 734 490 3 1,893 5,680 3,787

    4 245 979 245 4 1,893 7,574 1,893

    5 245 1,224 - 5 1,893 9,467 -

    6 0 0 - 6 0 0 -

    7 0 0 - 7 0 0 - 8 0 0 - 8 0 0 -

    9 0 0 - 9 0 0 -

    10 0 0 - 10 0 0 -

    Straight Line Straight Line5 5

    Annual Accumulated Annual Accumulated

    Year Depreciation Depreciation Book Value Year Depreciation Depreciation Book Value- - - - - -

    1 - - - 1 - - -

    2 - - - 2 - - -

    3 - - - 3 - - -

    4 - - - 4 - - -

    5 - - - 5 - - -

    6 - - - 6 - - -

    7 - - - 7 - - -

    8 - - - 8 - - -

    9 - - - 9 - - - 10 - - - 10 - - -

    Fixed A sset

    Econom ic L ife (yrs)

    Cost (RM ) Method

    Method

    Econom ic L ife (yrs)

    Fixed A sset Cost (RM )

    Office & Fittings

    Econom ic L ife (yrs)

    Cost (RM ) Method

    Fixed A sset

    Method

    Fixed A sset

    Office EquipmentsCost (RM )

    Econom ic L ife (yrs)

  • 8/19/2019 ENT 300 UITM Samarahan 2

    64/70

    Straight Line Straight Line5 5

    Annual Accumulated Annual AccumulatedYear Depreciation Depreciation Book Value Year Depreciation Depreciation Book

    - - - - - -

    1 - - - 1 - - -

    2 - - - 2 - - -

    3 - - - 3 - - -

    4 - - - 4 - - -

    5 - - - 5 - - -

    6 - - - 6 - - -

    7 - - - 7 - - -

    8 - - - 8 - - -

    9 - - - 9 - - -

    10 - - - 10 - - -

    Straight Line Straight Line

    5 5 Annual Accumulated Annual Accumulated

    Year Depreciation Depreciation Book Value Year Depreciation Depreciation Book- - - - - -

    1 - - - 1 - - -

    2 - - - 2 - - -

    3 - - - 3 - - -

    4 - - - 4 - - -

    5 - - - 5 - - -

    6 - - - 6 - - -

    7 - - - 7 - - -

    8 - - - 8 - - -

    9 - - - 9 - - -

    10 - - - 10 - - -

    Econom ic Life (yrs) Econom ic Life (yrs)

    M ethod M ethod

    Econ om ic Life (yrs)

    Fixed A sset Fixed A sset

    Fixed A sset Cost (RM ) Cost (RM )

    Econom ic L ife (yrs)

    Fixed A sset

    Cost (RM ) Cost (RM ) M ethod M ethod

  • 8/19/2019 ENT 300 UITM Samarahan 2

    65/70

    28,616 4,819Straight Line Straight Line

    5 5 Annual Accumulated Annual Accumulated

    Year Depreciation Depreciation Book Value Year Depreciation Depreciation Book Value

    - - 28,616 - - 4,819

    1 5,723 5,723 22,893 1 964 964 3,855

    2 5,723 11,446 17,170 2 964 1,928 2,891

    3 5,723 17,170 11,446 3 964 2,891 1,928

    4 5,723 22,893 5,723 4 964 3,855 964

    5 5,723 28,616 - 5 0 0 964

    6 0 0 - 6 0 0 964

    7 0 0 - 7 0 0 964

    8 0 0 - 8 0 0 964

    9 0 0 - 9 0 0 964

    10 0 0 - 10 0 0 964

    Straight Line Straight Line5 5

    Annual Accumulated Annual Accumulated

    Year Depreciation Depreciation Book Value Year Depreciation Depreciation Book Value

    - - - - - -

    1 - - - 1 - - -

    2 - - - 2 - - -

    3 - - - 3 - - -

    4 - - - 4 - - -

    5 - - - 5 - - -

    6 - - - 6 - - -

    7 - - - 7 - - -

    8 - - - 8 - - -

    9 - - - 9 - - -

    10 - - - 10 - - -

    Econ o m ic L i fe (yrs) Eco n om i c Li fe (yrs)

    Fixed A sset Fixed A sset Machine & Equipments

    M eth od M etho d

    Material EquipmentsCost (RM ) Co st (RM )

    Fi xed A sset Fixed A sset

    Econ o m ic L i fe (yrs) Eco n om i c Li fe (yrs)

    Cost (RM ) Co st (RM ) M eth od M etho d

  • 8/19/2019 ENT 300 UITM Samarahan 2

    66/70

    H.A.R.K. TEAM BUILDING: PROFORMA CASHFLOW STATEMENT

    M O N T H

    P r e - O

    p e r a t

    i o n s

    1

    2

    3

    4

    5

    6

    7

    8

    9

    1 0

    1 1

    1 2

    T O T A L Y R 1

    Y E A R 2

    Y E A R 3

    C A S H I N F L O W

    C a p i t a

    l ( C a s h

    )

