Biomass, the oldest form of renewable energy, has been used
for thousands of years. However, with the emergence of fossil
fuels, its relative share of use has declined in recent years.
Currently some 13% of the worlds primary energy supply is
from biomass, though there are strong regional differences.
BIOMASS- AN OVERVIEW
Developed countries derive around 3% of their energy from
biomass.
while in Africa the proportion ranges between 70% and 90%.With the adverse environmental effects of fossil fuels on the
environment (such as climate change) coming to the forefront,
people everywhere are rediscovering the advantages of
biomass.
7/29/2019 Enquiry for Pradeep
3/14
The use of biomass as a fuel is considered to be carbon neutral because plants
and trees remove carbon dioxide (CO2) from the atmosphere and store it while
they grow. Burning biomass in homes, in industrial processes, for energy
generation, or for transport activities returns this sequestered CO2 to the
atmosphere.
BIOMASS- AN OVERVIEW
e same me, new p an or ree grow eeps e a mosp ere s
carbon cycle in balance by recapturing CO2.
This net-zero or carbon-neutral cycle can be repeated indefinitely, as long as
biomass is re-grown in the next management cycle and harvested for use.
The sustainable management of the biomass source is thus critical toEnsuring that the carbon cycle is not interrupted.
In contrast to biomass, fossil fuels such as gas, oil, and coal are not
regarded as carbon-neutral because they release CO2 which
has been stored for millions of years, and because they
cannot be stored or sequestered.
7/29/2019 Enquiry for Pradeep
4/14
Source wise Installed capacity of Renewable power in India
7/29/2019 Enquiry for Pradeep
5/14
Biomass based energy generation has significant potential to contribute to Indias growing
energy needs. Technology has also significantly advanced and is being made available locally
along with a host of financial incentives and policy measures being put into place to
accelerate the investment in this sector. (Source- Bio energy india-7)
10%
20,000
,
Potentia l Installed
Biomass based power (MW)Source-MNRE 31.12.2010
53%
10%
1%
3%
23%
Coal Gas Diesel Nuclear Large Hydro Renewable
Installed Capacities (by fuel type)Source-C.E.A july 2010
7/29/2019 Enquiry for Pradeep
6/14
Crops Fields
(Producing of mustard crops)
Crops waste for storage
(Piles)
Briquette manufacturing plants
Product of Mustard for
domestic use
This is one of the best substitutes to save the consumption of Fuel
wood.Biomass briquettes are easy to handle, transport and store.
BRIQUETTE- AT YOUR DOOR
Industrial Units
(Steam / Power Generation)
r quette ava a e n un orm an s zes.
This help to solve the residual disposal problem by its non hazardous
nature.
Pollution will be minimize by burning the fuel.
Briquette is the low cost fuel in comparison of coal, fuel oil.
Briquettes are sulfur free product.
Briquette has a consistent quality, comparatively high calorific value,More uniform combustion in comparison of coal.
Handling costs are less.
Easy to burn.
Briquettes have high specific density (1200 Kg/m3) and
bulk density (800 Kg/m3) compared to 60 to 180 Kg/m3 of loose biomass.
Briquettes have high specific density (1200 Kg/m3) and
bulk density (800 Kg/m3) compared to 60 to 180 Kg/m3 of loose biomass.
7/29/2019 Enquiry for Pradeep
7/14
Loose form Loose form close view Die and punch machine
BRIQUETTE- AT YOUR DOOR
Product from m/c Briquette in piles Briquette in Begs
Average Beg Weight - 35-40 Kgs.
Transport lorry weight- 15-16 Tons.
Suggested storage - 50-60 Tons (5-6 days of consumption)
Average Beg Weight - 35-40 Kgs.
Transport lorry weight- 15-16 Tons.
Suggested storage - 50-60 Tons (5-6 days of consumption)
7/29/2019 Enquiry for Pradeep
8/14
biomass conversion refers to the process of converting biomass into energy that will in turn be
used to generate electricity and/or heat.
The principal categories of biomass conversion technologies for power and heat production are
direct-fired and gasification systems.
Within the direct-fired category, specific technologies include stoker boilers, fluidized bed
boilers, and co firing.
Within the gasification category, specific technologies include fixed bed gasifiers and fluidized
BOILER- CONVERT TO BIOMASS
e gas ers. naero c ges ers are a so cons ere a omass convers on ec no ogy
Reduced cost of steam generation.
Reduced Sulphure emisson.
Reduced Carbon di oxide emission.Reduced NOX due to low combustion temperature
Less sound pollution.
Increase company image in surrounding areas.
Inculcates waste to wealth culture
Save foreign exchange
Conversion Benefits
7/29/2019 Enquiry for Pradeep
9/14
Biomass Briquette- GC V- 3400-3800 Kcal/Kg
Moisture- Max 10 %
Ash- Max 8%
7/29/2019 Enquiry for Pradeep
10/14
Description U/M FO Briquettes
Fuel Consumption Ltr/Kgs/Hr 293.2 942.7
Per Day 7,036 22,624
Per Months 168,855 542,977
Based on 4,250 Kgs/Hr steam generation
Fuel Unit Cost Rs. 46.00 5.80
Cost of Fuel Consumption Rs/Hr 13,485 5,467
Rs/Day 323,639 131,220
Rs/Months 7,767,340 3,149,269
Steam Cost Rs/Kgs 3.17 1.29
7/29/2019 Enquiry for Pradeep
11/14
Machine Biomass Fired system with Accessories.
Installation, Commissioning with related IBR approvals.
Material - Room for Boiler (if required)
Room for Briquette storage
Biomass Briquette (fuel)
Manpower- Contract labor for Biomass Handling
Unloading, Firing, Ash disposal
Option -1
Retrofit the Existing boiler
Into biomass firing
(Dreaded capacity or Full capacity)
Option - 2
Install new Biomass fired
Boiler
7/29/2019 Enquiry for Pradeep
12/14
Option-1
Change of Fuel firing system (Steam generation capacity get dreaded 60% of design)
Need No IBR formalities.
Tentative cost will be Rs. 1,700,000 (Rs, Seventeen lacs approximately)
Option-1
Change of Fuel firing system (Steam generation capacity get dreaded 60% of design)
Need No IBR formalities.
Tentative cost will be Rs. 1,700,000 (Rs, Seventeen lacs approximately)
Option-2
Change of Fuel firing system (Keeping the Steam Generation capacity same)
IBR formalities required.
Tentative cost will be Rs. 3,200,000 (Rs. Thirty two lacs approximately)
Option-3
Installation of new Biomass fired boiler
Tentative cost will be Rs. 6,500,000 (Rs. Sixty Five lacs approximately)
7/29/2019 Enquiry for Pradeep
13/14
Boiler conversion
Planning
Retrofit the existing
BoilerInstall new Boiler
Internal Furnace
External Furnace
Way towards
CDM
e ra e e
Boiler capacity)
ema n t e same
capacity)
No IBR changesNeed IBR approvals
for water wallsNeed IBR approvals
Extra Power
consumption
Extra Power
consumption
Extra Power
consumption
Labor contract for
Unload, Handle,
Ash Disposal etc
Labor contract for
Unload, Handle,
Ash Disposal etc
Labor contract for
Unload, Handle,
Ash Disposal etc
Low Investment
cost
Moderate
Investment cost
Higher Investment
cost
Payback time- 2-5 Months