77

ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki
Page 2: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3

TABLE OF CONTENTS

SECTION I: COMPANY OVERVIEW CHAIRMAN MESSAGE

GROUP ORGANIZATION CHART

KEY PERSONNEL

SECTION II: ENGINEERING & CONSTRUCTION

LIST OF PROJECTS

SECTION III: WASTE MANAGEMENT

SECTION IV: FACILITY MANAGEMENT

SECTION V: LIST OF EQUIPMENT AND MACHINERY

SECTION VI: OFFICIAL DOCUMENTS CERTIFICATES OF COMPLETION

OFFICIAL DOCUMENTS AND CLASSIFICATIONS

ISO/OHSAS CERTIFICATIONS

Page 3: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

54

SECTION I: COMPANY OVERVIEW

SECTION I:COMPANYOVERVIEW

Page 4: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

76

CHAIRMAN MESSAGE

As I look at the growth over the years since our inception in 1967, I am extremely proud of what we have achieved, and even more excited about our outlook and promising future.

At RAMCO, we are committed to building long lasting relationship based on integrity, performance, value, and client satisfaction. We provide the means to complete projects on time and within budget, whilst maintaining unparalleled safety and quality standards.

Over the past five decades, we have developed our skills and professional excellence of constructions-in hotels, residential, commercial, hospitals, schools, resorts, public parking, industrial factories, infrastructure, roads, bridges, soil retaining and pilling. We have also expanded our scope to include facility management and eco-friendly waste management projects where we foresee a sustainable growth potential.

I deeply thank all the clients we have served over the past decades and truly value our strong relationships. Staying true to our code of ethics, trustworthiness and professionalism are the common threads that bond our employees and RAMCO together. Our commitment to the construction, facility management and waste management industries is strong and we embrace our future with great enthusiasm!

WASSIM AMMACHECHAIRMAN

Page 5: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

98

GROUP ORGANIZATION CHART

Information TechnologyDepartment

Human ResourceDepartment

Finance and AdministrativeDepartment

KEY PERSONNEL

DESIGNATION NAME

Chairman - CEO Wassim Ammache

DIVISION MANAGERS

Chief Financial Officer Walid Bou Saad

Projects Manager Gerald Medawar

Commercial & Business Development Marwan Daher

Waste Management Project Manager Zaher Mansour

Internal Auditor Charbel Daou

Legal Advisor Abdel Rahman Labban

HEAD OF DEPARTMENTS

Head of Vehicle Control Department Mohammad Ali Makki

Workshop Manager Ayman Hilal

Waste Management & Operation Manager Khaled Salman

Head of Accounting Department Tony Hourany

Head of HR Department Karol Kairouz

Head of IT Department Rustom Mabsout

Head of Plant & Equipment Management Toufic Mukhalalti

Head of Estimation Department Mona Wazzan

Head of Projects Control & Quality Management Department Wafaa Saab

Head of Quantity Surveying Department Fady Karam

Head of Procurement Department Rania Ardroumli

Head of HSE Department Ibrahim Haroun

Page 6: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

1110

LIST OF PROJECTSSECTION II: ENGINEERING & CONSTRUCTION

SECTION II:ENGINEERING & CONSTRUCTION

Page 7: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

1312

DESCRIPTIONMajestic Tower is a high standard residential project facing the Mediterranean Sea. It is a 22 story building with 3 basements for car parking, a ground floor, a service floor, 3 main elevators and 2 service elevators.

TYPE OF WORKS• Reinforced Concrete: 20,000m3

• Excavation: 36,000m3

• Reinforcing Steel: 2,200Tons

MAJESTIC TOWER

LOCATIONAin Mreisse, Beirut, Lebanon

CLIENTAmmache Group Jaroudi Management Group

CONSULTANTKhatib & Alami

PROJECT VALUE$33,000,000.00

PROJECT DURATION36 Months

DESCRIPTIONRas Beirut 493 is two residential tower blocks that come together to create a community. With apartments of 190m2, Hamra Garden tower rises on Makdesi street in an area that has always been a highly attractive location. Bustling with urban energy and a distinctive vibe, Hamra is known for its timeless elegance, and pedestrian friendly streets. Top-notch medical centers, renowned universities like AUB and cultural centers are also found in close proximity to Hamra garden.

HAMRA GARDEN

LOCATIONRas Beirut, Beirut, Lebanon

CLIENTAmmache GroupJaroudi Management Group

CONSULTANTHawa Moujaes

PROJECT VALUE$15,000,000.00

PROJECT DURATION24 Months

RESIDENTIALS

Page 8: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

1514

DESCRIPTIONThe Tower is situated on the peak of Ras Beirut, overlooking Beirut Lighthouse with a breathtaking sea view that captures your vision from all its floors.Beirut 700 is situated at the peak of Ras Beirut. It overlooks the Beirut Lighthouse, and hosts a breathtaking sea view that captures your vision from all floors. This tower features different apartment sizes that vary from 325m2, 435m2 to 640m2, where everyone can enjoy the gardens and the recreational facilities; these include 4 swimming pools and 2 gymnasiums.

