Mr. Scott Solid Waste Division ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY 5301 Northshore Drive North Rock, AR 72118-5317 RE: Engineer Certification Report County Recycling Facility November 21,2013 Parking Addition Construction Project Arkansas #0013-SWTP-Rl 35-00317 Dear Me Williams: Enclosed please find one (1) bound copy and one (1) electronic copy in CD-R format of Certification Report for the above referenced site. Should you have any questions or information, please do not hesitate to contact me. enclosure( s) cc: JEFF-8640 s. Respectfully, PMI {32 Brad Wingfiel , Project Manager e FAX

ENGINEER CERTIFICATION REPORT

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENGINEER CERTIFICATION REPORT

Mr. Scott Solid Waste Division ARKANSAS DEPARTMENT OF

ENVIRONMENTAL QUALITY 5301 Northshore Drive North Rock, AR 72118-5317

RE: Engineer Certification Report County Recycling Facility

November 21,2013

Parking Addition Construction Project Arkansas

#0013-SWTP-Rl 35-00317

Dear Me Williams:

Enclosed please find one (1) bound copy and one (1) electronic copy in CD-R format of -'--'U"'"'·"'"'~ Certification Report for the above referenced site. Should you have any questions

or information, please do not hesitate to contact me.

enclosure( s)

cc:

JEFF-8640

s.

Respectfully,

PMI

{32 Brad Wingfiel , Project Manager

e FAX

Page 2: ENGINEER CERTIFICATION REPORT

ENGINEER CERTIFICATION REPORT

JEFFERSON COUNTY RECYCLING FACILITY PARKING ADDITION CONSTRUCTION PROJECT

6700 GRAVEL PIT ROAD WHITE HALL, ARKANSAS

PERMIT # 0013-SWTP-R1

AFIN 35-00317

Prepared by:

Pollution Management, Inc. 3512 S. Shackleford Road

Little Rock, AR 72205-6933

Page 3: ENGINEER CERTIFICATION REPORT

JEFF-8640

TABLE OF CONTENTS

1.0 INTRODUCTION ............................................................................................................... 1

2.0 SUMMARY OF CONSTRUCTION ................................................................................... 1

3.0 SUMMARY OF FINAL SITE VISIT ................................................................................. 2

4.0 PROFESSIONAL ENGINEER’S CERTIFICATION ........................................................ 3

FIGURE: Figure 1: Vicinity Map DRAWINGS: Drawing Number 1: Aerial Site Layout for Parking Addition Drawing Number 2: Grading Plan LIST OF APPENDICIES: Appendix A: ASTM D6270-08 Standard Practice for Use of Scrap Tires in Civil

Engineering Applications Appendix B: Laboratory Testing Results Appendix C: Logs of Field Visits Appendix D: Photographs

Page 4: ENGINEER CERTIFICATION REPORT

Engineer Certification Report Jefferson County Recycling November, 2013

1

1.0 INTRODUCTION

Jefferson County Recycling Facility (JCRF) has completed construction of the parking

addition construction project located in White Hall, Arkansas, see vicinity map, Figure 1. The

construction project used tire derived aggregate (TDA) as fill material.

The parking addition construction project was designed and permitted by Pollution

Management, Inc. (PMI) of Little Rock, Arkansas. The design of the parking addition was

submitted to Arkansas Department of Environmental Quality (ADEQ) for approval. ADEQ

approved the design and issued permit number 0013-SWTP-R1 for the construction project.

JCRF used local county equipment and staff for the construction project, and contracted with

Anderson Engineering Consultants, Inc. of Little Rock, Arkansas for the laboratory and onsite

testing.

PMI provided full time on-site construction observation during the construction of the

project. PMI provided Quality Assurance/Quality Control (QA/QC) for the installation of the

soil and TDA fill material. Anderson Engineering Consultants, Inc. provided QA/QC for the

construction parking addition.

2.0 SUMMARY OF CONSTRUCTION

The general sequence of construction and a description of the design components from

the ground up are as follows:

a. Perform laboratory testing of soil and TDA to obtain Proctor Curve;

b. Install erosion and sedimentation controls around the area to be disturbed and around soil stockpile areas;

c. Strip topsoil and stockpile onsite; d. Excavated remaining soil and stockpile on site separately;

Page 5: ENGINEER CERTIFICATION REPORT

Engineer Certification Report Jefferson County Recycling November, 2013

2

e. Place Type B TDA and compact in place using a maximum of 300 mm lifts; f. Maintain 3H:1V slope along the west, south, and eastern perimeters of the disturbed

area; g. Place and compact lifts until 3 meter thickness of TDA is achieved; h. Cover the TDA with a geotextile and a minimum of 0.5 meters of soil and compact; i. Place BAB in parking area; j. Revegetate all disturbed areas not receiving BAB; k. Maintain erosion and sedimentation controls until final stabilization is achieved;

3.0 SUMMARY OF FINAL SITE VISIT

The parking addition was constructed according to the design plans and specifications.