    8 0 , 0

    0 0

    8 0 , 0

    0 0

    L o a n

    2 5 , 6

    4 4

    2 5 , 6

    4 4

    C a s h

    S a l e s

    2 8 , 0

    0 0

    3 4 , 5

    0 0

    3 1 , 2 0 0

    3 0 , 0

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    3 3 , 3

    0 0

    3 1 , 2

    0 0

    3 0 , 2

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    3 7 4 , 4 0 0

    4 1 1 , 8 4 0

    4 9 4 , 2 0 8

    C o l l e c t

    i o n o f

    A c c o u n t s

    R e c e i v a

    b l e

    T O T A L C A S H I N F L O W

    1 0 5 ,

    6 4 4

    2 8 , 0

    0 0

    3 4 , 5

    0 0

    3 1 , 2 0 0

    3 0 , 0

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    3 3 , 3

    0 0

    3 1 , 2

    0 0

    3 0 , 2

    0 0

    3 1 , 2

    0 0

    3 1 , 2

    0 0

    4 8 0 , 0 4 4

    4 1 1 , 8 4 0

    4 9 4 , 2 0 8

    C A S H O U T F L O W

    A d m

    i n i s t r a t

    i v e E x p e n

    d i t u r e

    L a n d

    & B u i l d i n g ( R e n t )

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    5 , 0 0 0

    6 0 , 0

    0 0

    6 0 , 0

    0 0

    6 0 , 0

    0 0

    S a l a r y

    ( E P F & S O C S O )

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2 7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 1 , 2

    7 9

    1 3 5 ,

    3 4 8

    1 3 5 ,

    3 4 8

    1 3 5 ,

    3 4 8

    U t i l i t i e s

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 3 0

    1 , 5 6

    0

    1 , 5 6

    0

    1 , 5 6

    0

    M a r

    k e t

    i n g

    E x p e n

    d i t u r e

    S t a t

    i o n a r i e s

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 0

    3 6 0

    3 6 0

    3 6 0

    O p e r a t

    i o n s

    E x p e n d

    i t u r e

    C a s h

    P u r c

    h a s e

    P a y m e n t o

    f A c c o u n t P a y a b

    l e

    C a r r

    i a g e

    I n w a r

    d &

    D u t y

    S a l a r i e s ,

    E P F & S O C S O

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 , 1 2 9

    3 7 , 5

    4 8

    3 7 , 5

    4 8

    3 7 , 5

    4 8

    U t i l i t i e s (

    E l e c t r

    i c i t y +

    W a t e r

    )

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    8 5 0

    1 0 , 2

    0 0

    1 0 , 2

    0 0

    1 0 , 2

    0 0

    S e c u r i t y

    S e r v i c e s

    ( 9 0 0 * 2 )

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    1 , 8 0 0

    2 1 , 6

    0 0

    2 1 , 6

    0 0

    2 1 , 6

    0 0

    C l e a n e r

    S e r v i c e s

    ( 7 5 0

    * 3 )

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 , 2 5 0

    2 7 , 0

    0 0

    2 7 , 0

    0 0

    2 7 , 0

    0 0

    C a t e r i n g

    S e r v i c e s

    ( 1 5 *

    1 6 0 )

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 , 4 0 0

    2 8 , 8

    0 0

    2 8 , 8

    0 0

    2 8 , 8

    0 0

    O t h e r

    E x p e n d

    i t u r e

    P r e - O

    p e r a t i o n s

    D e p o s i t ( r e n t

    , u t i l i t i e s , e t c .

    )

    1 1 , 9

    6 0

    1 1 , 9

    6 0

    B u s i n e s s

    R e g i s t r a t

    i o n

    & L i c e n c e s

    1 0 0

    1 0 0

    I n s u r a n c e

    & R o a d

    T a x

    f o r

    M o t o r

    V e h

    i c l e

    O t h e r

    P r e -

    O p e r a t

    i o n s

    E x p e n d

    i t u r e

    1 7 , 5

    5 9

    1 7 , 5

    5 9

    F i x e

    d A s s e t s

    P u r c

    h a s e o f

    F i x e

    d A s s e t s -

    L a n d

    & B u i

    l d i n g

    P u r c

    h a s e o f

    F i x e

    d A s s e t s -

    O t h e r s

    4 4 , 1

    2 6

    4 4 , 1

    2 6

    H i r e - P

    u r c h a s e

    D o w n

    P a y m e n t

    H i r e -

    P u r c

    h a s e R e p a y m e n t :

    P r i n c i p a

    l

    I n t e r e s t

    L o a n

    R e p a y m e n t :

    P r i n c i p a

    l

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    7 1 2

    8 , 5 4

    8

    8 , 5 4

    8

    8 , 5 4

    8

    I n t e r e s t

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 0 7

    1 , 2 8 2

    8 5 5

    4 2 7

    T a x

    P a y a

    b l e

    0

    0

    0

    0

    T O T A L C A S H O U T F L O W

    7 3 , 7

    4 5

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6 8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    2 7 , 6