BEIRUT 700

LOCATIONAin Mreisse, Beirut, Lebanon

CLIENTJaroudi Management Group

CONSULTANTKhatib & Alami

PROJECT VALUE$31,000,000.00

PROJECT DURATION48 Months

RESIDENTIALS

DESCRIPTIONCalifornia 615 is located in Ras Beirut on California Street. It blends prime location with breathtaking views and quality living space. California 615 is a 10-story building with three basements for parking (this entails 3 car stores and common electro-mechanical services). Each floor consists of one apartment of 310m2.TYPE OF WORKS• Reinforced concrete structure with 30cm• Hourdi Slab and Super Deluxe Finishing• Reinforced Concrete: 3,026m3

• Excavation: 6,600m3

• Reinforcing Steel: 450Tons

CALIFORNIA 615

LOCATIONCalifornia Street, adjacent to Bliss Street, Beirut

CLIENTJaroudi Management Group

CONSULTANTHawa Moujaes

PROJECT VALUE$7,000,000.00

PROJECT DURATION24 Months

Page 9: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

1716

DESCRIPTIONGray D’albion is located in a 920m2 plot in Ain Mreisseh, Beirut, Lebanon. The site connects Corniche area to the Beirut Central District and Beirut New Waterfront. The project is a 10 story building with a penthouse at its top. The lower floors are composed of 2 apartments per floor.The 7th, 8th and 9th floors of the building have one apartment per floor ranging from 450m2 to 550m2. The penthouse is a duplex apartment, and has private access to the roof with spectacular panoramic views of the Mediterranean Sea and Beirut City.

TYPE OF WORKS• Structural Concrete Works: 6,500m3

GRAY D’ALBION

LOCATIONAin Mreisse 38, Beirut, Lebanon

CLIENTDogmoch Real Estate

CONSULTANTKhatib & Alami

PROJECT VALUE$14,000,000.00

PROJECT DURATION30 Months

DESCRIPTIONRaouche 1090 is a 22-floor luxury apartments building, located on the coast facing Raouche Rocks. The building consists of 5 basements, a ground floor and a service floor with breathtaking landscape and water mirrors.

TYPE OF WORKS• Reinforced Concrete: 30,000m3

• Reinforcing Steel: 4,500Tons

RAOUCHE 1090

LOCATIONLot 1090, Raouche, Beirut, Lebanon

CLIENTLURC (Lebanese United Real Estate Company)

CONSULTANTKhatib & Alami

PROJECT VALUE$55,000,000.00

PROJECT DURATION36 Months

RESIDENTIALS

Page 10: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

1918

DESCRIPTIONThis building is located in Beirut Central District. It consists of 5 basement floors, a ground floor, and 16 upper floors with a total construction area of 11,500m2. The building has a vault area, fitness centre, gymnasium, cafeteria, auditorium, and a majestic entrance lobby.

MEDITERRANEE GROUP COMPLEX

LOCATIONDowntown, Beirut, Lebanon

CLIENTMed Bank

CONSULTANTMansour Jamal

PROJECT VALUE$15,000,000.00

PROJECT DURATION12 Months

DESCRIPTIONManara 587 is a 17 story prestigious residential building located in the heart of Beirut. With its anti-seismic design and double glazed facades, the building consists of 3 underground parking levels with automatic controlled entrance, independent air conditioning & heating systems, integrated central management systems and electric generator. Fire-fighting equipment, including CO2 total flooding system and close circuit television cameras are included to guarantee safety and optimum security at all times. The building also hosts 2 main elevators and 1 service elevator.

TYPE OF WORKSFinishing works include marble/parquet internal flooring, granite kitchens with marble tops, gypsum false ceiling, premium hardwood doors, and aluminum double glazed windows with electrical rolling shutter.

MANARA 587

LOCATIONManara, Beirut, Lebanon

CLIENTAmmache Group

CONSULTANTKhatib & Alami

PROJECT VALUE$12,505,000.00

PROJECT DURATION24 Months

RESIDENTIALS

Page 11: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

2120

DESCRIPTIONJawad building is a distinguished and renowned structure from the 19th century. It was chosen among the few remaining buildings to be renovated as part of the reconstruction of downtown Beirut.

TYPE OF WORKSThe works included demolishing, renovation, restoration, underpinning a, and new construction works, achieved with full respect of regulation, in order to preserve the original building architecture.

JAWAD BUILDING

LOCATIONManara,Beirut, Lebanon

CLIENTBankMed Jawad

CONSULTANTOGER s.a.l

PROJECT VALUE$2,500,000.00

PROJECT DURATION12 Months

RESIDENTIALS

DESCRIPTIONThe project consists of six basements, one ground floor, one ground floor mezzanine, one podium, one podium mezzanine, 11 upper floors, and roof.The project’s total built-up area is around 17118.76m 2.

