26
0 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING Richard De La Cruz, P.E. DIRECTOR OF ENGINEERING Engineering Services NORTHSIDE INDEPENDENT SCHOOL DISTRICT February 2018

Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

0

Leroy San Miguel

ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

Henry Acosta

EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

Richard De La Cruz, P.E.

DIRECTOR OF ENGINEERING

Engineering Services

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

February 2018

Page 2: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

1

PROJECTS IN CONSTRUCTION

Page 3: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

2

Track & Field Upgrades at Jay HS

ATHLETICS UPGRADES

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Contract Amount – $1,895,356

Contractor – Field Turf USA, Inc.

Construction Period – April 2017- TBD

Construction Status – 80%

Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).

Synthetic Turf Installment

Page 4: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

3

Tennis Court Upgrades at Sul Ross MS & Stevens HS

Engineering Firm – Moy Tarin Ramirez Engineers, LLC.

NISD Project Manager – Troy Spear Contract Amount – $103,875 Contractor – Premier Courts Limited Company Construction Period – September 2017 – October 2018

Construction Status – 100% for Sul Ross MS and 10% for Stevens HS

Project Scope – Tennis court resurfacing at both campuses.

Completed Tennis Court at Sul Ross MS

Page 5: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

4

Tennis Court Upgrades at Taft HS

Engineering Firm – Moy Tarin Ramirez Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Contract Amount – $56,846

Contractor – Premier Courts Limited Company

Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Tennis court resurfacing

Page 6: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

5

CHILLER REPLACEMENTS

Chiller Replacement, Electrical & Lighting Upgrades at Carlos Coon ES and PE/Athletics Dressing/Locker Room AC Installation at Stevens HS

Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $947,228 Contractor – Flo-Aire Service, Inc. Construction Period – April 2018 – July 2018

0% Construction

Project Scope – Carlos Coon ES – Replace chiller, main electrical panel and motor control

centers. Replace 32 watt lamps with 28 watt lamps throughout campus. Stevens HS - Install air conditioning and heating in boy’s and girl’s locker

rooms.

Chiller Replacement, PE/Athletics Dressing/Locker Room AC Installation, Energy Savings & Lighting Upgrades at Health Careers HS

Engineering Firm – Alderson & Associates, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $2,415,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace chiller, cooling tower, condenser and chilled water pumps. Install air conditioning and heating in boy’s and girl’s locker rooms. Replace existing lamps in Gym with LED lamps.

Page 7: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

6

Fencing Upgrades at Leon Springs ES

FENCING UPGRADES

Engineering Firm – N/A

NISD Project Manager – Troy Spear Contract Amount – $49,700 Contractor – Pecos Fence, Inc. Construction Period – December 2017- January 2018

65% Construction

Project Scope – Improve exterior perimeter fencing.

Fire Alarm System Upgrades at Stevenson MS & Mary Hull ES

FIRE ALARM SYSTEM UPGRADES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace fire alarm systems.

Page 8: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

7

Fire Alarm System Upgrades at Howsman ES, Transportation North & Transportation South

Engineering Firm – MS2 Inc. Consulting Engineers

NISD Project Manager – Carlos Rodriguez Contract Amount – $155,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace fire alarm systems.

Fire Alarm System Upgrade at Holmes HS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $189,400 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace fire alarm system.

Page 9: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

8

HVAC RENOVATION

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra

Contract Amount - $16,200,000

Contractor – Bartlett-Cocke General Contractors

Construction Period – June 2016 – June 2018

Construction Status – 70% Construction Phase VII of IX in Progress

Project Scope – Replace HVAC system including boiler and piping; install air

conditioning and heating in boy’s and girl’s locker rooms.

HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

Installation at Clark HS

Clark HS New Hydronic Piping

Page 10: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

9

Engineering Firm – CNG Engineering, PLLC

NISD Project Manager – Carlos Rodriguez

Contract Amount – $288,150

Contractor – Central Electric Contractors Ent. & Co.

Construction Period – June 2017 – February 2018

Construction Status – 95% at Raba ES and 95% at Central Office

Project Scope –

Raba ES – Replace 32 watt lamps with 28 watt lamps in Wings C, D, E & F. Replace existing lamps in Gym with LED lamps. Install corridor smoke detectors.

Central Office – Replace electrical panels in Building “A”.