The onsite materials met the requirements of the design specifications. The final site visit by

PMI personnel occurred on October 11, 2013, at which time, JCRF had completed placing and

compacting all fill material. BAB was placed in the area immediately after all grading activities

were complete. All disturbed surfaces not receiving BAB will be revegetated. All erosion and

sedimentation controls will be maintained until final stabilization is achieved. Listed below in

Table I is the amount of tires used to created the TD A fill material.

Page 6: ENGINEER CERTIFICATION REPORT
Page 7: ENGINEER CERTIFICATION REPORT

FIGURE

Page 8: ENGINEER CERTIFICATION REPORT
Page 9: ENGINEER CERTIFICATION REPORT

DRAWINGS

Page 10: ENGINEER CERTIFICATION REPORT
Page 11: ENGINEER CERTIFICATION REPORT
Page 12: ENGINEER CERTIFICATION REPORT

APPENDIX A

ASTM D6270-08

Standard Practice for Use of Scrap Tires in Civil

Engineering Applications

Page 13: ENGINEER CERTIFICATION REPORT
Page 14: ENGINEER CERTIFICATION REPORT
Page 15: ENGINEER CERTIFICATION REPORT
Page 16: ENGINEER CERTIFICATION REPORT
Page 17: ENGINEER CERTIFICATION REPORT
Page 18: ENGINEER CERTIFICATION REPORT
Page 19: ENGINEER CERTIFICATION REPORT
Page 20: ENGINEER CERTIFICATION REPORT
Page 21: ENGINEER CERTIFICATION REPORT
Page 22: ENGINEER CERTIFICATION REPORT
Page 23: ENGINEER CERTIFICATION REPORT
Page 24: ENGINEER CERTIFICATION REPORT
Page 25: ENGINEER CERTIFICATION REPORT
Page 26: ENGINEER CERTIFICATION REPORT
Page 27: ENGINEER CERTIFICATION REPORT
Page 28: ENGINEER CERTIFICATION REPORT
Page 29: ENGINEER CERTIFICATION REPORT
Page 30: ENGINEER CERTIFICATION REPORT
Page 31: ENGINEER CERTIFICATION REPORT
Page 32: ENGINEER CERTIFICATION REPORT
Page 33: ENGINEER CERTIFICATION REPORT
Page 34: ENGINEER CERTIFICATION REPORT
Page 35: ENGINEER CERTIFICATION REPORT

APPENDIX B

Laboratory Testing Results

Page 36: ENGINEER CERTIFICATION REPORT
Page 37: ENGINEER CERTIFICATION REPORT

APPENDIX C

Log of Field Visits

Page 38: ENGINEER CERTIFICATION REPORT
Page 39: ENGINEER CERTIFICATION REPORT
Page 40: ENGINEER CERTIFICATION REPORT
Page 41: ENGINEER CERTIFICATION REPORT

APPENDIX D

Photographs

Page 42: ENGINEER CERTIFICATION REPORT

1

Engineering Certification Report Jefferson County Recycling Facility

Parking Addition Construction Project

Photograph No. 1

Job Number: JEFF-8640

Date: November 1, 2012

Taken By: Andrew Gertsch

Description: Excavated park-ing area receiving fill in lifts. Picture is looking west.

Photograph No. 2

Job Number: JEFF-8640

Date: November 1, 2012

Taken By: Andrew Gertsch

Description: Excavated park-ing area receiving fill in lifts and compacted with sheepsfoot roller. Picture is looking east.

Page 43: ENGINEER CERTIFICATION REPORT

2

Engineering Certification Report Jefferson County Recycling Facility

Parking Addition Construction Project

Photograph No. 3

Job Number: JEFF-8640

Date: November 1, 2012

Taken By: Andrew Gertsch

Description: Silt fence in-stalled on southern perimeter of area of excavation. Picture is looking east.

Photograph No. 4

Job Number: JEFF-8640

Date: November 1, 2012

Taken By: Andrew Gertsch

Description: Silt fence in-stalled around excavated soil stockpiles. Picture is looking east.

Page 44: ENGINEER CERTIFICATION REPORT

3

Engineering Certification Report Jefferson County Recycling Facility

Parking Addition Construction Project

Photograph No. 5

Job Number: JEFF-8640

Date: October 11, 2013

Taken By: Brad Wingfield

Description: Completed fill and compacted parking area to receive BAB. Picture looking southeast.

Photograph No. 6

Job Number: JEFF-8640

Date: October 11, 2013

Taken By: Brad Wingfield

Description: Completed fill and compacted parking area to receive BAB. Picture is looking southwest.

Page 45: ENGINEER CERTIFICATION REPORT

4

Engineering Certification Report Jefferson County Recycling Facility

Parking Addition Construction Project

Photograph No. 7

Job Number: JEFF-8640

Date: October 11, 2013

Taken By: Brad Wingfield

Description: Silt fence re-maining until final stabiliza-tion is achieved. Picture is looking west along southern perimeter of parking addition.