Engineering Design Geotechnical Services
Project Team
AMBER GARTNER
PAUL SOFFE
RICHARD BUSCHE
STEWART HILL
NICHOLAS MORA
Roadway Design
Roadway Design
Principal-in-ChargeProject Manager
Drainage
Project Understanding• This is a SCOP project and has an agreement with FDOT. Use RRR criteria.
• Perform survey and roadway core sampling services.
• Mill and resurface the length of the project.
• Widening to provide 12-foot travel lanes and 8-foot shoulders (2-foot paved).
• Installation of mitered end sections at side drains where they do not exist.
• Improvements to cross drain end treatments within the clear zone.
• Pavement marking upgrades along the length of the project, including installation of rumble striping or profiled thermoplastic.
• Replacing traffic signage along the length of the project to meet current FDOT standards and retro-reflectivity requirements.
Limits of Construction
Typical Section
• Assumes 50 mph design speed
• Could potentially be reduced to 45 mph design speed
• Evaluate objects in Clear Zone
Accurate Pavement Evaluation• Understand existing AADT and
truck percentages
• Develop projected AADT for the design year (20-years out)
• Collect pavement cores to evaluate existing asphalt/limerock/subgrade conditions
• Perform ESAL calculations for the design life of the roadway
• Develop a pavement section which exceeds required structural number
Right-of-Way
• Wantman Group currently preparing R/W maintenance map
• Limited distance between existing edge of pavement and fence
• Right of entry agreements or temporary construction easements may be necessary
• Based on Property Appraiser, R/W is approximately 60’ in most areas, 50’ in others
Utility Coordination
•Utilities Present in Corridor Sumter Electric Cooperative
(SECO)
Withlacoochee River Electric Cooperative
Century Link
Florida Fiber Network
Utility Provider Contact Phone AddressUtilities
Present within
Project?
Date of Most
Recent
Correspondence
RGB's
Received?
Utility Work
Schedule
Completed?Notes
Dwayne
Leachman 352-861-3206
David Detmer 352-368-8862
Jay Haden 352-569-9635
Rhonda Cason 904-234-6032
Yes
No utilities
in project
area
Not Yet
Not Yet
10/20/2016
10/27/2016
Yes
Yes
Yes
N/A
C-475 SCOP - UTILITY CONTACT LIST
Yes 10/6/2016
Yes 11/15/2016
Not Yet
Not Yet319 SE Broadway, Room 408
Ocala, FL 34470
730 S. Main St.
Wildwood, FL. 34785
5908-A Hampton Oaks
Parkway
Tampa, FL 33610
117 E. Joe P. Strickland Jr. Ave
Bushnell, FL 33513
Brighthouse
Networks (Charter)
Century Link
SECO
City of Bushnell
Utilities
Safety
• Thermoplastic pavement markings and proper edgeline/centerline application
• Improved turning radii at side streets
• Correction of deficient drainage end treatments within Clear Zone
Floodplain Considerations
• Unnumbered A zones present
• History of flooding will be evaluated
• Flood zones may not be accurate
Permitting
Cost Estimating
Communication and Client Service
• You will receive regular proactive communications
• You will always know the current status of your project
• You will always know about upcoming milestones
• You have the team immediately available for meetings, calls, etc.
When Kimley-Horn is your consultant:
High Expectations
Exceptional Client Service
Honesty, Integrity, and Ethics
Sharing and Caring
Communication and Client Service
Why Should You Select Kimley-Horn?• We have a proven track record of success for Sumter County.
• We are trusted by your administration and BOCC, and the partnering agencies.
• We have a thorough understanding of what is needed to make this project a success.
• We have completed numerous projects just like this one, successfully, in Sumter County.
• We have the best project team.
• We simply cannot fail to deliver for you.
• ROUNDABOUT EDUCATION FLYER
• MORSE BLVD PHASE 1
• SUMTER COUNTY LAND FILL PHASE 3
• MORSE BLVD PHASE 2
• MORSE/466 TURN LANES
• MORSE ELEV MONITORING
• MORSE PH1 FIELD OVERSIGHT
• MORSE 1A FIELD OVERSIGHT
• MORSE PH2 FIELD OVERSIGHT
• LAKE PANASOFFKEE CART STUDY
• SUMTER COUNTY LANDFILL
• BUENA VISTA BLVD AT C466
• C-466W RESURFACING
• LOCAL RESURFACING CONT #1
• C-462 PD&E STUDY
• C-466W PD&E STUDY
• MORSE ELEV MONITORING
• C466A WIDENING
• SWA-BVB AT TALLY RIDGE N
• RES SPEED LIMIT STUDY
• 2011 PAVEMENT MGMT
• C469 RESURFACING
• CR 462 DESIGN
• MORSE BRIDGE CEI
• C-466W DESIGN
• 2012 PAVEMENT MGMT
• LAKE PANASOFFKEE GOLF CART STUDY
• CROOM TRAFFIC CALMING
• BELVEDERE PARR INT EVAL
• BVB & ECR TRAFFIC EVALUATION
• PROJECT PROCESS & MANUAL
• 2013 PAVEMENT MGMT CPS
• C466A WIDENING LEGAL ASSISTANCE
• BELVEDERE PARR DESIGN
• C466A CONSTR SERVICES
• C466A EXPERT WITNESS
• PANACOOCHEE RETREATS 4
• HWY 301/LAWRENCE CT SURVEY
• CR 575 AND CR 622C SURVEY
• SW SUMTER FIRE STN SURVEY
• 2014 PAVEMENT MGMT
• SUMTER FAIRGROUNDS SURVEY
• OXFORD FIRE STATION SURVEY
• CR 121 MAINTENANCE MAP
• PROJECT AND PROCESS MANUAL
• CR 121 ALTERNATIVES EVALUATION
• CR 651 REHABILITATION
• CR 501 PES
• CR 467 DRAINAGE IMPROVEMENTS
• 2015 PAVEMENT MGMT
• C-476 SAFETY IMP
• C466A SCHOOL MARKING
• TRANSPORTATION MANUAL TRAINING
• BUSHNELL CAMPUS ASSESSMENT
• ENGINEERING STANDARDS MANUAL
• 2016 PAVEMENT MGMTT
• CR 101 ROADWAY IMP
• CR 219 ROADWAY IMP
• CR 747 ROADWAY IMP
• CR 525 EXTENSION
• C-476 IMP CONSTR ADMIN
• CR 525 E EXTENSION
• C466W EOR CPA SERVICES
• C468 UTILITY DESIGN
• C-475 SCOP
• CR 468-US 301 TO C-505
• CR 468 R/W ACQUISITION
Relevant Experience