LIGHTING UPGRADES

Lighting Upgrades at Jay HS & Police Station and Energy Controls at Neff MS Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Ramiro Guerrero Contract Amount – $180,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Jay HS –Replace existing lamps in Gym with LED lamps. Police Station – Replace ballasts and 32 watt lamps with 28 watt lamps

throughout campus. Neff MS – Upgrade network cabling.

Lighting & Fire Alarm Upgrades at Raba ES and Electrical Upgrades at Central

Office

Page 11: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

10

MECHANICAL UPGRADES

Lighting Upgrades at Locke Hill ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Carlos Rodriguez Contract Amount – $338,120 Contractor – Central Electric Enterprises & Co. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace PA system to include the callback feature at both

campuses.

Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $85,173 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.

Mechanical & Lighting Upgrades at Mary Hull ES and Electrical & Lighting Upgrades at Westwood Terrace ES

Page 12: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

11

Mechanical Upgrades at Jordan MS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $7,465,000 Contractor – D.L. Bandy Constructors, Inc.

Construction Period – June 2018 – August 2020

0% Construction

Project Scope – Install new VAV system throughout campus; replace chiller.

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero

Contract Amount - $2,345,820

Contractor – Comfort-Air Engineering, Inc.

Construction Period – June 2017 – August 2018

Construction Status – 5% Construction Phase III of IV in Progress

Project Scope – Replace unit ventilators throughout the campus with VAV

systems, replace two chillers and HVAC controls throughout.

Mechanical Upgrades & Energy Controls Upgrade at Elrod ES

Page 13: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

12

Paving Upgrades at Human Resources

Engineering Firm – MTR Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Contract Amount – $143,360

Contractor – SBM General Contractors, LLC Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Replace paving for staff parking.

PAVING UPGRADES

Paving & Drainage Upgrades at Northside Children Center & Rawlinson MS

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Jacob Villarreal, P.E.

Contract Amount – $274,000

Contractor – R.L. Rohde General Contractors Construction Period – June 2018 – August 2018

0% Construction

Project Scope – Rawlinson MS – Improve drainage system. Northside Children’s Center – Replace paving for staff parking and bus

loop.

Page 14: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

13

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $652,065 Contractor – Comfort-Air Engineering, Inc.

Construction Period – March 2018 – July 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Warren HS

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Rob Ibarra Contract Amount – $507,030 Contractor – Comfort-Air Engineering, Inc.

Construction Period – March 2018 – July 2018

0% Construction

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Brandeis HS

P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION

Page 15: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

14

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $162,500

Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.

Construction Period – April 2018 – June 2018

0% Construction

Project Scope – Geodesic dome replacement at five campuses.

Playground Upgrades at Allen ES, Cable ES, Carnahan ES, Nichols ES & NW Crossing ES

Playground Upgrades at Boone ES, Brauchle ES, Burke ES, Carson ES & Scobee ES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $163,775

Contractor – SBM General Contractors, LLC

Construction Period – April 2018 – June 2018

0% Construction

Project Scope – Geodesic dome replacement at five campuses.

PLAYGROUND UPGRADES

Page 16: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

15

Playground Upgrades at Cody ES, Meadow Village ES, Powell ES & Westwood Terrace ES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Contract Amount – $121,400

Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.

Construction Period – April 2018 – June 2018

0% Construction

Project Scope – Geodesic dome replacement at four campuses.

Playground Upgrades at Behlau ES, Glenoaks ES, Murnin ES, Valley Hi ES & Villarreal ES

Engineering Firm – MTR Engineers, LLC

NISD Project Manager – Troy Spear

Contract Amount – $165,500

Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc.

Construction Period – April 2018 – June 2018

0% Construction

Project Scope – Geodesic dome replacement at five campuses.

Page 17: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

16

San Antonio Sports School Park at Burke ES and Colonies North ES

Engineering Firm – Moy Tarin Ramirez Engineers, LLC.

NISD Project Manager – Jacob Villarreal, P.E.

Contract Amount – $104,324

Contractor – R.L. Rhode General Contracting, Inc.

Construction Period –March 2017 – August 2017

0% Construction

Project Scope – Community fitness park on school grounds to include fitness

equipment and walking paths.