TYPE OF WORKS• Architectural • Electro-Mechanical• Civil Works

MAR ELIAS BUILDING

LOCATIONMar Elias- Lot 1986, Beirut, Lebanon

CLIENTJCC

CONSULTANTCode

PROJECT VALUE$13,000,000

Page 12: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

2322

DESCRIPTIONThe project comprises the construction of a new building composed of one basement, Two semi basements and two floors and the roofThe total built-up area is approximate 1,229 m2

TYPE OF WORKS• Architectural • Electro-Mechanical• Civil Works

EMBASSY OF THE HASHEMITE KINGDOM OF JORDAN

LOCATIONBaabda, Lebanon

CLIENTJordanian Embassy

CONSULTANTDar Al Handasah

PROJECT VALUE$3,200,000

DESCRIPTIONPrime Gate project is a high end office building with total built-up area of 17500 m².The building consists of 4 basements, a ground floor, and 9 upper floors.

TYPE OF WORKS• Architectural works• MEP works• Civil works• Landscape works

BCD 1494PRIME GATE

LOCATIONSolidere – Beirut, Lebanon

CLIENTPrime Gate sal

CONSULTANTJo Geitani Architects

PROJECT VALUE$34,000,000

RESIDENTIALS

Page 13: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

2524

DESCRIPTIONThe project is located on two plots and defines the south-eastern corner of the Beirut Central District. It is within walking distance from its main business center, several shopping areas and educational institutions. Saifi Plaza I- Lot 1068 is comprised of two building blocks with four basements and six floors above the ground level each. The two building blocks are connected to each other via a panoramic glazed bridged walkway at each floor level. Saifi Plaza II- Lot 1059 is formed of one building with four basements and seven floors above the ground level.

TYPE OF WORKSReinforced concrete, MEP, Finishes for the core of the building, and the external skin made of a unique blend of stone and glass.

SAIFI PLAZA 1 & 2

LOCATIONDowtown, Beirut, Lebanon

CLIENTAL Mada sal,Saifi square sal

CONSULTANTNabil Ghoulam architects

PROJECT MANAGEMENTASAM(Ayman Sanyoura architecture and management)

PROJECT VALUE$24,000,000.00

PROJECT DURATION24 Months

DESCRIPTIONEnabling Works (shoring and excavation) on a 31,000m2 property to allow the construction of a Mixed Use Development of 400,000m2 built-up area for hotel, residential, office and commercial spaces.

ABRAJ SOURIA

LOCATIONBaramkeh, Damascus, Syria

CLIENTAbraj Souria

CONSULTANTKhatib & Alami

PROJECT VALUE$355,000,000.00

Completed 1st phase

TYPE OF WORKS• Reinforced Concrete: 5,000m3

• Excavation: 800,000m3

• Shoring Piles: 11,000lm• Shotcrete: 9,000m2

• Anchors: 55,000lm• Reinforcing Steel: 1,500Tons

COMMERCIAL CENTERS

Page 14: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

2726

DESCRIPTIONEnabling Works (shoring, excavation, foundation piles and permanent diversion of Barada River) on a 45,000m2 property to allow the construction of a Mixed Use Development of 200,000m2 built-up area for hotel, residential, office and commercial spaces.

TYPE OF WORKS• Reinforced Concrete: 6,000m3

• Excavation: 400,000m3

• Shoring Piles: 8,500lm• Shotcrete: 9,000m2

• Anchors: 7,500lm• Building Piles: 17,500lm• Reinforcing Steel: 2,500Tons

KIWAN MIXED USED DEVELOPMENT

LOCATIONBeirut Road, Damascus, Syria

CLIENTKiwan JointStock Company(Al Kharafi Group)

CONSULTANTKhatib & Alami

PROJECT VALUE$178,000,000.00

Completed 1st phase

PROJECT DURATION16 Months

COMMERCIAL CENTERS VILLAS

DESCRIPTIONThe project is a private villa in Baadbat region.It includes one basement, ground floor and two upper floors. The approximate built up area is 3000m2 and 2000m2 landscaping area.

TYPE OF WORKSThe works comprise civil works, architectural, electro-mechanical and interior design works.

VILLA BAABDAT

LOCATIONBaabdat, Lebanon

CLIENTBaabdat Villa

CONSULTANTRafik Khoury & Partners

PROJECT DURATION2 Years

Page 15: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

2928

DESCRIPTIONThe project is located on two plots in the Neehmeh area directly on the sea side. It is composed of 20 blocks leading to 47 housing units (simplexes, duplexes and triplexes), as well as a health club. Each villa has its own pool and landscaping area. Total plot area 36,000m2 and built up area 26,000m2.

TYPE OF WORKSReinforced concrete, electro-mechanical works, finishing works.

NEEMEH 576-611

LOCATIONNeehme, Lebanon

CLIENTHiba Real estate

CONSULTANTYoussef HaidarArchitecte DPLG

PROJECT VALUE$32,000,000.00

PROJECT DURATION24 Months

RESORTS

DESCRIPTIONFaqra Hills is a unique private residential project perched in the hills overlooking Faqra’s mountain resort. The project consists of 7 buildings, each with 6 independent apartments and two underground car park floors. Faqra Hills also includes a hotel with sport facilities and parking spaces that are all connected to the hotel via underground tunnels.