    8 7

    4 0 5 ,

    9 9 1

    3 3 1 , 8 1 9

    3 3 1 , 3 9 1

    C A S H S U R P L U S ( D E F I C I T )

    3 1 , 8

    9 9

    3 1 3

    6 , 8 1 3

    3 , 5 1 3

    2 , 3 1 3

    3 , 5 1

    3

    3 , 5 1

    3

    3 , 5 1

    3

    5 , 6 1 3

    3 , 5 1

    3

    2 , 5 1

    3

    3 , 5 1

    3

    3 , 5 1

    3

    7 4 , 0

    5 3

    8 0 , 0

    2 1

    1 6 2 , 8 1 7

    B E G I N N I N G C A S H B A L A N C E

    3 1 , 8

    9 9

    3 2 , 2

    1 1

    3 9 , 0 2 4

    4 2 , 5

    3 7

    4 4 , 8

    5 0

    4 8 , 3

    6 3

    5 1 , 8

    7 6

    5 5 , 3

    8 8

    6 1 , 0

    0 1

    6 4 , 5

    1 4

    6 7 , 0

    2 7

    7 0 , 5

    4 0

    7 4 , 0

    5 3

    1 5 4 , 0 7 4

    E N D I N G C A S H B A

    L A N C E

    3 1 , 8

    9 9

    3 2 , 2

    1 1

    3 9 , 0

    2 4

    4 2 , 5 3 7

    4 4 , 8

    5 0

    4 8 , 3

    6 3

    5 1 , 8

    7 6

    5 5 , 3

    8 8

    6 1 , 0

    0 1

    6 4 , 5

    1 4

    6 7 , 0

    2 7

    7 0 , 5

    4 0

    7 4 , 0

    5 3

    7 4 , 0

    5 3

    1 5 4 , 0 7 4

    3 1 6 , 8 9 1

    H . A . R . K . T

    e a m

    B u i

    l d i n g

    P R O F O R M A C A S H F L O W S T A T E M E N T

  • 8/19/2019 ENT 300 UITM Samarahan 2

    67/70

    H.A.R.K. TEAM BUILDING: PRO-FORMA INCOME STATEMENT

    Year 1 Year 2 Year 3374,400 411,840 494,208

    196,908 196,908 196,908

    360 360 360

    100

    17,559

    1,282 855 427

    8,825 8,825 8,825

    125,148 125,148 125,148

    350,182 332,096 331,669

    24,218 79,744 162,539

    0 0 024,218 79,744 162,539

    24,218 103,962 266,501

    Purchases

    Opening stock

    Sales

    Less: Cost of Sales

    Depreciation of Fixed Assets

    Total Expenditure

    Net Profit Before Tax

    Net Profit After Tax

    Accumulated Net Profit

    Operations Expenditure

    Tax

    Adminis trative Expenditure

    Less: Ending Stock

    Gross Profit

    H.A.R.K. Team BuildingPRO-FORMA INCOME STATEMENT

    Interest on Loan

    Marketing Expenditure

    Business Registration & Licences

    Insurance & Road Tax for Motor Vehicle

    Other Pre-Operations Expenditure

    Other Expenditure

    Carriage Inward & Duty

    Less: Enpenditure

    Interest on Hire-Purchase

  • 8/19/2019 ENT 300 UITM Samarahan 2

    68/70

    H.A.R.K TEAM BUILDING: PRO-FORMA BALANCE SHEET ACCOUNT

    PRO-FORMA BALANCE SHEET

    Year 1 Year 2 Year 3

    ASSETS

    Non-Current Assets (BookValue)Land & BuildingOffice & Fittings 979 734 490Office Equipment 7,574 5,680 3,787

    Machine & Equipment 22,893 17,170 11,446Materials Equipment 3,855 2,891 1,928

    Other AssetsDeposit 11,960 11,960 11,960

    47,261 38,435 29,611

    Current AssetsStock of Raw Materials 0 0 0Stock of Finished Goods 0 0 0

    Accounts ReceivableCash Balance 74,053 154,074 316,891

    74,053 154,074 316,891

    TOTAL ASSETS 133,274 204,470 358,461

    Owners' EquityCapital 80,000 80,000 80,000

    Accumulated ProfitDeposit

    24,21811,960

    103,96211,960

    266,50111,960

    116,178 195,922 358,461Long-Term LiabilitiesLoan Balance 17,096 8,548Hire-Purchase Balance

    17,096 8,548Current Liabilities

    Accounts Payable

    TOTAL EQUITY & LIABILITIES 133,274 204,470 358,461

  • 8/19/2019 ENT 300 UITM Samarahan 2

    69/70

    H.A.R.K. TEAM BUILDING: CONCLUSION AND RECOMMENDATIONS

    In conclusion, event management business is a potential industry to be tapped into because there is lot of potential customer; individual group customer, public and private sectorwho always have a function that they need the service of external party to conduct.

    Moreover, bumiputera entrepreneurs have higher advantages to enter the market as longas they are creative, innovative and passionate in the industry that they exploring.