SAN ANTONIO SPORTS SCHOOL PARK

Page 18: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

17

PROJECTS IN DESIGN/PLANNING

Page 19: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

18

ENERGY CONTROLS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Ramiro Guerrero Budget Amount – $400,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope –

Jay HS – Upgrade network cabling. Carson ES – Upgrade network cabling and install new Native programming

system.

Energy Controls, Fire Alarm System & Lighting Upgrades at Burke ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Budget Amount – $131,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Helotes ES – Upgrade cabling and full HVAC control system. Nichols ES – Upgrade network cabling.

Energy Controls at Helotes ES & Nichols ES

Page 20: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

19

Energy Controls at Jay HS & Carson ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero Budget Amount – $400,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Upgrade network cabling and install new Native programming system; replace fire alarm system. Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.

FENCING UPGRADES

Fencing Upgrades at NW Crossing ES, Westwood Terrace ES & Marshall HS

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear Budget Amount – $49,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Improve exterior perimeter fencing at four campuses.

Page 21: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

20

LIGHTING UPGRADES

Lighting Upgrades at Howsman ES, Transportation Rhodes & Transportation South

Lighting Upgrades at Grissom CIT & Purchasing Warehouse

Purchasing Warehouse Engineering Firm – KCI Technologies

NISD Project Manager – Ramiro Guerrero Budget Amount – $125,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Grissom CIT – Replace 32 watt lamps with 28 watt lamps throughout

campus. Replace existing lamps in Bus area with LED lamps. Purchasing Warehouse – Replace 32 watt lamps with 28 watt lamps

throughout campus. Replace existing lamps in Warehouse with LED lamps.

Engineering Firm – MS2 Inc. Consulting Engineers

NISD Project Manager – Ramiro Guerrero Budget Amount – $140,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Howsman ES –Replace existing lamps with LED lamps throughout

campus. Transportation Rhodes & South – Replace ballasts and 32 watt lamps with

28 watt lamps throughout campuses. Replace existing lamps in Bus areas with LED lamps.

Page 22: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

21

MECHANICAL UPGRADES

Mechanical Upgrades at Brauchle ES

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra

Budget Amount – $3,000,000 Contractor - TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Replace unit ventilators with VAV system in classrooms.

Mechanical Upgrades at Linton ES

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra Budget Amount – $880,000 Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Replace air handling unit and install VAV system for Library,

Cafeteria, Admin, Auditorium and Stage.

Page 23: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

22

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra Budget Amount – $1,525,000 Contractor – TBD Construction Period – April 2018 – July 2018

100% Design

Project Scope – Taft HS – Replace air handling unit and rooftop unit in Building B. Stinson MS & Taft HS – Install air conditioning and heating in boy’s and

girl’s locker rooms at both campuses.

Mechanical Upgrades at Taft HS and PE/Athletics Dressing/Locker Room AC

Installation at Rayburn MS, Stinson MS &Taft HS

Page 24: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

23

PAVING / DRAINAGE UPGRADES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $305,000

Contractor – TBD Construction Period – June 2018 – August 2018

100% Design

Project Scope – Replace paving for staff parking and bus loop at both campuses.

Paving & Drainage Upgrades at Alternative HS & Burke ES

Paving Upgrades at McDermott ES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Troy Spear

Budget Amount – $110,000

Contractor – TBD Construction Period – June 2018 – August 2018

30% Design

Project Scope – Replace paving for staff parking and bus loop.

Page 25: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

24

P.A. INTERCOM SYSTEMS P.A. Intercom System at Murnin ES & Mead ES

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Carlos Rodriguez Budget Amount – $80,000 Contractor – TBD Construction Period – June 2018 – August 2018

95% Design

Project Scope – Replace PA system to include the callback feature at both

campuses.

Page 26: Engineering Services · Project Scope – Full replacement of track and football field with synthetic ... condenser and chilled water pumps. Install air conditioning and heating in

25

P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION

PE/Athletics Dressing/Locker Room AC Installation at Brennan HS

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra Budget Amount – $500,000 Contractor – TBD

Construction Period – March 2018 – July 2018

60% Design

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.

PE/Athletics Dressing/Locker Room AC Installation at Garcia MS

Engineering Firm – KCA Engineers, Inc.

NISD Project Manager – Rob Ibarra Budget Amount – $425,000 Contractor – TBD

Construction Period – March 2018 – July 2018

100% Design

Project Scope – Install air conditioning and heating in boy’s and girl’s locker

rooms.