TYPE OF WORKS• Reinforced concrete structure with 30cm• Hourdi Slab and Super Deluxe Finishing• Reinforced Concrete: 17,000m3

• Excavation: 66,000m3

• Shoring Piles: 1,500 lm• Anchors: 6,000lm• Reinforcing Steel: 1,500Tons

FAQRA HILLS

LOCATIONFaqra, Lebanon

CLIENTStructura Development

CONSULTANTAbdul Wahad Chehab

PROJECT VALUE$32,000,000.00

PROJECT DURATION36 Months

Page 16: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3130

DESCRIPTIONThe project is an extension of the existing Clemenceau medical center hospital; it is composed of 6 basements, a ground floor, an attic floor, 10 floors, a roof and a top of roof.

TYPE OF WORKS• Reinforced Concrete: 9480m3

• Architectural works at existing block• Finishing works at new extension block• Electro-mechanical Works

CLEMENCEAU MEDICAL CENTER (CMC) EXTENSION

LOCATIONBeirut-Clemenceau

CLIENTClemeceau Medical Center S.A.L

CONSULTANTKhatib & Alami

PROJECT VALUE$25,000,000.00

PROJECT DURATION20 Months

DESCRIPTIONThe project is an outpatient clinic building located next to the Clemenceau Medical Centre. The project comprises of 4 basements, a lower ground floor for parking and general services, an upper ground floor for lobby and offices, 8 typical floors for clinics, a roof and a rooftop.

TYPE OF WORKS• Reinforced concrete structure with 30cm• Solid Slab and Super Deluxe Finishing.• Reinforced Concrete: 3,088m3

• Reinforcing Steel: 618

CLEMENCEAU MEDICAL CENTER (CMC) OPD

LOCATIONBeirut-Clemenceau

CLIENTClemenceau Medical center

CONSULTANTKhatib & Alami

PROJECT VALUE$9,000,000

PROJECT DURATION12 Months

HOSPITALS

Page 17: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3332

HOSPITALS

DESCRIPTIONThe hospital consists of a 5-story building with 40 hospital beds, 2 surgery rooms, a pharmacy and an emergency entrance. The total “built-up” area for the building is 3100m2 and 5,000m2 for landscaping.

TYPE OF WORKS• Reinforced concrete structure, Architecture Finishing

HABTOOR HOSPITAL

LOCATIONHrar , Akkar, North Lebanon

CLIENTSandouk Al Zakat

CONSULTANTArkan

PROJECT VALUE$6,000,000.00

PROJECT DURATION18 Months

DESCRIPTIONConstruction of a five star hotel consisting of 250 rooms, 60 suites, underground parking facility for 500 cars, 4 restaurants, a shopping centre,3 conference halls and a health club.

TYPE OF WORKS• Excavation Works• Concrete Construction• All Tiling Works• All Painting Works• All Wood Works• All Electro-Mechanical Works• All Kitchen Equipment• All Laundry Equipment• Swimming Pool• All Other Finishes Except for Furniture

SHERATON HOTEL (PM-RC)

LOCATIONAleppo, Syria

CLIENTBab Al-Faraj Company for Tourism and Hotels

CONSULTANTKahtib & Alami

PROJECT VALUE$25,000,000.00

PROJECT DURATION22 Months

HOTEL

Page 18: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3534

DESCRIPTIONBeirut Northern Entrances.

TYPE OF WORKSTraining of Nahr Beirut, construction of pre-stressed concrete viaduct and crossings, and construction of a highway and service road.• Excavation: 390,000m3

• Fill: 220,000m3

• Concrete: 120,000m3

• Asphalt: 23,000m3

ROADS PARALLEL TO NAHR BEIRUT

LOCATIONKarantina,Jisr El Bacha,Beirut, Lebanon

CLIENTCouncil of Development and Reconstruction

CONSULTANTDar Al-Handasah Shair and Partners

PROJECT VALUE$32,700,000.00

PROJECT DURATION24 Months

DESCRIPTIONHighway and infrastructure construction, measuring 4.89Km in length and including two tunnels, retaining walls, U-sections and all related electro-Mechanical works.

KHALDEH-COCODI HIGHWAY

LOCATIONBetween Khaldeh-Choueifat and Cocodi, Lebanon

CLIENTCouncil of Development and Reconstruction

CONSULTANTDar Al-Handasah Shair and Partners

PROJECT VALUE$50,000,000.00

PROJECT DURATION14 Months

TYPE OF WORKSHighway and infrastructure construction, measuring 4.89Km in length including 2 tunnels, retaining walls, U-sections and all related electro-mechanical works (plumbing stations, transformers, UPS, lighting, CO monitoring system); in addition to complete storm and sewage networks. • Excavation : 900,000m3

• Concrete: 150,000m3

• Asphalt: 12,850m3

• Storm drain line: 7,000m• Sewer line: 5,100m

ROADS & UTILITY WORKS

Page 19: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3736

DESCRIPTIONBeirut International Airport Car Park Facility.

