1
PROJECTS IN CONSTRUCTION
2
Track & Field Upgrades at Jay HS
ATHLETICS UPGRADES
Engineering Firm – Cude Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Contract Amount – $1,895,356
Contractor – Field Turf USA, Inc.
Construction Period – April 2017- TBD
Construction Status – 80%
Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).
Synthetic Turf Installment
3
Tennis Court Upgrades at Sul Ross MS & Stevens HS
Engineering Firm – Moy Tarin Ramirez Engineers, LLC.
NISD Project Manager – Troy Spear Contract Amount – $103,875 Contractor – Premier Courts Limited Company Construction Period – September 2017 – October 2018
Construction Status – 100% for Sul Ross MS and 10% for Stevens HS
Project Scope – Tennis court resurfacing at both campuses.
Completed Tennis Court at Sul Ross MS
4
Tennis Court Upgrades at Taft HS
Engineering Firm – Moy Tarin Ramirez Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Contract Amount – $56,846
Contractor – Premier Courts Limited Company
Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Tennis court resurfacing
5
CHILLER REPLACEMENTS
Chiller Replacement, Electrical & Lighting Upgrades at Carlos Coon ES and PE/Athletics Dressing/Locker Room AC Installation at Stevens HS
Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $947,228 Contractor – Flo-Aire Service, Inc. Construction Period – April 2018 – July 2018
0% Construction
Project Scope – Carlos Coon ES – Replace chiller, main electrical panel and motor control
centers. Replace 32 watt lamps with 28 watt lamps throughout campus. Stevens HS - Install air conditioning and heating in boy’s and girl’s locker
rooms.
Chiller Replacement, PE/Athletics Dressing/Locker Room AC Installation, Energy Savings & Lighting Upgrades at Health Careers HS
Engineering Firm – Alderson & Associates, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $2,415,000 Contractor – R.E.C. Industries, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace chiller, cooling tower, condenser and chilled water pumps. Install air conditioning and heating in boy’s and girl’s locker rooms. Replace existing lamps in Gym with LED lamps.
6
Fencing Upgrades at Leon Springs ES
FENCING UPGRADES
Engineering Firm – N/A
NISD Project Manager – Troy Spear Contract Amount – $49,700 Contractor – Pecos Fence, Inc. Construction Period – December 2017- January 2018
65% Construction
Project Scope – Improve exterior perimeter fencing.
Fire Alarm System Upgrades at Stevenson MS & Mary Hull ES
FIRE ALARM SYSTEM UPGRADES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $399,000 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace fire alarm systems.
7
Fire Alarm System Upgrades at Howsman ES, Transportation North & Transportation South
Engineering Firm – MS2 Inc. Consulting Engineers
NISD Project Manager – Carlos Rodriguez Contract Amount – $155,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace fire alarm systems.
Fire Alarm System Upgrade at Holmes HS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $189,400 Contractor – Central Electric Contractors Ent. & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace fire alarm system.
8
HVAC RENOVATION
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra
Contract Amount - $16,200,000
Contractor – Bartlett-Cocke General Contractors
Construction Period – June 2016 – June 2018
Construction Status – 70% Construction Phase VII of IX in Progress
Project Scope – Replace HVAC system including boiler and piping; install air
conditioning and heating in boy’s and girl’s locker rooms.
HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC
Installation at Clark HS
Clark HS New Hydronic Piping
9
Engineering Firm – CNG Engineering, PLLC
NISD Project Manager – Carlos Rodriguez
Contract Amount – $288,150
Contractor – Central Electric Contractors Ent. & Co.
Construction Period – June 2017 – February 2018
Construction Status – 95% at Raba ES and 95% at Central Office
Project Scope –
Raba ES – Replace 32 watt lamps with 28 watt lamps in Wings C, D, E & F. Replace existing lamps in Gym with LED lamps. Install corridor smoke detectors.
Central Office – Replace electrical panels in Building “A”.
LIGHTING UPGRADES
Lighting Upgrades at Jay HS & Police Station and Energy Controls at Neff MS Engineering Firm – Silber & Associates Consulting Engineers, Inc.
NISD Project Manager – Ramiro Guerrero Contract Amount – $180,000 Contractor – CRI Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Jay HS –Replace existing lamps in Gym with LED lamps. Police Station – Replace ballasts and 32 watt lamps with 28 watt lamps
throughout campus. Neff MS – Upgrade network cabling.
