Engineering Design Geotechnical Services

Page 3: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement
Page 4: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Project Team

AMBER GARTNER

PAUL SOFFE

RICHARD BUSCHE

STEWART HILL

NICHOLAS MORA

Roadway Design

Roadway Design

Principal-in-ChargeProject Manager

Drainage

Page 5: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Project Understanding• This is a SCOP project and has an agreement with FDOT. Use RRR criteria.

• Perform survey and roadway core sampling services.

• Mill and resurface the length of the project.

• Widening to provide 12-foot travel lanes and 8-foot shoulders (2-foot paved).

• Installation of mitered end sections at side drains where they do not exist.

• Improvements to cross drain end treatments within the clear zone.

• Pavement marking upgrades along the length of the project, including installation of rumble striping or profiled thermoplastic.

• Replacing traffic signage along the length of the project to meet current FDOT standards and retro-reflectivity requirements.

Page 6: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Limits of Construction

Page 7: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Typical Section

• Assumes 50 mph design speed

• Could potentially be reduced to 45 mph design speed

• Evaluate objects in Clear Zone

Page 8: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Accurate Pavement Evaluation• Understand existing AADT and

truck percentages

• Develop projected AADT for the design year (20-years out)

• Collect pavement cores to evaluate existing asphalt/limerock/subgrade conditions

• Perform ESAL calculations for the design life of the roadway

• Develop a pavement section which exceeds required structural number

Page 9: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Right-of-Way

• Wantman Group currently preparing R/W maintenance map

• Limited distance between existing edge of pavement and fence

• Right of entry agreements or temporary construction easements may be necessary

• Based on Property Appraiser, R/W is approximately 60’ in most areas, 50’ in others

Page 10: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Utility Coordination

•Utilities Present in Corridor Sumter Electric Cooperative

(SECO)

Withlacoochee River Electric Cooperative

Century Link

Florida Fiber Network

Page 11: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Utility Provider Contact Phone AddressUtilities

Present within

Project?

Date of Most

Recent

Correspondence

RGB's

Received?

Utility Work

Schedule

Completed?Notes

Dwayne

Leachman 352-861-3206

David Detmer 352-368-8862

Jay Haden 352-569-9635

Rhonda Cason 904-234-6032

Yes

No utilities

in project

area

Not Yet

Not Yet

10/20/2016

10/27/2016

Yes

Yes

Yes

N/A

C-475 SCOP - UTILITY CONTACT LIST

Yes 10/6/2016

Yes 11/15/2016

Not Yet

Not Yet319 SE Broadway, Room 408

Ocala, FL 34470

730 S. Main St.

Wildwood, FL. 34785

5908-A Hampton Oaks

Parkway

Tampa, FL 33610

117 E. Joe P. Strickland Jr. Ave

Bushnell, FL 33513

[email protected]

[email protected]

Brighthouse

Networks (Charter)

[email protected]

Century Link

SECO

City of Bushnell

Utilities

[email protected]

Page 12: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Safety

• Thermoplastic pavement markings and proper edgeline/centerline application

• Improved turning radii at side streets

• Correction of deficient drainage end treatments within Clear Zone

Page 13: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement
Page 14: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement
Page 15: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Floodplain Considerations

• Unnumbered A zones present

• History of flooding will be evaluated

• Flood zones may not be accurate

Page 16: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Permitting

Page 17: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement
Page 18: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Cost Estimating

Page 19: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Communication and Client Service

• You will receive regular proactive communications

• You will always know the current status of your project

• You will always know about upcoming milestones

• You have the team immediately available for meetings, calls, etc.

When Kimley-Horn is your consultant:

High Expectations

Exceptional Client Service

Honesty, Integrity, and Ethics

Sharing and Caring

Page 20: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Communication and Client Service

Page 21: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

Why Should You Select Kimley-Horn?• We have a proven track record of success for Sumter County.

• We are trusted by your administration and BOCC, and the partnering agencies.

• We have a thorough understanding of what is needed to make this project a success.

• We have completed numerous projects just like this one, successfully, in Sumter County.

• We have the best project team.

• We simply cannot fail to deliver for you.

Page 22: Engineering Design Geotechnical Servicessumterclerk.granicus.com/DocumentViewer.php?file=sumter... · 2017-01-27 · Project Understanding •This is a SCOP project and has an agreement

• ROUNDABOUT EDUCATION FLYER

• MORSE BLVD PHASE 1

• SUMTER COUNTY LAND FILL PHASE 3

• MORSE BLVD PHASE 2

• MORSE/466 TURN LANES

• MORSE ELEV MONITORING

• MORSE PH1 FIELD OVERSIGHT

• MORSE 1A FIELD OVERSIGHT

• MORSE PH2 FIELD OVERSIGHT

• LAKE PANASOFFKEE CART STUDY

• SUMTER COUNTY LANDFILL

• BUENA VISTA BLVD AT C466

• C-466W RESURFACING

• LOCAL RESURFACING CONT #1

• C-462 PD&E STUDY

• C-466W PD&E STUDY

• MORSE ELEV MONITORING

• C466A WIDENING

• SWA-BVB AT TALLY RIDGE N

• RES SPEED LIMIT STUDY

• 2011 PAVEMENT MGMT

• C469 RESURFACING

• CR 462 DESIGN

• MORSE BRIDGE CEI

• C-466W DESIGN

• 2012 PAVEMENT MGMT

• LAKE PANASOFFKEE GOLF CART STUDY

• CROOM TRAFFIC CALMING

• BELVEDERE PARR INT EVAL

• BVB & ECR TRAFFIC EVALUATION

• PROJECT PROCESS & MANUAL

• 2013 PAVEMENT MGMT CPS

• C466A WIDENING LEGAL ASSISTANCE

• BELVEDERE PARR DESIGN

• C466A CONSTR SERVICES

• C466A EXPERT WITNESS

• PANACOOCHEE RETREATS 4

• HWY 301/LAWRENCE CT SURVEY

• CR 575 AND CR 622C SURVEY

• SW SUMTER FIRE STN SURVEY

• 2014 PAVEMENT MGMT

• SUMTER FAIRGROUNDS SURVEY

• OXFORD FIRE STATION SURVEY

• CR 121 MAINTENANCE MAP

• PROJECT AND PROCESS MANUAL

• CR 121 ALTERNATIVES EVALUATION

• CR 651 REHABILITATION

• CR 501 PES

• CR 467 DRAINAGE IMPROVEMENTS

• 2015 PAVEMENT MGMT

• C-476 SAFETY IMP

• C466A SCHOOL MARKING

• TRANSPORTATION MANUAL TRAINING

• BUSHNELL CAMPUS ASSESSMENT

• ENGINEERING STANDARDS MANUAL

• 2016 PAVEMENT MGMTT

• CR 101 ROADWAY IMP

• CR 219 ROADWAY IMP

• CR 747 ROADWAY IMP

• CR 525 EXTENSION

• C-476 IMP CONSTR ADMIN

• CR 525 E EXTENSION

• C466W EOR CPA SERVICES

• C468 UTILITY DESIGN

• C-475 SCOP

• CR 468-US 301 TO C-505

• CR 468 R/W ACQUISITION

Relevant Experience