TYPE OF WORKSParking facilities for BIA employees, passengers, and visitors. With a total capacity of 2,350 vehicles, the parking holds a capacity of 1,748 cars, in addition to a 30,000m2 surface area for 602 vehicles. An underground pedestrian tunnel connects the parking structure to the terminal building.• Excavation: 397,000m3

• Concrete: 34,000m3

• Asphalt: 20,000m3

BEIRUT AIRPORT CAR PARK

LOCATIONBeirut International Airport (BIA), Lebanon

CLIENTMohammad Adulmohsen Al Kharafi & Sons, WLL

CONSULTANTDar Al-Handasah Shairand Partners

PROJECT VALUE$18,000,000.00

PROJECT DURATION24 Months

DESCRIPTIONRehabilitation/renovation works in Beirut southern suburbs.

BEIRUT CITY SERVICE UPGRADING

LOCATIONBeirut City Services Upgrading, Lebanon

CLIENTConseil Executif des Grands Projects de Beyrouth

PROJECT VALUE$10,800,000.00

PROJECT DURATION24 Months

TYPE OF WORKSRehabilitation and upgrading of roads and utilities in 250 main and secondary streets within Beirut southern suburbs. Works included the installation of sewage and water supply networks, in addition to sidewalk and asphalt works. Excavation: 450,000m3

Asphalt: 26,000m3

Storm channels: 30,000mSewer Line: 26,000mWater Supply Lines: 6,000mSidewalks: 50,000m2

Curbstone: 35,000m

ROADS & UTILITY WORKS

Page 20: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

3938

TYPE OF WORKSConstruction and rehabilitation of existing civil, mechanical, and electrical infrastructure in Bourj Hammoud. Works included the separation of sewer from storm water networks, as well as the rehabilitation of storm, sewer and potable water networks. Work on road and street lighting were also carried out.Excavation: 41,500m3

Concrete: 5,500m3

Asphalt: 3,000m3

Sewer Lines: 9,000mPotable Water Lines: 5,000m

DESCRIPTIONRehabilitation works in Beirut Northern suburbs.

REHABILITATION WORKS

LOCATIONBourj Hammoud,Lebanon

CLIENTCouncil of Development and Reconstruction

CONSULTANTDar Al –Handasah(Shair& Partners)

PROJECT VALUE$4,200,000.00

PROJECT DURATION24 Months

DESCRIPTION100km dual carriageway between the cities of Lattakia and Ariha - Syria.

TYPE OF WORKSConcrete works include the construction of 92 bridges, 140 underpasses, 130,000km of safety barriers, and all ancillary works for a total of 1,000,000m3 of concrete.

LATTAKIA-ARIHA HIGHWAY(PM-RC)

LOCATIONSyrian Arab Republic

CLIENTMohammad Adulmohsen Al Kharafi & Sons, WLL

CONSULTANTKhatib & Alami

PROJECT VALUE$155,000,000.00

PROJECT DURATION5 Years

ROADS & UTILITY WORKS

Page 21: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

4140

DESCRIPTION100km Highway between the cities of Deir Ezzor and Al Hassakah - Syria.

TYPE OF WORKSConstruction of 4 bridges, 36 culverts and related safety barriers for the 95km newly constructed highway between Deir Ezzor and Al Hassakah.

DEIR EZZOR-AL HASSAKAH HIGHWAY(PM-RC)

LOCATIONSyrian Arab Republic

CLIENTPublic Establishment for Roads Communications.

CONSULTANTKhatib & Alami

PROJECT VALUE$25,000,000.00

PROJECT DURATION20 Months

DESCRIPTIONThe project is composed of Basement 7 allocated for water tanks and pump rooms, 6 basements (B6-B1) allocated for car parking, Ground floor allocated for guard rooms, utilities and gardens.

METROPOLITE AWDE GARDEN AND CAR PARK

CLIENTBeirut Municipality JCC SAL

CONSULTANTDar Al HandasahNazih Taleb

PROJECT DURATION18 Months

ROADS & UTILITY WORKS

TYPE OF WORKSThe works comprise:Architectural, electro-mechanical works and civil works.

Page 22: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

4342

RETAIL& LEISURE COMPLEX1338

LOCATIONSector Mina El Hosn, Beirut Central District, Lebanon

CLIENTSolidere SAL – Araco SAL

CONSULTANT-

PROJECT VALUE-

PROJECT DURATION-

DESCRIPTIONThe Project consists of the construction of an educational facility building; Teacher’s academy and Conservatoire National des Arts et Métiers” known as CNAM which is in relation with the Lebanese University and CNAM, Paris. The project has a built-up area of approximately 26,500m², covering 4 super-structure levels in U-shape design, an open air courtyard at ground level, and 2 underground levels covering nearly the whole land area

DESCRIPTIONPhase I Construction of Retail and Leisure Complex constituting 6 underground parking levels with all enabling works (concrete, waterproofing) finished with Epoxy Flooring and serviced with all related electro-mechanical items and provisions (Elevators, ventilation, BMS, Fire, V&D, access control, FM200, CCTV, PMS etc)

CNAM & TEACHERS’ ACADEMY

LOCATIONBeirut – Lebanon

CLIENTThe Council for Development & Reconstruction (CDR)

CONSULTANT-

PROJECT VALUE-

PROJECT DURATION-

ROADS & UTILITY WORKS

TYPE OF WORKSDemolitionArchitecturalElectro-MechanicalCivil Works

TYPE OF WORKSArchitecturalElectro-MechanicalCivil Works

Page 23: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

4544

SECTION III:WASTE

MANAGEMENT

SECTION III: WASTE MANAGEMENT

significance of a healthy and clean environment, which is why we offer waste management services to municipalities across Lebanon.