Lighting & Fire Alarm Upgrades at Raba ES and Electrical Upgrades at Central
Office
10
MECHANICAL UPGRADES
Lighting Upgrades at Locke Hill ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Carlos Rodriguez Contract Amount – $338,120 Contractor – Central Electric Enterprises & Co. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace PA system to include the callback feature at both
campuses.
Engineering Firm – DBR Engineering Consultants, Inc. NISD Project Manager – Ramiro Guerrero Contract Amount – $85,173 Contractor – HJD Capital Electric, Inc. Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.
Mechanical & Lighting Upgrades at Mary Hull ES and Electrical & Lighting Upgrades at Westwood Terrace ES
11
Mechanical Upgrades at Jordan MS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $7,465,000 Contractor – D.L. Bandy Constructors, Inc.
Construction Period – June 2018 – August 2020
0% Construction
Project Scope – Install new VAV system throughout campus; replace chiller.
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero
Contract Amount - $2,345,820
Contractor – Comfort-Air Engineering, Inc.
Construction Period – June 2017 – August 2018
Construction Status – 5% Construction Phase III of IV in Progress
Project Scope – Replace unit ventilators throughout the campus with VAV
systems, replace two chillers and HVAC controls throughout.
Mechanical Upgrades & Energy Controls Upgrade at Elrod ES
12
Paving Upgrades at Human Resources
Engineering Firm – MTR Engineers, LLC
NISD Project Manager – Jacob Villarreal, P.E.
Contract Amount – $143,360
Contractor – SBM General Contractors, LLC Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Replace paving for staff parking.
PAVING UPGRADES
Paving & Drainage Upgrades at Northside Children Center & Rawlinson MS
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Jacob Villarreal, P.E.
Contract Amount – $274,000
Contractor – R.L. Rohde General Contractors Construction Period – June 2018 – August 2018
0% Construction
Project Scope – Rawlinson MS – Improve drainage system. Northside Children’s Center – Replace paving for staff parking and bus
loop.
13
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $652,065 Contractor – Comfort-Air Engineering, Inc.
Construction Period – March 2018 – July 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Warren HS
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Rob Ibarra Contract Amount – $507,030 Contractor – Comfort-Air Engineering, Inc.
Construction Period – March 2018 – July 2018
0% Construction
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Brandeis HS
P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION
14
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $162,500
Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.
Construction Period – April 2018 – June 2018
0% Construction
Project Scope – Geodesic dome replacement at five campuses.
Playground Upgrades at Allen ES, Cable ES, Carnahan ES, Nichols ES & NW Crossing ES
Playground Upgrades at Boone ES, Brauchle ES, Burke ES, Carson ES & Scobee ES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $163,775
Contractor – SBM General Contractors, LLC
Construction Period – April 2018 – June 2018
0% Construction
Project Scope – Geodesic dome replacement at five campuses.
PLAYGROUND UPGRADES
15
Playground Upgrades at Cody ES, Meadow Village ES, Powell ES & Westwood Terrace ES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Contract Amount – $121,400
Contractor – Pronto Sandblasting & Coating & Oil Field Services Co.
Construction Period – April 2018 – June 2018
0% Construction
Project Scope – Geodesic dome replacement at four campuses.
Playground Upgrades at Behlau ES, Glenoaks ES, Murnin ES, Valley Hi ES & Villarreal ES
Engineering Firm – MTR Engineers, LLC
NISD Project Manager – Troy Spear
Contract Amount – $165,500
Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc.
Construction Period – April 2018 – June 2018
0% Construction
Project Scope – Geodesic dome replacement at five campuses.
16
San Antonio Sports School Park at Burke ES and Colonies North ES
Engineering Firm – Moy Tarin Ramirez Engineers, LLC.
NISD Project Manager – Jacob Villarreal, P.E.
Contract Amount – $104,324
Contractor – R.L. Rhode General Contracting, Inc.
Construction Period –March 2017 – August 2017
0% Construction
Project Scope – Community fitness park on school grounds to include fitness
equipment and walking paths.
SAN ANTONIO SPORTS SCHOOL PARK
17
PROJECTS IN DESIGN/PLANNING
18
ENERGY CONTROLS
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Ramiro Guerrero Budget Amount – $400,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope –
Jay HS – Upgrade network cabling. Carson ES – Upgrade network cabling and install new Native programming
system.