WHAT WE DO

WE PROVIDE WASTE MANAGEMENT SERVICES FOR ALL KINDS OF WASTE

We gather, haul, transfer and dispose of municipal solid waste including recycling materials. We deal in construction, excavation, packaging and electronic waste.

We have state of the art technologies for the management of waste. We believe in contributing to the environment through taking care of all kinds of municipal solid waste. We understand the

Page 24: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

4746

DESCRIPTIONYearly collection of 550,000ton of municipal solid and bulky waste including 1000km of daily mechanical and manual streets and highways sweeping.

SWEEPING AND MUNICIPAL WASTE COLLECTION

LOCATIONMetn & Keserouan, Lebanon

CLIENTCouncil for Development and Reconstruction

CONSULTANTDJ Jones

PROJECT VALUE$140,000,000

PROJECT DURATION7 years

WASTE MANAGEMENT

Page 25: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

4948

SWEEPING AND MUNICIPAL WASTE COLLECTION

LOCATIONBeirut, Lebanon

CLIENTBeirut Municipality

CONSULTANTRafik El Khoury

PROJECT VALUE$75,000,000

PROJECT DURATION5 years

DESCRIPTIONYearly collection of 300,000ton of municipal solid and bulky waste. 600km of daily mechanical and manual sweeping of roads including the provision of hydraulically operated underground bins collection points.

equipped with advanced machinery making the drive and reach of remote garbage cans across the narrowest and busiest roads, a child’s play.We have highly trained and experienced staff along with the widest range of vehicles to take away the weight of wastage from the environment.Our fleet includes EURO5 Class vehicles, having the lowest noise and emission levels, in line with our belief in safety, security, cleanliness and healthy environment. We strongly insist on our personnel safety which is why we strictly follow the highest standards of EN 1501.

WHAT WE USE

WE WORK OUR MAGIC WHEN THE WORLD IS SLEEPING

We were the first company to introduce a wide variety of garbage collecting vehicles equipped with modern-day technology, hybrid systems, and hydraulic pressures. We believe in applying technological breakthroughs to achieve a more beautiful tomorrow. Our vehicles and garbage disposal systems are manufactured in the top notch industries of Europe.Our garbage collecting automobiles are

WASTE MANAGEMENT

Page 26: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

5150

OUR ACHIEVEMENTSWe aim at reducing all kinds of pollution and wastage including even noise, we hence take special care during the procedure of emptying of the garbage containers to minimize the annoyance.

We aim at creating service benchmarks for achieving a healthy world. We continuously strive to develop state-of-the-art vehicles to clean the streets of the city.

WASTE MANAGEMENT

Page 27: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

5352

OUR COMMITMENTSWe are devoted to taking care of the aesthetic value of the city while providing a clean and beautiful environment. Posters which are hung on the walls without permission and damaging the beauty of the streets are cleaned using pressurized water and special equipment.

WASTE MANAGEMENT

Page 28: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

5554

SECTION IV:FACILITY

MANAGEMENT

WHEN THE PROJECT IS COMPLETED AND COMMISSIONED, A NEW RELATIONSHIP BEGINS

Ramco gained experience in buildings construction and management during construction phase has facilitated the setup of facility management and maintenance services department (Ramco Facility Management) to handle projects at post construction phase.

We at Ramco Facility Management, ensure that our clients’ assets operate as efficient as possible. This means minimizing asset downtime

and maximizing their useful life. Our experienced facilities teams are focused on delivering the highest quality service, while ensuring absolute compliance with health, safety and environmental standards.

SECTION IV: FACILITY MANAGEMENT

Page 29: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

5756

SECTION V:LIST OF

EQUIPMENT AND MACHINERY

SECTION V: LIST OF EQUIPMENT AND MACHINER

Page 30: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

5958

LIST OF EQUIPMENT AND MACHINER

RAMCO LIST OF MAJOR OWNED EQUIPMENT

CONSTRUCTION DIVISION

ITEM CATEGORY DESCRIPTION TYPE/MODEL QUANTITYTower Cranes MC115 Potain 5

Tower Cranes MC85 Potain 8

Mobile Cranes Tones 10 Kato 2

Generators 110KVA Mets 3

Generators 100KVA Perkins 1

Generators 60KVA Perkins 2

Generators 350KVA Caterpillar 3

Generators 140KVA Mets 5

Generators 200KVA Jubaily 2

Generators 60KVA Mets 2

Bobcat N/A Caterpillar 3

Forklift N/A Caterpillar 2

Forklift N/A Someco 3

Pickup Trucks N/A Hino 6

FORMWORK

TYPE CATEGORY DESCRIPTION BRAND QUANTITYVertical Elements Double Sided Walls Linear Meter Core Wall 20 RMD 8

Vertical Elements Double Sided Walls Panels 3.3M RMD 18

Vertical Elements Double Sided Walls Panels 3M RMD 18

Vertical Elements Double Sided Walls Panels 2.4M RMD 20

Vertical Elements Single Sided Walls Linear Meter Core Wall 20 RMD 6

Vertical Elements Columns 60*80 RMD 12

Vertical Elements Columns 60*100 RMD 14

Vertical Elements Columns 60*120 RMD 12

Vertical Elements Columns 70*70 RMD 6

Vertical Elements Columns 85*85 RMD 8

Vertical Elements Columns 30*100 RMD 8

Vertical Elements Columns 30*110 RMD 6

Vertical Elements Columns 60*90 RMD 10

Vertical Elements Columns 60*60 RMD 10

Horizontal Elements Slabs Heavy Duty Post 2500mm RMD 8790

Horizontal Elements Slabs Heavy Duty Post 2000mm RMD 10520

Horizontal Elements Slabs Heavy Duty Post 1500mm RMD 4830

Horizontal Elements Slabs Heavy Duty Post 1000mm RMD 6920

Horizontal Elements Slabs Pin for Post RMD 10800

Horizontal Elements Slabs Adjustable Base Plate 750mm RMD 9800

Horizontal Elements Slabs Adjustable U-Top 750mm RMD 19320

Horizontal Elements Slabs Horizontal Connector 1200mm RMD 38700

Horizontal Elements Slabs Horizontal Connector 1700mm RMD 18250

WASTE MANAGEMENT DIVISION

ITEM CATEGORY AND DESCRIPTION QUANTITYBACKHOE CATERPILLAR MODEL 428F 4

BOBCAT CATERPILLAR MODEL 236D 8

BUSS NISSAN CIVILIAN 29 SEAT 12

CAR GREAT WALL WINGLE DOUBLE CABIN - MANUAL 28

CAR LADA LARGUS MT 7 SEATS 36

FORKLIFT MODEL DP30NT 36

PICKUP TOYOTA DYNA 400 LONG MY 2017 WITH COMPACTORS 40

TRUCK CRANE KOBELCO 15T 2

TRUCK MERCEDES ACTROS 2032 (4 x 2)- 15M3 COMPACTOR, GW 20 TONS 80

TRUCK MERCEDES ACTROS 2032 (4 x 2)- WITH BINS WASHING SYSTEM 8

TRUCK MERCEDES ACTROS 2032 (4 x 2) WITH SKIP LOADER 6M3 4

TRUCK MERCEDES ACTROS 3336 - 21M3 HIDRO-MAK COMPACTOR, TRUCK WEIGHT GVW 33

TONS16

TRUCK MERCEDES ACTROS 3336 - 21M3 WITH SKIP LOADER HIDRO-MAK COMPACTOR, TRUCK

WEIGHT GVW 33 TONS20

TRUCK MERCEDES ACTROS 3336 - Long Wheel Base - With Hook Lift- GW 33 TONS 4

TRUCK MERCEDES ATEGO 1729 - LONG WHEEN BASE WITH CRANE 4

TRUCK MERCEDES ATEGO 1729 - SWEEPER 8

TRUCK MERCEDES ATEGO 1729 - WITH MAINTENANCE UNIT 4

TRUCK MERCEDES ATEGO 1729 - 12M3 HIDRO-MAK COMPACTOR, TRUCK WEIGHT GVW 18

TONS48

WHEEL LOADER 950GC CATERPILLAR 4

Page 31: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

6160

DESCRIPTIONThe project is an extension of the existing Clemenceau medical center hospital; it is composed of 6 basements, a ground floor, an attic floor, 10 floors, a roof and a top of roof.

TYPE OF WORKS:Maintain the Hospital’s physical environment and providing maintenance services towards the goal of achieving excellence in the delivery of quality healthcare and patient service, and provide around the clock emergent maintenance service to the hospital.

CMC HOSPITAL

LOCATIONBeirut-Clemenceau

CLIENTClemeceau Medical Center

CONSULTANTKhatib & Alami

PROJECT VALUE$2,574,000

PROJECT DURATION3 years

DESCRIPTIONThe project is an outpatient clinic building located next to the Clemenceau Medical Centre. The project comprises of 4 basements, a lower ground floor for parking and general services, an upper ground floor for lobby and offices, 8 typical floors for clinics, a roof and a rooftop.

TYPE OF WORKSProvide maintenance and operational services for all installed finishing works including electromechanical systems.

CLEMENCEAU MEDICAL CENTER (CMC) OPD

LOCATIONBeirut-Clemenceau

CLIENTClemenceau Medical center

CONSULTANTKhatib & Alami

PROJECT VALUE$450,000

PROJECT DURATION3 years

FACILITY MANAGEMENT

Page 32: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

6362

DESCRIPTIONThe Tower is situated on the peak of Ras Beirut, overlooking Beirut Lighthouse with a breathtaking sea view that captures your vision from all its floors.Beirut 700 is situated at the peak of Ras Beirut. It overlooks the Beirut Lighthouse, and hosts a breathtaking sea view that captures your vision from all floors. This tower features different apartment sizes that vary from 325m2, 435m2 to 640m2, where everyone can enjoy the gardens and the recreational facilities; these include 4 swimming pools and 2 gymnasiums.