Energy Controls, Fire Alarm System & Lighting Upgrades at Burke ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Budget Amount – $131,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Helotes ES – Upgrade cabling and full HVAC control system. Nichols ES – Upgrade network cabling.
Energy Controls at Helotes ES & Nichols ES
19
Energy Controls at Jay HS & Carson ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Ramiro Guerrero Budget Amount – $400,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Upgrade network cabling and install new Native programming system; replace fire alarm system. Replace 32 watt lamps with 28 watt lamps throughout campus. Replace existing lamps in Gym with LED lamps.
FENCING UPGRADES
Fencing Upgrades at NW Crossing ES, Westwood Terrace ES & Marshall HS
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear Budget Amount – $49,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Improve exterior perimeter fencing at four campuses.
20
LIGHTING UPGRADES
Lighting Upgrades at Howsman ES, Transportation Rhodes & Transportation South
Lighting Upgrades at Grissom CIT & Purchasing Warehouse
Purchasing Warehouse Engineering Firm – KCI Technologies
NISD Project Manager – Ramiro Guerrero Budget Amount – $125,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Grissom CIT – Replace 32 watt lamps with 28 watt lamps throughout
campus. Replace existing lamps in Bus area with LED lamps. Purchasing Warehouse – Replace 32 watt lamps with 28 watt lamps
throughout campus. Replace existing lamps in Warehouse with LED lamps.
Engineering Firm – MS2 Inc. Consulting Engineers
NISD Project Manager – Ramiro Guerrero Budget Amount – $140,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Howsman ES –Replace existing lamps with LED lamps throughout
campus. Transportation Rhodes & South – Replace ballasts and 32 watt lamps with
28 watt lamps throughout campuses. Replace existing lamps in Bus areas with LED lamps.
21
MECHANICAL UPGRADES
Mechanical Upgrades at Brauchle ES
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra
Budget Amount – $3,000,000 Contractor - TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Replace unit ventilators with VAV system in classrooms.
Mechanical Upgrades at Linton ES
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra Budget Amount – $880,000 Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Replace air handling unit and install VAV system for Library,
Cafeteria, Admin, Auditorium and Stage.
22
Engineering Firm – Wallis Engineering Group, Inc.
NISD Project Manager – Rob Ibarra Budget Amount – $1,525,000 Contractor – TBD Construction Period – April 2018 – July 2018
100% Design
Project Scope – Taft HS – Replace air handling unit and rooftop unit in Building B. Stinson MS & Taft HS – Install air conditioning and heating in boy’s and
girl’s locker rooms at both campuses.
Mechanical Upgrades at Taft HS and PE/Athletics Dressing/Locker Room AC
Installation at Rayburn MS, Stinson MS &Taft HS
23
PAVING / DRAINAGE UPGRADES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Jacob Villarreal, P.E.
Budget Amount – $305,000
Contractor – TBD Construction Period – June 2018 – August 2018
100% Design
Project Scope – Replace paving for staff parking and bus loop at both campuses.
Paving & Drainage Upgrades at Alternative HS & Burke ES
Paving Upgrades at McDermott ES
Engineering Firm – CDS Muery Engineers
NISD Project Manager – Troy Spear
Budget Amount – $110,000
Contractor – TBD Construction Period – June 2018 – August 2018
30% Design
Project Scope – Replace paving for staff parking and bus loop.
24
P.A. INTERCOM SYSTEMS P.A. Intercom System at Murnin ES & Mead ES
Engineering Firm – DBR Engineering Consultants, Inc.
NISD Project Manager – Carlos Rodriguez Budget Amount – $80,000 Contractor – TBD Construction Period – June 2018 – August 2018
95% Design
Project Scope – Replace PA system to include the callback feature at both
campuses.
25
P.E. / ATHLETICS DRESSING / LOCKER RM AC INSTALLATION
PE/Athletics Dressing/Locker Room AC Installation at Brennan HS
Engineering Firm – Cleary Zimmermann Engineers
NISD Project Manager – Rob Ibarra Budget Amount – $500,000 Contractor – TBD
Construction Period – March 2018 – July 2018
60% Design
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.
PE/Athletics Dressing/Locker Room AC Installation at Garcia MS
Engineering Firm – KCA Engineers, Inc.
NISD Project Manager – Rob Ibarra Budget Amount – $425,000 Contractor – TBD
Construction Period – March 2018 – July 2018
100% Design
Project Scope – Install air conditioning and heating in boy’s and girl’s locker
rooms.