BEIRUT 700

LOCATIONAin Mreisse, Beirut, Lebanon

CLIENTOwner AssociationBeirut 700

CONSULTANTKhatib & Alami

PROJECT VALUE$1,362,000

PROJECT DURATION3 years

TYPE OF WORKSProvide operation and service maintenance to all installed finishing and electromechanical systems.

DESCRIPTIONManara 587 is a 17 story prestigious residential building located in the heart of Beirut. With its anti-seismic design and double glazed facades, the building consists of 3 underground parking levels with automatic controlled entrance, independent air conditioning & heating systems, integrated central management systems and electric generator. Fire-fighting equipment, including CO2 total flooding system and close circuit television cameras are included to guarantee safety and optimum security at all times. The building also hosts 2 main elevators and 1 service elevator.

TYPE OF WORKSProvide operation and service maintenance to all installed finishing and electromechanical systems.

MANARA 587

LOCATIONManara, Beirut, Lebanon

CLIENTOwner AssociationManara 587

CONSULTANTKhatib & Alami

PROJECT VALUE$1,125,000

PROJECT DURATION3 years

FACILITY MANAGEMENT

Page 33: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

6564

WE SCHEDULE PROGRAMMED PREVENTATIVE AND STATUTORY MAINTENANCE WORKSWe support our clients with a 24/7 reactive breakdown service. Our proven maintenance management system underpins our service delivery.

FACILITY MANAGEMENT

SERVICES• Preventive, predictive, and corrective maintenance• Environmental health and safety• Life cycle asset management • Critical support functions (i.e. help desk and call centers)• Cost management• Work order processing

In addition to our core self-performed management capability, we can scale to our clients’ needs through our subcontracting. This is achieved through Supply Chain Management,

whereby qualified suppliers are chosen based on their commitment to Ramco Facility Management mission and goals.

Some of the services that we procure through subcontract management, include:

• Janitorial services • Landscaping and grounds maintenance • Third party service provider maintenance

Page 34: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

6766

CERTIFICATES OF MAJOR PRIVATE PROJECTS

SECTION VI:OFFICIAL

DOCUMENTS

Page 35: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

6968

MAJOR PRIVATE PROJECTS

Page 36: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

7170

MAJOR PRIVATE PROJECTS

Page 37: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

7372

MAJOR PRIVATE PROJECTS

Page 38: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

7574

MAJOR PRIVATE PROJECTS

Page 39: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

7776

Page 40: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

7978

MAJOR PRIVATE PROJECTS

Page 41: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

8180

MAJOR PRIVATE PROJECTS

Page 42: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

8382

MAJOR PRIVATE PROJECTS

Page 43: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

8584

MAJOR PRIVATE PROJECTS

Page 44: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

8786

MAJOR PRIVATE PROJECTS

Page 45: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

8988

MAJOR PRIVATE PROJECTS

Page 46: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

9190

MAJOR PRIVATE PROJECTS

Page 47: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

9392

MAJOR PUBLIC PROJECTS

Page 48: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

9594

MAJOR PUBLIC PROJECTS

Page 49: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

9796

Page 50: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

9998

MAJOR PUBLIC PROJECTS

Page 51: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

101100

MAJOR PUBLIC PROJECTS

Page 52: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

103102

MAJOR PUBLIC PROJECTS

Page 53: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

105104

MAJOR PUBLIC PROJECTS

Page 54: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

107106

Page 55: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

109108

Page 56: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

111110

MAJOR PUBLIC PROJECTS

Page 57: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

113112

MAJOR PUBLIC PROJECTS

Page 58: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

115114

MAJOR PUBLIC PROJECTS OFFICIAL DOCUMENTS

Page 59: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

117116

OFFICIAL DOCUMENTS

Page 60: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

119118

OFFICIAL DOCUMENTS

Page 61: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

121120

Page 62: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

123122

CLASSIFICATION

Page 63: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

125124

CLASSIFICATION

Page 64: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

127126

CLASSIFICATION

Page 65: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

129128

CLASSIFICATION

Page 66: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

131130

CLASSIFICATION

Page 67: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

133132

CLASSIFICATION

Page 68: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

135134

ISO/OHSAS CERTIFICATIONS

Page 69: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

137136

Page 70: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

139138

Page 71: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

141140

Page 72: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

143142

Page 73: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

145144

Page 74: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

147146

Page 75: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

149148

Page 76: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki

150

SECTION V: OUR OFFICES

OUR OFFICESHuman Ressource [email protected]

LEBANONRAMCO MAIN OFFICESarroulla Bldg 7th flr, Hamra Street, Beirut, Lebanon

Tel : +961 1 354 635 / 6Fax: +961 1 347 [email protected]

RAMCO WASTE MANAGMENTBiakout-Metn highway Lot 214Hotline : +961 70 686 868

www.ramcoeng.com

SECTION V:OUR OFFICES

Page 77: ENGINEERING & CONSTRUCTION...Commercial & Business Development Marwan Daher Waste Management Project Manager Zaher Mansour ... Head of Vehicle Control Department Mohammad Ali Makki